throbber
GSM
`TECHNICAL
`SPECIFICATION
`
`GSM 04.08
`
`December 1995
`
`Version 5.0.0
`
`Source: ETSI TC-SMG
`
`Reference: TS/SMG-030408Q
`
`ICS: 33.060.50
`
`Key words: Digital cellular telecommunications system, Global System for Mobile communications (GSM)
`
`Digital cellular telecommunications system (Phase 2+);
`Mobile radio interface layer 3 specification
`(GSM 04.08)
`
`ETSI
`
`European Telecommunications Standards Institute
`
`ETSI Secretariat
`
`Postal address: F-06921 Sophia Antipolis CEDEX - FRANCE
`Office address: 650 Route des Lucioles - Sophia Antipolis - Valbonne - FRANCE
`X.400: c=fr, a=atlas, p=etsi, s=secretariat - Internet: secretariat@etsi.fr
`
`Tel.: +33 92 94 42 00 - Fax: +33 93 65 47 16
`
`Copyright Notification: No part may be reproduced except as authorized by written permission. The copyright and the
`foregoing restriction extend to reproduction in all media.
`
`© European Telecommunications Standards Institute 1995. All rights reserved.
`
`Page 1
`
`New presentation - see History box
`
`

`

`GSM
`TECHNICAL
`SPECIFICATION
`
`GSM 04.08
`
`December 1995
`
`Version 5.0.0
`
`Source: ETSI TC-SMG
`
`Reference: TS/SMG-030408Q
`
`ICS: 33.060.50
`
`Key words: Digital cellular telecommunications system, Global System for Mobile communications (GSM)
`
`Digital cellular telecommunications system (Phase 2+);
`Mobile radio interface layer 3 specification
`(GSM 04.08)
`
`ETSI
`
`European Telecommunications Standards Institute
`
`ETSI Secretariat
`
`Postal address: F-06921 Sophia Antipolis CEDEX - FRANCE
`Office address: 650 Route des Lucioles - Sophia Antipolis - Valbonne - FRANCE
`X.400: c=fr, a=atlas, p=etsi, s=secretariat - Internet: secretariat@etsi.fr
`
`Tel.: +33 92 94 42 00 - Fax: +33 93 65 47 16
`
`Copyright Notification: No part may be reproduced except as authorized by written permission. The copyright and the
`foregoing restriction extend to reproduction in all media.
`
`© European Telecommunications Standards Institute 1995. All rights reserved.
`
`Page 1
`
`New presentation - see History box
`
`

`

`Page 2
`GSM 04.08 version 5.0.0 December 1995
`
`Whilst every care has been taken in the preparation and publication of this document, errors in content,
`typographical or otherwise, may occur. If you have comments concerning its accuracy, please write to
`"ETSI Editing and Committee Support Dept." at the address shown on the title page.
`
`

