throbber

`3GPP TSG RAN WG1 Meeting #50b
`Shanghai, China, 8 – 12 October, 2007
`Agenda item
`3
`Title:
`Draft Report of 3GPP TSG RAN WG1 #50 v0.2.0
`(Athens, Greece, 20 – 24 August, 2007)
`Approval
`MCC Support
`
`Document for:
`Source:
`
`R1-073896
`
`Fact Summary
`Meeting:
`Dates:
`Venue:
`Host:
`Attendees:
`Documents:
`
`3GPP TSG RAN WG1 #50
`20th through 24th August, 2007
`Athenaeum Intercontinental Hotel, Athens, GREECE
`European Friends of 3GPP
`203 delegates
`652 (including some withdrawn and post-meeting artefacts)
`
`Patrick Mérias
`ETSI Mobile Competence Center
`F-06921 Sophia Antipolis Cedex
`Tel: +33 4 92 94 42 06
`
`Patrick.merias@etsi.org
`
`APPLE 1046
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50b
`Shanghai, China, 8 – 12 October, 2007
`Table of contents
`
`R1-073896
`
`
`Executive summary ......................................................................................................................................... 3
`1
`Opening of the meeting ........................................................................................................................ 5
`1.1
`Call for IPR ....................................................................................................................................................... 5
`2
`Approval of the agenda ......................................................................................................................... 5
`3
`Approval of the minutes from previous meeting ............................................................................... 5
`4
`Election of 3GPP RAN WG1 Officials ................................................................................................. 6
`5
`Liaison statement handling .................................................................................................................. 7
`6
`Maintenance of R99, Rel4, Rel5, Rel6, Rel-7 ................................................................................... 8
`7
`Evolved UTRA and UTRAN ............................................................................................................... 17
`7.1
`Updated Physical Layer Specifications ...................................................................................................... 17
`7.2
`Finalization of TS 36.211 .............................................................................................................................. 18
`7.2.1
`Downlink reference signals .................................................................................................................... 19
`7.2.2
`Uplink reference signals ......................................................................................................................... 22
`7.2.3
`Downlink Control Signaling .................................................................................................................... 25
`7.2.4
`Uplink Control Signaling ......................................................................................................................... 29
`7.2.5
`Mapping of virtual resource blocks to physical resource blocks ....................................................... 35
`7.2.6
`Remaining details on DL MIMO, TX diversity and beamforming ...................................................... 38
`7.2.7
`SSC, PSC ................................................................................................................................................. 40
`7.2.8
`PBCH ......................................................................................................................................................... 40
`7.2.9
`RACH......................................................................................................................................................... 40
`7.3
`Finalization of TS 36.212 .............................................................................................................................. 42
`7.4
`Finalization of TS 36.213 .............................................................................................................................. 47
`7.4.1
`Timing synchronization ........................................................................................................................... 47
`7.4.2
`UL/DL Power Control .............................................................................................................................. 47
`7.4.3
`Inter-cell Interference Coordination ....................................................................................................... 48
`7.4.4
`RACH timing and preamble sequence selection ................................................................................ 48
`7.4.5
`UE Procedures for downlink shared channel ...................................................................................... 49
`7.4.6
`UE Procedures for uplink shared channel ........................................................................................... 49
`7.5
`Finalization of TS 36.214 .............................................................................................................................. 50
`8.
`Combination of Higher Order Modulation and MIMO in HSDPA .................................................. 51
`9. MBSFN Downlink Optimized Broadcast 3.84Mcps TDD ............................................................... 51
`10. Closing of the meeting ........................................................................................................................ 53
`Annex A: List of participants at RAN1 #50 ............................................................................................. 54
`Annex B: TSG RAN WG1 meetings in 2007 .......................................................................................... 55
`Annex C: List of CRs agreed at RAN1#50 .............................................................................................. 56
`Annex D: List of Outgoing LSs from RAN1#50 ...................................................................................... 57
`Annex E: List of Tdocs at RAN1 #50 ....................................................................................................... 58
`Annex F: List of actions ............................................................................................................................. 59
`
`
`
` 2
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50b
`Shanghai, China, 8 – 12 October, 2007
`
`R1-073896
`
`Executive summary
`3GPP TSG WG RAN1 #50 meeting took place in the Athenaeum Intercontinental hotel, Athens, GREECE.
`
`The meeting started at 9:15 on Monday 20th August and finished at 17:00 on Friday 24th August 2007.
`
`
`
`On the first day, 20th of August, the election of WG RAN1 Chairman and Vice Chairmen took place and the result of the
`election was as follows:
`New Chairman:
`
`New Vice Chairmen:
`
`
`
`
`
`
`Mr. Dirk Gerstenberger (Telefon AB LM Ericsson, ETSI)
`Dr. Sadayuki Abeta (NTT DoCoMo Inc. ARIB)
`Dr. Juho Lee (Samsung Electronic Co., Ltd, TTA)
`
`
`
`The week was scheduled as follows:
`
` Monday: Agenda items 1, 2, 3, 4, 5, 7.1 and 7.2.3 – Parallel session (from 5:00PM) for 6 (TS on FDD only) and
`continuing discussions on 7.2.3.
`
` Tuesday: Agenda items 7.2.1 and 7.2.4 – Parallel session (from 6:30PM) for 6 (TS on TDD only) and continuing
`discussions on 7.2.4
`
` Wednesday: Agenda items 7.2.2 and 7.3 – Parallel session (from 7:00PM) for 7.5 and continuing discussions on
`7.3
`
` Thursday: Agenda items 7.2.5, 7.2.9, 7.2.6, 6 (reviewing early in the week decisions), 8. and 9. – Farewell dinner
`for the departing Chairmen and Vice-Chairmen at 8:30PM
`
` Friday: Agenda items revisiting 7.1, 5 and 6, 7.4.2 and 7.4.5.
`
`Agenda items 7.2.7, 7.2.8, 7.4.1, 7.4.3, 7.4.4 and 7.4.6 have not been treated due to lack of time.
`
`
`The list of action points that required RAN1 close follow-up is listed in Annex F (end of document).
`
`
`
`
`
`The number of contribution documents for this meeting was 631, and those documents were categorized as followed.
`Input
`Discussed
`Document
`Document
`25
`25
`66
`66
`540
`113
`
`Agenda Item
`Liaison statement handling
`Maintenance of Rel7
`Evolved UTRA and UTRAN
`
`
`
`3
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50b
`Shanghai, China, 8 – 12 October, 2007
`
`R1-073896
`
`
`
`The following set of documents is missing. The corresponding contributions have not been handed over by companies.
`
`R1-073271
`
`UL power control details
`
`R1-073367
`
`eNode-B Measurements
`
`Qualcomm Europe
`
`Motorola
`
`R1-073415
`
`Performance of LTE DL multi-user MIMO
`
`Freescale Semiconductor
`
`R1-073500
`
`Preamble Indication for Non-Synchronized RACH
`
`LG Electronics
`
`R1-073543
`
`PUCCH channel coding: block coding vs convolutional coding
`
`Samsung
`
`R1-073625
`
`Remaining issues on random access
`
`R1-073694
`
`Uplink Power Control Method for E-UTRA
`
`R1-073695
`
`Investigation on Effect of Overload Indicator for Uplink Inter-cell Power
`Control
`
`R1-073696
`
`Multiplexing Method of Control Signals in PDCCH
`
`Panasonic
`
`NTT DoCoMo
`
`NTT DoCoMo
`
`NTT DoCoMo
`
`4
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50b
`Shanghai, China, 8 – 12 October, 2007
`
`R1-073896
`
`Opening of the meeting
`1
`Mr. Dirk Gerstenberger (RAN1 Chairman) welcomed the participants to the 50th RAN WG1 meeting and opened the
`meeting at 09:15.
`
`Mr. Andreas Bury from NXP Semiconductors welcomed the delegates on behalf of the European Friends of 3GPP.
`
`Call for IPR
`1.1
`The Chairman drew attention to Members’ obligations under the 3GPP Partner Organizations’ IPR policies. Every
`Individual Member organization is obliged to declare to the Partner Organization or Organizations of which it is a
`member any IPR owned by the Individual Member or any other organization which is or is likely to become
`essential to the work of 3GPP.
`
`
`The attention of the members of this Technical Specification Group is drawn to the fact that 3GPP
`Individual Members have the obligation under the IPR Policies of their respective Organizational Partners
`to inform their respective Organizational Partners of Essential IPRs they become aware of.
`
`The members take note that they are hereby invited:
`
`to investigate in their company whether their company does own IPRs which are, or are likely to become
`Essential in respect of the work of the Technical Specification Group.
`
`to notify the Director-General, or the Chairman of their respective Organizational Partners, of all
`potential IPRs that their company may own, by means of the IPR Statement and the Licensing declaration
`forms (e.g. see the ETSI IPR forms http://webapp.etsi.org/Ipr/).
`
`Approval of the agenda
`
`
`
`
`
` 2
`
`
`
`Draft Agenda for RAN1#50 meeting
`R1-073777
`Dirk Gerstenberger (Chairman) proposed the agenda for the meeting.
`Discussion (Question / Comment):
`Decision: The agenda was approved.
`
`RAN1 Chairman
`
`(R1-073240)
`
`Approval of the minutes from previous meeting
`
` 3
`
`
`
`Draft report of RAN1#49b meeting
`R1-073241
`The document was presented by Patrick Mérias
`Discussion (Question / Comment): Typo mistake to be solved. Mr Chairman commented on the added information w.r.t
`post RAN#36 voting issues  this was supposed to be reported at plenary meeting.
`Decision: The document is noted and shall be revised in R1-073815 during the week.
`
`MCC Support
`
`Draft report of RAN1#49b meeting
`R1-073815
`Decision: The document is agreed.
`
`
`
`MCC Support
`
`5
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50b
`Shanghai, China, 8 – 12 October, 2007
`
`R1-073896
`
`Election of 3GPP RAN WG1 Officials
`
`4
`
`
`
`The position of Chairman had a single candidate, Mr. Dirk Gerstenberger (Telefon AB LM Ericsson, ETSI) who was
`appointed to the position of WG RAN1 Chairman.
`
`
`
`The first position of Vice Chairman had four candidates, Dr. Sadayuki Abeta (NTT DoCoMo, ARIB), Dr. Juho Lee
`(Samsung Electronics Co., Ltd, TTA), Mr. Tang Hai (CATT, CCSA) and Mr. Xiang Guang Che (Nokia Corporation,
`ETSI). The result of the first ballot for the first position was as follows:
`
`Total Votes cast was 93
`
`Dr. Sadayuki Abeta :
`
`41 votes (44,086%)
`
`Dr. Juho Lee:
`
`Mr Tang Hai:
`
`
`
`
`
`24 votes (25,806%)
`
`16 votes (17,204%)
`
`Mr Xiang Guang Che:
`
`12 votes (12,903%)
`
`Dr. Juho Lee, Mr. Tang Hai and Mr. Xiang Guang Che decided to withdraw from a second ballot round for the first
`position of Vice Chairman and Dr. Sadayuki Abeta (NTT DoCoMo, ARIB) was therefore appointed to the first position of
`WG RAN1 Vice Chairman.
`
`
`
`The second position of Vice Chairman had three candidates, Dr. Juho Lee (Samsung Electronics Co., Ltd, TTA), Mr. Tang
`Hai (CATT, CCSA) and Mr. Xiang Guang Che (Nokia Corporation, ETSI). The result of the first ballot for the second
`position was as follows:
`
`Total Votes cast was 95
`
`Dr. Juho Lee:
`
`Mr Tang Hai:
`
`
`
`
`
`64 votes (67,368%)
`
`17 votes (17,895%)
`
`Mr Xiang Guang Che:
`
`14 votes (14,737%)
`
`Mr. Tang Hai and Mr. Xiang Guang Che decided to withdraw from a second ballot round for the second position of Vice
`Chairman and Dr. Juho Lee (Samsung Electronic Co., Ltd, TTA) was therefore appointed to the second position of WG
`RAN1 Vice Chairman.
`
`
`
`6
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50b
`Shanghai, China, 8 – 12 October, 2007
`
`R1-073896
`
`5
`
`Liaison statement handling
`
`Receiver performance and enhanced CELL_FACH state
`R1-073242
`The document was presented by (…) from LGE.
`Discussion (Question / Comment):
`Decision: Document is noted and RAN1 decided to leave the answer to RAN4.
`
`RAN2, LGE
`
`Reply LS on physical layer aspects of Enhanced CELL_FACH state in
`R1-073243
`FDD from WG1
`The document was presented by Eliza Wong from Alcatel-Lucent.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`RAN2, Alcatel-
`Lucent
`
`LS on Introduction of Very low bit rate WB-AMR Combinations into
`R1-073244
`25.993
`The document was presented by Joern Krause from NSN.
`Discussion (Question / Comment):
`Decision: Document is noted. Comments from other companies will be checked during the week. Reply LS document
`shall be done in R1-073816 (action point is obsolete and document is withdrawn from Tdoc list – see hereafter)
`Friday 24th
`
`RAN2, NSN
`
`There is new LS from RAN2 in R1-073880 that supersedes the previous in R1-073244.
`
`LS on Introduction of RAB Combination into 25.993
`R1-073880
`The document was presented by Joern Krause from NSN.
`Discussion (Question / Comment):
`Decision: Document is noted. Extra time is provided for full check until 31/08 and Reply LS shall be in R1-073883 by the
`5th of September.
`
`RAN2, NSN
`
`
`
`LS on HS-SCCH less + MIMO
`R1-073245
`The document was presented by (…) from Qualcomm.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`R1-073713
`
`Draft reply to LS on HS-SCCH less + MIMO [R1-073245]
`
`RAN2, Qualcomm
`
`Philips, Ericsson,
`Nokia, Nokia
`Siemens
`Networks, NXP
`Semiconductors
`
`The document was presented by Matthew Baker from Philips.
`Discussion (Question / Comment):
`Decision: Document is noted and proposal agreed in principle. Revised LS in R1-073817 shall be prepared to reflect the
`approval of related CRs.
`Friday 24th
`
`Reply LS on HS-SCCH less + MIMO
`R1-073817
`The document was presented by Matthew Baker from Philips.
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`
`
`RAN1, Philips
`
`7
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50b
`Shanghai, China, 8 – 12 October, 2007
`
`R1-073896
`
`Update on Relevant RAN5 Agreed CRs to TS 34.108
`R1-073248
`The document was presented by Sadayuki Abeta from NTT DoCoMo.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Physical Layer Aspects of eMBMS Counting
`R1-073246
`The document was presented by Nick Anderson from IPWireless.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`RAN5, NTT
`DoCoMo
`
`RAN2, IPWireless
`
`Draft reply to LS on Physical Layer Aspects of eMBMS Counting [R1-
`R1-073714
`073246]
`The document was presented by Matthew Baker from Philips.
`Discussion (Question / Comment):
`Decision: Document is noted. Draft reply further to offline discussion shall be done in R1-073818 before the end of the
`week.
`Friday 24th
`
`Philips, NXP
`Semiconductors
`
`Draft reply to LS on Physical Layer Aspects of eMBMS Counting [R1-
`R1-073818
`073246]
`The document was presented by Matthew Baker from Philips.
`Discussion (Question / Comment):
`Decision: Document is agreed. Final reply in R1-073884
`
`Philips, NXP
`Semiconductors
`
`
`
`[DRAFT] LS on Complementary Time Domain Filter for Neighbour
`R1-073247
`Cell Measurements
`The document was presented by Ylva Jading from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Liaison Statement to RAN1 on LTE Transmission of SU-1 of System
`R1-073287
`Information
`The document was presented by Erik Dahlman from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`New incoming LS received during Athens’ meeting
`
`LS on the dynamic range of the UE transmission power
`R1-073857
`The document was presented by Robert Love from Motorola.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`RAN4, Ericsson
`
`RAN2, Ericsson
`
`RAN4, Motorola
`
` 6
`
`Maintenance of R99, Rel4, Rel5, Rel6, Rel-7
`
`CR to TS25.201
`
`8
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50b
`Shanghai, China, 8 – 12 October, 2007
`
`R1-073896
`
`R1-073450
`
`25201 CR035 “Minor modification related to EDCH in 1.28Mcps
`TDD”
`
`The document was presented by (…) from (…).
`Discussion (Question / Comment):
`Decision: Document is noted. Revision is to be prepared in R1-073830.
`
`R1-073830
`
`25201 CR035r1 (Rel-7, F) "Minor modification related to EDCH in
`1.28Mcps TDD"
`The document was presented by (…) from (…).
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`ZTE, CATT, TD-
`TECH,
`Spreadtrum
`Communications
`
`
`
`ZTE, CATT, TD-TECH,
`Spreadtrum
`Communications
`
`
`CR to TS25.211
`
`25211CR242 "PICH associated HS-SCCH for Enhanced
`R1-073324
`CELL_FACH"
`The document was presented by Karri Ranta-aho from NSN.
`Discussion (Question / Comment):
`Decision: Document is noted. Revision is to be prepared in R1-073825.
`Thursday 23rd
`
`Nokia Siemens
`Networks, Nokia
`
`
`
`25211CR242r1 (Rel-7, F) "PICH associated HS-SCCH for Enhanced
`R1-073825
`CELL_FACH"
`The document was presented by Karri Ranta-aho from NSN.
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`Nokia Siemens
`Networks, Nokia
`
`
`
`25211CR243 "Clarification for CPC feature"
`R1-073325
`The document was presented by Karri Ranta-aho from NSN.
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`Nokia Siemens
`Networks, Nokia
`
`25.211CR245 Clarifications on the use of S-CCPCH pilot bits for
`R1-073336
`MBSFN FDD feature
`The document was presented by (…) from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`Ericsson
`
`
`
`
`
`
`
`25211CR246 “Clarification on MICH”
`R1-073342
`The document was presented by Eliza Wong from Alcatel-Lucent.
`Discussion (Question / Comment): Mr Chairman suggested changing WI to MBMS L1 and category to A
`Decision: Document is agreed in principle, according the changes to cover sheet. Rel-6 CR (Cat F) shall also be prepared
`in R1-073826
`Thursday 23rd
`
`Alcatel-Lucent
`
`
`
`R1-073826
`
`25211CR247 (Rel-6, F) "Clarification on MICH"
`
`Alcatel-Lucent
`
`9
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50b
`Shanghai, China, 8 – 12 October, 2007
`
`R1-073896
`
`The document was presented by Eliza Wong from Alcatel-Lucent and covered both releases 6 and 7.
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`
`
`25.211 CR0232r3 (Rel-7, C) “Enhanced F-DPCH”
`
`R1-073343
`The document was presented by (…) from Qualcomm.
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`
`CR to TS25.212
`
`Qualcomm
`Europe
`
`
`
`Nokia Siemens
`
`16QAM modulation selection algorithm for HSUPA
`R1-073326
`Networks, Nokia
`The document was presented by Karri Ranta-aho from NSN and explains issues concerning the algorithm for modulation
`selection and outlines a solution proposal. Associated CR is in R1-073327.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`25212CR252 “16QAM modulation selection for HSUPA”
`R1-073327
`The document was presented by Karri Ranta-aho from NSN.
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`
`
`Nokia Siemens
`Networks, Nokia
`
`
`
`25.212CR253 Clarifications of MIMO
`R1-073337
`The document was presented by Johan Bergman from Ericsson.
`Discussion (Question / Comment): MCC is asked to change font color from red to black in section 4.6B.1 when
`implementing the CR.
`Decision: Document is agreed.
`
`Ericsson
`
`
`
`25.212CR254 “Clarifications of CPC and MIMO”
`R1-073339
`The document was presented by Johan Bergman from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`
`
`Ericsson
`
`
`
`25.212 CR255 (Rel-7, F) "RM1 transparent for HS-SCCH-less
`R1-073344
`operation"
`The document was presented by (…) from Qualcomm.
`Discussion (Question / Comment):
`Decision: Document is noted. Further check is required with RAN2 to make certain the problem is taken care of in RRC.
`LS to RAN2 shall be prepared in R1-073827.
`
`Qualcomm
`Europe
`
`
`
`LS on maximum transport block size for HS-SCCH-less operation
`R1-073827
`The document was presented by Matthew Baker from Philips.
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`RAN1, Philips
`
`
`
`10
`
`

`

`R1-073896
`
`
`3GPP TSG RAN WG1 Meeting #50b
`Shanghai, China, 8 – 12 October, 2007
`
`CR to TS25.213
`
`25.213 CR090 (Rel-7, D) "Editorial changes in 25.213 for 16QAM
`R1-073346
`specification"
`The document was presented by (…) from Qualcomm.
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`Qualcomm
`Europe
`
`
`
`
`CR to TS25.214
`
`25214CR452 “CPC preamble and postamble clarification for CQI
`R1-073328
`transmission”
`The document was presented by Karri Ranta-aho from NSN.
`Discussion (Question / Comment):
`Decision: Document is noted and shall be revised in R1-073828.
`Friday 24th
`
`Nokia Siemens
`Networks, Nokia
`
`
`
`Nokia Siemens
`25214CR452r2 "CPC preamble and postamble clarification for CQI
`R1-073877
`Networks, Nokia
`transmission"
`The document was presented by Karri Ranta-aho from NSN as R1-073828 has been further revised during the week.
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`
`
`25214CR453 “Removal of
`R1-073329
`Inactivity_Threshold_for_UE_Grant_Monitoring definition”
`The document was presented by Karri Ranta-aho from NSN.
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`
`
`25214CR454 “Corrections to HS-DSCH procedures for
`R1-073330
`CELL_FACH and MIMO”
`The document was presented by Karri Ranta-aho from NSN.
`Discussion (Question / Comment):
`Decision: Document is noted and shall be revised in R1-073829.
`Friday 24th
`
`Nokia Siemens
`Networks, Nokia
`
`
`
`Nokia Siemens
`Networks, Nokia
`
`
`
`Nokia Siemens
`25214CR454r2 "Corrections to HS-DSCH procedures for
`R1-073861
`Networks, Nokia
`CELL_FACH and MIMO"
`The document was presented by Karri Ranta-aho from NSN as R1-073829 has been further revised during the week to
`align with “Type3” naming.
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`
`R1-073332
`
`Rel-7 E-DPDCH gain factor calculation
`
`The document was presented by (…) from NSN.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`11
`
`Nokia, Nokia
`Siemens
`Networks
`
`
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50b
`Shanghai, China, 8 – 12 October, 2007
`
`R1-073333
`
`25214CR456 “Correction to Rel-7 E-DPDCH gain factor
`calculation”
`The document was presented by (…) from NSN.
`Discussion (Question / Comment):
`Decision: Document is noted and shall be revised in R1-073831.
`Friday 24th
`
`R1-073896
`
`Nokia, Nokia
`Siemens
`Networks
`
`
`
`Nokia, Nokia Siemens
`25214 CR456r2 (Rel-7,F) "Correction to Rel-7 E-DPDCH gain factor
`R1-073864
`Networks, Philips
`calculation"
`The document was presented by (…) from NSN as R1-073831 has been further revised during the week.
`Discussion (Question / Comment):
`Decision: Document is agreed in principle and final revision to make the correct change marks in R1-073866.
`
`
`
`R1-073334
`
`Update to 64QAM CQI tables
`
`The document was presented by Arto Lethi from Nokia.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`R1-073335
`
`25214CR457 “Clarification to applicability of CQI tables in Rel. 7”
`
`The document was presented by Arto Lethi from Nokia.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Nokia, Nokia
`Siemens
`Networks
`
`Nokia, Nokia
`Siemens
`Networks
`
`
`
`
`
`25.214CR458 “Clarifications of MIMO and 64QAM”
`R1-073338
`The document was presented by Johan Bergman from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is noted and suggestion is made for offline discussion to merge, if possible, R1-073335 and R1-
`073338. Merged CR should be in R1-073832.
`Thursday 23rd
`
`Ericsson
`
`
`
`25.214 CR458r1 (Rel-7, F) "Correction of 64QAM CQI tables"
`R1-073832
`The document was presented by Johan Bergman from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`
`
`25.214CR459 Clarifications of CPC
`R1-073340
`The document was presented by Johan Bergman from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`Ericsson, Philips, Nokia,
`Nokia Siemens Networks
`
`Ericsson
`
`
`
`25.214 CR460 (Rel-7, F) "E-DPDCH scaling when UE is at max
`R1-073345
`power"
`The document was presented by Juan Montojo from Qualcomm.
`Discussion (Question / Comment):
`Decision: Document is noted. Discuss off line during the week and revised CR shall be in R1-073862.
`
`Qualcomm
`Europe
`
`
`
`12
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50b
`Shanghai, China, 8 – 12 October, 2007
`
`Friday 24th
`
`R1-073896
`
`25.214 CR460r1 (Rel-7, F) "E-DPDCH scaling when UE is at max
`R1-073862
`power"
`The document was presented by Juan Montojo from Qualcomm.
`Discussion (Question / Comment):
`Decision: Document is agreed in principle and final revision to make the correct change marks in R1-073865.
`
`Qualcomm Europe
`
`
`
`R1-073812
`CQI tables for HSDPA MIMO
`The document was presented by Johan Bergman from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Ericsson
`
`
`
`R1-073838
`25.214 CR462r1 (Rel-7, F) "Correction of MIMO CQI tables
`The document was presented by Johan Bergman from Ericsson.
`Discussion (Question / Comment):
`Decision: Document is noted. Due to late revision, grant is given for email approval until 31st August.
`
`Ericsson, Philips, Nokia,
`Nokia Siemens Networks
`
`
`CR to TS25.215
`
`25215 CR176 “Adding GANSS related measurements in the FDD
`R1-073341
`physical layer measurements”
`The document was presented by Eliza Wong from Alcatel-Lucent.
`Discussion (Question / Comment): Mr Chairman suggested changing WI to MBMS L1 and category to A
`Decision: Document is noted and shall be revised in R1-073814.
`Thursday 23rd
`
`Alcatel-Lucent,
`Orange
`
`
`
`25215 CR176r1 "Adding GANSS related measurements in the FDD
`R1-073814
`physical layer measurements"
`The document was presented by Eliza Wong from Alcatel-Lucent.
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`Alcatel-Lucent, Orange
`
`
`CR to TS25.221
`
`R1-073807
`
`Introduce TD-SCDMA industry standard in CCSA to 3GPP
`
`RITT, CMCC,
`ZTE, CATT, TD-
`TECH,
`Spreadtrum
`Communications,
`Alcatel Shanghai
`Bell
`The document was presented by (…) from ZTE and gives an introduction of the main differences between TD-SCDMA
`industry standard in CCSA and 3GPP (1.28Mcps TDD specification). Main changes for 3GPP release 7 specifications are
`also introduced.
`Discussion (Question / Comment): Mr Chairman suggested to discuss the topic in RAN and to create the WI definition.
`Technical comments are welcomed from other companies but due to late submission, the analyzing of the proposed CRs
`was not possible in Athens. Extra time should be granted for further investigation.
`Decision: Document is noted.
`
`(R1-073448)
`
`13
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50b
`Shanghai, China, 8 – 12 October, 2007
`
`R1-073896
`
`R1-073443
`
`25221 CR144 “Introduction of multi-frequency operation for
`1.28Mcps TDD”
`
`RITT, CMCC,
`ZTE, CATT, TD-
`TECH,
`Spreadtrum
`Communications,
`Alcatel Shanghai
`Bell
`
`
`
`The document was presented by (…) from ZTE.
`Discussion (Question / Comment): No comments
`Decision: Document is noted. Extra time for further review is given and CR shall be reviewed on 23rd August.
`Thursday 23rd
`Decision: Document is technically endorsed. It’s asked RAN to clarify the work item situation.
`
`
`
`TFCI mapping for S-CCPCH and 16QAM for 1.28 Mcps TDD
`
`CATT
`R1-073523
`MBSFN
`The document was presented by (…) from CATT and proposes a modification of the mapping of TFCI code words on S-
`CCPCH frames using 16QAM. It also demonstrates why TFCI physical channel bits should be mapped on a modulus
`signal point constellation.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`25221 CR145 (Rel-7, F) “TFCI mapping for S-CCPCH and
`R1-073524
`16QAM for 1.28 Mcps TDD MBSFN”
`The document was presented by (…) from CATT.
`Discussion (Question / Comment): No comments
`Decision: Document is agreed.
`
`CR to TS25.222
`
`CATT
`
`R1-073444
`
`25222 CR136 “Introduction of multi-frequency operation for
`1.28Mcps TDD”
`
`RITT, CMCC,
`ZTE, CATT, TD-
`TECH,
`Spreadtrum
`Communications,
`Alcatel Shanghai
`Bell
`
`
`
`
`
`The document was presented by (…) from ZTE.
`Discussion (Question / Comment): No comments
`Decision: Document is noted. Extra time for further review is given and CR shall be reviewed on 23rd August.
`Thursday 23rd
`Decision: Document is technically endorsed. It’s asked RAN to clarify the work item situation.
`
`
`
`25222 CR137 (Rel-7, F) “TFCI mapping for S-CCPCH and
`R1-073525
`16QAM for 1.28 Mcps TDD MBSFN”
`The document was presented by (…) from CATT.
`Discussion (Question / Comment): No comments
`Decision: Document is agreed.
`
`
`
`CATT
`
`
`
`R1-073796
`
`Improved E-HICH signature allocation for LCR-TDD
`
`Spreadtrum
`Communications
`
`(R1-073471)
`
`14
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50b
`Shanghai, China, 8 – 12 October, 2007
`
`R1-073896
`
`The document was presented by Ke Wang from CATT on behalf of Spreadtrum. Simulation results for the detection
`performance of E-HICH of LCR TDD and a modification on the allocation of E-HICH signature are proposed. Related CR
`to TS25222 is in R1-073797.
`Discussion (Question / Comment):
`Decision: Document is noted.
`
`Spreadtrum
`25222 CR138r1 (Rel-7, C) “Improved E-HICH signature allocation
`R1-073797
`Communications
`method for LCR-TDD”
`The document was presented by Ke Wang from CATT on behalf of Spreadtrum.
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`(R1-073472)
`
`
`CR to TS25.223
`
`R1-073445
`
`25223 CR046 “Introduction of multi-frequency operation for
`1.28Mcps TDD”
`
`RITT, CMCC,
`ZTE, CATT, TD-
`TECH,
`Spreadtrum
`Communications,
`Alcatel Shanghai
`Bell
`
`
`
`The document was presented by (…) from ZTE.
`Discussion (Question / Comment): Typo error in last sentence needs correction. HS-DSCH shall be deleted.
`Decision: Document is noted. CR shall be revised in R1-073839.
`Thursday 23rd
`
`RITT, CMCC, ZTE,
`CATT, TD-TECH,
`Spreadtrum
`Communications, Alcatel
`Shanghai Bell
`
`R1-073839
`
`25223 CR046r1 "Introduction of multi-frequency operation for
`1.28Mcps TDD"
`
`The document was presented by (…) from ZTE.
`Discussion (Question / Comment):
`Decision: Document is technically endorsed. It’s asked RAN to clarify the work item situation.
`
`CR to TS25.224
`
`R1-073446
`
`25224 CR163 “Introduction of multi-frequency operation for
`1.28Mcps TDD”
`
`RITT, CMCC,
`ZTE, CATT, TD-
`TECH,
`Spreadtrum
`Communications,
`Alcatel Shanghai
`Bell
`
`
`
`The document was presented by (…) from ZTE.
`Discussion (Question / Comment): No comments
`Decision: Document is noted. New CR shall be prepared to make the change in annex A1 (R1-073840)
`Thursday 23rd
`
`R1-073840
`
`25224 CR163r1 "Introduction of multi-frequency operation for
`1.28Mcps TDD"
`
`The document was presented by (…) from ZTE.
`Discussion (Question / Comment):
`Decision: Document is technically endorsed. It’s asked RAN to clarify the work item situation.
`
`RITT, CMCC, ZTE,
`CATT, TD-TECH,
`Spreadtrum
`Communications, Alcatel
`Shanghai Bell
`
`15
`
`

`

`
`3GPP TSG RAN WG1 Meeting #50b
`Shanghai, China, 8 – 12 October, 2007
`
`
`
`25224 CR164r1 “Improvement on the power control of E-PUCH in
`R1-073808
`1.28Mcps TDD”
`The document was presented by (…) from ZTE.
`Discussion (Question / Comment):
`Decision: Document is agreed.
`
`
`
`R1-073896
`
`ZTE
`
`(R1-073449)
`
`R1-073853
`

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket