`
`Case 2:l5—cv—00225—JRG—RSP Document 65-2 Filed 10/12/15 Page 1 of 6 Page|D #: 1518
`
`APPENDIX B
`
`APPENDIX B
`
`
`
`Case 2:15-cv-00225-JRG-RSP Document 65-2 Filed 10/12/15 Page 2 of 6 PageID #: 1519
`
`Claim Construction Chart
`
`Court’s Construction
`
`
`
`
`
`
`
`ZTE’s Construction
`“a signal line or set of
`associated signal lines to
`which a number of devices are
`connected and over which
`information may be transferred
`by only one device at a time”
`
`
`“a bus that connects directly
`with a memory”
`
`
`
`Indefinite.
`
`
`
`1
`
`PUMA’s Construction
`No construction necessary.
`
`Alternative construction:
`
`“a signal line or a set of
`associated signal lines to
`which a number of devices are
`coupled and over which
`information may be
`transferred between them”
`
`No construction necessary.
`
`Alternative construction:
`
`“a signal line or a set of
`associated signal lines to
`which a number of devices,
`including a memory, are
`coupled and over which
`information may be
`transferred”
`“fast enough to keep up with
`an input data stream”
`
`No.
`
`Term(s)
`
`“bus”
`
`789: claims 1, 13, 15, 28
`459: claims 1-2, 7, 11, 13
`194: claims 1-2, 9, 11,
`16-18, 23
`368: claims 1, 5, 7, 13,
`19-20, 23
`045: claims 1, 4-5, 12, 15
`753: claims 1, 7
`315: claims 1
`164: claims 1, 6, 7
`“memory bus”
`
`164: claims 1, 6, 7
`
`“in real time”
`
`789: claims 1, 13, 15, 28
`315: claim 1
`164: claims 1, 6
`
`
`1.
`
`2.
`
`3.
`
`
`
`Case 2:15-cv-00225-JRG-RSP Document 65-2 Filed 10/12/15 Page 3 of 6 PageID #: 1520
`
`Court’s Construction
`
`
`
`
`
`
`
`
`
`ZTE’s Construction
`“bus with a bandwidth greater
`than the bandwidth required
`for the decoder to operate in
`real time”
`“circuitry that uses a priority
`scheme to determine which
`requesting device will gain
`direct access”
`
`
`
`PUMA’s Construction
`“bus with a bandwidth equal
`to or greater than the required
`bandwidth to operate in real
`time”
`“circuitry that uses a priority
`scheme to determine which
`requesting device will gain
`access”
`
`No construction necessary.
`
`“an electronic control device
`that is separate from the CPU
`or processor and that interacts
`with the operating system”
`
`a. “supplied without being
`stored in main memory for
`
`a. “supplied without
`intervening components”
`
`2
`
`Term(s)
`“fast bus”
`
`No.
`
`4.
`
`“arbiter”
`
`“arbitration circuit”
`
`“memory arbiter”
`
`“arbiter circuit”
`
`789: claims 1, 19
`459: claims 1-3, 7, 9, 11,
`13
`194: claims 1-3, 7, 9, 11,
`16-18, 22-23
`368: claims 1, 5, 7, 13,
`17, 19-20, 23
`045: claims 1, 4-5, 9, 12,
`15
`753: claims 1, 4, 7-10, 12
`164: claims 1, 8, 12
`
`“control circuit”
`
`464: claims 1, 2, 7-13, 16-
`24, 32
`
`a. “directly supplied”
`
`
`5.
`
`6.
`
`7.
`
`
`
`Case 2:15-cv-00225-JRG-RSP Document 65-2 Filed 10/12/15 Page 4 of 6 PageID #: 1521
`
`ZTE’s Construction
`
`Court’s Construction
`
`
`b. “supplies without
`intervening components”
`
`PUMA’s Construction
`purposes of decoding
`subsequent images”
`
`b. “supplies without being
`stored in main memory for
`purposes of decoding
`subsequent images”
`
`
`
`
`“formed within”
`
`
`
`and
`
`“formed on a single
`semiconductor chip with”
`
`
`and
`
`3
`
`Term(s)
`194: claim 15
`368: claim 3
`
`b. “directly supplies”
`
`194: claim 2
`368: claims 2, 14, 21
`045: claims 2, 6, 13
`753: claim 3
`
`
`
`“monolithically
`integrated
`into”
`“integrated into”
`
`789: claims 6, 21, 23
`194: claim 19
`368: claims 17, 23
`045: claims 9, 15
`753: claim 12
`164: claim 12
`
`“monolithically
`integrated with”
`“integrated with”
`
`459: claims 2, 3
`194: claims 2, 3
`164: claim 8
`
`No.
`
`8.
`
`
`
`No.
`
`Case 2:15-cv-00225-JRG-RSP Document 65-2 Filed 10/12/15 Page 5 of 6 PageID #: 1522
`
`PUMA’s Construction
`“directly or
`indirectly
`a.
`connected”
`
`“directly or
`b.
`connectable”
`
`“directly or
`c.
`connecting”
`
`indirectly
`
`indirectly
`
`Court’s Construction
`
`
`
`ZTE’s Construction
`a. “attached, resulting in an
`arrangement that includes no
`more than one bus”
`
`b. “attached, resulting in an
`arrangement that includes no
`more than one bus”
`
`c. “attached, resulting in an
`arrangement that includes no
`more than one bus”
`
`Alternatively: indefinite.
`
`[AGREED]
`
`[AGREED]
`
`“accesses the bus at the same
`time”
`
`[AGREED]
`
`[AGREED]
`
`“screen and its circuitry”
`
`4
`
`Term(s)
`a. “coupled”
`
`789: claims 1, 5, 15
`464: claims 1, 8, 10 , 12,
`13, 17, 19, 20, 21, 23, 33,
`34, 35
`368: claims 1, 7, 13, 19,
`20
`045: claims 1, 4, 5, 12
`753: claims 1, 7
`315: claims 1, 14, 15
`164: claims 1, 8-9, 11
`
`b. “coupleable”
`
`045: claims 1, 4, 12
`753: claim 7
`315: claim 1
`164: claim 1
`
`c. “coupling”
`
`789: claim 1
`194: claims 1, 16-17
`
`“simultaneously accesses
`the bus”
`
`789: claim 1
`13. “display device”
`
`
`10.
`
`10.
`
`
`
`Case 2:15-cv-00225-JRG-RSP Document 65-2 Filed 10/12/15 Page 6 of 6 PageID #: 1523
`
`Term(s)
`194: claims 1, 3, 7, 11,
`16-17
`368: claims 1, 7, 13-14,
`20-21
`045: claims 1, 4-6, 12-13
`753: claims 1, 7
`“display adapter”
`
`368: claims 2-3
`045: claim 2
`753: claim 3
`
`No.
`
`14.
`
`
`
`PUMA’s Construction
`
`ZTE’s Construction
`
`Court’s Construction
`
`[AGREED]
`
`[AGREED]
`
`that processes
`“an adapter
`images for a display device”
`
`5