`

`Page 3
`GSM 04.08 version 5.0.0 December 1995
`
`Contents
`
`Foreword ......................................................................................................................................... 19
`
`0 Scope ........................................................................................................................................... 21
`0.1 Scope of the Technical Specification ................................................................................... 21
`0.2 Application to the interface structures.................................................................................. 21
`0.3 Structure of layer 3 procedures .......................................................................................... 22
`0.4 Test procedures ................................................................................................................ 22
`0.5 Use of logical channels....................................................................................................... 22
`0.6 Overview of control procedures .......................................................................................... 23
`0.6.1 List of procedures............................................................................................. 23
`
`1 Normative references ..................................................................................................................... 25
`
`2 Definitions and abbreviations........................................................................................................... 30
`2.1 Random values.................................................................................................................. 30
`2.2 Vocabulary........................................................................................................................ 30
`
`3 Radio Resource management procedures........................................................................................ 31
`3.1 Overview/General.............................................................................................................. 31
`3.1.1 General ........................................................................................................... 31
`3.1.2 Services provided to upper layers ...................................................................... 31
`3.1.2.1 Idle mode................................................................................... 31
`3.1.2.2 Establishment and release of a RR connection .............................. 31
`3.1.2.3 RR connected mode.................................................................... 32
`3.1.3 Services required from data link and physical layers............................................ 32
`3.1.4 Change of dedicated channels ........................................................................... 32
`3.1.4.1 Change of dedicated channels using SAPI = 0............................... 32
`3.1.4.2 Change of dedicated channels using other SAPIs than 0 ................ 33
`3.1.4.3 Sequenced message transfer operation........................................ 33
`3.1.4.3.1 Variables and sequence numbers ...................... 33
`3.1.4.3.1.2 Send sequence number N(SD)........................ 33
`3.1.4.3.2 Procedures for the initiation, transfer execution
`and termination of the sequenced
`message transfer operation ................ 33
`3.1.4.3.2.2 Transfer Execution......................................... 34
`3.1.5 Procedure for Service Request and Contention Resolution................................... 34
`3.2 Idle mode procedures ........................................................................................................ 35
`3.2.1 Mobile station side............................................................................................ 35
`3.2.2 Network side.................................................................................................... 35
`3.2.2.1 System information broadcasting.................................................. 35
`3.2.2.2 Paging 36
`3.3 RR connection establishment.............................................................................................. 36
`3.3.1 RR connection establishment initiated by the mobile station: immediate
`assignment procedure ............................................................................ 36
`3.3.1.1 Permission to access the network ................................................ 36
`3.3.1.2 Initiation of the immediate assignment procedure........................... 37
`3.3.1.3 Answer from the network............................................................. 38
`3.3.1.3.1 On receipt of a CHANNEL REQUEST message.. 38
`3.3.1.3.2 Assignment rejection......................................... 39
`3.3.1.4 Assignment completion................................................................ 40
`3.3.1.5 Abnormal cases.......................................................................... 40
`3.3.2 Paging procedure ............................................................................................. 41
`3.3.2.1 Paging initiation by the network .................................................... 41
`3.3.2.2 Paging response......................................................................... 42
`
`

`

`Page 4
`GSM 04.08 version 5.0.0 December 1995
`
`3.3.2.3 Abnormal cases ..........................................................................42
`3.4 RR connection transfer phase.............................................................................................43
`3.4.1 SACCH procedures...........................................................................................43
`3.4.1.1 General 43
`3.4.1.2 Measurement report....................................................................43
`3.4.2 Transfer of messages and link layer service provision..........................................43
`3.4.3 Channel assignment procedure ..........................................................................44
`3.4.3.1 Channel assignment initiation........................................................44
`3.4.3.2 Assignment completion ................................................................46
`3.4.3.3 Abnormal cases ..........................................................................46
`3.4.4 Handover procedure..........................................................................................47
`3.4.4.1 Handover initiation .......................................................................48
`3.4.4.2 Physical channel establishment.....................................................49
`3.4.4.2.1 Finely synchronized cell case.............................49
`3.4.4.2.2 Non synchronized cell case................................50
`3.4.4.2.3 Pseudo-synchronised cell case ..........................51
`3.4.4.2.4 Pre-synchronised cell case................................51
`3.4.4.3 Handover completion ...................................................................51
`3.4.4.4 Abnormal cases ..........................................................................52
`3.4.5 Frequency redefinition procedure .......................................................................53
`3.4.5.1 Abnormal cases ..........................................................................53
`3.4.6 Channel mode modify procedure ........................................................................54
`3.4.6.1 Initiation of the channel mode modify procedure.............................54
`3.4.6.2 Completion of channel mode modify procedure..............................54
`3.4.6.3 Abnormal cases ..........................................................................54
`3.4.7 Ciphering mode setting procedure......................................................................55
`3.4.7.1 Ciphering mode setting initiation ...................................................55
`3.4.7.2 Ciphering mode setting completion ...............................................55
`3.4.8 Additional channel assignment procedure............................................................56
`3.4.8.1 Additional assignment procedure initiation .....................................56
`3.4.8.2 Additional assignment procedure completion ................................. 56
`3.4.8.3 Abnormal cases ..........................................................................56
`3.4.9 Partial channel release procedure ......................................................................57
`3.4.9.1 Partial release procedure initiation ................................................57
`3.4.9.2 Abnormal cases ..........................................................................57
`3.4.10 Classmark change procedure...........................................................................57
`3.4.11 Classmark interrogation procedure ...................................................................58
`3.4.11.1 Classmark interrogation initiation ................................................58
`3.4.11.2 Classmark interrogation completion ............................................58
`3.5 RR connection release procedure .......................................................................................58
`3.5.1 Normal release procedure .................................................................................58
`3.5.1.1 Channel release procedure initiation..............................................58
`3.5.1.2 Abnormal cases ..........................................................................59
`3.5.2 Radio link failure ...............................................................................................59
`3.5.2.1 Mobile side.................................................................................59
`3.5.2.2 Network side ..............................................................................59
`3.5.3 RR connection abortion .....................................................................................60
`3.6 Receiving a RR STATUS message by a RR entity................................................................60
`
`4 Elementary procedures for Mobility Management .............................................................................61
`4.1 General.............................................................................................................................61
`4.1.1 Type of MM procedures ....................................................................................61
`4.1.2 MM sublayer states ..........................................................................................62
`4.1.2.1 MM sublayer states in the Mobile Station......................................62
`4.1.2.1.1 Main states ......................................................62
`4.1.2.1.2 Substates of the MM IDLE state........................65
`4.1.2.2 The update Status.......................................................................66
`4.1.2.3 MM sublayer states on the network side.......................................67
`4.2 Behaviour in MM IDLE State...............................................................................................67
`4.2.1 Primary Service State selection .........................................................................68
`
`

`

`Page 5
`GSM 04.08 version 5.0.0 December 1995
`
`4.2.1.1 Selection of the Service State after Power On. ............................. 68
`4.2.1.2 Other Cases............................................................................... 69
`4.2.2 Detailed Description of the MS behaviour in MM IDLE State. ............................... 69
`4.2.2.1 Service State, NORMAL SERVICE .............................................. 69
`4.2.2.2 Service State, ATTEMPTING TO UPDATE. .................................. 70
`4.2.2.3 Service State, LIMITED SERVICE ............................................... 70
`4.2.2.4 Service State, NO IMSI............................................................... 70
`4.2.2.5 Service State, SEARCH FOR PLMN, NORMAL SERVICE ............. 71
`4.2.2.6 Service State, SEARCH FOR PLMN ............................................ 71
`4.2.3 Service state when back to state MM IDLE from another state ............................ 71
`4.3 MM common procedures.................................................................................................... 72
`4.3.1 TMSI reallocation procedure.............................................................................. 72
`4.3.1.1 TMSI reallocation initiation by the network .................................... 73
`4.3.1.2 TMSI reallocation completion by the Mobile Station ....................... 73
`4.3.1.3 TMSI reallocation completion in the network.................................. 73
`4.3.1.4 Abnormal cases.......................................................................... 73
`4.3.2 Authentication procedure ................................................................................... 75
`4.3.2.1 Authentication request by the network .......................................... 75
`4.3.2.2 Authentication response by the Mobile Station............................... 75
`4.3.2.3 Authentication processing in the network....................................... 75
`4.3.2.4 Ciphering key sequence number................................................... 76
`4.3.2.5 Unsuccessful authentication ......................................................... 76
`4.3.2.6 Abnormal cases.......................................................................... 77
`4.3.3 Identification procedure..................................................................................... 77
`4.3.3.1 Identity request by the network .................................................... 77
`4.3.3.2 Identification response by the Mobile Station................................. 77
`4.3.3.3 Abnormal cases.......................................................................... 78
`4.3.4 IMSI detach procedure ..................................................................................... 78
`4.3.4.1 IMSI detach initiation by the Mobile Station ................................... 78
`4.3.4.2 IMSI detach procedure in the network .......................................... 78
`4.3.4.3 IMSI detach completion by the Mobile Station ............................... 79
`4.3.4.4 Abnormal cases.......................................................................... 79
`4.3.5 Abort procedure ............................................................................................... 79
`4.3.5.1 Abort procedure initiation by the network ...................................... 79
`4.3.5.2 Abort procedure in the Mobile Station........................................... 79
`4.4 MM specific procedures..................................................................................................... 80
`4.4.1 Location updating procedure.............................................................................. 80
`4.4.2 Periodic updating.............................................................................................. 81
`4.4.3 IMSI attach procedure ...................................................................................... 82
`4.4.4 Generic Location Updating procedure................................................................. 83
`4.4.4.1 Location updating initiation by the Mobile Station ........................... 83
`4.4.4.1a Network Request for Additional MS Capability Information ........... 83
`4.4.4.2 Identification request from the network ......................................... 83
`4.4.4.3 Authentication by the network ...................................................... 83
`4.4.4.4 Ciphering mode setting by the network ......................................... 83
`4.4.4.5 Attempt Counter ......................................................................... 84
`4.4.4.6 Location updating accepted by the network................................... 84
`4.4.4.7 Location updating not accepted by the network ............................. 85
`4.4.4.8 Release of RR connection after location updating .......................... 86
`4.4.4.9 Abnormal cases on the Mobile Station side ................................... 86
`4.4.4.10 Abnormal cases on the network side .......................................... 87
`4.5 Connection management sublayer service provision.............................................................. 88
`4.5.1 MM connection establishment............................................................................ 88
`4.5.1.1 MM connection establishment initiated by the mobile station ........... 88
`4.5.1.2 Abnormal cases.......................................................................... 91
`4.5.1.3 MM connection establishment initiated by the network ................... 92
`4.5.1.4 Abnormal cases.......................................................................... 92
`4.5.1.5 MM connection establishment for emergency calls......................... 93
`4.5.1.6 Call re-establishment................................................................... 94
`
`

`

`Page 6
`GSM 04.08 version 5.0.0 December 1995
`
`4.5.1.6.1 Call re-establishment, initiation by the mobile
`station ...............................................94
`4.5.1.6.2 Abnormal cases................................................96
`4.5.1.7 Forced release during MO MM connection establishment...............97
`4.5.2 MM connection information transfer phase..........................................................97
`4.5.2.1 Sending CM messages................................................................97
`4.5.2.2 Receiving CM messages .............................................................98
`4.5.2.3 Abnormal cases ..........................................................................98
`4.5.3 MM connection release .....................................................................................98
`4.5.3.1 Release of associated RR connection...........................................99
`4.6 Receiving a MM STATUS message by a MM entity..............................................................99
`
`5 Elementary procedures for circuit-switched Call Control .................................................................. 100
`5.1 Overview......................................................................................................................... 100
`5.1.1 General.......................................................................................................... 100
`5.1.2 Call Control States.......................................................................................... 103
`5.1.2.1 Call states at the Mobile Station side of the interface................... 103
`5.1.2.1.1 Null (State U0)................................................ 103
`5.1.2.1.2 MM Connection pending (U0.1)........................ 103
`5.1.2.1.3 Call initiated (U1) ............................................ 103
`5.1.2.1.4 Mobile originating call proceeding (U3) ............. 103
`5.1.2.1.5 Call delivered (U4) .......................................... 103
`5.1.2.1.6 Call present (U6) ............................................ 103
`5.1.2.1.7 Call received (U7) ........................................... 103
`5.1.2.1.8 Connect Request (U8)..................................... 104
`5.1.2.1.9 Mobile terminating call confirmed (U9).............. 104
`5.1.2.1.10 Active (U10) ................................................. 104
`5.1.2.1.11 Disconnect request (U11) .............................. 104
`5.1.2.1.12 Disconnect indication (U12)............................ 104
`5.1.2.1.13 Release request (U19) .................................. 104
`5.1.2.1.14 Mobile originating modify (U26)...................... 104
`5.1.2.1.15 Mobile terminating modify (U27)..................... 104
`5.1.2.2 Network call states.................................................................... 105
`5.1.2.2.1 Null (State N0)................................................ 105
`5.1.2.2.2 MM connection pending (N0.1) ........................ 105
`5.1.2.2.3 Call initiated (N1) ............................................ 105
`5.1.2.2.4 Mobile originating call proceeding (N3) ............. 105
`5.1.2.2.5 Call delivered (N4) .......................................... 105
`5.1.2.2.6 Call present (N6) ............................................ 105
`5.1.2.2.7 Call received (N7) ........................................... 105
`5.1.2.2.8 Connect request (N8)...................................... 106
`5.1.2.2.9 Mobile terminating call confirmed (N9).............. 106
`5.1.2.2.10 Active (N10) ................................................. 106
`5.1.2.2.11 {Not used}.................................................... 106
`5.1.2.2.12 Disconnect indication (N12)............................ 106
`5.1.2.2.13 Release request (N19) .................................. 106
`5.1.2.2.14 Mobile originating modify (N26)...................... 106
`5.1.2.2.15 Mobile terminating modify (N27)..................... 106
`5.1.2.2.16 Connect Indication (N28) ............................... 107
`5.2 Call establishment procedures .......................................................................................... 107
`5.2.1 Mobile originating call establishment................................................................. 108
`5.2.1.1 Call initiation ............................................................................. 108
`5.2.1.2 Receipt of a setup message ...................................................... 109
`5.2.1.3 Receipt of a CALL PROCEEDING message ............................... 110
`5.2.1.4 Notification of progressing mobile originated call .......................... 111
`5.2.1.4.1 Notification of interworking in connection with
`mobile originated call establishment ... 111
`5.2.1.4.2 Call progress in the PLMN/ISDN environment.... 111
`5.2.1.5 Alerting 112
`5.2.1.6 Call connected .......................................................................... 112
`
`

`

`Page 7
`GSM 04.08 version 5.0.0 December 1995
`
`5.2.1.7 Call rejection............................................................................. 113
`5.2.1.8 Transit network selection........................................................... 113
`5.2.1.9 Traffic channel assignment at mobile originating call establishment 113
`5.2.1.10 Call queuing at mobile originating call establishment................... 113
`5.2.2 Mobile terminating call establishment................................................................ 114
`5.2.2.1 Call indication ........................................................................... 114
`5.2.2.2 Compatibility checking ............................................................... 114
`5.2.2.3 Call confirmation ....................................................................... 114
`5.2.2.3.1 Response to SETUP....................................... 114
`5.2.2.3.2 Receipt of CALL CONFIRMED and ALERTING
`by the network ................................. 115
`5.2.2.3.3 Call failure procedures .................................... 116
`5.2.2.3.4 Called Mobile Station clearing during mobile
`terminating call establishment............ 116
`5.2.2.4 Notification of interworking in connection with mobile terminating
`call establishment ......................................................... 116
`5.2.2.5 Call accept ............................................................................... 117
`5.2.2.6 Active indication ........................................................................ 117
`5.2.2.7 Traffic channel assignment at mobile terminating call establishment117
`5.2.2.8 Call queuing at mobile terminating call establishment.................... 118
`5.2.2.9 User connection attachment during a mobile terminating call......... 118
`5.3 Signalling procedures during the "active" state ................................................................... 118
`5.3.1 User notification procedure.............................................................................. 118
`5.3.2 Call rearrangements ....................................................................................... 118
`5.3.3 Not used ........................................................................................................ 118
`5.3.4 Support of Dual Services................................................................................. 118
`5.3.4.1 Service Description ................................................................... 119
`5.3.4.2 Call establishment..................................................................... 119
`5.3.4.2.1 Mobile Originating Establishment ..................... 119
`5.3.4.2.2 Mobile Terminating Establishment.................... 120
`5.3.4.3 Changing the Call Mode............................................................. 120
`5.3.4.3.1 Initiation of in-call modification ......................... 121
`5.3.4.3.2 Successful completion of in-call modification ..... 121
`5.3.4.3.3 Change of the channel configuration ................. 121
`5.3.4.3.4 Failure of in-call modification............................ 122
`5.3.4.3.4.2 Mobile Station rejection of in-call modification 122
`5.3.4.3.4.3 Time-out recovery........................................ 122
`5.3.4.4 Abnormal procedures ................................................................ 122
`5.4 Call clearing .................................................................................................................... 124
`5.4.1 Terminology ................................................................................................... 124
`5.4.2 Exception conditions ....................................................................................... 124
`5.4.3 Clearing initiated by the Mobile Station ............................................................. 125
`5.4.3.1 Initiation of call clearing ............................................................. 125
`5.4.3.2 Receipt of a DISCONNECT message from the Mobile Station...... 125
`5.4.3.3 Receipt of a RELEASE message from the network ..................... 125
`5.4.3.4 Receipt of a RELEASE COMPLETE message from the Mobile
`Station......................................................................... 125
`5.4.3.5 Abnormal cases........................................................................ 125
`5.4.4 Clearing initiated by the network ...................................................................... 126
`5.4.4.1 Clearing when tones/announcements provided............................. 126
`5.4.4.1.1 Receipt of a DISCONNECT message with
`progress indicator #8 from the
`network ........................................... 126
`5.4.4.1.2 Expiry of timer T306 ....................................... 126
`5.4.4.2 Clearing when tones/announcements not provided ....................... 127
`5.4.4.2.1 Receipt of a DISCONNECT message without
`progress indicator or with progress
`indicator different from #8 from the
`network ........................................... 127
`
`

`

`Page 8
`GSM 04.08 version 5.0.0 December 1995
`
`5.4.4.2.2 Receipt of a RELEASE message from the
`Mobile Station .................................. 127
`5.4.4.2.3 Abnormal cases.............................................. 127
`5.4.4.3 Completion of clearing ............................................................... 128
`5.4.4.3.1 Abnormal cases.............................................. 128
`5.4.5 Clear collision ................................................................................................. 128
`5.5 Miscellaneous procedures ................................................................................................ 129
`5.5.1 In-band tones and announcements ................................................................... 129
`5.5.2 Call collisions.................................................................................................. 129
`5.5.3 Status procedures .......................................................................................... 130
`5.5.3.1 Status enquiry procedure........................................................... 130
`5.5.3.2 Reception of a STATUS message by a CC entity ........................ 130
`5.5.3.2.1 STATUS message with incompatible state........ 130
`5.5.3.2.2 STATUS message with compatible state .......... 131
`5.5.4 Call re-establishment, mobile station side ......................................................... 131
`5.5.4.1 Indication from the mobility management sublayer ....................... 131
`5.5.4.2 Reaction of call control .............................................................. 131
`5.5.4.3 Completion of re-establishment .................................................. 132
`5.5.4.4 Unsuccessful outcome ............................................................... 132
`5.5.5 Call re-establishment, network side.................................................................. 132
`5.5.5.1 State alignment......................................................................... 132
`5.5.6 Progress........................................................................................................ 132
`5.5.7 DTMF protocol control procedure..................................................................... 133
`5.5.7.1 Start DTMF request by the Mobile Station .................................. 133
`5.5.7.2 Start DTMF response by the network ......................................... 133
`5.5.7.3 Stop DTMF request by the Mobile Station................................... 133
`5.5.7.4 Stop DTMF response by the network ......................................... 134
`5.5.7.5 Sequencing of subsequent start DTMF requests by the Mobile
`Station ......................................................................... 134
`
`6 Support of packet services. .......................................................................................................... 136
`
`7 Examples of structured procedures ............................................................................................... 137
`7.1 General........................................................................................................................... 137
`7.1.1 Paging request ............................................................................................... 138
`7.1.2 Immediate assignment .................................................................................... 138
`7.1.3 Service request and contention resolution ......................................................... 139
`7.1.4 Authe

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket