throbber

`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`Third Generation
`Partnership Project
`
`
`3GPP
`
`
`Working Procedures
`
`
`01 September 2022
`
`Samsung Ex. 1202, Page 1 of 45
`
`

`

`2
`Third Generation Partnership Project Working Procedures, 01 September 2022
`
`Foreword
`
`These Working Procedures of the Third Generation Partnership Project (3GPP) are effective from 01 September 2022.
`
`An electronic version of these Partnership Project Working Procedures is available from the following address:
`
`http://www.3gpp.org
`
`Samsung Ex. 1202, Page 2 of 45
`
`

`

`3
`Third Generation Partnership Project Working Procedures, 01 September 2022
`
`Contents
`
`Foreword............................................................................................................................................................. 2
`
`SECTION A:
`
`GENERAL ........................................................................................................................... 7
`
`Article 1: Description ..................................................................................................................................... 7
`
`Article 2: Purpose ........................................................................................................................................... 7
`
`Article 3: Scope and objectives ...................................................................................................................... 7
`
`SECTION B: PARTICIPATION .................................................................................................................... 8
`
`Article 4: Categories ...................................................................................................................................... 8
`
`Article 5: Partnership ..................................................................................................................................... 8
`
`Article 6: Organizational Partnership ............................................................................................................. 8
`
`Article 7: Market Representation Partnership ................................................................................................ 9
`
`Article 8:
`
`Individual Membership .................................................................................................................. 9
`
`Article 9: Termination of Individual Membership ....................................................................................... 10
`
`Article 10:
`
`Observers and Guests .............................................................................................................. 10
`
`SECTION C: STRUCTURE ......................................................................................................................... 10
`
`Article 11:
`
`Structure of 3GPP ................................................................................................................... 10
`
`SECTION D:
`
`PARTNERS’ COLLECTIVE RESPONSIBILITIES ........................................................ 10
`
`Article 12:
`
`Organizational Partners’ Collective Responsibilities ............................................................. 10
`
`Article 13:
`
`Collective responsibilities of all Partners ............................................................................... 11
`
`SECTION E: PROJECT CO-ORDINATION GROUP (PCG) ..................................................................... 11
`
`Article 14:
`
`PCG tasks ................................................................................................................................ 11
`
`Article 15:
`
`PCG participation ................................................................................................................... 12
`
`Article 16:
`
`PCG appointment of Chair and Vice Chairs ........................................................................... 12
`
`Article 17:
`
`PCG Chair and Vice Chair Responsibilities ........................................................................... 12
`
`Article 18:
`
`PCG meetings ......................................................................................................................... 13
`
`Article 19:
`
`PCG decision making ............................................................................................................. 13
`
`SECTION F: TECHNICAL SPECIFICATION GROUPS........................................................................... 13
`
`Article 20:
`
`TSG tasks ................................................................................................................................ 13
`
`Article 21:
`
`TSG participation .................................................................................................................... 14
`
`TSG and WG election of Chair and Vice Chairs .................................................................... 14
`Article 22:
`22.1
`TSG elections ................................................................................................................................................... 14
`22.2
`WG elections ................................................................................................................................................... 15
`
`Samsung Ex. 1202, Page 3 of 45
`
`

`

`4
`Third Generation Partnership Project Working Procedures, 01 September 2022
`
`Article 23:
`
`TSG and WG Chair and Vice Chair responsibilities .............................................................. 16
`
`Article 24:
`
`TSG and WG Chair and Vice Chair dismissal ........................................................................ 17
`
`Article 25:
`
`TSG and WG decision making ............................................................................................... 17
`
`Article 26:
`
`TSG and WG voting during a meeting ................................................................................... 17
`
`Article 27:
`
`TSG or WG voting by correspondence ................................................................................... 18
`
`Article 28:
`
`TSG or WG voting for the election of TSG or WG Chair and Vice Chair ............................. 18
`
`Article 29:
`
`TSG or WG appeal process .................................................................................................... 18
`
`Article 30:
`
`TSG and WG meetings ........................................................................................................... 19
`
`Article 30A: TSG and WG participation ..................................................................................................... 19
`
`Article 31:
`
`TSG and WG meeting invitation ............................................................................................ 19
`
`Article 32:
`
`TSG and WG meeting agenda ................................................................................................ 19
`
`Article 33:
`
`TSG and WG meeting registration ......................................................................................... 19
`
`Article 34:
`
`TSG and WG meeting document and file naming .................................................................. 19
`
`TSG and WG Voting Membership List .................................................................................. 20
`Article 35:
`35.1
`Voting list ........................................................................................................................................................ 20
`35.2
`On creation of new TSG or WG ...................................................................................................................... 20
`35.3
`Established TSGs and WGs ............................................................................................................................. 21
`35.4
`Removal from and reinstatement to voting list ................................................................................................ 21
`35.5
`Meetings other than ordinary meetings ............................................................................................................ 21
`
`Samsung Ex. 1202, Page 4 of 45
`
`

