IEEE TRANSACnONS ON SEMICONDUmOR MANUFACTURING, VOL. 7, NO. 2. MAY 1994
`
`A Planner and Scheduler for
`Semiconductor Manufacturing
`Hugh E. Fargher, Michael A. Kilgore, Paul J. Kline, and Richard A. Smith
`
`~
`
`117
`
`Abstract- The Microelectronics Manufacturing Science &
`Technology (MMST) project includes two closely related CIM
`subsystems for planning and scheduling wafer production. The
`MMST Planner plans all work release into a factory so as to meet
`stated goals, and predicts work completion dates. The MMST
`Scheduler operates in real-time to determine the sequence of
`lot movements and machine loadings that will be performed on
`the fab floor. Both the Planner and the Scheduler continually
`maintain plans which are up to date with the factory status
`by incrementally replanning for unexpected events. The MMST
`Planner can be used as a decision support tool to rapidly analyze
`the consequences of various manufacturing decisions. Planning is
`performed using a modified beam search algorithm, and is based
`on a time-phased capacity model of the factory. Fuzzy arithmetic
`is used to model the uncertainty inherent in cycle time data.
`The MMST Planner is fully distributed, allowing simultaneous
`users in different parts of the factory. The MMST Scheduler
`uses a heuristic method called Score Tables to develop schedules
`of future events. The Scheduler evaluates event prerequisites to
`determine when to initiate lot transfers and machine loadings,
`and responds to any failures of execution.
`
`I. INTRODUCTION
`HE Computer Integrated Manufacturing (CIM) compo-
`
`T nent of the Microelectronics Manufacturing Science &
`
`Technology (MMST) project formed an important part of
`the final project loo0 (1-K) wafer demonstration. This paper
`describes two closely related CIM subsystems used to manage
`production control, namely the MMST Planner and Scheduler.
`The MMST Planner was used to maintain a wafer release
`plan into the MMST factory, and to predict wafer processing
`completion dates. However, once released, control of wafer
`movement passed to the MMST Scheduler. The MMST Sched-
`uler operated in real-time to determine the sequence of lot
`movements and machine loadings performed on the fab floor.
`This paper also describes some of the results obtained through
`using the MMST Planner and Scheduler subsystems during the
`1 -K wafer demonstration, together with possible future work.
`
`11. MMST PLANNER
`The problem tackled by the MMST Planner is that of
`determining when to release work into a factory so as to
`best satisfy customer requests, given the current manufac-
`turing constraints. With this in mind, the MMST Planner
`Manuscript received August 1, 1993; revised December 22, 1993. This work
`was supported in part by the Air Force Wright Laboratory and the DARF'A
`Microelectronics Technology Office under Contract F33615-88-C-5448.
`The authors are with Texas Instruments, Inc., P.O. Box 655012, Dallas, TX
`75265 USA.
`IEEE Log Number 9400853.
`
`has been designed as a make to order or make to forecast
`planning system, for use in complex job-shop manufacturing
`environments. The system maintains a work release plan,
`which determines when work should be released into the
`factory and, to a given confidence level, when that work will
`complete processing. The work release plan is generated so
`as to avoid starving or overloading bottleneck machines at
`any projected time in the plan. This in turn helps reduce
`work-in-process (WIP) and production cycle-times. Plans are
`incrementally updated in line with a user defined strategy
`which, for example, could be used to give preference to plans
`that meet customer requested due dates over those that simply
`maximize machine utilization. The MMST Planner functions
`as a decision support tool, continually maintaining an up-
`to-date plan and providing rapid analysis of user requests.
`Processing capacity of the factory is represented using a high
`level capacity model. Plans are generated using an artificial
`intelligence heuristic search technique which ultimately de-
`termines the recommended work release plan. This contrasts
`with the MMST Simulator [l] which may use a given work
`release plan as input to determine measures such as resulting
`production cycle-times. The MMST Planner is typically used
`to provide a rapid analysis of the consequences of operational
`decisions (such as when to release a particular order), in
`terms of how they would affect the factory in its current
`configuration. Again this contrasts with simulation, which
`is typically used to determine the consequences of more
`strategic decisions (such as work release policies or addition
`of machines) by running suites of simulations on differing
`factory configurations.
`
`A . MMST Planner Goals
`The overall goal of the MMST Planner is to provide decision
`support for production planning in complex manufacturing
`environments. Such a tool could enable improved customer
`satisfaction, while making better use of the production re-
`sources available.
`There is considerable evidence to show the importance of
`work release in achieving the typical goals of semiconductor
`manufacturing [2]. Consequently, an important goal of the
`MMST Planner is to continually maintain an up-to-date plan,
`which determines when work should be released into the
`factory, and to predict when that work will be completed. The
`plan does not determine precisely when wafers are processed at
`particular machines, instead, it simply determines that machine
`processing capacity will be available during the time that work
`
`0894-6507/94$04.00 0 1994 IEEE
`
`Authorized licensed use limited to: Don Zhe Nan Wang. Downloaded on July 24,2021 at 02:26:29 UTC from IEEE Xplore. Restrictions apply.
`
`Applied Materials, Inc. Ex. 1027
`Applied v. Ocean, IPR Patent No. 6,968,248
`Page 1 of 10
`
`

`

`118
`
`IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, VOL. 7, NO. 2, MAY 1994
`
`is planned to be in the factory. All times are determined to
`within some granularity, defined by a time interval duration
`which is typically a day or shift. A plan horizon is maintained
`to equal a multiple of the chosen time interval duration.
`Although the MMST Planner determines work that may be
`released during each time interval, the MMST Scheduler
`determines when that work is released into the factory on a
`minute-by-minute basis. In this way, the MMST Planner can
`be thought of as shuffling a queue of work outside of the
`factory entrance. Higher priority work is inserted nearer the
`front of the queue, and is therefore planned for release at an
`earlier date.
`Maintaining an up-to-date plan requires a plan representa-
`tion which remains consistent with the current factory status
`and clock-time. To achieve this, the MMST Planner compares
`the planned and actual work progress in terms of the percent
`processing complete. Replanning is then performed on work
`that is ahead or behind plan. In addition, replanning may be
`performed when machines unexpectedly go down or become
`available for processing. Furthermore, the plan representation
`always covers the current clock-time up to the plan horizon.
`The MMST Planner must also model uncertainty when
`planning work release and completion dates. This applies
`particularly to predicting work cycle-times once released into
`the factory. Very often, the best available data is in the form of
`previously observed cycle-time distributions and as a result the
`MMST Planner associates a confidence level with all planned
`work completion dates that it calculates.
`The MMST Planner requires a strategy, which is used
`to guide plan generation. A strategy is composed of an
`ordered list of goals, which are used to define heuristics and
`constraints. Goals are used to sequence planning decisions so
`as to attempt to meet given plan measures, such as meeting all
`due dates or balancing machine utilization. For example, a goal
`to meet all requested due dates may have a heuristic which
`sequences work based on slack to due date. Constraints are
`used to limit plan measures such as planned WIP. A constraint
`to limit planned WIP would prevent generation of a plan that
`exceeds the stated WIP at any point in time. At any point in
`the planning process, decisions are sequenced using the first
`goal on the strategy’s ordered list of goals that is relevant to
`the decision being made. The user may also define multiple
`strategies, but only the active strategy is used at any one time
`to sequence altematives.
`Part of the overall goal of the MMST Planner is to allow
`multiple, simultaneous users of the system, in a distributed
`environment. This is achieved by providing access to the
`MMST Planner from any connected workstation in the factory,
`and by managing the concurrency issues that arise when more
`than one person is using the system (such as when two users
`attempt to update the plan at the same time).
`Finally, for decision support, the MMST Planner must
`provide a way of rapidly exploring the consequences of various
`manufacturing decisions. It achieves this by allowing rapid
`incremental updates to the existing plan to be explored, without
`having to necessarily commit to such updates. Consequently,
`the MMST Planner concentrates on the impact of decisions on
`the factory as it currently exists.
`
`B. MMST Planner Approach
`The planning algorithm used within the MMST Planner is
`described in detail elsewhere [3], [4]. This section gives only
`a brief overview of the algorithm.
`The plan representation used within the MMST Planner
`has been devised so as to model the projected work load
`within the factory, while allowing incremental updates at any
`time to account for changing circumstances, such as new
`orders or machine failures. Allowing incremental updates for
`new orders enables rapid feedback to customers concerning
`feasible ship dates, without having to wait for a daily or
`weekly periodic plan update. Allowing incremental updates for
`machine failures provides an early warning for work that may
`be late. The plan representation is based on the processing
`capacity of machine groups within the factory, divided into
`contiguous time intervals of arbitrary duration. The use of
`contiguous time intervals is referred to as a time-phased
`representation, and allows a plan to be represented up to some
`predefined horizon to any level of detail. Consequently, the
`planning algorithm is used to determine work committed to
`each machine group during each time interval. In practice
`plan generation is influenced by the bottleneck machines, a
`feature shared by other planning approaches [5]. By using a
`time-phased capacity model, bottlenecks for a particular time
`interval can always be identified, since bottlenecks may vary
`over time.
`The planning algorithm is divided into two parts, that of
`determining the sequence of work to be planned (given its
`requested due-date, customer priority, etc.), and incorporating
`the required work into the plan (given the current machine
`group commitments, type of planning request, and any con-
`straints on which time interval the work may be planned
`for). Ultimately, any update to the existing plan (including
`replanning due to machine failure) can be tackled in this way.
`The MMST Planner strategy determines the sequence of work
`to be planned. To incorporate the required work, the MMST
`Planner algorithm uses a beam search similar to that used
`within other artificial intelligence planning systems such as
`ISIS [6]. However, unlike ISIS the beam width grows with
`search depth and uses a simple backtracking scheme to search
`within the beam. The search algorithm is ultimately searching
`for available processing capacity, over existing time intervals,
`to incrementally update the plan to accommodate any change
`in work commitments.
`The plan representation must also model the uncertainty
`inherent in the entire production process cycle-time, since such
`cycle-times often form the best available data for planning. Un-
`certainty is modeled by reinterpreting the plan representation
`in terms of fuzzy sets, an approach which has been previously
`used within FSS [7]. However, whereas FSS generates an
`overall cycle-time distribution from all contributing process
`cycle-time distributions, the MMST Planner performs the
`reverse operation. Comparisons with simulation have shown
`the accuracy of this reverse operation [3]. The result can
`be used to determine the degree of membership of work
`commitment for each machine group within each time interval,
`which reflects the expected accuracy of the projected work
`
`Authorized licensed use limited to: Don Zhe Nan Wang. Downloaded on July 24,2021 at 02:26:29 UTC from IEEE Xplore. Restrictions apply.
`
`Applied Materials, Inc. Ex. 1027
`Applied v. Ocean, IPR Patent No. 6,968,248
`Page 2 of 10
`
`

`

`FARGHER et al.: A PLANNER AND SCHEDULER FOR SEMICONDUCTOR MANUFACTURING
`
`I I9
`
`load. Typically, projections become less certain the further
`they are made into the future. The final result is that planned
`work completion dates are computed to some confidence
`level. The overall cycle-time distribution can also be used to
`determine an earliest and latest expected completion date.
`
`C . MMST Planner Architecture
`One of the requirements of the MMST Planner architecture
`is to operate in a distributed environment. To satisfy this
`requirement the MMST Planner can be accessed from any
`connected workstation in the factory, and used to view the
`current plan, plan new work or perform what-if analysis.
`Clearly, determining the user’s authority is important. Few
`users would have the authority to accept updates to an existing
`production plan, while many may have the authority to view
`the current plan. Experience has shown that while the main
`users of the MMST Planner work from within their office, it
`is important that they be able to use the same features on a
`workstation on the factory floor.
`The MMST Planner is able to run in a distributed envi-
`ronment using two different processes: the server and the
`User Interface (UI) process. At any point in time there is
`one server process running and zero or more U1 processes,
`all running on one or more workstations. The server process
`runs continuously, while U1 processes are started and stopped
`depending on when users need access to the planner. The
`server process is responsible for maintaining the continuous
`presence of the planning system, and automatically replan-
`ning whenever the manufacturing environment significantly
`changes from the production plan assumptions. Examples
`of such changes include work release, work completion, or
`unexpected machine failure. While automated interactions go
`directly to the server, human interaction with the planner is
`performed using the U1 process. Examples of such interaction
`include order entry, browsing the current plan, planning new
`orders, and performing what-if analysis. Since multiple pro-
`cesses can run simultaneously, concurrency issues are handled
`by preventing users from committing plan changes that violate
`other committed changes, and informing users of any plan
`changes that have recently occurred.
`The server process also monitors the comparison between
`planned and actual work progress in the factory, therefore
`providing some feedback between the MMST Scheduler and
`Planner. If actual work progress deviates more than some
`user defined tolerance from planned progress, the work is
`automatically replanned. This provides a warning to system
`users that particular work may be deviating from its original
`planned completion date.
`D. MMST Planner User Interaction
`The MMST Planner enables the system user to explore
`the consequences of various manufacturing decisions, without
`having to necessarily commit to them. Decision support is
`divided into two types: implicit what-if and explicit what-
`i f analysis. The two types of decision support reflect two
`different uses of the system. Implicit what-if is limited to ana-
`lyzing the consequences of planning new work, or replanning
`current work, in the factory. Once performed, the updated plan
`
`can be either accepted by the system user (in which case it
`becomes the current factory production plan) or rejected (in
`which case all updates are discarded). For this reason, implicit
`what-if planning requests are limited to those for which the
`system user has the authority to execute. Explicit what-if
`analysis is used to analyze the consequences of a variety of
`operational decisions, such as when to bring a machine down
`for maintenance, or whether to continue processing particular
`work over a weekend. However, plans generated using explicit
`what-if analysis may not be accepted through the MMST
`Planner user interfaces, since they typically imply production
`decisions which are outside the authority of the planner system
`user.
`Implicit what-if analysis can be used to plan new work with
`a variety of commands. The commands either plan new work
`non-disruptively (which guarantees that no existing planned
`release or completion dates will be affected) or disruptively
`(which makes no such guarantee). Disruptive planning requests
`are those which effectively reshuffle the queue of orders
`outside the factory door, while non-disruptive requests simply
`slip a new order into that queue. Furthermore, plan requests
`either attempt to plan work release so as to complete on a
`particular day (which invokes a backward planning algorithm)
`or plan release regardless of completion dates (which invokes a
`forward planning algorithm). Fig. 1 shows the MMST Planner
`screen that results from an implicit what-if request. In this case,
`plans are displayed in tabular form (as opposed to a Gantt
`chart), showing the current plan (lower), and the modified
`plan (upper) on the same screen. Notice that the system user
`can then compare the two plans before deciding whether
`to accept or reject the modifications. The four smaller lists
`in between the plan tables show other information such as
`successfully planned work, work which could not be planned
`due to capacity constraints, any work dislodged during the
`planning process (and not planned back in) and all remaining
`unplanned work.
`Explicit what-if analysis is divided further into two
`and extensive analysis. As the name suggests,
`types-brief
`brief analysis is performed faster, but provides less information
`to the system user. For example, brief analysis may be used
`to determine which planned order items would be affected
`if a particular machine was to go down for 36 hours, but
`would not determine by how much their planned release or
`completion dates are pushed back. Extensive analysis, which
`employs full-scale incremental replanning, would determine
`precisely by how much the planned dates are pushed back.
`The advantage in having both brief and extensive analyses
`available is that system users can quickly browse the overall
`effects of a wide variety of decisions using brief analysis,
`before evaluating particular decisions in more detail using
`extensive analysis.
`Fig. 2 shows the MMST Planner screen used to perform
`brief analysis. Notice that the particular analysis just performed
`is that of determining which order items are affected by taking
`the AVP526ChamberSpec machine down for 12 hours, the
`result being displayed in the scrollable list (“Order Items
`Affected”). Other brief analysis query types are listed on the
`screen in Fig. 2.
`
`Authorized licensed use limited to: Don Zhe Nan Wang. Downloaded on July 24,2021 at 02:26:29 UTC from IEEE Xplore. Restrictions apply.
`
`Applied Materials, Inc. Ex. 1027
`Applied v. Ocean, IPR Patent No. 6,968,248
`Page 3 of 10
`
`

