`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`R1-073815
`
`Agenda item
`Title:
`
`Document for:
`Source:
`
`3
`Draft Report of 3GPP TSG RAN WG1 #49b v0.3.0
`(Orlando, Florida-USA, 25 – 29 June, 2007)
`Approval
`MCC Support
`
`Fact Summary
`Meeting:
`Dates:
`Venue:
`Host:
`Attendees:
`Documents:
`
`3GPP TSG RAN WG1 #49b
`25th through 29th June, 2007
`Orlando World Center Marriott Resort & Convention Center, Orlando, Florida
`North American Friends of 3GPP
`170 delegates
`589 (including some withdrawn and post-meeting artefacts)
`
`Patrick Mérias
`ETSI Mobile Competence Center
`F-06921 Sophia Antipolis Cedex
`Tel: +33 4 92 94 42 06
`
`Patrick.merias@etsi.org
`
`APPLE 1056
`
`
`
`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`Table of contents
`
`R1-073815
`
`
`Executive summary ......................................................................................................................................... 1
`1
`Opening of the meeting ........................................................................................................................ 3
`1.1
`Call for IPR ....................................................................................................................................................... 3
`2
`Approval of the agenda ......................................................................................................................... 3
`3
`Approval of the minutes from previous meetings ............................................................................. 3
`4
`Liaison statement handling (LTE related LS) .................................................................................... 4
`5.
`Evolved UTRA and UTRAN ................................................................................................................. 5
`5.1
`Updated Physical Layer Specifications ........................................................................................................ 6
`5.2
`SCH and Cell Search ...................................................................................................................................... 6
`5.3
`BCH ................................................................................................................................................................... 9
`5.4
`RACH .............................................................................................................................................................. 11
`5.5
`Channel coding .............................................................................................................................................. 13
`5.6
`UL/DL Power Control .................................................................................................................................... 18
`5.7
`Inter-cell Interference Coordination ............................................................................................................ 19
`5.8
`UL Timing Control .......................................................................................................................................... 21
`5.9
`Physical Layer Measurements .................................................................................................................... 22
`5.10
`MIMO, Transmit Diversity and Beamforming ............................................................................................ 24
`5.10.1
`DL Precoding Details, 4 antenna Codebook ........................................................................................ 24
`5.10.2
`DL MU-MIMO ........................................................................................................................................... 25
`5.10.3
`DL Transmit diversity with 4 TX Antennas ............................................................................................ 27
`5.10.4
`DL Beamforming ...................................................................................................................................... 28
`5.10.5
`UL Antenna Switching ............................................................................................................................. 29
`5.10.6
`UL MU-MIMO ........................................................................................................................................... 29
`5.11
`Reference signal structure ........................................................................................................................... 29
`5.11.1
`Downlink reference signals .................................................................................................................... 29
`5.11.2
`Uplink reference signals ......................................................................................................................... 30
`5.12
`Mapping of Virtual resource blocks to Physical resource blocks ........................................................... 33
`5.13
`Control Signaling ........................................................................................................................................... 34
`5.13.1
`Downlink Control Signalling ................................................................................................................... 34
`5.13.2
`Uplink Control Signalling ......................................................................................................................... 39
`6.
`Closing of the meeting ........................................................................................................................ 44
`Annex A: List of participants at RAN1 #49b ........................................................................................... 45
`Annex B: TSG RAN WG1 meetings in 2007 .......................................................................................... 46
`Annex C: List of CRs agreed at RAN1#49b ........................................................................................... 47
`Annex D: List of Outgoing LSs from RAN1#49b .................................................................................... 48
`Annex E: List of Tdocs at RAN1 #49b ..................................................................................................... 49
`Annex F: List of actions ............................................................................................................................. 50
`
`
`
` 2
`
`
`
`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`R1-073815
`
`Executive summary
`3GPP TSG WG RAN1 #49b meeting took place in Marriott Orlando World Center Resort, Orlando, Florida-USA.
`
`The meeting started at 9:20 on Monday 25th June and finished at 17:10 on Friday 29th June 2007.
`
`The week was scheduled as follows:
`
` Monday: Agenda items 1, 2, 3, 4, 5.1, 5.2 and 5.3
`
` Tuesday: Agenda items 5.8, 5.13.1 and 5.13.2
`
` Wednesday: Agenda items 5.5 and 5.6 – Parallel session (full day) for 5.10
`
` Thursday: Agenda items 5.9, 5.11.2 – Parallel session (4:00PM-7:00PM) for 5.10.4 – Cocktail at 7:00PM
`
` Friday: Agenda items 5.7, 5.4, 5.12, 5.11.1
`
`The meeting focused on LTE only discussions and progress. Therefore a set of Incoming Liaison Statements with regard to
`Release 7 Work items have been postponed to next 3GPP TSG WG RAN1 #50 meeting for further treatment.
`
`
`
`Agenda Item
`
`The number of contribution documents for this meeting was 589, and those documents were categorized as followed.
`Input
`Discussed
`Document
`Document
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`The following set of documents is missing. The corresponding contributions have not been handed over by companies.
`
`R1-072809
`
`Way Forward on MU-MIMO
`
`R1-072914
`
`MU-MIMO codebook and CQI reporting
`
`Freescale
`Semiconductor
`
`ZTE
`
`R1-072948
`
`Downlink L1/L2 Control Channel Structure in E-UTRA - Coding
`
`NTT DoCoMo
`
`R1-072956
`
`Frequency Granularity of MIMO Precoding in E-UTRA Downlink
`
`NTT DoCoMo
`
`R1-072958
`
`Closed Loop-Based Antenna Switching Transmit Diversity in E-UTRA
`Uplink
`
`NTT DoCoMo
`
`R1-073126
`
`Scheduling request trasnmission using non-coherent OOK
`
`R1-073131
`
`DL ACK/NACK to RE mapping
`
`R1-073157
`
`Way Forward: Differential Codebook for SU-MIMO
`
`Samsung
`
`Samsung
`
`Broadcom
`
`R1-073180
`
`Additional considerations on the SU-MIMO precoding design
`
`Samsung
`
`R1-073204
`
`Way Forward on 4-Tx Antenna Codebook for SU-MIMO
`
`Texas Instruments
`
`R1-073213
`
`UE TX power measurement
`
`Ericsson
`
`
`
` 1
`
`
`
`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`R1-073815
`
`The next document, not presented during the session, provides a very good summary of remaining issues to RAN1 (thanks
`to Sadayuki Abeta who made the effort preparing the relevant material) and lists the different email moderators in charge
`of each issue:
`
` R1-073233
`
`Remaining Issues in RAN1
`
`
`
` 2
`
`
`
`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`R1-073815
`
`Opening of the meeting
`1
`Mr. Dirk Gerstenberger (RAN1 Chairman) welcomed the participants to the 49th RAN WG1 bis meeting and opened the
`meeting at 09:20.
`
`Mr. Sharat Chander from Cingular Wireless welcomed the delegates on behalf of the North American Friends of 3GPP.
`
`Call for IPR
`1.1
`The Chairman drew attention to Members’ obligations under the 3GPP Partner Organizations’ IPR policies. Every
`Individual Member organization is obliged to declare to the Partner Organization or Organizations of which it is a
`member any IPR owned by the Individual Member or any other organization which is or is likely to become
`essential to the work of 3GPP.
`
`
`The attention of the members of this Technical Specification Group is drawn to the fact that 3GPP
`Individual Members have the obligation under the IPR Policies of their respective Organizational Partners
`to inform their respective Organizational Partners of Essential IPRs they become aware of.
`
`The members take note that they are hereby invited:
`
`
`
`
`
`to investigate in their company whether their company does own IPRs which are, or are likely to become
`Essential in respect of the work of the Technical Specification Group.
`
`to notify the Director-General, or the Chairman of their respective Organizational Partners, of all
`potential IPRs that their company may own, by means of the IPR Statement and the Licensing declaration
`forms (e.g. see the ETSI IPR forms http://webapp.etsi.org/Ipr/).
`
`
`
`
`
`2
`
`Approval of the agenda
`
`Draft Agenda for RAN1#49b meeting
`R1-072645
`Dirk Gerstenberger (Chairman) proposed the agenda for the meeting.
`Discussion (Question / Comment):
`Decision: The agenda was approved.
`
`RAN1 Chairman
`
`
`
`
`
`3
`
`Approval of the minutes from previous meetings
`
`Draft report of RAN1#49 meeting
`R1-072646
`The document was presented by Patrick Mérias
`Discussion (Question / Comment): Mr Chairman expressed that minutes shall be reported by the secretary only and no
`company inputs should be written down directly into the minutes
`Decision: The document is approved.
`
`MCC Support
`
` 3
`
`
`
`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`R1-073815
`
`4
`Incoming LS
`
`Liaison statement handling (LTE related LS)
`
`R1-072647
`LS on neighbour cell lists and reading neighbour cell P-BCH
`The document was presented by Sadayuki Abeta from NTT DoCoMo.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`R1-072648
`LS on LTE latency analysis
`The document was presented by Stefan Parkvall from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`Response to LS R2-071605 (R4-070714) on MBSFN cluster selection
`R1-072649
`and reselection, and suitability criteria
`The document was presented by Jari Lindholm from Nokia.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`RAN2, NTT
`DoCoMo
`
`= R2-072188
`
`RAN2, Ericsson
`
`= R2-072193
`
`RAN4, Nokia
`
`= R4-070823
`
`[DRAFT] LS on CQI reporting requirements for E-UTRA UE
`R1-072650
`The document was presented by Timo Lunttila from Nokia.
`Discussion (Question / Comment):
`Decision: Document is noted. Document shall be revisited once discussion on CQI is reported (Tuesday session)
`
`= R4-070802
`
`RAN4, Nokia
`
`Friday: No revision available by the end of the week
`
`
`Incoming LSs received during RAN1#49b WG meeting.
`
` LS on RAN3 EMBMS architecture discussion and agreements
`R1-073158
`The document was presented by Joern Krause from NSN.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`RAN3, NSN
`
`= R3-071269
`
`R1-073179
`
`Synchronization in Radio Access Networks
`
`ITU-T SG15,
`Ericsson, Orange,
`Alcatel-Lucent
`The document was presented by Dirk Gerstenberger from Ericsson and outlines the following actions for 3GPP RAN1,
`RAN3 and RAN4:
`
`
`
` Request for comments about the existing 3GPP Synchronization requirements with respect to ITU-T
`recommendations and on the proposal for clarification on the ITU-T Rec. G.823 and G.824.
`
` Request for 3GPP Synchronization future requirements
`Discussion (Question / Comment): Mr Chairman suggested to leave the lead to RAN3 on these particular
`synchronization topics and to provide support on request.
`
` 4
`
`
`
`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`R1-073815
`
`Decision: Document is noted.
`
`
`
`Response LS on neighbour cell lists and reading neighbour cell P-
`R1-073198
`BCH
`The document was presented by Asbjörn Grovlen from Nokia.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`RAN4, Nokia
`
`= R4-071084
`
`The following LS has not been treated at RAN1#49b. Postponed to next WG meeting.
`
`R1-073226
`
`[DRAFT] LS on Complementary Time Domain Filter for Neighbour
`Cell Measurements
`
`RAN4, Ericsson
`
`= R4-071119
`
`
`
`
`Outgoing LS
`
`DRAFT LS response on maintenance of UL Synchronisation
`R1-073017
`The document was presented by Stefan Parkvall from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is noted. Document shall be revised in R1-073169 in order to include the decisions from UL TA
`session and to consider the feedback from the discussion of R1-073017.
`
`Ericsson
`
`
`
`Wednesday: LS was agreed in R1-073185.
`
`
`
`(R1-073019)
`Ericsson
`Physical-layer parameters to be configured by RRC
`R1-073165
`The document was shortly introduced by Erik Dahlman from Ericsson but not presented. This paper provides a first list of
`physical-layer parameters configurable by RRC with the intention to be communicated to RAN2.
`Discussion (Question / Comment):
`Decision: Drafting session is planned on Tuesday 26th 8:00AM and R1-073184 is reserved for the revised version.
`
`Thursday: Further to a number of revisions (R1-073184R1-073220), list of parameters is finally agreed as R1-073221.
`
`LS R1-073211 to RAN2 is revised and agreed in R1-073222 (with R1-073221 as attachment to LS)
`
`
`Draft LS on the dynamic range of UE transmission power
`R1-073223
`The document was presented by Hidetoshi Suzuki from Panasonic.
`Discussion (Question / Comment):
`Decision: Document is noted and agreed in R1-073230.
`
`Panasonic
`
`(R1-073177)
`
`
`
`
`
`Evolved UTRA and UTRAN
`5.
`The following set of documents has not been treated during the session.
`
` 5
`
`
`
`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`R1-073815
`
`R1-072992
`
`DL UL allocation period of 20ms for EUTRA TDD Frame
`Structure Type 1
`
`R1-072993
`
`DL UL allocation options for EUTRA TDD
`
`Nokia, Nokia
`Siemens
`Networks
`Nokia, Nokia
`Siemens
`Networks
`
`
`
`5.1
`
`Updated Physical Layer Specifications
`
`TS 36.201 v1.1.1
`R1-073021
`The document was presented by Dirk Gerstenberger from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is noted and endorsed as v.1.2.0 in R1-073170.
`
`
`Ericsson
`
`
`
`
`
`
`
`TS 36.211 v1.1.2
`R1-073020
`The document was presented by Stefan Parkvall from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is noted. Decision is taken to inform RAN2 about the current list of PhCH names in R1-073171
`drafting LS. Off line discussion should go on during the week w.r.t OOK mapping.
`
`Ericsson
`
`
`
`Document is endorsed as v.1.2.0 in R1-073172.
`
`Friday: LS R1-073171 is presented by Sadayuki Abeta from NTT DoCoMo and is revised and agreed in R1-073231.
`
`
`
`New version of 36.212
`R1-072725
`The document was presented Juan Montojo from Qualcomm.
`Discussion (Question / Comment): Mr Chairman requested more time for every delegates to have a chance to review
`more deeply this late contribution and provide their comments
`Decision: Document is noted. It shall be revised in R1-073173 by email approval until July 13th.
`
`
`
`Qualcomm
`Europe
`
`
`
`R1-072959
`TS 36.214 v.1.0.1
`The document was presented by Asbjörn Grovlen from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is noted and endorsed in R1-073175 as v1.1.0.
`
`
`
`5.2
`
`SCH and Cell Search
`
`Nokia
`
`
`
`
`Motorola
`Cell Search E-mail Reflector Summary
`R1-072663
`The document was presented by Amitava Ghosh from Motorola and reports the results of the email discussion w.r.t cell
`search from different companies.
`Discussion (Question / Comment):
`Decision: Document is noted. As result of this contribution and long debate afterwards, following statements are drawn:
`
` Conclusion for PSC:
`
` 6
`
`
`
`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`R1-073815
`
`o ZC sequence length =63 and PSC sequence length =63 (including DC)
`o The root indices are M=n1, M=N-n1, M=n2
` N=63, n1=29, n2=25
`o Leave the remaining 9 sub-carriers reserved
`
`
`
`
`
` Way forward on SSC:
`o M-sequence based code
` Generate a set of 31 sequences obtained as cyclic shifts of a single length 31 M-sequence
`generated from the primitive polynomial x^5+x^2+1 over GF(2)
` Two short SSC codes selected from above set
`
`Interleaved multiplexing of two short SSC sequences.
`
`It is noted that whether to use the P-SCH as a phase-reference is an implementation
`issue
` First and second sequence scrambled with a binary scrambling code depending on the P-SCH
` FFS: Exact specification of scrambling code
` Scrambling of the second sequence with a binary scrambling code corresponding to the index of
`the first sequence. Many-to-1 relation between scrambling code and first sequence index is not
`precluded.
` FFS: Exact specification of scrambling code and relation of scrambling code to index
`of the first sequence
` Mapping onto sub-carriers: 31 length sequence + DC + 31 length sequence
` Leave the remaining 9 sub-carriers reserved
` BPSK mapping of binary sequence
`
`
`P_SCH
`
`R1-073087
`
`CP length of P-SCH for TDD frame structure type 2
`
`Samsung
`
`
`
`The document was presented by (…) from Samsung. In this contribution, discussion on the CP length design of P-SCH,
`aiming to maximize the commonality between frame structure type 2 and frame structure type 1 is provided.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`ZTE, CATT,
`CP Detection in the Initial Cell Search for the TDD Frame
`(R1-072911)
`R1-073167
`Huawei
`Structure Type 2
`The document was presented by Zuo Zhisong from ZTE and shows the evaluation of two kinds of CP length blind
`detection methods for the TDD frame structure type 2, which are based on DL RS and S-SCH respectively.
`Discussion (Question / Comment):
`Decision: Document is noted.
`Conclusion: No change of current FS2. Correct DwPTS length (both for short and extended CP) in 36.211 Figure 2 to
`2560, remaining 12 samples added in the end of UpPTS.
`
`
`
`The following set of documents has not been treated during the session.
`
`R1-072660
`
`ZC sequence selection for P-SCH
`
`R1-072726
`
`Details on PSC sequence design
`
`R1-072818
`
`P-SCH for LTE cell search
`
`R1-072860
`
`P-SCH design
`
`R1-072896
`
`Optimised P-SCH sequences
`
`R1-073161
`
`Primary SCH Design and Performance
`
`Motorola
`
`Qualcomm
`Europe
`
`NEC Group
`
`LGE
`
`Huawei
`
`Texas
`Instruments
`
`
`
`
`
`
`
`
`
`
`
`(R1-072836)
`
` 7
`
`
`
`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`R1-073815
`
`R1-073084
`
`ZC Based P-SCH Sequences and Initial Frequency Estimation
`Uncertainty
`
`Broadcom
`
`
`S_SCH
`
`S-SCH design
`R1-072861
`The document was presented by (…) from LGE.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Details on SSC sequence design
`R1-072727
`The document was presented by Juan Montojo from Qualcomm.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`R1-072784
`
`PN-Hadamard Orthogonal Sequences for S-SCH in E-UTRA
`
`The document was presented by Ron Murias from InterDigital.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`The following set of documents has not been treated during the session.
`
`LGE
`
`Qualcomm
`Europe
`
`InterDigital
`Communications
`Corporation
`
`R1-072661
`
`Scrambling Method for Two S-SCH Short Code
`
`Motorola
`
`R1-072662
`
`Evaluations of number of sub-carriers occupied by S-SCH
`
`Motorola
`
`R1-072757
`
`Further Discussion on the Mapping of Short Sequences for S-
`SCH
`
`R1-072811
`
`Design of S-SCH sequences
`
`R1-072819
`
`S-SCH for LTE cell search
`
`R1-072837
`
`Secondary SCH Design and Performance
`
`Nortel
`
`ETRI
`
`NEC Group
`
`Texas
`Instruments
`
`R1-072897
`
`R1-072910
`
`S-SCH sequences based on concatenated Golay-Hadamard
`codes
`Scrambling Method for S-SCH
`
`Huawei
`
`ZTE
`
`R1-072940
`
`Scrambling Method for S-SCH for E-UTRA Downlink
`
`NTT DoCoMo
`
`R1-072941
`
`S-SCH Structure for E-UTRA Downlink
`
`R1-073023
`
`Synchronization signals for LTE
`
`NTT DoCoMo
`
`Ericsson
`
`
`Cell Search
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`The next document has not been treated during the session.
`
`R1-072942
`
`Neighbouring Cell Search Time Performance in E-UTRA
`
`NTT DoCoMo
`
`
`
`
`
` 8
`
`
`
`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`5.3
`
`BCH
`
`R1-073815
`
`Summary of e-mail discussion on BCH physical-layer structure
`R1-073024
`The document was presented by Erik Dahlman from Ericsson.
`
`Ericsson
`
`
`
`Further to RAN1 #49 decisions regarding the BCH physical-layer structure, this document summarizes the email
`discussions since then and makes proposals for decision.
`Discussion (Question / Comment):
`Decision: Document is noted.
`Conclusions are as follows:
`
` The coded BCH transport block is mapped to four subframes (subframes #0) within a 40 ms interval
`
`
`
`40 ms timing is blindly detected, i.e. there is no explicit signalling indicating 40 ms timing.
`
` Coded BCH mapped to 4 OFDM symbols within a subframe. In case of extended CP, this implies a restriction in
`number of idle symbols in case of TDD FS type 1 to three idle symbols.
`
` Each subframe should be self-decodable, approach 2 is agreed
`
` The downlink reference-signal transmit power is not signalled on the BCH but as part of the dynamic system
`information.
`
`
`Number of symbols carrying PBCH
`
`
`NTT DoCoMo
`BCH Structure for E-UTRA Downlink
`R1-072943
`The document was presented by (…) from NTT DoCoMo and presents the number of P-BCH transmission bursts within a
`40-msec TTI, detection of the 40-msec TTI boundary, the scheme for multiplexing the P-BCH into a sub-frame, and the
`transmit diversity scheme for the P-BCH.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Nokia Siemens
`
`Primary BCH performance; coverage and detection
`R1-072960
`Networks, Nokia
`The document was presented by Mieszko Chmiel from NSN and provides an analysis of the performance of the primary
`broadcast channel (P-BCH) channel in a 1.25 MHz bandwidth or 6 RBs.
`
`The multiplexing structure of the P-BCH is addressed in R1-072962.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`The following set of documents has not been treated during the session.
`
`R1-072665
`
`P-BCH Design
`
`R1-072728
`
`Structure of PBCH and location of D-BCH
`
`R1-072962
`
`On the multiplexing structure of the primary broadcast channel
`
`
`PBCH coding and mapping structure
`
`The following set of documents has not been treated during the session.
`
` 9
`
`Motorola
`
`Qualcomm
`Europe
`Nokia Siemens
`Networks, Nokia
`
`
`
`
`
`
`
`
`
`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`R1-073815
`
`R1-073123
`
`P-BCH structure
`
`R1-072653
`
`P-BCH to CCPCH mapping scheme for 40msec TTI timing blind
`detection
`
`R1-072759
`
`The detection of P-BCH TTI
`
`R1-072813
`
`P-BCH structure considering soft-combining
`
`
`Transmit diversity for PBCH
`
`Samsung
`
`Toshiba
`
`Nortel
`
`ETRI
`
`
`
`
`
`
`
`
`
`Qualcomm
`
`Open Loop TxDiv for PBCH
`R1-072730
`Europe
`The document was presented by Juan Montojo from Qualcomm and provides a comparison of the link performance for
`both VTSTD and SFBC transmit diversity and channel estimation schemes for PBCH in the 2x2 antenna configuration.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`ETRI
`Efficient diversity scheme for P-BCH transmission
`R1-072812
`The document was presented by Kapseok Chang from ETRI and provides system level simulation results and analysis for
`each candidate TX Div scheme for both ANT cases, and a guideline for the selection of the Div scheme for PBCH.
`Discussion (Question / Comment):
`Decision: Document is noted.
`Agreed compromise proposal:
`
`
`
`340 hypotheses on SSC, and SFBC based TX diversity scheme
`o For 2 TX antennas SFBC
`o For 4 TX antennas based on SFBC + FSTD
` No antenna information carried on SSC for SFBC
`
`
`
`SFBC+FSTD
`
`The following set of documents has not been treated during the session.
`
`R1-072665
`
`P-BCH Design
`
`Motorola
`
`R1-072961
`
`Further results on transmit diversity and channel estimation for
`primary BCH
`
`Nokia Siemens
`Networks, Nokia
`
`R1-073025
`
`Transmit Diversity for Primary BCH in E-UTRA DL
`
`Ericsson
`
`R1-073102
`
`Link Performance of 4-Tx Antenna diversity for P-BCH
`
`Samsung
`
`R1-072651
`
`Performance Evaluation of various CCPCH Structures
`employing Transmit Diversity
`
`Toshiba
`
`R1-072758
`
`Simulation Comparison of Tx Diversity Schemes for P-BCH
`
`Nortel
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`TDD specific issues
`The following set of documents has not been treated during the session. Mr Chairman requested companies to continue
`off-line discussion regarding TDD specifics issues.
`
`R1-072666
`
`LTE TDD split signaling on D-BCH
`
`Motorola
`
`R1-073147
`
`Frame configurations for TDD frame structure type 1
`
`IPWireless
`
`
`
`
`
` 10
`
`
`
`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`R1-073815
`
`R1-073040
`
`Idle subframes for TDD
`
`Ericsson
`
`
`
`
`LS to RAN2
`
`The following set of documents has not been treated during the session. Mr Chairman requested the companies to bring a
`common response to RAN2 LS as far as possible during the week.
`
`R1-072965
`
`Proposed response to RAN2 LS on System Information (R1-
`072622)
`
`Nokia Siemens
`Networks, Nokia
`
`R1-072817
`
`Proposed response to RAN2 LS on System Information
`
`NEC Group
`
`R1-073152
`R1-073153
`
`Response to TSG RAN WG1 LS on “System Information”
`Draft LS" RAN1 response to RAN2 LS System Information"
`
`R1-073154
`
`UE capabilities
`
`
`
`Motorola
`Motorola
`
`Motorola
`
`
`
`
`
`
`
`
`
`
`Motorola, NSN,
`NEC, Panasonic,
`Nokia
`
`R1-073192
`
`Draft LS response on System Information (Simultaneous reception of
`system information and unicast data)
`The document was presented by Jean-Aicard Fabien from Motorola.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Thursday: LS is revised and agreed in R1-073219.
`
`
`
`The following set of documents has not been treated during the session.
`
`R1-072652
`
`Soft-Combining for CCPCH
`
`R1-072664
`
`BCH/SCH transmission for odd number of RB
`
`R1-072713
`
`SFN Synchronization for LTE UEs
`
`R1-072729
`
`Capacity of PBCH for SIMO
`
`Toshiba
`
`Motorola
`
`SHARP
`
`Qualcomm
`Europe
`
`R1-072820
`
`Maximizing radio efficiency of BCCH transmission on DL-SCH
`
`NEC Group
`
`R1-072821
`
`One Bit info in network maintained neighbour list
`
`NEC Group
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`5.4
`
`RACH
`
`R1-072667
`Random Access E-mail Reflector Summary
`Motorola
`
`The document was presented by Amitava Ghosh from Motorola and collects the result of email discussions on RACH.
`Discussion (Question / Comment):
`Decision: Document is noted.
`Conclusions from email discussion:
`
` Signalling of one index number and cyclic shift duration. The exact definition of the index number is FFS.
`
` Predefined random access slot configurations (at most 4bits)
`
` 11
`
`
`
`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`
`
`16 shifts for NCS. Value of the shift FFS.
`
` Use a dedicated scheduling request channel.
`
`
`
`R1-073815
`
`In R1-072667, 16 shifts for NCS was agreed.(third bullet). Nokia disagreed with the conclusion and proposed to look at R1-
`072966.
`
`Nokia Siemens
`
`Flexible RACH signature number
`R1-072966
`Networks, Nokia
`The document was presented by (…) from Nokia and proposes the extension of the Ncs set to 32 values so that the more
`flexible scheme (where the total number of sequences could vary and be larger than 64) could be fully utilized.
`Discussion (Question / Comment): No formal agreement could be reached further to the discussion. Conclusions remain
`as they are.
`Decision: Document is noted.
`
`
`
`The following set of documents has not been treated during the session.
`
`R1-072731
`
`Scheduling requests using CQI
`
`R1-072800
`
`RACH sequence allocation and indication to the cell
`
`R1-072801
`
`RACH sequence allocation for efficient matched filter
`implementation
`
`R1-072838
`
`Random Access Preamble L1 Parameters in E-UTRA
`
`R1-072862
`
`Additional Burst Types for Non-Synchronized RACH
`
`R1-072863
`
`Cyclic Shift Configuration Set for Non-Synchronized RACH
`
`R1-072864
`
`Preamble Allocation for Non-Synchronized RACH
`
`R1-072892
`
`RACH in LTE TDD frame structure type 2
`
`Qualcomm
`Europe
`
`Panasonic
`
`Panasonic
`
`Texas
`Instruments
`
`LGE
`
`LGE
`
`LGE
`
`Huawei
`
`R1-072898
`
`Specification of restricted set of cyclic shifts of root Zadoff-Chu
`sequences
`
`Huawei,
`Panasonic
`
`R1-072899
`
`Multiple values of cyclic shift increment NCS
`
`R1-072937
`
`On the specification of restricted set of cyclic shifts of root
`Zadoff-Chu sequences
`
`R1-073026
`
`RACH transmission timing alignment for LTE TDD
`
`R1-073058
`
`Contention and Dedicated RACH signature allocation
`
`R1-073059
`
`Transport Format in RACH signature
`
`R1-073060
`
`Comparison of Formula for Restricted Cyclic shift Set
`
`R1-073113
`
`R1-073148
`
`R1-073168
`
`Procedure and Algorithm to Determine the Cyclic Shift
`Restricted Sets and Associated Signalling for RACH
`RACH for TDD frame structure type 1
`Using Restricted Preamble Set for RACH in High Mobility
`Environments
`
`Huawei
`
`Huawei,
`Panasonic, LGE,
`Nokia, Nokia
`Siemens
`Networks
`Ericsson
`
`LG Electronics
`Inc.
`LG Electronics
`Inc.
`LG Electronics
`Inc., Nokia, Nokia
`Siemens
`Networks
`
`Samsung
`
`IPWireless
`
`Samsung
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`(R1-073112)
`
`R1-073178
`
`Limitation of RACH sequence allocation for high mobility cell
`
`Panasonic
`
`(R1-072802)
`
` 12
`
`
`
`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`
`5.5
`
`Channel coding
`
`R1-073815
`
`
`NTT DoCoMo
`Summary of the e-mail discussion on channel coding
`R1-072927
`The document was presented by Sadayuki Abeta from NTT DoCoMo and provides the results of email discussion on listed
`below topics:
`
` Rate matching for turbo code
`
` Rate matching for convolutional code
`
` Coding chain (CRC attachment, channel interleaving)
`
` Number of HARQ processes
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`HARQ Processing
`
`
`Motorola
`HARQ Timing and Number of HARQ Processes
`R1-072674
`The document was presented by Jean-Aicard Fabien from Motorola and outlines a potential acknowledgement timing
`scheme for both downlink and uplink, leading to a recommendation on the minimum number of HARQ processes to be
`supported.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Discussion on LTE channel coding
`R1-072760
`The document was presented by (…) from Nortel.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Nortel
`
`
`
`
`Ericsson
`On the number of hybrid ARQ processes in LTE
`R1-073027
`The document was presented by Stefan Parkvall from Ericsson and addresses some aspects of hybrid ARQ and the
`associated rate matching.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Number of HARQ processes
`R1-073074
`The document was presented by Durga Malladi from Qualcomm.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Qualcomm
`Europe
`
`
`
`
`Samsung
`Analysis of per code bloc