`
` 1
`
` Opening of the meeting (Day 1: 9.00 AM)
`1.1 Call for IPR
`
`I draw your attention to your obligations under the 3GPP Partner Organizations' IPR policies. Every Individual
`Member organization is obliged to declare to the Partner Organization or Organizations of which it is a member
`any IPR owned by the Individual Member or any other organization which is or is likely to become essential to the
`work of 3GPP.
`
`The attention of the delegates to the meeting of this Technical Specification Group was drawn to the fact that
`3GPP Individual Members have the obligation under the IPR Policies of their respective Organizational
`Partners to inform their respective Organizational Partners of Essential IPRs they become aware of.
`
`The delegates were asked to take note that they were thereby invited:
`
`
`
`
`
`to investigate whether their organization or any other organization owns IPRs which were, or were
`likely to become Essential in respect of the work of 3GPP.
`to notify their respective Organizational Partners of all potential IPRs, e.g., for ETSI, by means of
`the IPR Statement and the Licensing declaration forms (http://webapp.etsi.org/Ipr/).
`
`2 Approval of the agenda
`3 Approval of the minutes from previous meeting
`4 Liaison statement handling
`5 Maintenance of Release 99 – Release 7
`6 Evolved UTRA and UTRAN
`6.1 TDD Frame Structure
`Contributions related to the decision at TSG RAN#37 on Tdoc RP-070751.
`Summary of the conclusions from the email ad hoc to be prepared by Liu Guangyi.
`
`6.2 Finalization of TS 36.211
`
`6.2.1 Downlink reference signals
`Summary of the conclusions from the email ad hoc to be prepared by Aris Papasakellariou.
`
`3GPP TSG RAN WG1 Meeting #51
`Jeju, Korea, November 05 – 09, 2007
`
`
`Source:
`
`Title:
`
`Document for:
`
`The deadline is Monday, 29 October, 6.00 PM, CET
`Tdoc request:
`The deadline is Monday, 29 October, 9.00 AM, CET
`Tdoc submission (AI 5):
`Tdoc submission (all other AI): The deadline is Tuesday, 30 October, 6.00 PM, CET
`
`Chairman
`
`Draft Agenda
`
`Decision
`
`APPLE 1041
`
`Page 1 of 3
`
`
`
`Main remaining issues are detailed sequence design, dedicated RS pattern for DL beamforming.
`
`6.2.2 Uplink reference signals
`Summary of the conclusions from the email ad hoc to be prepared by Aris Papasakellariou.
`Main remaining issues are hopping and shifting for PUSCH/PUCCH RS and SRS parameters and
`mapping.
`
`6.2.3 Downlink Control Signalling
`Summary of the status from email discussions on control signalling to be prepared by Stefan Parkvall.
`Main remaining issues are details on CCE-to-RE mapping, details on agreed resource allocation
`approach and PDCCH contents.
`
`6.2.4 Uplink Control Signalling
`Summary of the status from email discussions on control signalling to be prepared by Stefan Parkvall.
`Main remaining issues are how to associate ACK/NACK and CCEs, simultaneous ACK/NACK and
`CQI, transmission of control information on PUSCH, and TDD specific issues.
`
`6.2.5 Mapping of virtual resource blocks to physical resource blocks
`Summary of the status from email discussions on virtual resource block mapping to be prepared by
`Brian Classon.
`
`6.2.6 Bit scrambling sequences for UL/DL transmissions
`Sequences for downlink and uplink scrambling are to be defined.
`
`6.2.7 RACH
`Summary of the conclusions from email ad hoc on RACH to be prepared by Amitava Ghosh.
`Main remaining issues are the frequency position of PRACH, 1.4MHz operation and cyclic shift values
`with sequence grouping for high speed UEs.
`
`6.3 Finalization of TS 36.212
`Summary of the conclusions from the email ad hoc to be prepared by Sadayuki Abeta.
`Main issues are related to finalization of remaining details, e.g. RV definitions, and discussion on
`HARQ number of processes vs processing times.
`
`6.4 Finalization of TS 36.213
`
`6.4.1 Timing synchronization
`Synchronization primitives, Radio link monitoring, inter-cell synchronisation, transmission timing
`adjustments.
`
`6.4.2 UL/DL Power Control
`Summary of the conclusions from the email ad hoc to be prepared by Jari Lindholm.
`Remaining details on PUCCH/PUSCH power control, power headroom, and description of UE and
`eNB behaviour in 36.213.
`
`Inter-cell Interference Coordination
`6.4.3
`Need for request/grant based schemes.
`
`6.4.4 RACH timing and preamble sequence selection
`
`6.4.5 UE Procedures for downlink shared channel
`Remaining details on UE Procedures for CQI reporting and extension to MIMO feedback reporting
`(CQI/PMI/Rank Reporting), UE Procedures related to TX diversity.
`
`Page 2 of 3
`
`
`
`6.4.6 UE Procedures for uplink shared channel
`UE procedures for Sounding, UE procedures for ACK/NACK detection, UE procedures for UL antenna
`switching, transmission scheme for scheduling request
`
`6.5 Finalization of TS 36.214
`Summary of the conclusions from the email discussion to be prepared by Dirk Gerstenberger.
`Continued discussion on UE measurements. Feasibility, necessity and definitions of eNB L1
`measurements.
`
`6.6 Finalization of TS 36.201
`
`6.7 UE Categories
`Summary of the conclusions from the email ad hoc to be prepared by Sadayuki Abeta.
`7 Combination of Higher Order Modulation and MIMO
`in HSDPA (FDD)
`8 Enhanced Uplink for Cell_FACH State in FDD
`9 Study Item on Synchronized E-DCH
`10 Study Item on Scope of future HSPA Evolution for
`1.28Mcps TDD
`11 Work item on Enhanced UE DRX
`This work item is under the lead of RAN2.
`12 Closing of the meeting (Day5: 5.00 PM at the latest)
`
`Page 3 of 3
`
`