throbber
Forecasting travel times based on actuated
`
`and historic data
`Danko A. Roozemond
`Delft University of Technology, Department of Civil Engineering,
`P.O. box 5048, Delft, The Nethelands
`E-mail: d.roozemond@ct.tudelft.nl
`
`Abstract
`
`In this research a model of forecasting the travel times of links will be addressed. Forecasting is
`one of the main topics of an integrated traffic management system and a necessity of dynamic
`route planning systems. To be able to forecast properly we use both historic data and current
`data from monitoring devices as input for our dynamic model. Thus, combining the best of
`both worlds, we are able to forecast travel times in the near future based largely on current data
`as well as travel times for some time ahead based on current and historic data. Accuracy and
`variability of data are important as they are the key element if these models will be
`incorporated in route guidance and traffic management schemes.
`
`1 Introduction
`
`Current estimates are that 65 percent of peak-hour travel on highways and urban
`roads and some ten percent of all daily urban travel is conducted under
`congested conditions [1]. In recent decades traffic problems have become both a
`social and economical embarrassment: congestion, deteriorating road safety,
`regression of mobility and environmental effects of traffic are widely considered
`important issues. The inability of the existing road network to cope with
`increased demand has been identified as one of the pressing infrastructure issues
`of this decade. Past custom to counter increased congestion with more, safer and
`wider roads, is currently giving way to more complex management and control
`systems and road pricing policies. Traffic management professionals and policy
`makers now turn to traffic management systems. The goals of traffic
`management systems are, among others: maximise safety and transport
`productivity; minimise congestion and damage through incidents; distribute
`information on traffic-conditions, road-conditions, weather, etc. A traffic
`management system should invoke appropriate intervening action when
`undesirable situations arise.
`
`As transportation is widely accepted as a crucial economic factor, a system of
`improvements to traffic management arises as the acceptable form to resolve the
`
`Transactions on the Built Environment vol 30, © 1997 WIT Press, www.witpress.com, ISSN 1743-3509
`
`Google Ex. 1019
`
`

`

`216 Urban Transport and the Environment for the 21st Century
`
`social and economic dependencies on transportation in the world. A more
`efficient use of existing infrastructure may gain time in which to develop
`alternate modes of transport and/or infrastructure. As with all demand-supply
`problems, solutions made through traffic management can be viewed as either
`increasing capacity to meet demand or modifying demand to levels deliverable
`under certain conditions. Both views rely as much on the actual transport
`conditions as on the perception of those conditions by the road user. A definite
`advantage can be gained by making the right kind of information available to the
`right kind of users. This requires the exchange of information between road
`system managers and the public.
`
`To handle the information requirements for route-guidance, traffic
`management and intelligent traffic control, one needs systems that accurately
`handle the behaviour of large complex road systems, while maintaining high
`levels of usability. To handle these information requirements one needs systems
`that accurately predict the, in essence unpredictable, behaviour of traffic
`participants. To be able to forecast we use both historic data and current data
`from monitoring devices as input for our dynamic model. Accuracy and
`variability of data are important as they are the key element if these models will
`be incorporated in traffic management schemes.
`
`2 Integrated Dynamic Traffic Management System
`
`To put IDTMS in perspective, integration of dynamic traffic management
`systems is no cure for all traffic problems, although it may streamline and reduce
`the traffic load and give better information and advise. Whatever the
`improvements, more direct routes available or more up-to-the-minute
`information, there would be a traffic problem, or new ones would arise.
`
`Benefits are not always easy to quantify as they are related to aspects like
`environment, information and finance and are difficult to quantify for groups or
`the whole system. The IDTMS is more than a mere management system,
`although operational benefits rely heavily on the forecasting properties of the
`system and the ability to act and adapt dynamically.
`
`2.1 Decision making in an IDTMS
`
`Traffic management can be divided into three different levels of decision making
`each with its own data demands [2]:
`
`• short term traffic control decisions; traffic management with a time-frame of a
`few minutes, implemented in traffic control systems; in most cases no human
`action is required.
`• medium term traffic management; based on a few hours time-frame,
`implemented in traffic management systems.
`• long term planning; based on a large (days to years) time scale, also called
`traffic planning systems used in a highly interactive environment as a tool to
`human design and planning efforts.
`
`The different levels of decision making have consequences for the required
`data. Long term planning can be done with aggregated, semi-dynamic data and
`is not used by travellers, but rather by policy makers and planners. Much more
`detailed data, more accuracy, reliability and actuality, is required for medium
`
`Transactions on the Built Environment vol 30, © 1997 WIT Press, www.witpress.com, ISSN 1743-3509
`
`Google Ex. 1019
`
`

`

`Urban Transport and the Environment for the 21st Century 217
`
`term planning. Highly accurate, up-to-date data is necessary for short term
`decisions in traffic control. To get the required data, on-line monitoring of traffic
`conditions is crucial for traffic control, but also very valuable for traffic
`management applications and profitable for planning purposes.
`
`2.2 Architecture of an IDTMS
`
`One of the main overall objectives of this project is to develop a framework
`integrating traffic and infrastructure planning, traffic management, traffic
`control, information and simulation systems into one multi-user, multi-discipline
`Integrated Dynamic Traffic Management System (IDTMS). To satisfy that
`objective, a dynamic traffic management system should be based on modular
`and distributed components that can operate within an open, evolutionary,
`distributed and scalable architectural framework serving the needs of several
`management layers [3, 4]. Standardisation is a requirement for components
`within the system to facilitate access to and manipulation of the information and
`models present in the system. Sub-systems are designed to perform as
`autonomously as possible, co-ordinating their own actions, interacting with
`other sub-systems trough standardised interfaces when necessary. This
`increases overall robustness of the system and creates an appropriate
`environment for information and traffic management systems that can address
`several goals and even can handle different and opposite goals. Forecasting is
`one of the main topics of an IDTMS and a necessity of dynamic route planning
`systems.
`
`When focusing on integrated network control, forecasting, incident detection
`and re-routing systems, there is a need for systems that accurately handle the
`large quantities of data and dependable data collection. In order to be effective,
`such systems need to collect and maintain data locally for immediate use, and on
`request aggregate data before it is presented to other components via a data
`handling system. For data handling, databases based on a GIS are proposed as
`one of the possible solutions. The GIS will perform the function of underlying
`database (storage, handling, etc.) and query language. Uniform standards
`should apply to any particular service in the overall system. What we need is a
`scalable system for shared use of distributed data that will search for the data,
`after merging available data from different sources, generate (un)available values
`or transpose the data and present it. The R&D efforts on distributed computing
`can be exemplified by a number of projects. The Andrew File System (AFS) is
`an ongoing project on distributed file systems, creating a virtual single file
`system with potential to provide terra-bytes of data on-line [5]. Project Athena
`recently ended in a campus wide distributed computing environment supplying
`services from and across networked resources by virtualising the classical link
`between node and user [6]. The wide spread of data across different
`organisations and installations within organisations creates a very practical
`problem for users and developers of modelling software for data intensive
`engineering applications. The obvious advantages of shared use of data are
`dwarfed by the problems generated when restricted use, data integrity, access
`security and cross accounting has to be considered. Not only do these pose a
`problem in general, but especially when large volumes of data have to be
`gathered in order to satisfy a single request, the system overhead to handle all
`details can easily explode.
`
`Transactions on the Built Environment vol 30, © 1997 WIT Press, www.witpress.com, ISSN 1743-3509
`
`Google Ex. 1019
`
`

`

`218 Urban Transport and the Environment for the 21st Century
`
`The data handling system should be able to deal with the large volumes of
`distributed data generated and consumed by modelling, simulation and DSS
`applications common to integrated traffic management systems. These problems
`will have to be addressed in a single comprehensive system, making use of
`existing distributed sources of scientific data sets [7]. Specific problems dealt
`with are the following:
`• access to and storage of time series data and spatial grid data independent of
`storage format and storage location;
`• storage and context mapping of data generated, making it available for later
`retrieval using the same system;
`• extending and transforming data to specified interval or grid, delivery of data
`in a format suitable for the requesting application.
`
`3 Dynamics in traffic systems
`
`As we all know: traffic is not fully predictable. Given all the initial facts, it is not
`always certain that accurate predictions can be made about the future; not
`everything is fully deterministic and non linearity is intrinsic to the system. This
`raises the question of how to avoid getting into an uncontrollable chaotic
`situation, which is not that functional for traffic control and traffic management
`systems; or when found in the middle of it, how get out of this situation with as
`many positive side-effects possible. Concerning traffic management and control
`we are in need of a theory that can cope with this uncertainty and complexity.
`From a mathematical point of view the stability and behaviour of participants in
`transportation systems are essential parts of the system. Traffic management and
`information provision for minimising congestion is made difficult not only by
`the magnitude of the problem but by the diversity of the interacting "intelligent
`agents" whether persons, (automated) control objects, etc. An intelligent
`transportation system must not only handle real-time needs; it must also be a
`system that adapt to changing system parameters and structures, continually
`improving its ability to act as well as react.
`
`Traffic management and traffic control in cities is the most problematic and
`complicated the whole transportation system as well as the most challenging and
`least researched. In urban areas the complexity exceeds that of the highway
`conditions due to the variety in means of transport, the difference in the speed of
`the participant and the greater probability of unanticipated events. Influences on
`the instability in highway conditions are for example geometry of the road, types
`of vehicles, motive for the trip, weather conditions and light conditions.
`Furthermore the driver itself is a great source of instabilities.
`
`As traffic management systems must react to the different states of traffic flow in
`the network the management system is the actor controlling and reacting to
`dynamic actions in the system. To be able to do so, a fully pro-active dynamic
`control mechanism should be an integral part of the IDTMS. For a more
`elaborate overview of adaptive traffic management we recommend Cuena et al
`[8]. To satisfy the information requirements for route guidance, traffic
`management and intelligent traffic control, one needs systems that cope with and
`predict the dynamic behaviour of large complex road systems. And, as the aim is
`to predict and prevent unwanted situations in the transport system there is an
`obvious need for traffic forecasting models on all time scales and the most
`wanted are the short- and medium term forecasting models.
`
`Transactions on the Built Environment vol 30, © 1997 WIT Press, www.witpress.com, ISSN 1743-3509
`
`Google Ex. 1019
`
`

`

`Urban Transport and the Environment for the 21st Century 219
`
`4 Forecasting dynamic transport systems
`
`As the reasons for forecasting may be obvious, the real advantages are viable
`when there are applications become available that do something with these
`models. We can see this happen in the next decade as more and more in-car
`equipment becomes available and humans are getting used to. As congestion
`levels grow and opposition to new roads grow also, the temporarily solution is
`to get more people over the same road. When people (traffic managers and the
`road users) get the forecasting information they are, given the information
`content is useful, using that information. Dynamic route guidance systems, with
`integrated forecasting properties, could provide significant benefits to both
`individual drivers as well as the overall transportation system. The effectiveness
`of systems that provide traffic information and their potential for reducing
`congestion, depends heavily on drivers' reaction to additional information.
`Drivers would avoid traffic congestion and incidents, and (theoretically, at least)
`arrive at their destination as fast as possible. Utilisation of the roadway system
`would improve, because many drivers could (theoretically, again) avoid already
`congested thoroughfares and lessen the severity of existing congestion. Usually
`traffic participants can choose between the different modes of transport. Given
`enough information the preferred mode of transport may change.
`
`4.1 Travel time forecasting
`
`Given a road map, the possible roads can be represented by several sections,
`each with their own characteristics. Every section has an entrance and an exit
`gate; the traversing time can be calculated with historic data. Every road sub-
`system has the underlying smaller-road-set that will only be used for transport
`inside the section and adjoining sections. Several specified road segments can be
`combined to a traversing link, thus creating a higher level for non local traffic.
`Example: Travelling from origin to a destination in an other city; the system start
`using the most detailed network with all routes bottom-up wards, until you are
`on a tertiary road-network; from there you are directed to travel further upwards
`until you use the main road-net (highways). Coming close to the destination the
`system uses the road-networks from the high level down.
`
`The basis for travel time forecasting is not that difficult: if a person can address
`the travel times on all possible routes and links, one can calculate the overall
`travel time of a proposed journey. As mentioned earlier this is only true for
`predictable situations and in most cases this isn't the case in traffic forecasting
`nowadays. The kind of calculus used is effectively a state prediction model:
`predicting the states on time tj. Every road segment has its travel time prediction,
`based on historic data, at a certain time or time span.
`
`For the several possible routes from origin to destination the chosen objective
`(time) should be calculated by formula's like [3]:
`
`total travel time = ]T A^.% • £.^ , where
`All links
`j — Start Node of link 7, k
`k = End Node of linkj.k
`Afy* = Traveltime on link;,/:
`£\ ^ = Correctionfactor for link y, k
`
`(1)
`
`Transactions on the Built Environment vol 30, © 1997 WIT Press, www.witpress.com, ISSN 1743-3509
`
`Google Ex. 1019
`
`

`

`220 Urban Transport and the Environment for the 21st Century
`
`Travel times consisting of several adjoining links can be calculated easily by
`calculating the solely links and adding them to one total trip-time. It may be clear
`that this kind of model is not that accurate as none of the disturbances that make
`traffic prediction so awkward are included. So there is a need for a more
`elaborate model end preferably a dynamic one.
`
`4.2 Dynamic forecasting based on actuated data
`
`While static systems are entirely self-contained, dynamic systems require
`accurate and up-to-date traffic data - data that must be provided by agencies
`through some type of infrastructure based monitoring device to user
`communication scheme.
`
`To be able to forecast properly we use both historic data and current data
`from monitoring devices as input for our dynamic model. Thus, combining the
`best of both worlds, we are able to forecast travel times in the near future based
`largely on actuated data as well as travel times for some time ahead (>15
`minutes) based on actuated and historic data. In general we can see that the need
`for actuated data becomes smaller as the needed forecast lies further away.
`Accuracy and variability of data are important as they are the key element when
`these models will be incorporated in traffic management schema's.
`
`The needed data itself needs to be extracted from the system; only specified data
`is given to the forecasting system:
`•
`the relevant road network given the links to be visited (origin-destination
`or preferred route);
`additional data on important aspects of traffic conditions: kind of day,
`part of the day, weather conditions, road conditions, etc.;
`additional data on important aspects of driver/car conditions: kind of
`driver: behaviour, age, etc., kind of car: velocity, acceleration and
`deceleration limits, etc.
`
`•
`
`•
`
`The forecasting system gets its data specified as road segments; as an object
`that 'knows' the forecasting equations, actual traffic conditions and constraints
`and, in combination with the above given data, future situations can be
`calculated. If the desired information is not in the near future, this can be
`simulated or calculated as accurate as possible with historic data.
`
`The kind of calculus used is effectively a state prediction model: predicting
`the states on time tj, given the state on time tj-dt-(where dt is not fixed). Every
`consecutive road segment gives its calculated travel-prediction, based on
`actuated and historic data, at a certain time given all the different inputs and the
`whole trip can be calculated. The travel time of a certain link is calculated on the
`moment that, real or virtual, car comes from the adjacent link, node or gate and
`enters the new link. So the correct entering time-state is known or, in case of a
`virtual car, calculated from the exit gate of the previous link.
`
`The whole optimisation process for the objective travel time can basically be
`written in a few formula's (2):
`
`total travel time =
`
`Ar.^^ • £.^^ , where
`
`(2)
`
`Transactions on the Built Environment vol 30, © 1997 WIT Press, www.witpress.com, ISSN 1743-3509
`
`Google Ex. 1019
`
`

`

`Urban Transport and the Environment for the 21st Century 221
`
`j = Start Node of linkj.k
`k = End Node of Ymkj,k
`
`T = Time
`Atj^j = Traveltime on link;,/: at time = T
`
`£j,k,T ~ Correctionfactor for \inkj,k at time = T
`
`(2a)
`
`Ar^j = (/^,r/^,r )^«driver/car , where
`Ij^j = Length of link j,k at time = T
`Vj,k,T - Mean velocity on link j,k at time = T
`^driver/car = non linear term on car and driver affecting traveltime on link j,k
`W,...) , where
`
`^ '
`
`%j^(t) = factor for congestion level at time t
`
`Note : The actual implementation could be far more complex then these formula's indicate
`as the non-linear terms should be specified, several inputs will be calculated via fuzzy set
`theory and the specific factors are further specified.
`
`The predictability of the mean velocity on link j, k at time T is the key
`element. Aggregated historic data can be used in cases when no direct time T is
`given or when T minus current time is larger then a couple of hours. In that case
`no specific extra information is in the actuated data. There is however extra
`information in weather forecasts, etc. So these should be used if available to
`make a better prediction. For time-spans less the an hour, especial when smaller
`then 15 minutes, a forecast based on actuated data is more accurate. In
`intermediate cases a fuzzy decision making process could determine what kind
`of mix of actuated and historic data should be used and what variables should be
`used. Fuzzy logic and fuzzy set theory provide a rich and meaningful addition to
`standard logic. Fuzzy quantifiers don't give the count exactly, but fuzzily in that
`way it can deal with fuzzy probability like 'not very likely', 'rarely, or 'fairly
`possible' [9].
`
`Even when predicted accurate the forecast is only valid for a limited time. In a
`couple of minutes the whole situation can be different. Uncertainty is present in
`most tasks that involve humans. In this case the prediction times will be
`uncertain, especially for trips longer then approximately one hour. In the
`meantime travel situations may improve or get worse.
`
`The main problem is that an a priori solution for the entire planning horizon
`ignores the unpredicted and unpredictable real-time variations of non recurrent
`variations in network characteristics. A solution to this problem, also
`implemented in the above given model is the use of a rolling horizon approach
`[10]. It addresses the scenario in which demands are not known a priori for the
`entire forecasting horizon. Long-term forecasts of future traffic conditions may
`not be as reliable as short-term forecasts. In rolling horizon approach the
`forecast horizon is subdivided into several stages or projection horizons with a
`limited time span; in each stage, reliable short-term forecasts and not-as-reliable
`medium- and long-term forecasts of traffic conditions are available when each
`user enters that stage. When solutions like these are used a more optimal route
`can be calculated during trips. An in-car device then becomes a necessity.
`
`Transactions on the Built Environment vol 30, © 1997 WIT Press, www.witpress.com, ISSN 1743-3509
`
`Google Ex. 1019
`
`

`

`222 Urban Transport and the Environment for the 21st Century
`
`It is presumed that data on upstream traffic can be used to predict the
`downstream traffic in a specific time period. Research has shown that models
`using historic, up-stream and current link traffic give the best results [12]. These
`models only give forecasts for specific links and don't take other links, possible
`disturbing that link's traffic into account. Thus a more elaborate model could
`give better results and for route guidance such a model could be more practical.
`The model used in that study [12] was (3):
`
`Z/+i = forecasts at time t + 1 on link i
`t//** = observed traffic at time t + lon link i + k (origin link)
`'+*-i) _ observed traffic at time t + lon link i + (k - 1) (adjecent link to origin link)
`+(k+i) _ observed traffic at time t + lon link i + (k + 1) (adjecent link to origin link)
`C\ = current traffic at time t on link i
`C/_j = current traffic at time t - 1 on link i
`C/_2 = current traffic at time t - 2 on link i
`C/_3 = current traffic at time t - 3 on link i
`yH}+i = historical average at time t on link i
`jp, /are weighting parameters
`
`Several other traffic forecasting methods can be used or even incorporated in
`the system. One of the most promising is the use of Artificial Neural Networks
`(ANN) for traffic forecasting [11]. The ANN techniques are notable for their use
`in addressing non-linear problem in data rich environments. The findings in
`most of the cases are that predictions, in the range till 15 minutes, are better then
`in ordinary cases. So the general idea is that predictions less then 15 minutes are
`viable by several means, ANN or general mathematics. The great virtue of the
`mathematics approach is that all inputs can be monitored and the influence on the
`outcome can de mathematically stated as in neural networks the total set of inputs
`gives an output, and you haven't got the slightest idea in what way the model is
`operating. So gaining inside in forecasting can best be done with (non-linear)
`mathematic models.
`
`We have not discussed the actual calculation part in depth, but in practise the
`calculation is the optimisation of a directed network. The optimisation techniques
`used are OR techniques. Faster algorithms, suitable for distributed computing
`can be useful as brute force is not that elegant and takes quite a long time.
`
`5 Dynamic route guidance
`
`Dynamic route guidance systems are the systems in traffic engineering relying
`heavily on forecasting models for accurate predictions. Fully dynamic route
`guidance systems offer additional benefits over semi-dynamic ones, in that they
`can be responsive to random fluctuations of actual traffic conditions. Those
`random fluctuations may be due to accidents or just some fluctuations in actual
`traffic conditions. The common feature of those random effects is that there is no
`way to predict them from historic data alone. In case of an accident, traffic can
`be redirected to avoid congestion through a new optimum route. One specific
`function of a dynamic route guidance system, of particular interest, concerns
`route choose calculations. The algorithm used to perform this task is the basis of
`the success of this part of the route guidance system; response time,
`
`Transactions on the Built Environment vol 30, © 1997 WIT Press, www.witpress.com, ISSN 1743-3509
`
`Google Ex. 1019
`
`

`

`Urban Transport and the Environment for the 21st Century 223
`
`performance, effectiveness and detailedness are all important. Criteria for the
`"best" route are: shortest, cheapest, fastest, prettiest, etc.
`
`For time dependent route planning algorithms dynamic and real time
`implementation is a necessity to reflect changes in traffic conditions. When a
`large number of cars have the same data and the same linear rules a situation can
`occur where an all or nothing assignment gets real. We are thus concerned with
`modelling dynamic networks when drivers simultaneously optimise their
`departure time and route choice. We state equilibrium conditions and propose a
`simulation-based model that can solve large networks accounting for all realities
`of actual networks. An approach based on user behaviour rules or statistics
`should be used to get a dispersion of the traffic flow and guide traffic to a less
`congested roadway. We need a time-dependent optimum path algorithm that
`computes paths on multi-modal networks, accounting for mode switching costs
`(time and money).
`
`The best place for route planning algorithms to operate is in each vehicle. The
`vehicle knows its progress and is able to fuse the actuated data with historic data
`and other sources and sending the vehicle data on travel time estimates. If there
`is two-way communication the vehicle may also be used as a probe for
`determining travel times on traversed links.
`
`6 Further research and conclusions
`
`An IDTMS is no cure for the traffic problems; it may streamline and reduce the
`traffic load, have more direct routes available, give good information and advise
`and still there would be a traffic problem. So research on changing attitudes,
`other ways of transport, etc. is equally important. An integrated design of an
`IDTMS that will easily include all mentioned options has yet to be developed.
`Seen in a broader perspective, allow for a sensible traffic management strategy
`to be executed by interconnected, modular intelligent traffic control systems.
`Switching to these new systems will, in the long run, enable cheap maintenance
`and easy transition to arising new facilities in traffic management based on the
`given infrastructure. To be able to economically develop IDTMS in the future,
`adopting rigorous interfacing and networking standards and implementing these
`in current investments is necessary now. To be able to even partly solve
`planning, management and control problems, there is a definite need for more
`suited dynamic models and control strategies.
`
`Traffic forecasting on historic data alone doesn't give a good enough basis for
`traffic forecasting in congested areas. In case of congestion a better forecasting
`model could be build using current data on that specific link, historic data (from
`similar time and road conditions on that specific link) and current data from
`adjoining links. At this stage we are not certain whether this forecasting principle
`is indeed a working solution, but the expected and very preliminary results seem
`to be very promising.
`
`The dynamic behaviour of traffic participants will change if information based
`on actuated data is presented. The specific changes and its influence on traffic is
`not yet clear and the influences of data availability is one of the remaining
`questions. For traffic control the research agenda comprises to adjusting the
`control schemes to appropriate ones that can deal with dynamic and actuated
`
`Transactions on the Built Environment vol 30, © 1997 WIT Press, www.witpress.com, ISSN 1743-3509
`
`Google Ex. 1019
`
`

`

`224 Urban Transport and the Environment for the 21st Century
`
`data. Some combination of historic data and actuated data will be needed to give
`predictions further ahead then the next 15 minutes.
`
`The subject of finding alternatives to the best path in a dynamic environment
`based on dynamic traffic forecasting is not fully functional yet. It remains a
`question to what extend this will be operational in the (near future) and effective
`implemented in route guidance systems. We should recognise that drivers may
`want to evaluate paths based on a combination of travel times and direct costs.
`While this is straight forward when these functions are linear, it is much more
`difficult when this is not the case. New algorithms, to efficiently solve these
`non-linear problems, are required.
`
`REFERENCES
`
`[1] Bernstein, D. (1993), Congestion pricing with tolls and subsidies, in:
`proc. Pacific Rim TransTech Conference, voi 11, ASCE, New York
`[2] Romph, E. de (1994), A dynamic traffic assignment model: theory and
`applications, DUT-press, Delft
`[3] Roozemond, D.A. (1995), An Integrated Multi-Discipline Dynamic Traffic
`Management System, Based on Information, Objects and Inter-Object
`Communication; Urban transport and the environment in the 21st century,
`Sucharov, L.J.(ed.), CMP, Southampton
`[4] Gollu, A., Deshpande, A, Hingorani, P., Varaiya, P. (1994), SmartDb:
`an object-oriented simulation framework for intelligent vehicles and
`highway systems, in proceedings of 5th conference on A/, simulation, and
`planning in high autonomy systems, IEEE, Los Alamos
`[6] Champine G.A., 1991, MIT Project Athena : a model for distributed
`campus computing, Digital Press, USA
`[6] Mauro, T., 1989, An overview of the AFS, Transarc Corporation,
`Pittsburg
`[7] Johanns, R.D and Roozemond, D.A.,1995, JGI coping with distributed
`incomplete data, in Critical review of the applications of advanced
`technologies (proceedings of the fifth EuroplA international conference),
`Miramond, M. & le Gauffre, P. & Beheshti, R.& Zreik, K. (eds),
`europia productions, Paris
`[8] Cuena, J., Hernandez, J., Molina, M. (1995), Knowledge-based models
`for adaptive traffic management systems i\\:transpn. res.-C, vol3, no 5,
`Elsevier
`[9] Zadeh, L.A. (1987), The role of fuzzy logic in the management of
`uncertainty in expert systems, in: Fuzzy sets and applications: Selected
`papers by L.A. Zadeh, Yager, R.R., Ovchinnikov, S., Nguyen,
`H.T.(eds), John Wiley, New York
`[10] Peeta, S.& Mahmassani, H.S. (1995), Multiple user classes real-time
`traffic assignment for online operations: a rolling horizon solution
`framework, in: Transp Res-C, vo!3, no 2, Elsevier
`[11] Lyons, G.D., McDonald, M., Hounsell, N.B., William, B., Cheese, J.,
`Radia, B. (1995), Urban traffic management: the viability of short term
`congestion forecasting using
`artificial neural networks;
`HTTP://www.smithsys.co.uk/ smith/public/tech/viabilit.html
`[12] Hobeika, A.G. & Kim, C.K. (1994), Traffic flow prediction systems
`based on upstream traffic; in: 7994 vehicle navigation & information
`systems conference proceedings ; IEEE
`
`Transactions on the Built Environme

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket