throbber

`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`R1-073815
`
`Agenda item
`Title:
`
`Document for:
`Source:
`
`3
`Draft Report of 3GPP TSG RAN WG1 #49b v0.3.0
`(Orlando, Florida-USA, 25 – 29 June, 2007)
`Approval
`MCC Support
`
`Fact Summary
`Meeting:
`Dates:
`Venue:
`Host:
`Attendees:
`Documents:
`
`3GPP TSG RAN WG1 #49b
`25th through 29th June, 2007
`Orlando World Center Marriott Resort & Convention Center, Orlando, Florida
`North American Friends of 3GPP
`170 delegates
`589 (including some withdrawn and post-meeting artefacts)
`
`Patrick Mérias
`ETSI Mobile Competence Center
`F-06921 Sophia Antipolis Cedex
`Tel: +33 4 92 94 42 06
`
`Patrick.merias@etsi.org
`
`APPLE 1056
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`Table of contents
`
`R1-073815
`
`
`Executive summary ......................................................................................................................................... 1
`1
`Opening of the meeting ........................................................................................................................ 3
`1.1
`Call for IPR ....................................................................................................................................................... 3
`2
`Approval of the agenda ......................................................................................................................... 3
`3
`Approval of the minutes from previous meetings ............................................................................. 3
`4
`Liaison statement handling (LTE related LS) .................................................................................... 4
`5.
`Evolved UTRA and UTRAN ................................................................................................................. 5
`5.1
`Updated Physical Layer Specifications ........................................................................................................ 6
`5.2
`SCH and Cell Search ...................................................................................................................................... 6
`5.3
`BCH ................................................................................................................................................................... 9
`5.4
`RACH .............................................................................................................................................................. 11
`5.5
`Channel coding .............................................................................................................................................. 13
`5.6
`UL/DL Power Control .................................................................................................................................... 18
`5.7
`Inter-cell Interference Coordination ............................................................................................................ 19
`5.8
`UL Timing Control .......................................................................................................................................... 21
`5.9
`Physical Layer Measurements .................................................................................................................... 22
`5.10
`MIMO, Transmit Diversity and Beamforming ............................................................................................ 24
`5.10.1
`DL Precoding Details, 4 antenna Codebook ........................................................................................ 24
`5.10.2
`DL MU-MIMO ........................................................................................................................................... 25
`5.10.3
`DL Transmit diversity with 4 TX Antennas ............................................................................................ 27
`5.10.4
`DL Beamforming ...................................................................................................................................... 28
`5.10.5
`UL Antenna Switching ............................................................................................................................. 29
`5.10.6
`UL MU-MIMO ........................................................................................................................................... 29
`5.11
`Reference signal structure ........................................................................................................................... 29
`5.11.1
`Downlink reference signals .................................................................................................................... 29
`5.11.2
`Uplink reference signals ......................................................................................................................... 30
`5.12
`Mapping of Virtual resource blocks to Physical resource blocks ........................................................... 33
`5.13
`Control Signaling ........................................................................................................................................... 34
`5.13.1
`Downlink Control Signalling ................................................................................................................... 34
`5.13.2
`Uplink Control Signalling ......................................................................................................................... 39
`6.
`Closing of the meeting ........................................................................................................................ 44
`Annex A: List of participants at RAN1 #49b ........................................................................................... 45
`Annex B: TSG RAN WG1 meetings in 2007 .......................................................................................... 46
`Annex C: List of CRs agreed at RAN1#49b ........................................................................................... 47
`Annex D: List of Outgoing LSs from RAN1#49b .................................................................................... 48
`Annex E: List of Tdocs at RAN1 #49b ..................................................................................................... 49
`Annex F: List of actions ............................................................................................................................. 50
`
`
`
` 2
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`R1-073815
`
`Executive summary
`3GPP TSG WG RAN1 #49b meeting took place in Marriott Orlando World Center Resort, Orlando, Florida-USA.
`
`The meeting started at 9:20 on Monday 25th June and finished at 17:10 on Friday 29th June 2007.
`
`The week was scheduled as follows:
`
` Monday: Agenda items 1, 2, 3, 4, 5.1, 5.2 and 5.3
`
` Tuesday: Agenda items 5.8, 5.13.1 and 5.13.2
`
` Wednesday: Agenda items 5.5 and 5.6 – Parallel session (full day) for 5.10
`
` Thursday: Agenda items 5.9, 5.11.2 – Parallel session (4:00PM-7:00PM) for 5.10.4 – Cocktail at 7:00PM
`
` Friday: Agenda items 5.7, 5.4, 5.12, 5.11.1
`
`The meeting focused on LTE only discussions and progress. Therefore a set of Incoming Liaison Statements with regard to
`Release 7 Work items have been postponed to next 3GPP TSG WG RAN1 #50 meeting for further treatment.
`
`
`
`Agenda Item
`
`The number of contribution documents for this meeting was 589, and those documents were categorized as followed.
`Input
`Discussed
`Document
`Document
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`The following set of documents is missing. The corresponding contributions have not been handed over by companies.
`
`R1-072809
`
`Way Forward on MU-MIMO
`
`R1-072914
`
`MU-MIMO codebook and CQI reporting
`
`Freescale
`Semiconductor
`
`ZTE
`
`R1-072948
`
`Downlink L1/L2 Control Channel Structure in E-UTRA - Coding
`
`NTT DoCoMo
`
`R1-072956
`
`Frequency Granularity of MIMO Precoding in E-UTRA Downlink
`
`NTT DoCoMo
`
`R1-072958
`
`Closed Loop-Based Antenna Switching Transmit Diversity in E-UTRA
`Uplink
`
`NTT DoCoMo
`
`R1-073126
`
`Scheduling request trasnmission using non-coherent OOK
`
`R1-073131
`
`DL ACK/NACK to RE mapping
`
`R1-073157
`
`Way Forward: Differential Codebook for SU-MIMO
`
`Samsung
`
`Samsung
`
`Broadcom
`
`R1-073180
`
`Additional considerations on the SU-MIMO precoding design
`
`Samsung
`
`R1-073204
`
`Way Forward on 4-Tx Antenna Codebook for SU-MIMO
`
`Texas Instruments
`
`R1-073213
`
`UE TX power measurement
`
`Ericsson
`
`
`
` 1
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`R1-073815
`
`The next document, not presented during the session, provides a very good summary of remaining issues to RAN1 (thanks
`to Sadayuki Abeta who made the effort preparing the relevant material) and lists the different email moderators in charge
`of each issue:
`
` R1-073233
`
`Remaining Issues in RAN1
`
`
`
` 2
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`R1-073815
`
`Opening of the meeting
`1
`Mr. Dirk Gerstenberger (RAN1 Chairman) welcomed the participants to the 49th RAN WG1 bis meeting and opened the
`meeting at 09:20.
`
`Mr. Sharat Chander from Cingular Wireless welcomed the delegates on behalf of the North American Friends of 3GPP.
`
`Call for IPR
`1.1
`The Chairman drew attention to Members’ obligations under the 3GPP Partner Organizations’ IPR policies. Every
`Individual Member organization is obliged to declare to the Partner Organization or Organizations of which it is a
`member any IPR owned by the Individual Member or any other organization which is or is likely to become
`essential to the work of 3GPP.
`
`
`The attention of the members of this Technical Specification Group is drawn to the fact that 3GPP
`Individual Members have the obligation under the IPR Policies of their respective Organizational Partners
`to inform their respective Organizational Partners of Essential IPRs they become aware of.
`
`The members take note that they are hereby invited:
`
`
`
`
`
`to investigate in their company whether their company does own IPRs which are, or are likely to become
`Essential in respect of the work of the Technical Specification Group.
`
`to notify the Director-General, or the Chairman of their respective Organizational Partners, of all
`potential IPRs that their company may own, by means of the IPR Statement and the Licensing declaration
`forms (e.g. see the ETSI IPR forms http://webapp.etsi.org/Ipr/).
`
`
`
`
`
`2
`
`Approval of the agenda
`
`Draft Agenda for RAN1#49b meeting
`R1-072645
`Dirk Gerstenberger (Chairman) proposed the agenda for the meeting.
`Discussion (Question / Comment):
`Decision: The agenda was approved.
`
`RAN1 Chairman
`
`
`
`
`
`3
`
`Approval of the minutes from previous meetings
`
`Draft report of RAN1#49 meeting
`R1-072646
`The document was presented by Patrick Mérias
`Discussion (Question / Comment): Mr Chairman expressed that minutes shall be reported by the secretary only and no
`company inputs should be written down directly into the minutes
`Decision: The document is approved.
`
`MCC Support
`
` 3
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`R1-073815
`
`4
`Incoming LS
`
`Liaison statement handling (LTE related LS)
`
`R1-072647
`LS on neighbour cell lists and reading neighbour cell P-BCH
`The document was presented by Sadayuki Abeta from NTT DoCoMo.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`R1-072648
`LS on LTE latency analysis
`The document was presented by Stefan Parkvall from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`Response to LS R2-071605 (R4-070714) on MBSFN cluster selection
`R1-072649
`and reselection, and suitability criteria
`The document was presented by Jari Lindholm from Nokia.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`RAN2, NTT
`DoCoMo
`
`= R2-072188
`
`RAN2, Ericsson
`
`= R2-072193
`
`RAN4, Nokia
`
`= R4-070823
`
`[DRAFT] LS on CQI reporting requirements for E-UTRA UE
`R1-072650
`The document was presented by Timo Lunttila from Nokia.
`Discussion (Question / Comment):
`Decision: Document is noted. Document shall be revisited once discussion on CQI is reported (Tuesday session)
`
`= R4-070802
`
`RAN4, Nokia
`
`Friday: No revision available by the end of the week
`
`
`Incoming LSs received during RAN1#49b WG meeting.
`
` LS on RAN3 EMBMS architecture discussion and agreements
`R1-073158
`The document was presented by Joern Krause from NSN.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`RAN3, NSN
`
`= R3-071269
`
`R1-073179
`
`Synchronization in Radio Access Networks
`
`ITU-T SG15,
`Ericsson, Orange,
`Alcatel-Lucent
`The document was presented by Dirk Gerstenberger from Ericsson and outlines the following actions for 3GPP RAN1,
`RAN3 and RAN4:
`
`
`
` Request for comments about the existing 3GPP Synchronization requirements with respect to ITU-T
`recommendations and on the proposal for clarification on the ITU-T Rec. G.823 and G.824.
`
` Request for 3GPP Synchronization future requirements
`Discussion (Question / Comment): Mr Chairman suggested to leave the lead to RAN3 on these particular
`synchronization topics and to provide support on request.
`
` 4
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`R1-073815
`
`Decision: Document is noted.
`
`
`
`Response LS on neighbour cell lists and reading neighbour cell P-
`R1-073198
`BCH
`The document was presented by Asbjörn Grovlen from Nokia.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`RAN4, Nokia
`
`= R4-071084
`
`The following LS has not been treated at RAN1#49b. Postponed to next WG meeting.
`
`R1-073226
`
`[DRAFT] LS on Complementary Time Domain Filter for Neighbour
`Cell Measurements
`
`RAN4, Ericsson
`
`= R4-071119
`
`
`
`
`Outgoing LS
`
`DRAFT LS response on maintenance of UL Synchronisation
`R1-073017
`The document was presented by Stefan Parkvall from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is noted. Document shall be revised in R1-073169 in order to include the decisions from UL TA
`session and to consider the feedback from the discussion of R1-073017.
`
`Ericsson
`
`
`
`Wednesday: LS was agreed in R1-073185.
`
`
`
`(R1-073019)
`Ericsson
`Physical-layer parameters to be configured by RRC
`R1-073165
`The document was shortly introduced by Erik Dahlman from Ericsson but not presented. This paper provides a first list of
`physical-layer parameters configurable by RRC with the intention to be communicated to RAN2.
`Discussion (Question / Comment):
`Decision: Drafting session is planned on Tuesday 26th 8:00AM and R1-073184 is reserved for the revised version.
`
`Thursday: Further to a number of revisions (R1-073184R1-073220), list of parameters is finally agreed as R1-073221.
`
`LS R1-073211 to RAN2 is revised and agreed in R1-073222 (with R1-073221 as attachment to LS)
`
`
`Draft LS on the dynamic range of UE transmission power
`R1-073223
`The document was presented by Hidetoshi Suzuki from Panasonic.
`Discussion (Question / Comment):
`Decision: Document is noted and agreed in R1-073230.
`
`Panasonic
`
`(R1-073177)
`
`
`
`
`
`Evolved UTRA and UTRAN
`5.
`The following set of documents has not been treated during the session.
`
` 5
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`R1-073815
`
`R1-072992
`
`DL UL allocation period of 20ms for EUTRA TDD Frame
`Structure Type 1
`
`R1-072993
`
`DL UL allocation options for EUTRA TDD
`
`Nokia, Nokia
`Siemens
`Networks
`Nokia, Nokia
`Siemens
`Networks
`
`
`
`5.1
`
`Updated Physical Layer Specifications
`
`TS 36.201 v1.1.1
`R1-073021
`The document was presented by Dirk Gerstenberger from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is noted and endorsed as v.1.2.0 in R1-073170.
`
`
`Ericsson
`
`
`
`
`
`
`
`TS 36.211 v1.1.2
`R1-073020
`The document was presented by Stefan Parkvall from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is noted. Decision is taken to inform RAN2 about the current list of PhCH names in R1-073171
`drafting LS. Off line discussion should go on during the week w.r.t OOK mapping.
`
`Ericsson
`
`
`
`Document is endorsed as v.1.2.0 in R1-073172.
`
`Friday: LS R1-073171 is presented by Sadayuki Abeta from NTT DoCoMo and is revised and agreed in R1-073231.
`
`
`
`New version of 36.212
`R1-072725
`The document was presented Juan Montojo from Qualcomm.
`Discussion (Question / Comment): Mr Chairman requested more time for every delegates to have a chance to review
`more deeply this late contribution and provide their comments
`Decision: Document is noted. It shall be revised in R1-073173 by email approval until July 13th.
`
`
`
`Qualcomm
`Europe
`
`
`
`R1-072959
`TS 36.214 v.1.0.1
`The document was presented by Asbjörn Grovlen from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is noted and endorsed in R1-073175 as v1.1.0.
`
`
`
`5.2
`
`SCH and Cell Search
`
`Nokia
`
`
`
`
`Motorola
`Cell Search E-mail Reflector Summary
`R1-072663
`The document was presented by Amitava Ghosh from Motorola and reports the results of the email discussion w.r.t cell
`search from different companies.
`Discussion (Question / Comment):
`Decision: Document is noted. As result of this contribution and long debate afterwards, following statements are drawn:
`
` Conclusion for PSC:
`
` 6
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`R1-073815
`
`o ZC sequence length =63 and PSC sequence length =63 (including DC)
`o The root indices are M=n1, M=N-n1, M=n2
` N=63, n1=29, n2=25
`o Leave the remaining 9 sub-carriers reserved
`
`
`
`
`
` Way forward on SSC:
`o M-sequence based code
` Generate a set of 31 sequences obtained as cyclic shifts of a single length 31 M-sequence
`generated from the primitive polynomial x^5+x^2+1 over GF(2)
` Two short SSC codes selected from above set
`
`Interleaved multiplexing of two short SSC sequences.
`
`It is noted that whether to use the P-SCH as a phase-reference is an implementation
`issue
` First and second sequence scrambled with a binary scrambling code depending on the P-SCH
` FFS: Exact specification of scrambling code
` Scrambling of the second sequence with a binary scrambling code corresponding to the index of
`the first sequence. Many-to-1 relation between scrambling code and first sequence index is not
`precluded.
` FFS: Exact specification of scrambling code and relation of scrambling code to index
`of the first sequence
` Mapping onto sub-carriers: 31 length sequence + DC + 31 length sequence
` Leave the remaining 9 sub-carriers reserved
` BPSK mapping of binary sequence
`
`
`P_SCH
`
`R1-073087
`
`CP length of P-SCH for TDD frame structure type 2
`
`Samsung
`
`
`
`The document was presented by (…) from Samsung. In this contribution, discussion on the CP length design of P-SCH,
`aiming to maximize the commonality between frame structure type 2 and frame structure type 1 is provided.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`ZTE, CATT,
`CP Detection in the Initial Cell Search for the TDD Frame
`(R1-072911)
`R1-073167
`Huawei
`Structure Type 2
`The document was presented by Zuo Zhisong from ZTE and shows the evaluation of two kinds of CP length blind
`detection methods for the TDD frame structure type 2, which are based on DL RS and S-SCH respectively.
`Discussion (Question / Comment):
`Decision: Document is noted.
`Conclusion: No change of current FS2. Correct DwPTS length (both for short and extended CP) in 36.211 Figure 2 to
`2560, remaining 12 samples added in the end of UpPTS.
`
`
`
`The following set of documents has not been treated during the session.
`
`R1-072660
`
`ZC sequence selection for P-SCH
`
`R1-072726
`
`Details on PSC sequence design
`
`R1-072818
`
`P-SCH for LTE cell search
`
`R1-072860
`
`P-SCH design
`
`R1-072896
`
`Optimised P-SCH sequences
`
`R1-073161
`
`Primary SCH Design and Performance
`
`Motorola
`
`Qualcomm
`Europe
`
`NEC Group
`
`LGE
`
`Huawei
`
`Texas
`Instruments
`
`
`
`
`
`
`
`
`
`
`
`(R1-072836)
`
` 7
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`R1-073815
`
`R1-073084
`
`ZC Based P-SCH Sequences and Initial Frequency Estimation
`Uncertainty
`
`Broadcom
`
`
`S_SCH
`
`S-SCH design
`R1-072861
`The document was presented by (…) from LGE.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Details on SSC sequence design
`R1-072727
`The document was presented by Juan Montojo from Qualcomm.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`R1-072784
`
`PN-Hadamard Orthogonal Sequences for S-SCH in E-UTRA
`
`The document was presented by Ron Murias from InterDigital.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`The following set of documents has not been treated during the session.
`
`LGE
`
`Qualcomm
`Europe
`
`InterDigital
`Communications
`Corporation
`
`R1-072661
`
`Scrambling Method for Two S-SCH Short Code
`
`Motorola
`
`R1-072662
`
`Evaluations of number of sub-carriers occupied by S-SCH
`
`Motorola
`
`R1-072757
`
`Further Discussion on the Mapping of Short Sequences for S-
`SCH
`
`R1-072811
`
`Design of S-SCH sequences
`
`R1-072819
`
`S-SCH for LTE cell search
`
`R1-072837
`
`Secondary SCH Design and Performance
`
`Nortel
`
`ETRI
`
`NEC Group
`
`Texas
`Instruments
`
`R1-072897
`
`R1-072910
`
`S-SCH sequences based on concatenated Golay-Hadamard
`codes
`Scrambling Method for S-SCH
`
`Huawei
`
`ZTE
`
`R1-072940
`
`Scrambling Method for S-SCH for E-UTRA Downlink
`
`NTT DoCoMo
`
`R1-072941
`
`S-SCH Structure for E-UTRA Downlink
`
`R1-073023
`
`Synchronization signals for LTE
`
`NTT DoCoMo
`
`Ericsson
`
`
`Cell Search
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`The next document has not been treated during the session.
`
`R1-072942
`
`Neighbouring Cell Search Time Performance in E-UTRA
`
`NTT DoCoMo
`
`
`
`
`
` 8
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`5.3
`
`BCH
`
`R1-073815
`
`Summary of e-mail discussion on BCH physical-layer structure
`R1-073024
`The document was presented by Erik Dahlman from Ericsson.
`
`Ericsson
`
`
`
`Further to RAN1 #49 decisions regarding the BCH physical-layer structure, this document summarizes the email
`discussions since then and makes proposals for decision.
`Discussion (Question / Comment):
`Decision: Document is noted.
`Conclusions are as follows:
`
` The coded BCH transport block is mapped to four subframes (subframes #0) within a 40 ms interval
`
`
`
`40 ms timing is blindly detected, i.e. there is no explicit signalling indicating 40 ms timing.
`
` Coded BCH mapped to 4 OFDM symbols within a subframe. In case of extended CP, this implies a restriction in
`number of idle symbols in case of TDD FS type 1 to three idle symbols.
`
` Each subframe should be self-decodable, approach 2 is agreed
`
` The downlink reference-signal transmit power is not signalled on the BCH but as part of the dynamic system
`information.
`
`
`Number of symbols carrying PBCH
`
`
`NTT DoCoMo
`BCH Structure for E-UTRA Downlink
`R1-072943
`The document was presented by (…) from NTT DoCoMo and presents the number of P-BCH transmission bursts within a
`40-msec TTI, detection of the 40-msec TTI boundary, the scheme for multiplexing the P-BCH into a sub-frame, and the
`transmit diversity scheme for the P-BCH.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Nokia Siemens
`
`Primary BCH performance; coverage and detection
`R1-072960
`Networks, Nokia
`The document was presented by Mieszko Chmiel from NSN and provides an analysis of the performance of the primary
`broadcast channel (P-BCH) channel in a 1.25 MHz bandwidth or 6 RBs.
`
`The multiplexing structure of the P-BCH is addressed in R1-072962.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`
`The following set of documents has not been treated during the session.
`
`R1-072665
`
`P-BCH Design
`
`R1-072728
`
`Structure of PBCH and location of D-BCH
`
`R1-072962
`
`On the multiplexing structure of the primary broadcast channel
`
`
`PBCH coding and mapping structure
`
`The following set of documents has not been treated during the session.
`
` 9
`
`Motorola
`
`Qualcomm
`Europe
`Nokia Siemens
`Networks, Nokia
`
`
`
`
`
`
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`R1-073815
`
`R1-073123
`
`P-BCH structure
`
`R1-072653
`
`P-BCH to CCPCH mapping scheme for 40msec TTI timing blind
`detection
`
`R1-072759
`
`The detection of P-BCH TTI
`
`R1-072813
`
`P-BCH structure considering soft-combining
`
`
`Transmit diversity for PBCH
`
`Samsung
`
`Toshiba
`
`Nortel
`
`ETRI
`
`
`
`
`
`
`
`
`
`Qualcomm
`
`Open Loop TxDiv for PBCH
`R1-072730
`Europe
`The document was presented by Juan Montojo from Qualcomm and provides a comparison of the link performance for
`both VTSTD and SFBC transmit diversity and channel estimation schemes for PBCH in the 2x2 antenna configuration.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`ETRI
`Efficient diversity scheme for P-BCH transmission
`R1-072812
`The document was presented by Kapseok Chang from ETRI and provides system level simulation results and analysis for
`each candidate TX Div scheme for both ANT cases, and a guideline for the selection of the Div scheme for PBCH.
`Discussion (Question / Comment):
`Decision: Document is noted.
`Agreed compromise proposal:
`
`
`
`340 hypotheses on SSC, and SFBC based TX diversity scheme
`o For 2 TX antennas SFBC
`o For 4 TX antennas based on SFBC + FSTD
` No antenna information carried on SSC for SFBC
`
`
`
`SFBC+FSTD
`
`The following set of documents has not been treated during the session.
`
`R1-072665
`
`P-BCH Design
`
`Motorola
`
`R1-072961
`
`Further results on transmit diversity and channel estimation for
`primary BCH
`
`Nokia Siemens
`Networks, Nokia
`
`R1-073025
`
`Transmit Diversity for Primary BCH in E-UTRA DL
`
`Ericsson
`
`R1-073102
`
`Link Performance of 4-Tx Antenna diversity for P-BCH
`
`Samsung
`
`R1-072651
`
`Performance Evaluation of various CCPCH Structures
`employing Transmit Diversity
`
`Toshiba
`
`R1-072758
`
`Simulation Comparison of Tx Diversity Schemes for P-BCH
`
`Nortel
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`TDD specific issues
`The following set of documents has not been treated during the session. Mr Chairman requested companies to continue
`off-line discussion regarding TDD specifics issues.
`
`R1-072666
`
`LTE TDD split signaling on D-BCH
`
`Motorola
`
`R1-073147
`
`Frame configurations for TDD frame structure type 1
`
`IPWireless
`
`
`
`
`
` 10
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`R1-073815
`
`R1-073040
`
`Idle subframes for TDD
`
`Ericsson
`
`
`
`
`LS to RAN2
`
`The following set of documents has not been treated during the session. Mr Chairman requested the companies to bring a
`common response to RAN2 LS as far as possible during the week.
`
`R1-072965
`
`Proposed response to RAN2 LS on System Information (R1-
`072622)
`
`Nokia Siemens
`Networks, Nokia
`
`R1-072817
`
`Proposed response to RAN2 LS on System Information
`
`NEC Group
`
`R1-073152
`R1-073153
`
`Response to TSG RAN WG1 LS on “System Information”
`Draft LS" RAN1 response to RAN2 LS System Information"
`
`R1-073154
`
`UE capabilities
`
`
`
`Motorola
`Motorola
`
`Motorola
`
`
`
`
`
`
`
`
`
`
`Motorola, NSN,
`NEC, Panasonic,
`Nokia
`
`R1-073192
`
`Draft LS response on System Information (Simultaneous reception of
`system information and unicast data)
`The document was presented by Jean-Aicard Fabien from Motorola.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Thursday: LS is revised and agreed in R1-073219.
`
`
`
`The following set of documents has not been treated during the session.
`
`R1-072652
`
`Soft-Combining for CCPCH
`
`R1-072664
`
`BCH/SCH transmission for odd number of RB
`
`R1-072713
`
`SFN Synchronization for LTE UEs
`
`R1-072729
`
`Capacity of PBCH for SIMO
`
`Toshiba
`
`Motorola
`
`SHARP
`
`Qualcomm
`Europe
`
`R1-072820
`
`Maximizing radio efficiency of BCCH transmission on DL-SCH
`
`NEC Group
`
`R1-072821
`
`One Bit info in network maintained neighbour list
`
`NEC Group
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`5.4
`
`RACH
`
`R1-072667
`Random Access E-mail Reflector Summary
`Motorola
`
`The document was presented by Amitava Ghosh from Motorola and collects the result of email discussions on RACH.
`Discussion (Question / Comment):
`Decision: Document is noted.
`Conclusions from email discussion:
`
` Signalling of one index number and cyclic shift duration. The exact definition of the index number is FFS.
`
` Predefined random access slot configurations (at most 4bits)
`
` 11
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`
`
`16 shifts for NCS. Value of the shift FFS.
`
` Use a dedicated scheduling request channel.
`
`
`
`R1-073815
`
`In R1-072667, 16 shifts for NCS was agreed.(third bullet). Nokia disagreed with the conclusion and proposed to look at R1-
`072966.
`
`Nokia Siemens
`
`Flexible RACH signature number
`R1-072966
`Networks, Nokia
`The document was presented by (…) from Nokia and proposes the extension of the Ncs set to 32 values so that the more
`flexible scheme (where the total number of sequences could vary and be larger than 64) could be fully utilized.
`Discussion (Question / Comment): No formal agreement could be reached further to the discussion. Conclusions remain
`as they are.
`Decision: Document is noted.
`
`
`
`The following set of documents has not been treated during the session.
`
`R1-072731
`
`Scheduling requests using CQI
`
`R1-072800
`
`RACH sequence allocation and indication to the cell
`
`R1-072801
`
`RACH sequence allocation for efficient matched filter
`implementation
`
`R1-072838
`
`Random Access Preamble L1 Parameters in E-UTRA
`
`R1-072862
`
`Additional Burst Types for Non-Synchronized RACH
`
`R1-072863
`
`Cyclic Shift Configuration Set for Non-Synchronized RACH
`
`R1-072864
`
`Preamble Allocation for Non-Synchronized RACH
`
`R1-072892
`
`RACH in LTE TDD frame structure type 2
`
`Qualcomm
`Europe
`
`Panasonic
`
`Panasonic
`
`Texas
`Instruments
`
`LGE
`
`LGE
`
`LGE
`
`Huawei
`
`R1-072898
`
`Specification of restricted set of cyclic shifts of root Zadoff-Chu
`sequences
`
`Huawei,
`Panasonic
`
`R1-072899
`
`Multiple values of cyclic shift increment NCS
`
`R1-072937
`
`On the specification of restricted set of cyclic shifts of root
`Zadoff-Chu sequences
`
`R1-073026
`
`RACH transmission timing alignment for LTE TDD
`
`R1-073058
`
`Contention and Dedicated RACH signature allocation
`
`R1-073059
`
`Transport Format in RACH signature
`
`R1-073060
`
`Comparison of Formula for Restricted Cyclic shift Set
`
`R1-073113
`
`R1-073148
`
`R1-073168
`
`Procedure and Algorithm to Determine the Cyclic Shift
`Restricted Sets and Associated Signalling for RACH
`RACH for TDD frame structure type 1
`Using Restricted Preamble Set for RACH in High Mobility
`Environments
`
`Huawei
`
`Huawei,
`Panasonic, LGE,
`Nokia, Nokia
`Siemens
`Networks
`Ericsson
`
`LG Electronics
`Inc.
`LG Electronics
`Inc.
`LG Electronics
`Inc., Nokia, Nokia
`Siemens
`Networks
`
`Samsung
`
`IPWireless
`
`Samsung
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`(R1-073112)
`
`R1-073178
`
`Limitation of RACH sequence allocation for high mobility cell
`
`Panasonic
`
`(R1-072802)
`
` 12
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50
`Athens, Greece, 20 – 24 August, 2007
`
`
`5.5
`
`Channel coding
`
`R1-073815
`
`
`NTT DoCoMo
`Summary of the e-mail discussion on channel coding
`R1-072927
`The document was presented by Sadayuki Abeta from NTT DoCoMo and provides the results of email discussion on listed
`below topics:
`
` Rate matching for turbo code
`
` Rate matching for convolutional code
`
` Coding chain (CRC attachment, channel interleaving)
`
` Number of HARQ processes
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`
`HARQ Processing
`
`
`Motorola
`HARQ Timing and Number of HARQ Processes
`R1-072674
`The document was presented by Jean-Aicard Fabien from Motorola and outlines a potential acknowledgement timing
`scheme for both downlink and uplink, leading to a recommendation on the minimum number of HARQ processes to be
`supported.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Discussion on LTE channel coding
`R1-072760
`The document was presented by (…) from Nortel.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Nortel
`
`
`
`
`Ericsson
`On the number of hybrid ARQ processes in LTE
`R1-073027
`The document was presented by Stefan Parkvall from Ericsson and addresses some aspects of hybrid ARQ and the
`associated rate matching.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Number of HARQ processes
`R1-073074
`The document was presented by Durga Malladi from Qualcomm.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Qualcomm
`Europe
`
`
`
`
`Samsung
`Analysis of per code bloc

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket