`Sorento, Italy, 11 – 15 February, 2008
`
`Agenda item
`
`3
`
`Title:
`
`Report of 3GPP TSG RAN WG1 #51bis v1.0.0
`(Sevilla, Spain, 14 – 18 January, 2008)
`
`Document for:
`
`Approval
`
`Source:
`
`MCC Support
`
`R1-080631
`
`Fact Summary
`
`Meeting:
`
`3GPP TSG RAN WG1 #51bis
`
`Dates:
`
`Venue:
`
`Host:
`
`14th through 18th January, 2008
`
`The Melia Sevilla Hotel, Sevilla, SPAIN
`
`European Friends of 3GPP
`
`Attendees:
`
`171 delegates
`
`Documents:
`
`622 (including some withdrawn and post-meeting artefacts)
`
`Patrick Mérias
`ETSI Mobile Competence Center
`F-06921 Sophia Antipolis Cedex
`Tel: +33 4 92 94 42 06
`
`Patrick.merias@etsi.org
`
`1 1
`
`Optis Cellular Ex 2014-p. 1
`Apple v Optis Cellular
`IPR2020-00465
`
`
`
`
`3GPP TSG RAN WG1 Meeting #52
`Sorento, Italy, 11 – 15 February, 2008
`
`Table of contents
`
`
`
`R1-080631
`
`Executive summary ......................................................................................................................................... 3
`
`1. Opening of the meeting ........................................................................................................................ 5
`1.1
`Call for IPR ....................................................................................................................................................... 5
`
`2.
`
`3.
`
`4.
`
`Approval of the agenda ......................................................................................................................... 5
`
`Approval of the minutes from previous meeting ............................................................................... 5
`
`Liaison statement handling .................................................................................................................. 6
`
`5. Maintenance of UTRA R99 – Rel-8 .................................................................................................. 13
`
`6.
`6.1
`6.1.1
`6.1.2
`6.1.3
`6.1.4
`6.1.5
`6.1.6
`6.1.7
`6.1.8
`6.2
`6.3
`6.3.1
`6.3.2
`6.3.3
`6.3.4
`6.3.5
`6.3.6
`6.3.7
`6.3.8
`6.4
`6.5
`
`Evolved UTRA and UTRAN ............................................................................................................... 14
`Finalization of TS 36.211 .............................................................................................................................. 14
`Downlink reference signals .................................................................................................................... 14
`Uplink reference signals ......................................................................................................................... 16
`Downlink Control Signalling ................................................................................................................... 18
`Uplink Control Signalling ......................................................................................................................... 25
`Mapping of virtual resource blocks to physical resource blocks ....................................................... 30
`Bit Scrambling sequences for UL/DL transmissions ........................................................................... 32
`Remaining issues for TDD and FDD HD .............................................................................................. 33
`Other remaining issues for 36.211 ........................................................................................................ 38
`Finalization of TS 36.212 .............................................................................................................................. 39
`Finalization of TS 36.213 .............................................................................................................................. 41
`Timing synchronization ........................................................................................................................... 41
`UL/DL Power Control .............................................................................................................................. 42
`Inter-cell Interference Coordination ....................................................................................................... 44
`RACH timing and preamble sequence selection ................................................................................ 46
`UE Procedures for downlink shared channel ...................................................................................... 48
`UE Procedures for uplink shared channel ........................................................................................... 55
`Remaining issues for TDD and FDD HD .............................................................................................. 55
`Other remaining issues for 36.213 ........................................................................................................ 55
`Finalization of TS 36.214 .............................................................................................................................. 56
`Finalization of TS 36.306 .............................................................................................................................. 56
`
`7.
`
`8.
`
`9.
`
`Enhanced Uplink for Cell_FACH State in FDD ............................................................................... 58
`
`Study Item on Synchronized E-DCH ................................................................................................ 61
`
`Study Item on HS-PDSCH serving cell change enhancements ................................................... 63
`
`10. Work Item on MBSFN DOB 3.84Mcps TDD .................................................................................... 64
`
`11. Study Item on Scope of future HSPA Evolution for 1.28Mcps TDD ............................................. 64
`
`12. Work Item on 64QAM for 1.28Mcps TDD HSDPA .......................................................................... 65
`
`13. Work Item on Enhanced CELL_FACH state in 1.28Mcps TDD (UL/DL) ..................................... 66
`
`14. Closing of the meeting ........................................................................................................................ 67
`
`Annex A: List of participants at RAN1 #51b ........................................................................................... 68
`
`Annex B: TSG RAN WG1 meetings in 2008 .......................................................................................... 69
`
`Annex C: List of CRs agreed at RAN1#51b ........................................................................................... 70
`
`Annex D: List of Outgoing LSs from RAN1#51b .................................................................................... 71
`
`Annex E: List of Tdocs at RAN1 #51b ..................................................................................................... 73
`
`Annex F: List of actions ............................................................................................................................. 74
`
`
`2 2
`
`Optis Cellular Ex 2014-p. 2
`Apple v Optis Cellular
`IPR2020-00465
`
`
`
`
`3GPP TSG RAN WG1 Meeting #52
`Sorento, Italy, 11 – 15 February, 2008
`
`
`Executive summary
`
`R1-080631
`
`3GPP TSG WG RAN1 #51b meeting took place in Melia Sevilla Hotel, Sevilla, SPAIN.
`
`The meeting started at 9:20 on Monday 14th January and finished at 17:10 on Friday 18th January 2008.
`
`
`
`The week was scheduled as follows:
`
` Monday: Common session on Agenda items 1, 2, 3 and 4 – Parallel session in the afternoon for Agenda items 5,
`10 and 6.1.7 chaired by Dirk Gerstenberger and discussions on 6.3.5 (DL procedures) chaired by Juho Lee.
`
` Tuesday: Parallel session in the morning for Agenda items 6.3.2 chaired by Dirk Gerstenberger and discussions
`on 6.2 (Channel coding) chaired by Sadayuki Abeta. Common session in the afternoon on Agenda item 6.1.3.
`
` Wednesday: Ad-hoc session (from 8:00AM) on TB size discussion (Agenda item 6.1.3) chaired by Stefan
`Parkvall. – Parallel session (from 9:30AM) for Agenda item 6.3.3 and continuing discussions on 6.3.5 (chaired by
`Juho Lee) – Common session on Agenda items 6.3.4, 6.1.4 and 6.1.5 in the afternoon.
`
` Thursday: 8:00-9:30AM Ad-hoc session on VRB (6.1.5 chaired by Brian Classon) – Parallel sessions for Agenda
`items 7, 8, 9, 11, 12,13, discussions on UE categories (AI 6.5), scrambling (AI 6.1.6) and DL/UL Reference
`Signals (AI 6.1.1 and 6.1.2) chaired by Sadayuki Abeta and continuing discussions on 6.3.5 (chaired by Juho
`Lee).
`
` Friday: Common session on Agenda items 6.4, 6.3.1 and 6.1.8. Review all parallel sessions results and pending
`issues.
`
`
`
`The list of action points that required RAN1 close follow-up is listed in Annex F (end of document).
`
`
`
`The number of contribution documents for this meeting was 612, and those documents were categorized as followed.
`
`Agenda Item
`
`Liaison statement handling
`Maintenance of R99, Rel4, Rel5, Rel6, Rel7
`Evolved UTRA and UTRAN
`Enhanced Uplink for Cell_FACH State in FDD
`Study Item on Synchronized E-DCH
`Study Item on HS-PDSCH serving cell change
`enhancements
`Work item on MBSFN DOB 3.84Mcps TDD
`Study Item on Scope of future HSPA Evolution for
`1.28Mcps TDD
`Work Item on 64QAM for 1.28Mcps TDD HSDPA
`Work Item on Enhanced CELL_FACH state in
`1.28Mcps TDD (UL/DL)
`
`Input
`Document
`43
`8
`488
`28
`17
`
`Discussed
`Document
`40
`8
`129
`15
`17
`
`4
`
`6
`
`4
`
`10
`
`4
`
`3
`
`6
`
`4
`
`10
`
`4
`
`
`
`
`
`The following set of documents is missing. The corresponding contributions have not been handed over by companies.
`
`
`
`R1-080076
`
`HARQ Process Identity for SU-MIMO
`
`Motorola
`
`3 3
`
`Optis Cellular Ex 2014-p. 3
`Apple v Optis Cellular
`IPR2020-00465
`
`
`
`
`3GPP TSG RAN WG1 Meeting #52
`Sorento, Italy, 11 – 15 February, 2008
`
`
`R1-080086
`
`UL ACK/NACK for TDD
`
`R1-080100
`
`Observations on UL ICIC
`
`R1-080146
`
`Sounding RS remaining issues
`
`R1-080169
`
`PHICH resource indication for LTE TDD
`
`R1-080214
`
`PCFICH mapping for odd number of RBs
`
`R1-080285
`
`A use case for the eNodeB Measurement
` “Maximum Tx Power per PRB
` relative to the rated output power”
`
`
`
`R1-080631
`
`Motorola
`
`Motorola
`
`Panasonic
`
`CATT
`
`ZTE
`
`Alcatel-Lucent
`
`4 4
`
`Optis Cellular Ex 2014-p. 4
`Apple v Optis Cellular
`IPR2020-00465
`
`
`
`
`3GPP TSG RAN WG1 Meeting #52
`Sorento, Italy, 11 – 15 February, 2008
`
`
`1.
`
`Opening of the meeting
`
`R1-080631
`
`Mr. Dirk Gerstenberger (RAN1 Chairman) welcomed the participants to the 51st bis RAN WG1 meeting and opened the
`meeting at 09:20.
`
`Mr. Jean-Aicard Fabien from Motorola welcomed the delegates on behalf of the European Friends of 3GPP.
`
`1.1
`
`Call for IPR
`
`The Chairman drew attention to Members’ obligations under the 3GPP Partner Organizations’ IPR policies. Every
`Individual Member organization is obliged to declare to the Partner Organization or Organizations of which it is a
`member any IPR owned by the Individual Member or any other organization which is or is likely to become
`essential to the work of 3GPP.
`
`
`
`
`
`The attention of the members of this Technical Specification Group is drawn to the fact that 3GPP
`Individual Members have the obligation under the IPR Policies of their respective Organizational Partners
`to inform their respective Organizational Partners of Essential IPRs they become aware of.
`
`The members take note that they are hereby invited:
`
`
`
`
`
`to investigate in their company whether their company does own IPRs which are, or are likely to become
`Essential in respect of the work of the Technical Specification Group.
`
`to notify the Director-General, or the Chairman of their respective Organizational Partners, of all
`potential IPRs that their company may own, by means of the IPR Statement and the Licensing declaration
`forms (e.g. see the ETSI IPR forms http://webapp.etsi.org/Ipr/).
`
`2.
`
`Approval of the agenda
`
`R1-080001
`
`Draft Agenda for RAN1#51bis meeting
`
`RAN1 Chairman
`
`Dirk Gerstenberger (Chairman) proposed the agenda for the meeting.
`
`Discussion (Question / Comment):
`Decision: The agenda was approved.
`
`
`
`3.
`
`Approval of the minutes from previous meeting
`
`R1-080002
`
`Draft report of RAN1#51 meeting
`
`MCC Support
`
`The document was presented by Patrick Mérias. Main changes concern annex F that captures all post meeting email
`approvals. The report also provides an update of 2008 WG meeting schedule (Kansas City in May and Warsaw in July).
`
`Discussion (Question / Comment): Mr Chairman informed delegates about workshop on IMT Advanced topic. This
`workshop will be held on April 07-08th in China, the week following RAN WGs.
`
`Mr Chairman further presented the outcomes from last plenary meeting and LTE overall work plan.
`
`Decision: The document is approved.
`
`5 5
`
`Optis Cellular Ex 2014-p. 5
`Apple v Optis Cellular
`IPR2020-00465
`
`
`
`
`3GPP TSG RAN WG1 Meeting #52
`Sorento, Italy, 11 – 15 February, 2008
`
`
`4.
`
`Liaison statement handling
`
`R1-080631
`
`R1-080006
`
`Reply LS on Enhanced Uplink for CELL_FACH state in FDD
`
`RAN2, Nokia
`
`= R2-075472
`
`The document was presented by Antti Hiltunen from Nokia.
`
`Discussion (Question / Comment): Further discussion required for the preparation of response under AI7.
`Decision: Document is noted. To be revisited under AI7. by the end of the week.
`
`
`
`R1-080009
`
`LS on Inter-RAT/frequency Automatic Neighbour Relation
`Function
`The document was presented by Georg Wannemacher from T-Mobile.
`
`RAN3, T-Mobile
`
`= R3-072403
`
`Discussion (Question / Comment):
`Decision: Document is noted. Discussion off line.
`
`
`
`R1-080010
`
`Reply LS on self tuning of cell reselection/handover parameters
`for load balancing purpose
`
`The document was presented by Enrico Buracchini from Telecom Italia.
`
`RAN3, Telecomitalia
`
`= R3-072444
`
`Discussion (Question / Comment): Sadayuki Abeta mentioned on the existence of contribution under AI 6.4
`Decision: Document is noted.
`
`R1-080158
`
`L1 eNB measurements to support load balancing
`
`NTT DoCoMo
`
`The document was presented by Sadayuki Abeta from NTT DoCoMo and proposes to define some L1 measurements at
`eNB that capture the current loading on the radio interface from L1 perspective.
`
`Discussion (Question / Comment): In principle, Telecom Italia supports the content of the document and wish to
`participate in further discussions during the week.
`Decision: Document is noted. Response shall be prepared and revisited by the end of the week.
`
`Friday 18th
`
`R1-080592
`
`Reply LS on Load balancing
`
`NTT DoCoMo, AT&T,
`NEC, Nokia, NSN,
`Orange, Telecom Italia,
`T-Mobile, Vodafone
`
`
`
`The document was presented by Sadayuki Abeta from NTT DoCoMo.
`
`Discussion (Question / Comment):
`Decision: Document is noted. LS shall be revised in R1-080601 after off line discussions.
`
`Friday 18th
`
`R1-080601
`
`Reply LS on Load balancing
`
`The document was presented by Sadayuki Abeta from NTT DoCoMo.
`
`Discussion (Question / Comment):
`Decision: Document is noted and final LS is agreed in R1-080617
`
`
`
`
`
`NTT DoCoMo, AT&T,
`NEC, Nokia, NSN,
`Orange, Telecom Italia,
`T-Mobile, Vodafone
`
`(R1-080592)
`
`R1-080011
`
`LS on Measurement Gap Design for Mobility Measurements
`between LTE and Mobile WiMAX
`
`RAN4, Samsung
`
`=R4-071808
`
`6 6
`
`Optis Cellular Ex 2014-p. 6
`Apple v Optis Cellular
`IPR2020-00465
`
`
`
`
`3GPP TSG RAN WG1 Meeting #52
`Sorento, Italy, 11 – 15 February, 2008
`
`
`R1-080631
`
`R1-080012
`
`LS on Measurement Quantities for Mobility Measurements
`between LTE and Mobile WiMAX
`
`RAN4, Samsung
`
`=R4-071812
`
`Both documents were just noted without presentation due to plenary decision on the topic.
`
`
`
`R1-080013
`
`LS to RAN2 on LTE channel numbering
`
`RAN4, Ericsson
`
`=R4-072116
`
`The document was presented by Erik Dahlman from Ericsson.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`R1-080015
`
`LS on enhancing radio bearer parameters in 34.108 for 64QAM,
`MIMO and Enhanced Layer 2
`
`RAN5, Ericsson
`
`= R5-073460
`
`The document was presented by Johan Bergman from Ericsson.
`
`Discussion (Question / Comment): Mr Chairman suggested giving time to companies to bring feedback by Friday.
`Decision: Document is noted. Reply LS shall be prepared in R1-080522
`
`Friday 18th
`
`R1-080522
`
`Draft Reply LS on enhancing radio bearer parameters in 34.108 for
`64QAM, MIMO and Enhanced Layer 2
`
`Ericsson
`
`R1-080608
`
`The document was presented by Johan Bergman from Ericsson.
`
`Discussion (Question / Comment):
`Decision: Document is noted and final reply LS is in R1-080608
`
`
`
`
`
`R1-080340
`
`Physical layer parameters to be configured by RRC
`
`Ericsson
`
`
`
`The document was briefly presented by Erik Dahlman from Ericsson.
`
`Discussion (Question / Comment): Motorola commented about their contributions (R1-080077, R1-080080) to that topic.
`Decision: Document is noted. To be revisited by the end of the week after off line discussion.
`
`Friday 18th
`
`R1-080599
`
`Physical layer parameters to be configured by RRC
`
`Ericsson
`
`(R1-080340)
`
`The document was briefly presented by Erik Dahlman from Ericsson.
`
`Discussion (Question / Comment):
`Decision: Document is noted. Related LS in R1-080600 is for email approval until 25/01.
`
`
`
`
`
`R1-080407
`
`DRAFT LS on code rate limitations for HS-DSCH UE cat 13 and
`15
`The document was presented by Johan Bergman from Ericsson.
`
`Ericsson
`
`Discussion (Question / Comment): No comments.
`Decision: Document is noted and agreed. Final reply LS is in R1-080523
`
`
`
`R1-080408
`
`DRAFT LS on UE release indication from SRNC to NodeB
`
`Ericsson
`
`The document was presented by Johan Bergman from Ericsson.
`
`
`
`
`
`7 7
`
`Optis Cellular Ex 2014-p. 7
`Apple v Optis Cellular
`IPR2020-00465
`
`
`
`
`3GPP TSG RAN WG1 Meeting #52
`Sorento, Italy, 11 – 15 February, 2008
`
`
`R1-080631
`
`Discussion (Question / Comment): NSN in principle agrees with the LS but would like to let RAN3 more freedom for
`further discussion during the week.
`Decision: Document is noted. To be revisited by the end of the week after off line discussion. Final LS shall be made in
`R1-080524
`
`Friday 18th
`
`R1-080524
`
`DRAFT LS on UE release indication from SRNC to NodeB
`
`Ericsson
`
`(R1-080408) R1-
`080609
`
`The document was presented by Johan Bergman from Ericsson.
`
`Discussion (Question / Comment):
`Decision: Document is noted and final reply LS is in R1-080609
`
`
`
`R1-080007
`
`LS on Signalling of MBSFN Subframe Allocation
`
`RAN2, Qualcomm
`
`= R2-075480
`
`The document was presented by Juan Montojo from Qualcomm
`
`Discussion (Question / Comment): Nokia highlighted a typo error (72bits shall be replaced by 64bits)
`Related contributions have been identified from Alcatel-Lucent, Huawei… (AI 6.1.3)
`Decision: Document is noted.
`
`R1-080210
`
`Signalling of MBSFN Subframe Allocations
`
`Alcatel-Lucent
`
`
`
`The document was presented by Ruppert Rheinschmitt from Alcatel-Lucent. In order to let the UE to be aware which
`subframes are parts of an MBSFN transmission, this contribution outlines
`
`
`
`
`a flexible MBSFN subframe allocation scheme using 3 bits
`the required signalling to inform the UEs about the MBSFN subframe allocation using a bitmap for the radio
`frames within the repetition period (i.e. 32 bits for a repetition period of 320 ms)
`
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`R1-080119
`
`MBSFN subframe allocation Signalling
`
`Huawei
`
`6.1.3
`
`Discussion/Decision
`
`
`
`The document was presented by Zhao Meng from Huawei and proposes a method for MBSFN subframe allocation
`signalling, having the following 4 basic features:
`
` To define a “modifying period of MBSFN subframe allocation” over which the allocation signalling information
`changes;
`
` Some frames contain MBSFN subframes while others do not;
`
` The distribution of MBSFN subframes in each MBSFN frame is the same;
`
` Node B broadcasts the MBSFN subframe allocation information via D-BCH.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`R1-080519
`
`LS response on Signalling of MBSFN Subframe allocation
`
`Alcatel-Lucent
`
`
`
`The document was presented by Ruppert Rheinschmitt from Alcatel-Lucent and provides a proposal as response to R2-
`075480 (R1-080007) questions.
`
`Discussion (Question / Comment):
`Decision: Document is noted. Discussion shall continue during the week and reply LS revised in R1-080525.
`
`Friday 18th
`
`R1-080525
`
`[Draft] LS response on Signalling of MBSFN Subframe Allocation
`
`Alcatel-Lucent
`
`(R1-080519)
`
`8 8
`
`Optis Cellular Ex 2014-p. 8
`Apple v Optis Cellular
`IPR2020-00465
`
`
`
`
`3GPP TSG RAN WG1 Meeting #52
`Sorento, Italy, 11 – 15 February, 2008
`
`
`The document was presented by Ruppert Rheinschmitt from Alcatel-Lucent.
`
`R1-080631
`
`Discussion (Question / Comment): Huawei, NSN both rejected the [draft] LS due to RAN3 related issues not appropriate
`
`Decision: Document is noted. As the meeting was running out of time, Mr Chairman suggested the discussion to continue
`and the LS is for email approval until 25/01.
`
`
`
`
`
`R1-080003
`
`LS on various aspects related to GERAN to E-UTRAN
`interworking
`
`GERAN, Nokia
`Siemens Networks
`
`= GP-072030
`
`The document was presented by Mieszko Chmiel from NSN and informes RAN1 on agreements reached at GERAN#36
`related to the principle of interworking procedures including:
`
`
`
`Inter-RAT Cell Reselection
`
` Neighbour Cell Description
`
` E-UTRAN Neighbour Cell Identification
`
` Number of E-UTRAN Cells in the Neighbour Cell Description sent in GERAN
`
`
`
`Inclusion of LTE Neighbour Cell Information into GERAN Broadcast Messages
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`R1-080287
`
`Proposed response to GERAN LS on various aspects related to
`GERAN to E-UTRAN interworking (GP-072030)
`
`Nokia Siemens
`Networks, Nokia
`
`
`
`The document was presented by Mieszko Chmiel from NSN and provides answers to previous LS.
`
`Discussion (Question / Comment):
`Decision: Document is noted. Off line checking is required and reply LS revised in R1-080528.
`
`Friday 18th
`
`R1-080528
`
`Draft Reply to LS on various aspects related to GERAN to E-
`UTRAN interworking
`
`Nokia Siemens
`Networks
`
`(R1-080287)
`
`The document was presented by Mieszko Chmiel from NSN.
`
`Discussion (Question / Comment):
`Decision: Document is noted and final reply LS agreed in R1-080610.
`
`
`
`
`
`R1-080004
`
`LS on RACH power control optimisation use case
`
`RAN2, NTT DoCoMo
`
`= R2-075463
`
`The document was presented by Sadayuki Abeta from NTT DoCoMo and raises RAN2 question for clarification on the
`use case optimizing RACH configurations.
`
`Discussion (Question / Comment):
`Decision: Document is noted and shall be readdressed after RACH PC discussion
`
`R1-080446
`
`Draft Reply to RAN2 LS on RACH power control optimisation use
`case
`
`Alcatel-Lucent
`
`
`
`The above document has not been treated.
`
`Friday 18th
`
`R1-080596
`
`Draft Reply to RAN2 LS on RACH power control optimisation use
`case
`
`Alcatel-Lucent
`
`(R1-080446)
`
`The document was presented by Ms Jungah Lee from Alcatel-Lucent.
`
`9 9
`
`Optis Cellular Ex 2014-p. 9
`Apple v Optis Cellular
`IPR2020-00465
`
`
`
`
`3GPP TSG RAN WG1 Meeting #52
`Sorento, Italy, 11 – 15 February, 2008
`
`
`R1-080631
`
`Discussion (Question / Comment): Philips remarked that the LS didn’t properly answer the question raised by RAN2.
`Decision: Document and Philips are noted. Nevertheless Mr Chairman decided to let RAN2 informed and final LS is
`agreed in R1-080612.
`
`
`
`
`
`R1-080005
`
`LS on uplink coverage for LTE
`
`RAN2, Ericsson
`
`= R2-075467
`
`The document was presented by Stefan Parkvall from Ericsson and raises questions on mechanism to enhance the uplink
`coverage for VoIP traffic.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`R1-080339
`
`On VoIP Uplink Coverage for LTE
`
`Ericsson
`
`
`
`The document was presented by Stefan Parkvall from Ericsson and provides link level results for VoIP considering current
`L2 protocol assumptions, especially L2 segmentation. The results show that L2 segmentation is inferior to retransmissions
`due to the high overhead introduced by L2 segmentation.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`R1-080444
`
`On the Need for VoIP Coverage Enhancement for the E-UTRA
`UL
`The document was presented by Rainer Bachl from Alcatel-Lucent and illustrates that the current E-UTRA UL HARQ
`operation results in a VoIP coverage gap compared to UMTS CS voice as well as HSUPA Release 7 VoIP. The paper
`concludes that techniques which form a longer effective TTI length (such as a 4ms TTI) close the link budget gap with
`HSUPA.
`
`Alcatel-Lucent
`
`
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Additional information was proposed in:
`
`R1-080443
`
`Multi-process transmission technique to improve UL coverage for
`LTE
`
`Alcatel-Lucent
`
`
`
`The document was presented by Rainer Bachl from Alcatel-Lucent and discusses possible solutions to improve uplink
`LTE coverage. As the basic idea is to form longer TTI length (but create significant impact to the current L1 agreements),
`the contribution proposes a mechanism known as “multi-process” transmission which effectively forms a larger TTI length
`by allowing autonomous retransmission in consecutive subframes using consecutive HARQ processes.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`As a conclusion, Mr Chairman suggested to come –up with some drafting of the reply LS to RAN2 in R1-080532. This
`should indicate that a solution to the UL coverage should be introduced…
`
`
`
`R1-080441
`
`Draft Reply LS on Uplink Coverage for LTE
`
`Alcatel-Lucent
`
`R1-080590
`
`On UL VoIP coverage
`
`Qualcomm Europe
`
`
`
`
`
`The above documents have not been treated.
`
`Friday 18th
`
`R1-080532
`
`DRAFT Reply LS on Uplink Coverage for LTE
`
`Ericsson
`
`
`
`The document was presented by Stefan Parkvall from Ericsson.
`
`Discussion (Question / Comment):
`
`10 10
`
`Optis Cellular Ex 2014-p. 10
`Apple v Optis Cellular
`IPR2020-00465
`
`
`
`
`3GPP TSG RAN WG1 Meeting #52
`Sorento, Italy, 11 – 15 February, 2008
`
`
`R1-080631
`
`Decision: Document is noted. Discussion shall continue over email until 01/02 and there should be an attempt writing LS
`on this topic.
`
`
`
`
`
`R1-080008
`
`LS on NDI vs. RV
`
`RAN2, Ericsson
`
`= R2-075481
`
`The document was presented by Stefan Parkvall from Ericsson.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`R1-080438
`
`LS Response on NDI vs RV
`
`Motorola
`
`
`
`The document was presented by Robert Love from Motorola.
`
`Discussion (Question / Comment):
`Decision: Document is noted. To be revisited by the end of the week after off line discussion.
`
`Friday 18th
`
`No answer to RAN2 question on whether the NDI or RV approach should be applied
`
`Following contributions have been addressed under AI 6.1.3.
`
`R1-080440
`
`NDI vs RV for E-UTRA Downlink
`
`Motorola
`
`
`
`R1-080529
`
`NDI vs RV for E-UTRA Uplink
`
`Motorola
`
`(R1-080439)
`
`
`
`
`
`R1-080014
`
`LS on implications of MIMO schemes on RAN4 requirements
`
`RAN4, Ericsson
`
`=R4-072232
`
`The document was presented by Georg Jongren from Ericsson.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`R1-080520
`
`Draft response to LS on implications of MIMO schemes on RAN4
`requirements (R4-072232)
`
`Samsung, LGE, ETRI
`
`(R1-080018)
`
`The document was presented by (…) from Samsung.
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`R1-080518
`
`Ericsson, Motorola,
`Nokia and Nokia
`Siemens Networks,
`Texas Instruments,
`Broadcom
`The document was presented by Georg Jongren from Ericsson as an alternative response to LS.
`
`Draft response to LS on implications of MIMO schemes on RAN4
`requirements
`
`(R1-080338)
`
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Based on proposed contributions, there seems to be some disagreement regarding the small delay CDD delay values.
`
`Off line discussion should continue.
`
`Friday 18th
`
`11 11
`
`Optis Cellular Ex 2014-p. 11
`Apple v Optis Cellular
`IPR2020-00465
`
`
`
`
`3GPP TSG RAN WG1 Meeting #52
`Sorento, Italy, 11 – 15 February, 2008
`
`
`R1-080631
`
`R1-080606
`
`Draft response to LS on implications of MIMO schemes on RAN4
`requirements
`
`Ericsson, Samsung,
`LGE, Nokia, Nokia
`Siemens Networks,
`Motorola, Texas
`Instruments
`
`(R1-080557)
`
`The document was presented by Georg Jongren from Ericsson.
`
`Discussion (Question / Comment):
`Decision: Document is noted and agreed in R1-080613.
`
`
`
`LSs received during the week
`
`R1-080572
`
`LS on the use of HS-DPCCH
`
`R1-080573
`
`LS on Enhanced Uplink for CELL_FACH in FDD
`
`Both LSs have been treated under AI 7.
`
`RAN2, Qualcomm
`
`RAN2, Nokia Siemens
`Networks
`
`
`
`
`
`
`
`
`
`12 12
`
`Optis Cellular Ex 2014-p. 12
`Apple v Optis Cellular
`IPR2020-00465
`
`
`
`
`3GPP TSG RAN WG1 Meeting #52
`Sorento, Italy, 11 – 15 February, 2008
`
`
`R1-080631
`
`5.
`
`Maintenance of UTRA R99 – Rel-8
`
`
`
`R1-080153
`
`25.224 CR170r1 (Rel-7, B) EUL power control improvement for
`1.28Mcps TDD
`
`TD Tech
`
`
`
`The document wasn’t presented by (…) from TD Tech as there is still discussion on going.
`
`Discussion (Question / Comment): TS25.221 also needs a CR.
`Decision: Document shall be revisited during the week.
`
`Friday 18th
`
`R1-080539
`
`25.224 CR170r2 (Rel-7, F) EUL power control improvement for
`1.28Mcps TDD
`
`TD Tech
`
`(R1-080153)
`
`The document was presented by (…) from TD Tech.
`
`Discussion (Question / Comment):
`Decision: Document is noted and CR is agreed.
`
`R1-080538
`
`25.221 CR0151 (Rel-7, F) EUL power control improvement for
`1.28Mcps TDD
`
`TD Tech
`
`The document was presented by (…) from TD Tech.
`
`Discussion (Question / Comment):
`Decision: Document is noted and CR is agreed.
`
`
`
`
`
`R1-080218
`
`25.214 CR472r2 (Rel-7,F) UE procedure for receiving HS-DSCH in
`the PCH state
`
`Huawei
`
`The document was presented by (…) from Huawei
`
`Discussion (Question / Comment): No comments.
`Decision: Document is noted and agreed.
`
`
`
`
`
`
`
`R1-080420
`
`25.211 CR0252 (Rel-7, F) Correction to tie use of transmit diversity on
`SCH and P-CCPCH
`
`QUALCOMM Europe
`
`
`
`The document was presented by Josef Blanz from Qualcomm.
`
`Discussion (Question / Comment):
`Decision: Document is noted and agreed.
`
`
`
`R1-080502
`
`25.221 CR0150 (Rel-7, F) Clarification of uplink multicode capability
`for 1.28Mcps TDD EUL
`
`CATT
`
`The document was presented by Ke Wang from CATT.
`
`Discussion (Question / Comment):
`Decision: Document is noted and agreed.
`
`
`
`R1-080503
`
`25.222 CR0143 (Rel-7, F) Clarification of E-RUCCH coding
`multiplexing for 1.28Mcps TDD
`
`The document was presented by Ke Wang from CATT.
`
`CATT, Spreadtrum
`communications, TD-
`TECH, ZTE
`
`
`
`
`
`Discussion (Question / Comment): IPWireless suggested looking at MAC layer specification (TS25321) where the
`multiplexed fields should be and check if clarification is required.
`
`13 13
`
`Optis Cellular Ex 2014-p. 13
`Apple v Optis Cellular
`IPR2020-00465
`
`
`
`
`3GPP TSG RAN WG1 Meeting #52
`Sorento, Italy, 11 – 15 February, 2008
`
`
`Decision: Document is noted. Check off line how this is described in MAC.
`
`
`
`R1-080631
`
`R1-080387
`
`Enhanced UE DRX for CELL_DCH state
`
`Nokia Siemens
`Networks, Nokia
`
`
`
`The document was presented by Karri Ranta-aho from NSN and describes a proposal for enhancing the CELL_DCH DRX.
`
`Discussion (Question / Comment): Mr Chairman asked whether RAN2 was starting similar work on this topic. The
`answer is “No” according to NSN.
`Ericsson requested having some examples proving the benefits behind the proposal.
`Decision: Document is noted.
`
`
`
`6.
`
`Evolved UTRA and UTRAN
`
`6.1
`
`Finalization of TS 36.211
`
`6.1.1
`
`Downlink reference signals
`
`R1-080595
`
`Summary of the reference signal ad hoc session
`
`Ad hoc chair (NTT
`DoCoMo)
`
`
`
`The document was presented by Sadayuki Abeta from NTT DoCoMo and highlights the decision taken on DL RS in ad
`hoc session.
`
`Discussion (Question / Comment):
`Decision: Document is noted and content on DL RS is agreed.
`
`
`
`Conclusion from email summary referring to:
`
`R1-080019
`
`Summary of Reflector Discussions on EUTRA DL RS
`
`Samsung
`
`
`
`The document was presented by Aris Papasakellariou from Samsung
`
`Conclusions:
`
`PRBS for Unicast
`
` The time-domain period of the sequences is one frame (1-to-1 mapping with the sub-frame number).
`
` The sequences are first mapped in the frequency-domain.
`
` The sequences are defined for 110 PRBs. For smaller transmission BW, only the RS within that BW are
`transmitted (and, together with (b), no BW knowledge required from the UEs to know the RS).
`
` The same sequences are used for antenna ports 0, 1, 2, and 3 with only half the sequence elements used for
`antenna ports 2 and 3.
`
`PRBS for MBSFN
`
` The time-domain period