`Denver, USA, 13 – 17 February, 2006
`
`R1-060270
`
`Source:
`
`Title:
`
`Chairman
`
`Draft Agenda
`
`Document for:
`
`Decision
`
`1 Opening of the meeting (Day 1: 9.00 AM)
`1.1 Call for IPR
`The attention of the members of this Technical Specification Group is drawn to the fact that 3GPP
`Individual Members have the obligation under the IPR Policies of their respective Organizational Partners
`to inform their respective Organizational Partners of Essential IPRs they become aware of.
`
`•
`
`The members take note that they are hereby invited:
`•
`to investigate in their company whether their company does own IPRs which are, or are likely to become
`Essential in respect of the work of the Technical Specification Group.
`to notify the Director-General, or the Chairman of their respective Organizational Partners, of all
`potential IPRs that their company may own, by means of the IPR Statement and the Licensing declaration
`forms (e.g. see the ETSI IPR forms http://webapp.etsi.org/Ipr/).
`2 Approval of the agenda
`3 Approval of the minutes from the previous
`meetings
`4 Report from TSG RAN#30 and RAN1 LTE Ad Hoc
`5 Liaison statement handling
`6 Maintenance of R99, Rel4, Rel5, Rel6
`6.1 R99 CRs + shadow CRs
`
`6.2 Rel4 CRs + shadow CRs
`
`6.3 Rel5 CRs + shadow CRs
`
`6.4 Rel6 CRs
`
`6.5 Other
`7 3.84 Mcps TDD Enhanced Uplink
`8 7.68 Mcps TDD Option
`
`APPLE 1025
`
`1
`
`
`
`9 MIMO in UTRA (Rel’7 work item)
`(Selection of MIMO scheme with 2 TX antennas according to the agreed process in RP-050884)
`10 Continuous Connectivity for Packet Data Users
`(Primarily a RAN1 Work Item)
`11 Improved support of gaming over HSPA
`(Primarily a RAN2 Work Item)
`12 Improvements of MBMS
`(Primarily a RAN2 Study Item)
`13 Evolved UTRA and UTRAN (Physical Layer)
`13.1 Description of OFDMA Downlink used in the concept evaluation
`
`13.1.1 Contributions reflecting results from email reflector discussions
`
`13.1.2 Downlink MIMO Scheme used in the concept evaluation
`(Parallel ad-hoc session planned.)
`
`13.1.3 Remaining downlink issues from the January Ad Hoc on LTE that need to be
`resolved
`
`13.2 Description of SC-FDMA Uplink used in the concept evaluation
`(Continuation of the discussion from January Ad hoc on LTE)
`
`13.2.1 Contributions reflecting results from email reflector discussions
`
`13.2.2 Basic Transmission Scheme
`
`13.2.2.1 Modulation Scheme
`
`13.2.2.2 Reference Signal Structure
`
`13.2.2.3 L1/L2 Control Signalling (Scheduling, Link Adaptation, HARQ, etc.)
`
`13.2.2.4 Channel coding and physical channel mapping
`
`13.2.2.5 Uplink MIMO Scheme used in the concept evaluation
`(Parallel ad-hoc session planned.)
`
`2
`
`
`
`13.2.3 Physical Layer Procedures
`
`13.2.3.1 Random Access Procedure
`
`13.2.3.2 Scheduling
`
`13.2.3.3 Link Adaptation
`
`13.2.3.4 Power Control
`
`13.2.3.5 HARQ
`
`13.2.3.6 Inter-cell interference mitigation
`
`13.2.4 Physical Layer Measurements
`
`13.2.5 Uplink related UE Capability
`14 Closing of the meeting (Day5: 5.00 PM)
`
`3
`
`