`

`5
`Third Generation Partnership Project Working Procedures, 01 September 2022
`
`Article 36:
`
`TSG Sub Working Groups ...................................................................................................... 21
`
`SECTION G:
`
`WORK PROGRAMME AND TECHNICAL CO-ORDINATION .................................. 22
`
`Article 37:
`
`Work Programme .................................................................................................................... 22
`
`Article 38:
`
`Work Items ............................................................................................................................. 22
`
`Article 39:
`
`Work Item creation ................................................................................................................. 22
`
`Article 40:
`
`Work Item adoption by PCG .................................................................................................. 22
`
`Article 41:
`
`Work Item stopping ................................................................................................................ 23
`
`Article 42:
`
`Technical co-ordination .......................................................................................................... 23
`
`SECTION H:
`
`DELIVERABLES.............................................................................................................. 23
`
`Article 43:
`
`Deliverable types .................................................................................................................... 23
`
`Article 44:
`
`Approval process .................................................................................................................... 23
`
`Article 45:
`
`Drafting rules .......................................................................................................................... 24
`
`Article 46:
`
`Copyright and ownership ........................................................................................................ 24
`
`Article 47:
`
`Conversion by Organizational Partners .................................................................................. 24
`
`SECTION I: REPORTING .......................................................................................................................... 24
`
`Article 48:
`
`Chair’s reporting obligations .................................................................................................. 24
`
`Article 49:
`
`Changes to structure and officials ........................................................................................... 24
`
`Article 50:
`
`Calendar of meetings .............................................................................................................. 24
`
`SECTION J: EXTERNAL RELATIONS .................................................................................................... 25
`
`Article 51:
`
`Relationship with the ITU ....................................................................................................... 25
`
`Article 52:
`
`Relations with other groups .................................................................................................... 25
`
`SECTION K:
`
`MISCELLANEOUS .......................................................................................................... 26
`
`Article 53:
`
`Resources ................................................................................................................................ 26
`
`Article 54:
`
`Support Team .......................................................................................................................... 26
`
`Article 55:
`
`Intellectual Property Rights (IPR) Policy ............................................................................... 26
`
`Article 56:
`
`Working language ................................................................................................................... 26
`
`Article 57:
`
`Duration .................................................................................................................................. 27
`
`Article 58:
`
`Review of activities ................................................................................................................ 27
`
`Article 59:
`
`Dissolution, winding up .......................................................................................................... 27
`
`Article 59A: Exhaustion of appeal procedures ............................................................................................ 27
`
`Article 60:
`
`Amendments to 3GPP Working Procedures ........................................................................... 27
`
`Annex A: Definitions .................................................................................................................................... 28
`
`Annex B: Abbreviations ............................................................................................................................... 30
`
`Annex C:
`
`Individual member application form ............................................................................................ 31
`
`Annex D:
`
`(Void) ........................................................................................................................................... 33
`
`Annex E: Guidance for MRP applicants ...................................................................................................... 34
`E.1
`Introduction...................................................................................................................................................... 34
`E.2
`Guidance .......................................................................................................................................................... 34
`
`Samsung Ex. 1202, Page 5 of 45
`
`

`

`6
`Third Generation Partnership Project Working Procedures, 01 September 2022
`
`Annex F: Guidance on meeting organization .............................................................................................. 35
`F.1
`Meeting classification ...................................................................................................................................... 35
`F.2
`Ordinary meetings ........................................................................................................................................... 35
`F.3
`Ad hoc meetings .............................................................................................................................................. 35
`F.4
`Attendance register .......................................................................................................................................... 36
`F.4.1
`Face to face meetings ................................................................................................................................. 36
`F.4.2
`Electronic meetings .................................................................................................................................... 36
`
`Annex G: Working agreements .................................................................................................................... 37
`
`Annex H: Calculation of quorum in TSGs and WGs ................................................................................... 38
`
`Annex I:
`
`Special procedures for exceptional situations restricting travel ................................................... 39
`
`Change history ............................................................................................................................. 45
`
`Annex J:
`
`
`
`
`Samsung Ex. 1202, Page 6 of 45
`
`

`

`7
`Third Generation Partnership Project Working Procedures, 01 September 2022
`
`SECTION A: GENERAL
`
`Article 1: Description
`
`The Partnership Project is not a legal entity but is a collaborative activity between the following recognized Standards
`Development Organizations:
`
`ARIB
`
`(Japan)
`
`CCSA
`
`(China)
`
`ETSI
`
`(Europe)
`
`ATIS
`
`(US)
`
`TTA
`
`(Korea)
`
`TTC
`
`(Japan)
`
`TSDSI (India)
`
`The Partnership Project is entitled the “THIRD GENERATION PARTNERSHIP PROJECT” and may be known by the
`acronym “3GPP”.
`
`top
`
`Article 2: Purpose
`
`The purpose of 3GPP is to prepare, approve and maintain globally applicable Technical Specifications and Technical
`Reports for
`
`- a 3rd Generation Mobile System based on the evolved GSM core network, and the Universal Terrestrial Radio
`Access (UTRA),
`
`-
`
`further development of radio technologies such as LTE, coupled with evolution of core network elements such
`as the Evolved Packet Core (EPC),
`
`-
`
`continuing evolution of the 2nd generation GSM/EDGE Radio Access Network (GERAN),
`
`to be transposed by the Organizational Partners into appropriate deliverables (e.g., standards).
`
`top
`
`Article 3: Scope and objectives
`
`The 3rd Generation Mobile System and its capabilities shall be developed in a phased approach. Initially, 3GPP shall
`prepare, approve and maintain the necessary set of Technical Specifications and Technical Reports for a 3rd Generation
`Mobile System including:
`
`• UTRAN (including UTRA; in Frequency Division Duplex (FDD) and Time Division Duplex (TDD) modes);
`
`• 3GPP Core Network (Third Generation networking capabilities evolved from GSM. These capabilities include
`mobility management, global roaming, and utilisation of relevant Internet Protocols);
`
`• Terminals for access to the above (including specifications for a UIM); and
`
`• System and service aspects.
`
`Samsung Ex. 1202, Page 7 of 45
`
`

`

`8
`Third Generation Partnership Project Working Procedures, 01 September 2022
`
`3GPP shall prepare, approve and maintain the necessary set of Technical Specifications and Technical Reports for:
`
`- the Global System for Mobile communication (GSM) including GSM evolved radio access technologies (e.g., General
`Packet Radio Service (GPRS) and Enhanced Data rates for GSM Evolution (EDGE)).
`
`3GPP shall consider the long term evolution.
`
`The Technical Specifications and Technical Reports shall be developed in view of global roaming and circulation of
`terminals.
`
`The set of 3GPP Technical Specifications and Technical Reports for the 3GPP core network and the specifications for
`the GSM core network should be common to the greatest extent possible and should not be unnecessarily different.
`
`Options in the form of a regulatory requirement particular to one or more regions / nations shall be included in 3GPP
`specifications. TSGs should not debate the inclusion or rejection of such options.
`
`The results of the 3GPP work shall form the basis of member contributions to the ITU in accordance with existing
`procedures.
`
`3GPP shall take account of emerging ITU recommendations on interworking between IMT-2000 family members.
`
`In the framework of agreed relationships, the 3GPP Technical Specifications and Technical Reports will form the basis
`of standards, or parts of standards, of the Organizational Partners.
`
`SECTION B: PARTICIPATION
`
`Article 4: Categories
`
`Participation in 3GPP shall be classified into one of the following categories:
`
`• Partners;
`
`•
`
`•
`
`Individual Members;
`
`ITU Representatives;
`
`• Observers;
`
`• Guests.
`
`Article 5: Partnership
`
`Partners in 3GPP shall be classified into one of the following two categories:
`
`• Organizational Partners;
`
`• Market Representation Partners.
`
`top
`
`top
`
`top
`
`Article 6: Organizational Partnership
`
`Organizational Partnership is open to any Standards Organization, irrespective of its geographical location, which has:
`
`Samsung Ex. 1202, Page 8 of 45
`
`

`

`9
`Third Generation Partnership Project Working Procedures, 01 September 2022
`
`• a national, regional or other officially recognized status and the capability and authority to define, publish and set
`standards within the 3GPP scope, in that nation or region;
`
`• an Intellectual Property Rights (IPR) Policy which is compatible with those of the Organizational Partners;
`
`• committed itself to all or part of the 3GPP scope;
`
`• signed the Partnership Project Agreement.
`
`Standards Organizations may apply to become an Organizational Partner by writing to any of the existing
`Organizational Partners.
`
`top
`
`Article 7: Market Representation Partnership
`
`The Organizational Partners may invite Market Representation Partners to take part in 3GPP.
`
`An invitation for Market Representation Partnership is open to any organization, irrespective of its geographical
`location, which:
`
`• has the ability to offer market advice to 3GPP and to bring into 3GPP a consensus view of market requirements
`(e.g., services, features and functionality) falling within the 3GPP scope;
`
`• does not have the capability and authority to define, publish and set standards within the 3GPP scope, nationally or
`regionally;
`
`• has committed itself to all or part of the 3GPP scope;
`
`• has signed the Partnership Project Agreement.
`
`Organizations may apply to become Market Representation Partners by writing to any of the existing Partners. Further
`guidance for MRP applicants can be found in annex E.
`
`top
`
`Article 8: Individual Membership
`
`Membership in an Organizational Partner is a pre-requisite for Individual Membership of 3GPP. All entities registered
`as members of an Organizational Partner and eligible for participation in the technical work of that Organizational
`Partner, can become Individual Members of 3GPP if they are committed to support 3GPP and:
`
`•
`
`•
`
`to contribute technically or otherwise to one or more of the Technical Specification Groups within the 3GPP scope;
`
`to use the 3GPP results to the extent feasible.
`
`An Individual Member has the right to participate in the work of 3GPP by attending meetings of the Technical
`Specification Groups and subtending groups.
`
`Applications for Individual Membership of a Technical Specification Group shall be made in writing to the relevant
`Organizational Partner using the form given at annex C. Applications may also be made on-line using the template
`available at http://www.3gpp.org.
`
`Individual Members act in 3GPP in their own right and carry the full responsibility for their contributions.
`
`top
`
`Samsung Ex. 1202, Page 9 of 45
`
`

`

`10
`Third Generation Partnership Project Working Procedures, 01 September 2022
`
`Article 9: Termination of Individual Membership
`
`Individual Membership of 3GPP may be terminated by dissolution, abolition, resignation or expulsion from the related
`Organizational Partner.
`
`top
`
`Article 10: Observers and Guests
`
`The status of Observer may be granted by the Organizational Partners to an entity which has the qualifications to
`become a future Partner.
`
`An Observer may send a single representative to an Organizational Partners or PCG meeting. An Observer may also
`have representatives at TSG meetings. Representatives of Observers may receive documents and contribute documents
`for information, but shall not submit documents that propose changes to the specifications, reports, work item
`descriptions, work plan, or any other document under the control of the TSG. Observers shall not take part in decision
`making or hold any leadership positions.
`
`Additional participation rights of an Observer shall be decided by the Organizational Partners on a case-by-case basis.
`
`The status of Guest may be granted for a limited period, by the Organizational Partners to an entity which has the
`qualifications to become a future Individual Member. The limited period shall be decided by the Organizational
`Partners on a case-by-case basis.
`
`A Guest may have representatives at TSG and subtending group meetings. Representatives may receive documents but
`shall not take part in decision making, participate in discussions, contribute documents, or hold any leadership
`positions.
`
`top
`
`SECTION C: STRUCTURE
`
`Article 11: Structure of 3GPP
`
`3GPP shall consist of a Project Co-ordination Group (PCG) and Technical Specification Groups (TSGs). The Technical
`Specification Groups may establish Working Groups if required.
`
`The Organizational Partners may decide to call a meeting of the full 3GPP membership if required.
`
`top
`
`SECTION D: PARTNERS’ COLLECTIVE
`RESPONSIBILITIES
`
`Article 12: Organizational Partners’ Collective
`Responsibilities
`
`The Organizational Partners shall determine the general policy and strategy of 3GPP.
`
`In addition the Organizational Partners shall perform the following tasks:
`
`• approval and maintenance of the 3GPP scope;
`
`Samsung Ex. 1202, Page 10 of 45
`
`

`

`11
`Third Generation Partnership Project Working Procedures, 01 September 2022
`
`• maintenance of the Partnership Project Description;
`
`•
`
`taking decisions on the creation or cessation of Technical Specification Groups, and approving their scope and terms
`of reference;
`
`• approval of Organizational Partner funding requirements;
`
`• allocation of human and financial resources provided by the Organizational Partners to the Project Co-ordination
`Group;
`
`• acting as a body of appeal on procedural matters referred to them;
`
`• conduct compliance training at least annually for elected leadership, relevant Support Team personnel and
`interested parties on best practices to follow to
`
`• avoid issues with respect to antitrust/competition laws and regulations;
`
`•
`
`fulfil the leadership/support role with impartiality and in the interests of 3GPP.
`
`Article 13: Collective responsibilities of all Partners
`
`Organizational Partners and Market Representation Partners shall perform the following tasks:
`
`• maintenance of the Partnership Project Agreement;
`
`• approval of applications for 3GPP partnership;
`
`•
`
`taking decisions relating to the dissolution of 3GPP.
`
`top
`
`top
`
`SECTION E: PROJECT CO-ORDINATION GROUP (PCG)
`
`Article 14: PCG tasks
`
`The PCG shall perform the following tasks:
`
`• appointment of PCG Chair and Vice Chairs;
`
`• allocation of human and financial resources provided by Organizational Partners to TSGs;
`
`• allocation of voluntary human and financial resources provided by Market Representation Partners and Individual
`Members;
`
`• management of the 3GPP Support Team;
`
`• handling of appeals from Individual Members on procedural matters referred to them;
`
`• propose and approve modifications to the Partnership Project Working Procedures;
`
`• handling of appeals from Individual Members on technical matters referred to them;
`
`• determination of the overall time frame and manage overall work progress;
`
`•
`
`final adoption of new and stopped work items proposed by the TSGs within the agreed 3GPP scope and objectives;
`
`• when a work item is outside the scope of the 3GPP, and where a common global solution is desired, recommend
`how to achieve a global solution;
`
`Samsung Ex. 1202, Page 11 of 45
`
`

`

`12
`Third Generation Partnership Project Working Procedures, 01 September 2022
`
`• appointment or dismissal of TSG Chairs and Vice Chairs, as proposed by TSGs based on election results. (The
`proposed candidate shall be appointed unless there are extraordinary reasons that prevent such an appointment, e.g.,
`severe company or geographical imbalance within 3GPP. In such cases the TSG shall be requested to elect an
`alternative candidate. The decision not to appoint a candidate shall be made by consensus.);
`
`• authorizing requests from the TSGs for approval to liaise with external organizations, and maintain a list of
`approved requests;
`
`• maintenance of the register of Individual Members eligible to participate in 3GPP;
`
`• maintenance of the register of IPR declarations relevant to 3GPP, received by the Organizational Partners.
`
`The PCG may decide to call a meeting of the full 3GPP membership if required.
`
`top
`
`Article 15: PCG participation
`
`The following shall have a right to participate in the PCG:
`
`• Typically, a maximum of five representatives of each Organizational Partner (not counting the Chair and Vice-
`Chairs);
`
`• A maximum of three representatives of each Market Representation Partner. (MRPs are however urged to limit their
`participation to one representative wherever possible.);
`
`• The Chairs and Vice Chairs of the TSGs as ex-officio members;
`
`• A maximum of three ITU representatives;
`
`• One representative of each Observer.
`
`top
`
`top
`
`Article 16: PCG appointment of Chair and Vice Chairs
`
`The PCG shall appoint their Chair and Vice Chairs from amongst the Organizational Partner representatives.
`
`The Chair and Vice Chairs shall be appointed for a one year term of office.
`
`The Chair and Vice Chairs shall normally serve one term of office. If no other candidates are available, the Chair or
`Vice Chairs may be appointed for a further term.
`
`Successive Chairs and Vice Chairs should not be from the same Organizational Partner, the same region or from the
`same group of companies, unless no other candidate is available.
`
`Article 17: PCG Chair and Vice Chair Responsibilities
`
`The PCG Chair is responsible for the overall management of the co-ordination work within 3GPP.
`
`The Chair has the overall responsibility to ensure that the Partnership Project Agreement, Partnership Project
`Description and Partnership Project Working Procedures are followed.
`
`The Chair may nominate officials to assist in the work.
`
`The Chair may be assisted by the Support Team.
`
`The Chair may delegate tasks to the Vice Chairs.
`
`Samsung Ex. 1202, Page 12 of 45
`
`

`

`13
`Third Generation Partnership Project Working Procedures, 01 September 2022
`
`In performing their leadership role, the Chair and Vice Chairs shall maintain impartiality and act in the interests of
`3GPP.
`
`At the commencement of each meeting of the PCG, the group shall be reminded that:
`
`
`
`(i) compliance with all applicable antitrust and competition laws is required; and
`
`(ii) the leadership will conduct the meeting with impartiality and in the interests of 3GPP.
`
`Article 18: PCG meetings
`
`A meeting of the PCG shall be held at least twice per year.
`
`At least thirty days before the due date, a calling notice, draft agenda and supporting documents shall be issued.
`
`top
`
`top
`
`Article 19: PCG decision making
`
`In any meeting of the PCG, the quorum required for decision making shall be 50% of the total number of
`Organizational Partners. Proxies shall not be permitted.
`
`The PCG shall endeavour to reach consensus on all issues. The views and opinions of the Market Representation
`Partners and the Chairs and Vice Chairs of the TSGs shall be taken into account during the consensus building process.
`If consensus cannot be achieved, the PCG Chair can decide to take a vote. The vote may exceptionally be performed by
`a secret ballot if decided by the PCG.
`
`Each Organizational Partner shall have one vote. A proposal shall be deemed to be approved if 71% of the votes cast
`are in favour. Abstentions or failure to submit a vote shall not be included in determining the number of votes cast.
`
`top
`
`SECTION F: TECHNICAL SPECIFICATION GROUPS
`
`Article 20:
`
`TSG tasks
`
`The TSGs shall prepare, approve and maintain the 3GPP Technical Specifications and Technical Reports taking into
`account the market requirements provided by Market Representation Partners.
`
`The TSGs shall also perform the following tasks:
`
`• Propose to the PCG for appointment TSG Chair and Vice Chairs based on election results;
`
`• Creation of TSG Working Groups and approval of their terms of reference;
`
`• When a new Working Group is created, the appointment of TSG Working Group Convenor;
`
`• Allocation of resources within the TSG;
`
`• Allocation of voluntary human and financial resources provided by Market Representation Partners and Individual
`Members;
`
`• Handling of appeals from Individual Members on technical matters;
`
`• Preparation of a detailed time frame and management of detailed work progress;
`
`Samsung Ex. 1202, Page 13 of 45
`
`

`

`14
`Third Generation Partnership Project Working Procedures, 01 September 2022
`
`• Management of work items;
`
`• Technical Co-ordination;
`
`• Proposal and approval of work items within the agreed scope and terms of reference of the TSG;
`
`• Where a work item is outside the scope of the 3GPP, but a common global solution is desired, recommend an
`approach to the PCG;
`
`• Assignment of work to Partners. (Specification development may be accomplished using various methods, including
`the assignment of work to Partners.);
`
`• Maintenance of the list of Individual Members eligible to vote within the TSG (Voting Members).
`
`Article 21:
`
`TSG participation
`
`The following shall have a right to participate in the TSGs:
`
`• Representatives of members of participating Organizational Partners (i.e. Individual Members);
`
`• Representatives of Organizational

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket