`
` 1
`
` Opening of the meeting (Day 1: 9.00 AM)
`1.1 Call for IPR
`
`I draw your attention to your obligations under the 3GPP Partner Organizations' IPR policies. Every Individual
`Member organization is obliged to declare to the Partner Organization or Organizations of which it is a member
`any IPR owned by the Individual Member or any other organization which is or is likely to become essential to the
`work of 3GPP.
`
`The attention of the delegates to the meeting of this Technical Specification Group was drawn to the fact that
`3GPP Individual Members have the obligation under the IPR Policies of their respective Organizational
`Partners to inform their respective Organizational Partners of Essential IPRs they become aware of.
`
`The delegates were asked to take note that they were thereby invited:
`
`
`
`
`
`to investigate whether their organization or any other organization owns IPRs which were, or were
`likely to become Essential in respect of the work of 3GPP.
`to notify their respective Organizational Partners of all potential IPRs, e.g., for ETSI, by means of
`the IPR Statement and the Licensing declaration forms (http://webapp.etsi.org/Ipr/).
`
`2 Approval of the agenda
`3 Approval of the minutes from previous meeting
`4 Liaison statement handling (LTE related LS)
`5 Evolved UTRA and UTRAN
`5.1 Updated Physical Layer Specifications
`Inputs to the draft specifications to be prepared by the editors.
`
`5.2 SCH and Cell Search
`Summary of the conclusions from email ad hoc on SCH to be prepared by Amitava Ghosh.
`
`5.3 BCH
`BCH transmission format, TX diversity for BCH.
`
`5.4 RACH
`Summary of the conclusions from email ad hoc on RACH to be prepared by Amitava Ghosh.
`
`3GPP TSG RAN WG1 Meeting #49bis
`Orlando, USA, June 25 – 29, 2007
`
`
`Source:
`
`Title:
`
`Document for:
`
`The deadline is 18 June 6.00 PM, CEST
`Tdoc request:
`Tdoc submission: The deadline is 20 June 9.00 AM, CEST
`
`Chairman
`
`Draft Agenda
`
`Decision
`
`APPLE 1059
`
`1
`
`
`
`5.5 Channel coding
`Summary of the conclusions from the email ad hoc to be prepared by Sadayuki Abeta.
`
`5.6 UL/DL Power Control
`Summary of the conclusions from the email ad hoc to be prepared by Jari Lindholm
`
`5.7
`
`Inter-cell Interference Coordination
`
`5.8 UL Timing Control
`
`5.9 Physical Layer Measurements
`Summary of the conclusions from the email discussion to be prepared by Dirk Gerstenberger
`
`5.10 MIMO, Transmit Diversity and Beamforming
`(Parallel session planned for Wednesday)
`Summary of the conclusions from email ad hoc on MIMO to be prepared by Juho Lee.
`
`5.10.1 DL Precoding Details, 4 Antenna Codebook
`
`5.10.2 DL MU-MIMO
`
`5.10.3 DL Transmit Diversity with 4 TX Antennas
`
`5.10.4 DL Beamforming
`
`5.10.5 UL Antenna Switching
`
`5.10.6 UL MU-MIMO
`
`5.11 Reference signal structure
`Summary of the conclusions from the email ad hoc to be prepared by Aris Papasakellariou.
`
`5.11.1 Downlink reference signals
`
`5.11.2 Uplink reference signals
`
`5.12 Mapping of virtual resource blocks to physical resource blocks
`
`5.13 Control Signalling
`Summary of the status from email discussions on control signalling to be prepared by Stefan Parkvall.
`Both MIMO specific and non-MIMO specific control signalling.
`
`5.13.1 Downlink Control Signalling
`
`5.13.2 Uplink Control Signalling
`6 Closing of the meeting (Day5: 5.00 PM at the latest)
`
`2
`
`