`Helsinki, Finland, 23 – 25 January, 2006
`
`R1-060001
`
`Source:
`
`Title:
`
`Chairman
`
`Draft Agenda
`
`Document for:
`
`Decision
`
`1 Opening of the meeting (Day 1: 9.00 AM)
`1.1 Call for IPR
`The attention of the members of this Technical Specification Group is drawn to the fact that 3GPP
`Individual Members have the obligation under the IPR Policies of their respective Organizational Partners
`to inform their respective Organizational Partners of Essential IPRs they become aware of.
`
`The members take note that they are hereby invited:
`•
`to investigate in their company whether their company does own IPRs which are, or are likely to become
`Essential in respect of the work of the Technical Specification Group.
`to notify the Director-General, or the Chairman of their respective Organizational Partners, of all
`potential IPRs that their company may own, by means of the IPR Statement and the Licensing declaration
`forms (e.g. see the ETSI IPR forms http://webapp.etsi.org/Ipr/).
`
`•
`
`APPLE 1038
`
`1
`
`
`
`2 Approval of the agenda
`3 Summary of LTE decisions from TSG RAN#30
`4 Liaison statement handling (LTE related LS only)
`5 Evolved UTRA and UTRAN (Physical Layer)
`5.1 Description of OFDMA Downlink used in the concept evaluation
`
`5.1.1 Contributions reflecting results from email reflector discussions
`
`5.1.2 Basic Transmission Scheme
`
`5.1.2.1 Modulation Scheme
`
`5.1.2.2 Reference-Signal Structure
`
`5.1.2.3 L1/L2 Control Signalling (Scheduling, Link Adaptation, HARQ, etc.)
`
`5.1.2.4 Channel coding and physical channel mapping
`
`5.1.3 Physical Layer Procedures
`
`5.1.3.1 Scheduling
`
`5.1.3.2 Link Adaptation
`
`5.1.3.3 HARQ
`
`5.1.3.4 Cell Search
`
`5.1.3.5
`
`Inter-cell interference mitigation
`
`5.1.4 Physical Layer Measurements
`
`5.1.5 Downlink related UE Capability
`
`
`2
`
`
`
`5.2 Description of SC-FDMA Uplink used in the concept evaluation
`
`5.2.1 Contributions reflecting results from email reflector discussions
`
`5.2.2 Basic Transmission Scheme
`
`5.2.2.1 Modulation Scheme
`
`5.2.2.2 Reference Signal Structure
`
`5.2.2.3 L1/L2 Control Signalling (Scheduling, Link Adaptation, HARQ, etc.)
`
`5.2.2.4 Channel coding and physical channel mapping
`
`5.2.3 Physical Layer Procedures
`
`5.2.3.1 Random Access Procedure
`
`5.2.3.2 Scheduling
`
`5.2.3.3 Link Adaptation
`
`5.2.3.4 Power Control
`
`5.2.3.5 HARQ
`
`5.2.3.6
`
`Inter-cell interference mitigation
`
`5.2.4 Physical Layer Measurements
`
`5.2.5 Uplink related UE Capability
`6 Closing of the meeting (Day3: 5.00 PM)
`
`3
`
`