throbber
3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`Agenda item
`3
`Title:
`Report of 3GPP TSG RAN WG1 #52 v1.0.0
`(Sorrento, Italy, 11 – 15 February, 2008)
`Comment
`MCC Support
`
`Document for:
`Source:
`
`
`R1-081166
`
`Fact Summary
`Meeting:
`Dates:
`Venue:
`Host:
`Attendees:
`Documents:
`
`3GPP TSG RAN WG1 #52
`11th through 15th February, 2008
`Hilton Sorrento Palace, Sorrento, ITALY
`European Friends of 3GPP
`162 delegates
`519 (including some withdrawn and post-meeting artefacts)
`
`Patrick Mérias
`ETSI Mobile Competence Center
`F-06921 Sophia Antipolis Cedex
`Tel: +33 4 92 94 42 06
`
`Patrick.merias@etsi.org
`
`1 1
`
`Optis Cellular Ex 2021-p. 1
`Apple v Optis Cellular
`IPR2020-00465
`
`

`

`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`Table of contents
`
`
`R1-081166
`
`Executive summary ......................................................................................................................................... 3
`1
`Opening of the meeting ........................................................................................................................ 5
`1.1
`Call for IPR ........................................................................................................................................................... 5
`2
`Approval of the agenda ......................................................................................................................... 5
`3
`Approval of the minutes from previous meeting ............................................................................... 5
`4
`Liaison statement handling .................................................................................................................. 6
`5. Maintenance of UTRA R99 – Rel-8 .................................................................................................... 9
`6.
`Evolved UTRA and UTRAN ............................................................................................................... 13
`6.1
`Finalization of TS 36.211 ................................................................................................................................. 13
`6.1.1
`Downlink reference signals ....................................................................................................................... 13
`6.1.2
`Uplink reference signals ............................................................................................................................ 15
`6.1.3
`Downlink Control Signalling ...................................................................................................................... 17
`6.1.4
`Uplink Control Signalling ........................................................................................................................... 25
`6.1.5
`Mapping of virtual resource blocks to physical resource blocks ........................................................ 31
`6.1.6
`Bit Scrambling sequences for UL/DL transmissions ............................................................................ 34
`6.1.7
`Remaining issues for TDD and FDD HD ................................................................................................ 35
`6.1.8
`Other remaining issues for 36.211 ........................................................................................................... 38
`6.2
`Finalization of TS 36.212 ................................................................................................................................. 38
`6.3
`Finalization of TS 36.213 ................................................................................................................................. 38
`6.3.1
`Timing synchronization .............................................................................................................................. 38
`6.3.2
`UL/DL Power Control ................................................................................................................................. 39
`6.3.3
`Inter-cell Interference Coordination ......................................................................................................... 42
`6.3.4
`UE Procedures for downlink shared channel ........................................................................................ 43
`6.3.5
`UE Procedures for uplink shared channel .............................................................................................. 43
`6.3.6
`Remaining issues for TDD and FDD HD ................................................................................................ 44
`6.3.7
`Other remaining issues for 36.213 .......................................................................................................... 44
`6.4
`Finalization of TS 36.214 ................................................................................................................................. 44
`6.5
`Finalization of TS 36.306 ................................................................................................................................. 45
`7.
`Enhanced Uplink for Cell_FACH State in FDD ............................................................................... 47
`8.
`Study Item on Synchronized E-DCH ................................................................................................ 52
`9.
`Study Item on HS-PDSCH serving cell change enhancements ................................................... 56
`10. Study Item on Scope of future HSPA Evolution for 1.28Mcps TDD ............................................. 57
`11. Work Item on 64QAM for 1.28Mcps TDD HSDPA .......................................................................... 57
`12. Work Item on Enhanced CELL_FACH state in 1.28Mcps TDD (UL/DL) ..................................... 57
`13. Closing of the meeting ........................................................................................................................ 57
`Annex A: List of participants at RAN1 #52 .............................................................................................. 59
`Annex B: TSG RAN WG1 meetings in 2008 .......................................................................................... 60
`Annex C: List of CRs agreed at RAN1#52 .............................................................................................. 61
`Annex D: List of Outgoing LSs from RAN1#52 ...................................................................................... 63
`Annex E: List of Tdocs at RAN1 #52 ....................................................................................................... 65
`Annex F: List of actions ............................................................................................................................. 66
`
`
`2 2
`
`Optis Cellular Ex 2021-p. 2
`Apple v Optis Cellular
`IPR2020-00465
`
`

`

`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`
`R1-081166
`
`Executive summary
`3GPP TSG WG RAN1 #52 meeting took place in Hilton Sorrento Palace, Sorrento, ITALY.
`
`The meeting started at 9:10 on Monday 11th February and finished at 17:00 on Friday 15th February 2008.
`
`
`
`The week was scheduled as follows:
`
` Monday: Common session on Agenda items 1, 2, 3, 4 and 6.1.3 – Parallel session in the afternoon for Agenda
`item 5 chaired by Dirk Gerstenberger and discussions on 6.3.4 chaired by Juho Lee.
`
` Tuesday: Parallel session in the morning for Agenda item 7 chaired by Dirk Gerstenberger and discussions on
`6.3.4 chaired by Juho Lee. Parallel session in the afternoon for Agenda items 8, 9, 10 and 11 chaired by Dirk
`Gerstenberger and discussions on 6.1.3 chaired by Stefan Parkvall. No contributions to AI 12.
`
` Wednesday: Parallel session for Agenda item 6.3.3 and discussions on 6.2 (chaired by Sadayuki Abeta) –
`Common session on Agenda items 6.1.7, 6.1.6 and 6.1.4 in the afternoon.
`
` Thursday: Common session on Agenda items 6.3.2, 6.1.5, 6.1.2 and 6.1.1.
`
` Friday: Common session on Agenda items 6.4 and 6.3.6. Review of the parallel session’s results and pending
`action points before closure.
`
`
`The list of action points that required RAN1 close follow-up is listed in Annex F (end of document).
`
`
`The number of contribution documents for this meeting was 504, and those documents were categorized as followed.
`Input
`Discussed
`Document
`Document
`23
`22
`25
`24
`385
`
`20
`19
`41
`36
`7
`7
`
`Agenda Item
`Liaison statement handling
`Maintenance of R99, Rel4, Rel5, Rel6, Rel7
`Evolved UTRA and UTRAN
`Enhanced Uplink for Cell_FACH State in FDD
`Study Item on Synchronized E-DCH
`Study Item on HS-PDSCH serving cell change
`enhancements
`Study Item on Scope of future HSPA Evolution for
`1.28Mcps TDD
`Work Item on 64QAM for 1.28Mcps TDD HSDPA
`Work Item on Enhanced CELL_FACH state in
`1.28Mcps TDD (UL/DL)
`
`2
`1
`-
`
`2
`1
`-
`
`
`
`
`
`3 3
`
`Optis Cellular Ex 2021-p. 3
`Apple v Optis Cellular
`IPR2020-00465
`
`

`

`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`The following set of documents is missing. The corresponding contributions have not been handed over by companies.
`
`R1-081166
`
`R1-080656
`
`Bitwidths for CQI reporting on PUCCH for MIMO support
`
`Qualcomm Europe
`
`R1-080657
`
`System analysis comparing best-M and cycling CQI report
`mechanisms
`
`Qualcomm Europe
`
`R1-080743
`
`System Results for Nd=3
`
`R1-080780
`
`Simulation on the 64-QAM modulation indication scheme for
`1.28Mcps TDD
`
`R1-080818
`
`UE-specific RS pattern
`
`R1-080867
`
`Uplink SRS, discussion/proposals on remaining issues
`
`R1-080901
`
`Holes in the L1 specification
`
`R1-081059
`
`Consideration of Supportable MCS for E-UTRA DL
`
`R1-081060
`
`CQI Reporting Procedure for E-UTRA
`
`R1-081061
`
`CQI and PMI Report Combinations on PUSCH
`
`Motorola
`
`ZTE
`
`Philips
`
`Ericsson
`
`Ericsson
`
`Texas Instruments
`
`Texas Instruments
`
`Texas Instruments
`
`R1-081070
`
`Way forward on modifying LBRM procedure to avoid inconsistency
`
`Broadcom
`
`R1-081154
`
`TR25.823 v0.1.4
`
`Nokia Siemens Networks
`
`
`
`
`
`
`
`4 4
`
`Optis Cellular Ex 2021-p. 4
`Apple v Optis Cellular
`IPR2020-00465
`
`

`

`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`
`R1-081166
`
`Opening of the meeting
`1
`Mr. Dirk Gerstenberger (RAN1 Chairman) welcomed the participants to the 52sd RAN WG1 meeting and opened the
`meeting at 09:10.
`
`Mr. Enrico Buracchini from Telecom Italia welcomed the delegates on behalf of the European Friends of 3GPP.
`
`Call for IPR
`1.1
`The Chairman drew attention to Members’ obligations under the 3GPP Partner Organizations’ IPR policies. Every
`Individual Member organization is obliged to declare to the Partner Organization or Organizations of which it is a
`member any IPR owned by the Individual Member or any other organization which is or is likely to become
`essential to the work of 3GPP.
`
`
`The attention of the members of this Technical Specification Group is drawn to the fact that 3GPP
`Individual Members have the obligation under the IPR Policies of their respective Organizational Partners
`to inform their respective Organizational Partners of Essential IPRs they become aware of.
`
`The members take note that they are hereby invited:
`
`to investigate in their company whether their company does own IPRs which are, or are likely to become
`Essential in respect of the work of the Technical Specification Group.
`
`to notify the Director-General, or the Chairman of their respective Organizational Partners, of all
`potential IPRs that their company may own, by means of the IPR Statement and the Licensing declaration
`forms (e.g. see the ETSI IPR forms http://webapp.etsi.org/Ipr/).
`
`Approval of the agenda
`
`
`
`
`
`
`
` 2
`
`Draft Agenda for RAN1#52 meeting
`R1-080630
`Dirk Gerstenberger (Chairman) proposed the agenda for the meeting.
`Discussion (Question / Comment):
`Decision: The agenda was approved.
`
`RAN1 Chairman
`
`Approval of the minutes from previous meeting
`
` 3
`
`
`
`Draft report of RAN1#51 bis meeting
`R1-080631
`The document was presented by Patrick Mérias.
`Discussion (Question / Comment):
`Decision: The document is approved.
`
`MCC Support
`
`5 5
`
`Optis Cellular Ex 2021-p. 5
`Apple v Optis Cellular
`IPR2020-00465
`
`

`

`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`
`4
`
`Liaison statement handling
`
`R1-081166
`
`= R2-080520
`RAN2, Ericsson
`Response LS on BCCH transmission
`R1-080632
`The document was presented by Erik Dahlman from Ericsson and reports decisions made in RAN2 on BCCH
`transmission.
`Discussion (Question / Comment): Mr Chairman suggested discussing with RAN2 colleagues if additional information
`on what has been decided is still required.
`Decision: Document is noted.
`
`
`
`Reply LS on various aspects related to GERAN to E-UTRAN
`R1-080635
`interworking
`The document was presented by Juan Montojo from Qualcomm.
`Discussion (Question / Comment): No change to Physical Layer Cell ID is expected.
`Decision: Document is noted.
`
`RAN2, Qualcomm
`
`= R2-080609
`
`
`
`LS on LS on enhancing radio bearer parameters in 34.108 for
`R1-080636
`64QAM, MIMO and Enhanced Layer 2
`The document was presented by Arto Lehti from Nokia.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`RAN2, Nokia
`
`= R2-080618
`
`Response LS to RAN1 and RAN2 on HSPA RB and SRB
`R1-081041
`configurations in 34.108
`The document was presented by Johan Bergman from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is noted. Document shall be revisited providing more time for reviewing the parameters definition.
`Reply LS in R1-081051.
`Friday 15th
`
`RAN5, Ericsson
`
`= R5-080525
`
`R1-081051
`
`Draft Reply LS on HSPA RB and SRB configurations in 34.108
`
`Ericsson
`
`The document was presented by Johan Bergman from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is noted. Final LS is agreed in R1-081144.
`
`
`
`LS to RAN1 and RAN2 on new MCCH radio bearer configuration
`R1-081042
`in 34.108
`The document was presented by Johan Bergman from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is noted. Document shall be revisited during the week. Reply LS in R1-081052.
`Friday 15th
`
`RAN5, Ericsson
`
`= R5-080526
`
`R1-081052
`
`Draft Reply LS on new MCCH radio bearer configuration in 34.108
`
`Ericsson
`
`The document was presented by Johan Bergman from Ericsson.
`Discussion (Question / Comment):
`
`6 6
`
`Optis Cellular Ex 2021-p. 6
`Apple v Optis Cellular
`IPR2020-00465
`
`

`

`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`Decision: Document is noted. Final LS is agreed in R1-081145.
`
`
`
`Physical-layer parameters to be configured by RRC
`R1-080900
`Document was not available. Recheck during the week.
`Friday 15th
`Decision is made to prepare LS for email approval until February 22sd.
`
`
`
`LS on RACH retransmission delay
`R1-080637
`The document was presented by Hidetoshi Suzuki from Panasonic.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Draft reply LS on RACH retransmission delay
`R1-080897
`The document was presented by Stefan Parkvall from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Draft LS response on RACH transmission delay
`R1-080987
`The document was presented by Hidetoshi Suzuki from Panasonic.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`R1-081166
`
`Ericsson
`
`
`
`RAN2, Panasonic
`
`= R2-080621
`
`Ericsson, Fujitsu
`
`Panasonic
`
`
`
`
`
`Based on proposed responses (R1-080897/R1-080967), LS reply shall be prepared in R1-081054
`Friday 15th
`
`Draft reply LS on RACH retransmission delay requirements
`R1-081054
`The document was presented by Hidetoshi Suzuki from Panasonic.
`Discussion (Question / Comment): Further checking on UE minimum processing delay is requested.
`Decision: Document is noted. LS for email approval until February 22sd
`
`
`
`Ericsson, Panasonic,
`LG, Fujitsu
`
`
`
`
`Nortel
`UL Sub-frame Bundling and VoIP coverage
`R1-080766
`The document was presented by (…) from Nortel and looks at the performance of TTI bundling in order to improve the
`UL VoIP coverage. A comparison between 2 methods for ACK/NAK transmissions for persistent users is provided and the
`paper recommends adopting method 1 for ACK/NAK signalling for UL sub-frame bundling.
`Discussion (Question / Comment): Alcatel-Lucent requested some explanation on how Nortel’s conclusions have been
`obtained.
`Decision: Document is noted.
`
`
`Philips, NXP
`UL coverage considerations for VoIP transmission
`R1-080831
`The document was presented by Matthew Baker from Philips and proposes a way forward for the UL VoIP coverage issue,
`based on TTI bundling while keeping the retransmission latency short.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`7 7
`
`Optis Cellular Ex 2021-p. 7
`Apple v Optis Cellular
`IPR2020-00465
`
`

`

`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`
`R1-081166
`
`
`Ericsson
`On Uplink coverage for LTE
`R1-080865
`The document was presented by Stefan Parkvall from Ericsson and compares TTI bundling and L2 segmentation and
`concludes in favour of TTI bundling.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`Alcatel-Lucent
`Performance Comparison of Solutions for Subframe Bundling
`R1-080913
`The document was presented by Rainer Bachl from Alcatel-Lucent and addresses the two possible solutions for the issue
`with uplink coverage for LTE (performance comparison). Conclusions are:
`
` Alternative 2 provides a 1-3 dB coverage improvement compared to Alternative 1 for VoIP
`
` Unlike Alternative 1, Alternative 2 allows LTE VoIP to achieve similar coverage compared to HSUPA VoIP
`(10ms TTI), which is necessary in overlay scenarios
`
` Alternative 2 should be chosen as the solution to improve LTE uplink coverage
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`Alcatel-Lucent
`Implications of Solutions for Subframe Bundling
`R1-080914
`The document was presented by Rainer Bachl from Alcatel-Lucent. As both proposed solutions for the issue with uplink
`coverage for LTE make use of subframe bundling, this contribution discusses possible implications of the subframe
`bundling solutions on the standards specification.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Based on above set of contributions, Mr Chairman suggested informing RAN2 about RAN1 discussions mainly on
`Subframe bundling including Qualcomm’s comment, namely as follows:
`
` Subframe bundling is beneficial for coverage
`
`
`
`3 different alternatives are proposed
`
` One semi-static configuration of number of subframes in a bundle
`o Minimize the number of semi-static configurations of number of subframes in a bundle
`o on/off signalling of bundling
`Note: Code rate >1 is not precluded by this decision for first HARQ transmission (this needs to be discussed separately as
`part of MCS discussions)
`
`Tdoc number allocated to the LS shall be R1-081053.
`Wednesday 13th
`
`DRAFT Reply LS on Uplink Coverage for LTE
`R1-081053
`The document was presented by Stefan Parkvall from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is noted and final LS agreed in R1-081103.
`
`
`
`Ericsson
`
`
`
`8 8
`
`Optis Cellular Ex 2021-p. 8
`Apple v Optis Cellular
`IPR2020-00465
`
`

`

`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`
`R1-081166
`
`5.
`
`Maintenance of UTRA R99 – Rel-8
`
`25.212 CR260 (Rel-8, F) Correction of RV mapping in HS-SCCH
`R1-080757
`
`QUALCOMM Europe
`type 3 for 64-QAM support
`The document was presented by (…) from Qualcomm and clarifies that the same RV mapping as in case of 16-QAM shall
`be used.
`Discussion (Question / Comment): Qualcomm mentioned that CR was identical to NSN (R1-080832).
`Decision: Document is noted.
`
`25212CR0261 (Rel-8, F), Correction to RV-coding in case of
`R1-080832
`simultaneous usage of 64QAM and MIMO
`The document was presented by Karri Ranta-aho from NSN.
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`
`
`Nokia, Nokia Siemens
`Networks
`
`
`
`25214CR0479 (Rel-7, F), Correction to UE grant monitoring
`R1-080833
`The document was presented by Antti Hiltunen from Nokia.
`Discussion (Question / Comment): Both Philips and Ericsson asked for reviewing off line the content together with
`Nokia and cleaning-up.
`Decision: Document is noted and shall be revisited during the week.
`
`
`
`Nokia, Nokia Siemens
`Networks
`
`25214CR0480 (Rel-8, A), Correction to UE grant monitoring
`R1-080834
`Refer to previous document and decision.
`Friday 15th
`Extra time is needed for reviewing. Thus, R1-080833 (resp. R1-080834) shall be revised in R1-081146 (resp. R1-081147)
`for email approval until February 22sd.
`
`
`
`Nokia, Nokia Siemens
`Networks
`
`
`
`
`QUALCOMM Europe
`Reducing smallest E-TFCI value
`R1-080806
`The document was presented by Sharad Sambhwani from Qualcomm and evaluates the link level performance of reducing
`the smallest E-TFCI values as well as the L2 implications of MAC segmentation.
`
`As a conclusion, both the Link Budget analysis and MAC segmentation study indicate that there is no benefit of reducing
`the transport block sizes beyond 120 bits. In particular it is sufficient to segment the AMR Full Rate frame (VoIP or CS
`Voice over HS) into 3 segments of 120 bits each. It is no point trying to optimize segmentation of the SID frames, since the
`cell edge boundary must support transmission of full rate frames.
`Discussion (Question / Comment):
`Decision: Document is noted. This topic can be revisited if requested after having further discussed with RAN2.
`Friday 15th
`Conclusion: There is no agreement for reducing smallest E-TFCI.
`
`
`Ericsson
`HS-SCCH orders for HS-SCCH-less operation
`R1-080904
`The document was presented by Johan Bergman from Ericsson and proposes to introduce HS-SCCH orders for activation
`and deactivation of HS-SCCH-less operation, so that the HSDPA scheduler in the serving NodeB can signal dynamically
`to the UE whether HS-SCCH-less operation is required or not (to avoid unnecessary UE battery consumption).
`
`Ericsson is willing to discuss the way making the change either as a Rel-7 correction or as a part of the ongoing Rel-8
`work item on UE DRX enhancements.
`
`9 9
`
`Optis Cellular Ex 2021-p. 9
`Apple v Optis Cellular
`IPR2020-00465
`
`

`

`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`Discussion (Question / Comment): Find out whether there are L2 and L3 implications (Nokia concerns)
`Node B controlling the switching on/off is foreseen as the best alternative.
`Decision: Document is noted and RAN1/RAN2 CRs (including stage 2) shall be prepared for next meeting, based on the
`HS-SCCH orders to switch HS-SCCH-less transmission off.
`
`R1-081166
`
`
`
`
`Ericsson
`Initial Multi-Carrier HSPA performance evaluation
`R1-080902
`The document was presented by Johan Bergman from Ericsson and addresses some aspects of a potential multi carrier
`(MC) operation of a HSPA system. The paper concludes that higher data rates are achievable for most users, including
`users experiencing low and moderate SNR, resulting in more users having access to high data rates. Furthermore, due to
`scheduling gains, the system capacity is also expected to be increased compared to system where the carriers are used
`independently.
`Discussion (Question / Comment): Nokia raised concern on the number of users used for the performance simulation.
`Decision: Document is noted.
`
`
`
`
`RITT
`Introduction of optimized FS2 for TDD
`R1-080660
`The document was presented by Lin Hui from RITT and reflects the impact on stage 2 spec TS 36.300 for removing the
`FS1 for TDD and introducing the optimized FS2.
`Discussion (Question / Comment):
`Decision: Document shall be revisited on Wednesday.
`Thursday 14th
`No comments and the attached draft LS in agreed in R1-081112.
`
`
`
`
`CATT
`25.221 CR0152 (Rel7,F) E-AGCH timing for 1.28Mcps TDD EUL
`R1-080783
`The document was presented by Ke Wang from CATT and introduces the changes on timing between E-AGCH and E-
`DCH nE-AGCH to 7 timeslots minimum for LCR TDD.
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`25.221CR0153 (Rel7,F) Clarification of the description about E-
`R1-080784
`PUCH for 1.28Mcps TDD EUL
`The document was presented by Ke Wang from CATT.
`Discussion (Question / Comment):
`Decision: Document is agreed
`
`
`
`25.222 CR0144r1 (Rel7,F) Some corrections for 1.28Mcps TDD
`R1-081064
`EUL
`The document was presented by Ke Wang from CATT.
`Discussion (Question / Comment):
`Decision: Document is agreed
`
`25.222 CR0145 (Rel7,F) Clarification on TFCI mapping for
`R1-080790
`1.28Mcps TDD MBMS
`The document was presented by (…) from CATT
`Discussion (Question / Comment): Philips reported typo errors
`Decision: Document is noted and shall be revised in R1-081065.
`Friday 15th
`
`CATT
`
`
`
`CATT
`
`(R1-080785)
`
`CATT
`
`
`
`10 10
`
`Optis Cellular Ex 2021-p. 10
`Apple v Optis Cellular
`IPR2020-00465
`
`

`

`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`
`R1-081065
`
`25.222 CR0145r1 (Rel7,F) Clarification on TFCI mapping for 1.28Mcps
`TDD MBMS
`
`CATT
`
`R1-081166
`
`The document was presented by (…) from CATT
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`
`
`TD Tech
`25.224 CR0174 (Rel-7, F) on EUL power control clarification
`R1-080782
`TD Tech mentioned that this CR was also partially covered by next document.
`
`
`
`25.224 CR0177 (Rel7,F) Clarification and Correction of E-PUCH
`R1-080788
`power control for LCR TDD
`The document was presented by Ke Wang from CATT.
`Discussion (Question / Comment):
`Decision: Document is noted. Second change is agreed in principle and shall be written in separate CR (R1-081066).
`
`CATT
`
`
`
`It’s also decided to discuss off line the merge between R1-080782 and first change in R1-080788. This shall be revisited
`later in the week.
`Friday 15th
`
`R1-081066
`
`25.224 CR0177r1 (Rel-7, F) Clarification and Correction of E-PUCH
`power control for LCR TDD
`
`CATT
`
`The document was presented by Ke Wang from CATT.
`Discussion (Question / Comment):
`Decision: Document is agreed. The question in relation with first change in R1-080788 is postponed as discussion shall
`continue.
`
`
`25.224 CR0175 (Rel7,F) Clarification of the E-AGCH monitoring
`R1-080786
`for 1.28Mcps TDD EUL
`The document was presented by (…) from CATT.
`Discussion (Question / Comment):
`Decision: Document is noted. This CR shall be revisited after off line discussion.
`Friday 15th
`Discussion to continue
`
`CATT
`
`
`
`
`
`25.224 CR0176 (Rel7,F) Improvement of the UL synchronisation
`R1-080787
`
`CATT
`of E-PUCH for 1.28Mcps TDD EUL
`The document was presented by Ke Wang from CATT and proposes improvement of the UL synchronisation of E-PUCH.
`Discussion (Question / Comment): RITT raised concern on wording. Mr Chairman recommended not leaving track
`changes on CR cover sheet in order avoiding confusion.
`Decision: Document is noted. This CR shall be revisited after off line discussion.
`Friday 15th
`No objection from off line discussion. R1-080787 is agreed.
`
`
`
`R1-080789
`
`25.224 Cr0178 (Rel7,F) Improvement of the non-scheduled E-
`DCH transmission procedure for 1.28Mcps TDD EUL
`
`CATT
`
`
`
`11 11
`
`Optis Cellular Ex 2021-p. 11
`Apple v Optis Cellular
`IPR2020-00465
`
`

`

`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`The document was presented by Ke Wang from CATT. An improvement of the non-scheduled E-DCH transmission
`procedure is Discussion (Question / Comment):
`Decision: Document is noted. This CR shall be revisited after off line discussion.
`Friday 15th
`CR to TS 25.321 shall be prepared and discussed at next RAN2 meeting.
`
`R1-081166
`
`
`
`
`
`
`QUALCOMM Europe
`Potential issues with large DRX cycles
`R1-080805
`The document was presented by Sandip Sarkar from Qualcomm and discusses strength/weakness of an enhancement to the
`CPC UE DRX in CELL_DCH.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`Ericsson
`On the introduction of a second UE DRX cycle in CELL_DCH
`R1-080903
`The document was presented by Johan Bergman from Ericsson and discusses some concerns with R1-080387, “Enhanced
`UE DRX for CELL_DCH state”, proposed by Nokia Siemens Networks, Nokia.
`Discussion (Question / Comment): NSN acknowledged all the observations made in the paper and agreed on the
`necessity for elaborating further the introduction of a second UE DRX cycle in CELL_DCH.
`Decision: Document is noted.
`
`Conclusion: Second DRX cycle for cell_DCH is not recommended by RAN1.
`
`
`
`
`
`12 12
`
`Optis Cellular Ex 2021-p. 12
`Apple v Optis Cellular
`IPR2020-00465
`
`

`

`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`
`6.
`
`6.1
`
`Evolved UTRA and UTRAN
`
`Finalization of TS 36.211
`
`R1-081166
`
`R1-080898
`Draft CR to 36.211 v8.1.0 including decisions from RAN1#51bis
`Ericsson
`
`The document was presented by Stefan Parkvall from Ericsson and provides a collection of changes that have been
`decided for inclusion into TS 36.211 as listed below:
`
`Specification of DwPTS/UpPTS lengths, UL/DL allocations (TDD); specification of VRB-to-PRB mapping (RB);
`definition of channelization for PUCCH format 0 and 1 (UL ctrl); specification of uplink reference-signal group hopping
`(UL RS); specification of RACH format 4 (RACH); specification of PHICH-to-RE mapping (DL ctrl); introduction of
`guard time for half-duplex FDD (HD-FDD); clarified support of single antenna port only for MBSFN (MBSFN); PBCH
`moved to second slot for both FDD and TDD (PBCH); specification of pseudo-random sequences for downlink reference
`signals (DL RS); scrambling sequences changed to length-31 (scrambling); normalization of large-delay CDD (PDSCH);
`normalization of DFT-precoder (PUSCH); editorial clarifications in multiple sections (editorial)
`Discussion (Question / Comment):
`Decision: Document is noted.
`Thursday 14th
`Decision is made to endorse draft CR and to use R1-080898 as the basis for inclusion of additional corrections from up
`coming decisions.
`
`
`
`
`
`Downlink reference signals
`6.1.1
`Remaining issues on DL reference signals, e.g.
`
` UE specific RS pattern
`
`Initialisation of shift registers for PRBS generation (see also scrambling)
`
`
`
`
`Samsung
`Summary of Reflector Discussions on EUTRA DL RS
`R1-080661
`The document was presented by Aris Papasakellariou from Samsung providing feedback on topics discussed over email
`reflector.
`Discussion (Question / Comment):
`Decision: Document is noted.
`From the summary:
`Dedicated RS (DRS)
`
` DRS Pattern
`
`R1-081108
`
`Way Forward on Dedicated Reference Signal Design for LTE
`downlink with Normal CP
`
`Motorola, Nortel,
`Broadcomm, Nokia,
`NSN, NTT DoCoMo,
`NEC, Mitsubishi,
`Alcatel-Lucent, CATT,
`Huawei, Sharp, Texas
`Instrument, ZTE,
`Panasonic, Philips,
`Toshiba
`
`
`
`The document was presented by (…) from (…).
`Discussion (Question / Comment):
`Decision: Document is noted. The way forward is agreed with following note:
`
`13 13
`
`Optis Cellular Ex 2021-p. 13
`Apple v Optis Cellular
`IPR2020-00465
`
`

`

`3GPP TSG RAN WG1 Meeting #52bis
`Shenzhen, China, 31 March – 4 April, 2008
`
`
`o Support of DRS operation is a UE capability for FDD/TDD
` CQI Estimation
`o CQI estimation (DL) is always based on CRS
`
`
`RS Orthogonal Sequences
`
`R1-081166
`
`Nokia, Nokia Siemens
`Networks, Broadcom,
`Freescale, Huawei, LG
`Electronics, NXP
`Semiconductors,
`Samsung, Texas
`Intruments, ZTE,
`NextWave Wireless
`
`(R1-081047)
`
`R1-081096
`
`Way Forward on Orthogonal Sequences for DL Reference
`signals
`
`The document was presented by Asbjörn Grovlen from Nokia.
`Discussion (Question / Comment):
`Decision: Document is noted and the way forward is agreed.
`
`
`Pseudo-Random RS Sequences
`
` Covered in scrambling section (6.1.6)
`
`
`DRS pattern for extended CP for 12 RS
`
` Needs further discussion
`
`
`
`The following set of documents has not been treated.
`
`R1-080638
`
`Further details on dedicated RS structure for DL beamforming
`
`Qualcomm Europe
`
`R1-080639
`
`RS power balancing in the spatial domain and interference
`estimation issues
`
`R1-080640
`
`Specification details for PRS sequences
`
`Qualcomm Europe
`
`Qualcomm Europe
`
`R1-080767
`
`R1-080768
`
`Performance evaluation of Dedicated RS Structures for Beam-
`Forming Transmission
`Channel Estimation Performance Evaluation on PDCCH in BF
`Zones
`
`Nortel
`
`Nortel
`
`R1-080795
`
`UE specific reference pattern
`
`CATT, CMCC, RITT
`
`R1-080796
`
`Multiplexing of UE-specific RS and cell-specific RS in DL
`
`R1-080817
`
`Open issues on UE-specific RS
`
`R1-081013
`
`Cl

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket