`Victor,
`
`As every installation is different when it comes to the seal between our floor and the surrounding structure, a building
`enveloped consultant would need to be in the loop as well as the installation contractor. There is some shared
`responsibility here. The installer who will be doing the silicone seal has to provide this warranty. As per our discussion
`we will work with the envelop consultant at the design phase modify our system details. Please see attached sketch on
`the discussions we have been having with our fire-consultants.
`
`Regarding structural, we would provide the glass structural calculation along with our steel support calculations, excluding
`the cable truss system which would be by others.
`
` conference call on these points would be welcome. I would like to include our engineering firm Lochsa Engineering
`and Mike Rae who is the LITEFLAM system designer. Mike is in the UK so the conference call would have to be in the
`AM.
`
`Ryan.
`
`
`
` A
`
`From: Victor Agran [mailto:vagran@pcparch.com]
`Sent: November 10, 2009 12:24 PM
`To: 'Ryan Dennett'
`Subject: RE: Transbay Transit Center Walkable Glass Floor
`
`Ryan,
`
`Can you please advise us on how Greenlight Glass handles waterproofing and warranty issues for a walkable glass floor?
`
`In addition, will Greenlight Glass also provide structural certification of the glass floor?
`
` I
`
` will try to call you tomorrow to discuss these issues further.
`
`
`Thanks,
`
`Victor
`
`
`
`From: Ryan Dennett [mailto:rdennett@greenliteglass.com]
`Sent: Wednesday, July 29, 2009 3:58 PM
`To: 'Victor Agran'
`Subject: RE: Transbay Transit Center
`
`Hello Victor,
`
`Nice to talk with you today, I have been waiting to hear from Pelli on this. As mentioned we have I had a meeting with
`PWP in San Fran back in May and we supplied them with the LITEFLOOR EXT top surface glass options. LITEFLOOR
`is the top walk-able glass portion of the LITEFLAM fire-rated system. Details for our LITEFLAM IGU Skylight System are
`1
`
`ELY HOLDINGS EXHIBIT 1023
`Page 1 of 3
`
`
`
`best described on the Shop Drawings for our most recent project at NYU. This again is an exterior plaza in which natural
`light was to flood into the classrooms and corridors below. In this case they had a 60min fire separation up hold.
`
`If you could let me know the fire-rating requirement for LITEFLAM. We currently have tested 60min and 90min systems
`to ASTM-E119-00. We are in the process of doing our 2hr test next.
`
`In the mean time I will send you the same set of samples that PWP has.
`
`Kind regards,
`
`Ryan Dennett
`
` GREENLITE GLASS SYSTEMS INC.
` Unit 55 - 2495 Davies Ave
` Port Coquitlam, BC (Vancouver)
` V3C 0B2
`
` Phone: 778.285.8530
` Fax: 778.285.8520
`
`
`
`
`
`From: Victor Agran [mailto:vagran@pcparch.com]
`Sent: July 29, 2009 12:17 PM
`To: info@greenliteglass.com; ryan@greenliteglass.com
`Subject: Transbay Transit Center
`
`
`Hi Ryan,
`
`This email follows my voicemail regarding our glass floor system for the Transbay Transit
`Center
`
`Regards,
`
`Victor
`
`
`
`
`Victor Agran
`Senior Associate
`Pelli Clarke Pelli Architects
`1056 Chapel Street New Haven, CT 06510
`203.777.2515 (t)
`203.787.2856 (f)
`vagran@pcparch.com
`
`www.pcparch.com
`
`
`
`2
`
`ELY HOLDINGS EXHIBIT 1023
`Page 2 of 3
`
`
`
`
`SECTION AT TRUSSSEVEN
`
`
`
`
`
`
`TRPLE LAMNATED
`
`
`AtrArsgs BW AaM-surP
`
`
`al
`
`STKE“Ties
`Ao BE CExBenel
`
`
`
`
`4 XChgLe
`ZILLES|
`
`
`6/8eam:
`PONTE
`TUE SEloN Suppo-
`
`
`
`:
`
`
`ELY HOLDINGS EXHIBIT 1023
`Page 3 of 3
`
`SECTION AT TRUSS NINE 7)
`
`1/4" = 1'-0"
`
`
`Note:
`WE Bt att te nt A AM PAM tk ben nam mein Leama
`
`tha natant
`
`ELY HOLDINGS EXHIBIT 1023
`Page 3 of 3
`
`