`Hi David/Eran/Gal,
`
`Please see Apple’s engineering team feedback with the suggested high level deliverables
`and milestones, let us know if you have any questions/feedback regarding the listed items
`and schedule:
`
`Software team's list of top level deliverables:
`
`1. Code for smooth transition between modules (exposure, focus, color balance, tone
`mapping)
`2. Still image fusion code which does not suffer from artifacts from high speed local
`motion
`3. Video processing code (to handle switch to/from tele)
`4. Calibration code
`5. Calibration setup (full mechanical/optical/electrical setup including test charts)
`6. Camera control for exposure/color/tone-map control as well as operating modes
`7. Readout synchronization between modules
`8. Alignment tolerances between modules
`9. Software compensation for drop induced errors and associated tolerances
`10. SW implementation which handles any orientation of modules, i.e. with the second
`module either placed above or next to the first module
`11. Software control of an OIS mechanism to be used as part of zoom user experience
`
`Suggested list of milestones with the timeline starting at the evaluation completion date
`(number of weeks are not cumulative):
`
`Documentation and/or C/matlab/pseudo code for Top Level Deliverable 1,
`+ 1 week:
`2, 3, 4, 6, 7, 8, 9, 10, and 11.
`+ 8 weeks:
`Functional version of Top Level Deliverable 5 and 6
`+ 12 weeks: GPU/CPU optimization running on iPhone 5s of Top Level Deliverable 2
`and 10. Max. processing time of 500ms.
`+ 12 weeks: GPU/CPU optimization running on iPhone 5s of Top Level Deliverable 3.
`Switch between modules should be almost invisible.
`+12 weeks: GPU/CPU optimization running on iPhone 5s of Top Level Deliverable 9.
`
`+ 24 weeks: Optimized version of Top Level Deliverables 5 and 6. Max. calibration
`time per module of 10s.
`
`APPLE V. COREPHOTONICS
`PROTECTIVE ORDER MATERIAL
`IPR2020-00906
`Exhibit 2007
`Page 1
`
`

`

`Hardware team’s may be interested in:
`
`1. Per module calibration
`2. Synchronization between the two sensors
`
`At this time there is no interest in lens design, magnetic interference minimization, OIS
`actuator synchronization
`
`Looking forward to your feedback regarding access to Qualcomm-based eval boards and
`list of features for exclusivity.
`
`Thanks,
`
`On Aug 3, 2014, at 7:49 AM, Eran Kali <ekali@corephotonics.com> wrote:
`
`Hi
`
` 
`
` contact details
` Please send us
` Please provide conference call in details for Monday 08:30 PDT
` We will shortly provide the features space and suggested restricted exclusivity scenario
` Checking with QCM
`
`Best Regards
`
`Eran Jonathan Kali
`ekali@corephotonics.com
`mobile: +972-54-440-2674
`
`From:
` [
`Sent: Friday, August 01, 2014 2:41 AM
`To: Eran Kali; David Mendlovic
`Cc:
`Subject: Re: Wednesday 7/30 London
`
`Hi Eran and David,
`
`Thanks for meeting with us yesterday in London, we felt that it was a very productive
`meeting.
`Below are the action items from my meeting notes.
`Please let me know if you have any questions or comments and feel free too add anything I
`have missed.
`
`
`]
`
`1. CP to send telephoto lens samples to Apple [Please send three pieces of your latest
` telephoto lens to Cupertino addressed to
`]
`
`APPLE V. COREPHOTONICS
`PROTECTIVE ORDER MATERIAL
`IPR2020-00906
`Exhibit 2007
`Page 2
`
`

`

`2. CP to discuss the value of the lens and module design with Apple [I will setup a meeting
`with the camera hardware team to discuss your value position in the area of lens and
`module design, would Monday 8:30 am PDT work for you?]
`3. CP to provide a list of features that can be used to define exclusivity [when can we
`expect this?]
`4. CP to seek permission from Qualcomm to allow Apple to use the evaluation boards
`without CP supervision [when can we expect an answer?]
`5. Apple to provide clarity on the scope (i.e. software, hardware or both), milestones and
`timing of the project [may require a conference call to brainstorm relevant milestones
`after the scope is defined]
`6. Apple to begin drafting the agreement in parallel
`7. Both parties to further discuss payment structure and amounts
`8. Meeting in Cupertino to finalize and sign the deal
`
`
`Regards,
`
`On Jul 22, 2014, at 4:48 AM, Eran Kali <ekali@corephotonics.com> wrote:
`
`APPLE V. COREPHOTONICS
`PROTECTIVE ORDER MATERIAL
`IPR2020-00906
`Exhibit 2007
`Page 3
`
`

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket