`From:
`
`Sent:
`
`To:
`
`Cc:
`
`Subject:
`
`Attachments:
`
`All,
`
`sonick@webcor.com on behalf of Scott Onick <sonick@webcor.com>
`
`Tuesday, March 03, 2015 10:55 AM
`
`pmilitello@tcco.com; Darin Cook; EdelAngel@adamson—associates.com
`
`Mark Zabaneh; Jeff Heath; GMetzger@adamson—associates.com; Sebastian Curria;
`
`echan@tcco.com; CKeim@adamson—associates.com; Ray Quesada;
`
`dturchon@transbaycenter.org; Eddie Phillips; Mark O'Dell; Seda Dogruel
`
`FW: TJPA"s request for information [Glass Floor Substitution Request]
`
`TGOS.7—003.pdf
`
`The email below contains the additional glass floor information, requested by the AAI via the response to RFI No.
`
`TGOS.7-003 (top sheet attached for reference), for Safti First’s substitution request.
`
`
`
`Regards,
`
`Scott Onick, LEED GA
`Project Manager — Transbay Transit Center
`Webcor/Obayashi Joint Venture — 175 Beale St, San Francisco CA 94105
`WEBCORBUILDERS
`
`sonick@webcor.com T: 415-978—1119 C: 510-205—0732
`www.webcor:com | a/meA/webcorA-oba‘ ashrcom
`
`
`From: William O'Keeffe [mailto:wfo@safti.com]
`Sent: Tuesday, March 03, 2015 2:53 AM
`To: Scott Onick; Jonathan Flaming
`Cc: Mike Vizcarra (mvapollo@yahoo.com); Jeff Griffiths; Sharon Heagney
`Subject: TJPA"s request for information
`
`Dear Scott,
`
`Please Thank the TJ PA for their input and consideration of Safti First. The answers and discussion of their questions are
`as follows:
`
`
`
`ELY HOLDINGS EXHIBIT 1027
`
`Page 1 of 3
`PEL-013834
`
`ELY HOLDINGS EXHIBIT 1027
`Page 1 of 3
`
`
`
`7. Two Hour Approval
`
`There is no system approved today that has trusses penetrating it or has been tested in many of the configurations
`
`shown. We plan on testing the full-scale assembly at the same time we have the bomb-blast and water testing
`done.
`
`8. Questions put on our test assembly drawings
`
`These drawings in no way reflect the full or suggested design required for the Transbay Transit Center and were only
`
`prepared for our own use in the on-going two hour floor testing we are engaged in.
`
`
`
`In conclusion, it is our desire to provide a system that will surpass the system currently being considered. This will be a
`
`design build project and a system that can be installed from the top, can provide seismic movement with less obtrusive
`
`connections, has a bomb blast hold down solution, will be leak free, require minimal maintenance, be condensation
`
`free, provide additional light, by the use of wider spacing & fewer beams, these beams spaced at five-foot centers with
`
`stainless steel cladding to reflect the light, able to enclose the electrical and sprinkler systems, eliminate the bearing
`
`pads and truss system, or make the trusses only ornamental, truly meet the AHJ requirements, not require painting
`maintenance, not require disassembly of the fire-rated glazing system to work on the electrical or sprinkler system, not
`
`expose all the perimeter fire-rated glazing to edge damage in a seismic event, to be made in California, is nearer and
`
`therefore greener and will be easier to install are put forth in an effort to satisfy your desire to have a truly spectacular
`
`2
`
`ELY HOLDINGS EXHIBIT 1027
`
`Page 2 of 3
`PEL-013835
`
`ELY HOLDINGS EXHIBIT 1027
`Page 2 of 3
`
`
`
`and cutting edge monumental project. We hope all these advantages presented will find favor in your decision making.
`
`Thank you for your consideration.
`
`Yours very truly
`
`Bill O’Keeffe
`
`William "Bill" O'Keeffe
`
`820 Laguna Honda Blvd.
`San Francisco
`
`California, 94127
`
`E-Mail wfo@safti.com
`
`1 415 753 6090 Home
`
`1 415 518 5500 Cell
`
`http:/www.safti.com
`
`http:/okeeffes.com
`
`
`
`ELY HOLDINGS EXHIBIT 1027
`
`Page 3 of 3
`PEL-013836
`
`ELY HOLDINGS EXHIBIT 1027
`Page 3 of 3
`
`