`

`I
`
`120
`
`IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, VOL. I, NO. 2, MAY 1994
`
`................................................................................................................................................................................................................................................................(cid:16)(cid:1)
`PlanWORKS: Plan Requestor Results: Planned order Items
`...............
`
`ModHied Pian
`
`(Planned - When Posslble) (created 6/6/93; 10:16 am)
`
`I
`
`Current P ~ M
`
`Fig. 1.
`
`Implicit what-if results screen.
`
`Performing a single extensive analysis may require more
`than one screen, since each such analysis may consist of a
`whole group of planning requests. For example, the analysis
`may determine the effects of taking one of the Coater and
`Implanter machines down for maintenance over the next 2
`days, while opening the factory to work on all critical order
`items over the following weekend in an attempt to make up the
`lost time. Separate MMST Planner screens are used to define
`the time period to take the machines down, as well as the time
`period to open the factory. Once all planning requests have
`been defined, the analysis is actually performed by selecting
`‘analyze’ on the main planner extensive analysis screen. The
`result of the analysis is a screen similar to Fig. 1, used to
`compare plans before and after a request has modified the
`production plan. However, the difference is that the modified
`plan may not be accepted in this case. It can only be browsed,
`with a view to warning other personnel of the effects that
`would result if they decided to place the Coater and Implanter
`down, together with working on critical order items over the
`following weekend. If the Coater and Implanter were then
`actually placed down for maintenance, the MMST Planner
`would be informed of the change in machine status and would
`perform an automatic replan so as to maintain consistency
`with the current factory status.
`
`E. MMST Planner Results
`During the MMST 1-K wafer demonstration the MMST
`Planner was used to perform continuous and off-line planning
`operations. Continuous planning operations included all day-
`to-day tasks, such as order entry, planning and work release, as
`well as planner server execution. Off-line planning operations
`were performed by the system developers, as and when
`required, to assist in any decision making.
`The day-to-day tasks were typically performed by the fac-
`tory plan manager. Order creation and planning were generally
`performed one day prior to the day corresponding to the
`required release date for the order. One or more orders
`would be created, planned and prepared for release at a time.
`Preparing the orders ahead of time ensured that new work
`was ready to start when the MMST Scheduler was prepared to
`begin processing the work. In addition to the tasks performed
`by the users of the MMST Planner, the Planner server was
`available 24 hours a day. The server monitored progress of
`work in the factory and supported the work release operation.
`As part of the day-to-day tasks, daily reports were produced
`detailing lot progress. The reports compared planned wafer
`moves against observed wafer moves, for various subsets of
`work. Both tabular and graphical versions of the report were
`
`Authorized licensed use limited to: Don Zhe Nan Wang. Downloaded on July 24,2021 at 02:26:29 UTC from IEEE Xplore. Restrictions apply.
`
`Applied Materials, Inc. Ex. 1027
`Applied v. Ocean, IPR Patent No. 6,968,248
`Page 4 of 10
`
`

`

`1
`
`FARGHER er al.: A PLANNER AND SCHEDULER FOR SEMICONDUCTOR MANUFACTURING
`
`121
`
`Analysis Selectlons
`
`Wpmal: 1 AVP526ChamberSpec
`
`I
`
`s-Date:
`
`1 P 6 / 0 7 / 9 3 ~ m n H l a r y Y
`
`--: pq" om
`
`-44Idyais Results
`onler lhmJ Affected
`MMST 11 3
`MMST122
`MMST.14 1
`
`mwn-
`
`-:
`
`pm
`
`+minutes
`4$ hours
`
`Fig. 2. Brief analysis screen.
`
`generated and were used by managers to determine whether
`work was progressing adequately.
`Historical data provided the opportunity to examine the
`accuracy of plans generated by the MMST Planner. Fig. 3
`shows a graph of planned and actual remaining wafer moves
`for a subset of lots run during the demonstration, where one
`wafer move corresponds to the completion of one processing
`step, for one wafer, on one machine. The subset chosen in this
`case corresponded to larger lot sizes which ran a greater than
`three day cycle time. The labeled dark line (labeled at each
`point) shows the planned remaining wafer moves on a day by
`day basis. The unlabeled grey line shows actual progress of the
`lots through the factory. By comparing agreement between the
`observed and planned lines, a measure of the MMST Planner's
`accuracy can be determined. One measure is to calculate the
`mean percent difference between planned and actual remaining
`wafer moves for a given time period. This example results
`in a measured mean difference of approximately 9%. For
`simplification, Fig. 3 shows a snapshot of the plan generated on
`March 24th and does not illustrate the effects of subsequent
`replanning.
`
`100
`
`0
`24
`March '93
`
`25
`
`26
`
`27
`
`28
`
`29
`
`30
`
`31
`
`Day st.r(lng
`
`1
`Apdl'93
`
`2
`
`Fig. 3. Planned and actual wafer moves.
`
`In addition to using the MMST Planner as the production
`planner during the demonstration, it was also used to perform
`several types of analysis in an off-line planning mode. Off-
`line analysis resulted in the generation and evaluation of
`plans that were not intended to be used as production plans;
`instead, they were generated to answers specific questions
`
`Authorized licensed use limited to: Don Zhe Nan Wang. Downloaded on July 24,2021 at 02:26:29 UTC from IEEE Xplore. Restrictions apply.
`
`Applied Materials, Inc. Ex. 1027
`Applied v. Ocean, IPR Patent No. 6,968,248
`Page 5 of 10
`
`

`

`122
`
`IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, VOL. 7, NO. 2, MAY 1994
`
`posed by various managers during the demonstration. The
`reason the analysis was performed off-line was because many
`of the requests required user interfaces that did not exist at
`the time. Consequently, the system developers implemented
`and executed additional code specifically to answer these
`questions. Requests for off-line analysis broadly fell into four
`categories: flow, production, resource usage and wafer move
`analysis. Typical examples included: flow analysis to calculate
`the number of steps per day needed to meet given cycle time
`multipliers, and production analysis to determine the effect of
`various product mixes. Most of the off-line requests can now
`be executed from the MMST Planner UI.
`To find the impact the MMST Planner had on the decision
`making process during the MMST 1-K wafer demonstration,
`users of the system were interviewed. Their feedback indicated
`that the system was used to make both operational and
`strategic decisions. An example operational decision was to
`determine suitable time periods for preventative maintenance
`on particular machines. An example strategic decision was to
`determine the product mix. In addition, daily reports provided
`a speedometer which was used to determine if weekend shifts
`were needed.
`
`F. MMST Planner Future Work
`The MMST 1-K wafer demonstration provided an excellent
`initial test for the MMST Planner. Installation of the MMST
`Planner to both intemal and external beta customers has
`already begun as part of the commercialization effort. Another
`important area of work will concentrate on model validation.
`Customer installations will provide the opportunity to collect
`historical data to compare with results generated by the MMST
`Planner. In addition, simulations will be performed to validate
`plans generated using the MMST Planner model. Other future
`developments for the MMST Planner include an improved
`search algorithm which would dynamically manage planned
`utilization during plan generation. This would enable the
`plan representation to model time intervals of an increasing
`duration. The justification for this is that near term planning
`should be performed with finer granularity (e.g., daily) than
`long term planning (which could use weekly or monthly time
`intervals). A further development includes generalizing the
`MMST Planner to address world-wide planning for multiple
`factories.
`
`111. MMST SCHEDULER
`In most wafer fabs, operators monitor the fab situation
`in order to make scheduling decisions. In the MMST CIM
`system, the Scheduler provides an automated capability for
`making scheduling decisions in real time on the fab floor.
`The Scheduler is responsible for factory scheduling; i.e., the
`movement of lots between machines and the sequence of
`lot processing in the fab. By contrast, the MMST Machine
`Control system [8] is responsible for machine scheduling; i.e.,
`wafer handling and the sequence of wafer processing within
`a machine.
`
`A. MMST Scheduler Goals
`The design of the MMST Scheduler was motivated by the
`following goals of the MMST 1-K wafer demonstration:
`fabricate double-level metal CMOS devices in less than
`three days;
`minimize processing errors;
`eliminate the use of paper in the fab.
`The function of the Scheduler within the MMST CIM system
`is to translate general instructions about fab operations into
`more specific instructions that can be executed by other
`CIM subsystems and fab personnel. For example, the MMST
`Specification subsystem might show that “gate pattem ex-
`pose’’ is step 23 in fabricating wafers of a particular device.
`This general instruction is translated by the Scheduler into a
`machine-loading instruction: “perform gate pattem expose for
`Lot 57 on Stepper #2 next.” The where and when that were
`left unspecified by the Specification system have been filled in
`by the Scheduler based on the current fab situation. This more
`detailed instruction is executable by the combined efforts of
`operators and the Machine Control system to accomplish step
`23. The Scheduler notifies the operators through user interfaces
`where lots should be taken for processing, which supports
`paperless manufacturing. The Scheduler also sends the lot id
`and detailed processing specifications to the Machine Control
`software for Stepper #2 to ensure the correct processing is
`performed.
`The goal of minimizing processing errors led us to adopt
`a predictive approach to scheduling and reject a dispatch rule
`approach. Dispatch rules are a common technique for wafer
`fab scheduling (e.g., [9], [lo]). First-In-First-Out is an example
`of a simple dispatch rule. When a machine becomes free,
`dispatch rules decide at that time which lot to load; i.e., there
`is no schedule of future loadings. However, it is common to
`have time constraints between certain processing steps, e.g.,
`cleanups and depositions. An approach to coping with these
`problems is to “look before you leap” by developing a schedule
`for future steps and checking that the constraints are satisfied
`before executing the first step. This is not an option for a pure
`dispatch rule approach.
`Although the MMST Scheduler does not yet cope with time
`constraints, it does develop a schedule of future events for each
`lot and each process resource. In the 1-K wafer demonstration,
`these schedules covered the next two hours (the duration is
`a configurable parameter), and indicated the estimated times
`(hr:min) for the start and completion of events. Schedules were
`developed using a new heuristic scheduling method, called
`Score Tables, to make decisions about which lot to assign next
`to process resources.
`A predictive schedule can become obsolete when lots go on
`hold or machines go down. In such cases, it is necessary to
`reschedule to accommodate the unexpected event. Automatic
`rescheduling is currently an active area of scheduling research
`[ 111. The approach we adopted was simply to flush the sched-
`ule for the affected lots and reschedule. This was satisfactory
`in the 1-K wafer demonstration, where there were typically
`less than ten lots in the fab at any one time. More efficient
`altematives may be required to cope with additional lots.
`
`Authorized licensed use limited to: Don Zhe Nan Wang. Downloaded on July 24,2021 at 02:26:29 UTC from IEEE Xplore. Restrictions apply.
`
`Applied Materials, Inc. Ex. 1027
`Applied v. Ocean, IPR Patent No. 6,968,248
`Page 6 of 10
`
`

`

`FARGHER et al.: A PLANNER AND SCHEDULER FOR SEMICONDUCTOR MANUFACTURING
`
`123
`
`MMST SCHEDULER
`
`GENERATOR
`
`Fig. 4. MMST Scheduler architecture.
`
`TABLE I
`
`ACTIONS hVOLVED IN DISPATCHING A LOT BETWEEN hfACH1NF.S
`SCHEDULER
`MACHINE 1
`Finish lot and
`quest removal
`
`I Move to WIP rack
`
`Ask operator to take
`>I to WIP rack
`operator logout lot
`Request next lot
`
`3 Reserve location for
`lot
`
`7 operator login lot
`
`9 Commit lot to Ma-
`chine 2
`
`12 Move to Mschine:
`
`8 Request next lot
`
`10 Ask operator to
`proccsr lot now
`11 o

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket