throbber
UNITED STATES PATENT AND TRADEMARK OFFICE
`
`
`
`
`
`
`
`
`
`BEFORE THE PATENT TRIAL AND APPEAL BOARD
`
`
`
`
`
`
`
`
`
`
`
`MICROSOFT CORPORATION
`
`Petitioner
`
`v.
`
`UNILOC 2017 LLC
`
`Patent Owner
`
`
`
`
`
`IPR2019-01116
`
`PATENT 7,016,676
`
`
`
`
`
`
`
`
`
`
`
`PATENT OWNER PRELIMINARY RESPONSE TO PETITION
`
`PURSUANT TO 37 C.F.R. §42.107(a)
`
`
`
`

`

`IPR2019-01116
`U.S. Patent 7,016,676
`
`
`Table of Contents
`
`
`
`I.
`
`II.
`
`INTRODUCTION .................................................................................... 1
`
`THE ’676 PATENT .................................................................................. 1
`
`III.
`
`RELATED PROCEEDINGS .................................................................... 3
`
`IV.
`
`THE LEVEL OF ORDINARY SKILL IN THE ART ............................. 4
`
`V.
`
`PETITIONER DOES NOT PROVE A REASONABLE
`LIKELIHOOD OF UNPATENTABILITY FOR ANY
`CHALLENGED CLAIM .......................................................................... 5
`
`A.
`
`Claim Construction ......................................................................... 5
`
`1.
`
`2.
`
`3.
`
`“Stations Which Operate In Accordance With A
`First Radio Interface Standard And/Or A Second
`Radio Interface Standard” .................................................... 6
`
`“Respective Duration In Which The Stations
`Working In Accordance With The Second Radio
`Interface Standard Are Allowed To Utilize The
`Frequency Band” .................................................................. 6
`
`“Renders The Frequency Band Available For
`Access By The Stations Working In Accordance
`With The Second Radio Interface Standard If
`Stations Working In Accordance With The First
`Radio Interface Standard Do Not Request Access
`To The Frequency Band” ..................................................... 7
`
`B.
`
`None of HomeRF, HomeRF Tutorial, and HomeRF
`Liaison Report (collectively “the HomeRF references”)
`Discloses “stations which operate in accordance with a
`first radio interface standard and/or a second radio
`interface standard” (Claim 1) (Grounds 1-3) ................................. 8
`
`C.
`
`None of HomeRF, HomeRF Tutorial, and HomeRF
`Liaison Report (collectively “the HomeRF references”)
`
`ii
`
`

`

`IPR2019-01116
`U.S. Patent 7,016,676
`
`
`Discloses “a control station which controls the alternate
`use of the frequency band” / “wherein the control station
`controls the access to the common frequency band for
`stations working in accordance with the first radio
`interface standard” (Claim 1) (Grounds 1-3)................................ 10
`
`1.
`
`2.
`
`The Petition’s primary scenario ......................................... 11
`
`The Petition’s alternative scenario ..................................... 14
`
`D.
`
`E.
`
`Lansford Does Not Disclose “a control station which
`controls the alternate use of the frequency band” (Claim
`1) (Ground 4) ................................................................................ 15
`
`The Petition Fails As To The Challenged Dependent
`Claim 2 .......................................................................................... 18
`
`VI.
`
`CONCLUSION ....................................................................................... 18
`
`
`
`iii
`
`

`

`IPR2019-01116
`U.S. Patent 7,016,676
`
`
`I.
`
`INTRODUCTION
`
`UNILOC 2017 LLC (“Uniloc” or “Patent Owner”) submits this Preliminary
`
`Response to Petition IPR2019-01116 for Inter Partes Review (“Pet.” or “Petition”)
`
`of United States Patent No. 7,016,676 (“the ’676 Patent” or “EX1001”) filed by
`
`Microsoft Corporation (“Petitioner”). The instant Petition is defective for at least the
`
`reasons set forth herein.
`
`II. THE ’676 PATENT
`
`The ’676 patent is titled “Method, network and control station for the two-
`
`way alternate control of radio systems of different standards in the same frequency
`
`band.” The ʼ676 patent issued March 21, 2006, from U.S. Patent Application No.
`
`10/089,959 filed April 4, 2002, which was a National Stage Entry of PCT No.
`
`PCT/EP01/09258 filed August 8, 2001 and published as W002/13457, which in turn
`
`claims priority to German Application No. DE10039532.5 filed August 8, 2000.
`
`The inventors of the ’676 patent observed that at the time of the invention, a
`
`radio system for wireless transmission of information was allowed to use
`
`transmission power only in accordance with standards by the national regulation
`
`authority. The national regulation authority determined on what frequencies with
`
`what transmission power and in accordance with what radio interface standard a
`
`radio system is allowed to transmit. There was also provided so-called ISM
`
`frequency bands (Industrial Scientific Medical) where radio systems transmitted in
`
`the same frequency band but in accordance with different radio interface standards.
`
`EX1001, 1:10-23. And in the event of interference, methods were standardized for
`
`1
`
`

`

`IPR2019-01116
`U.S. Patent 7,016,676
`
`
`an active switching to another frequency within the permitted frequency band, for
`
`controlling transmission power and for the adaptive coding and modulation to reduce
`
`interference. However, despite operating in the same frequency band, different radio
`
`systems have different Medium Access Controls (MAC), and despite the utilization
`
`of methods such as Transmitter Power Control (TPC) and Dynamic Frequency
`
`Selection (DFS), those methods did not make optimum use of spreading radio
`
`channels over the stations which operate under different radio standards. EX1001,
`
`1:24-2:10.
`
`According to the invention of the ’676 Patent, there is provided a method, a
`
`wireless network and a control station which make efficient use of radio transmission
`
`channels possible by an interface control protocol method for a radio system, which
`
`system comprises at least a frequency band provided for the alternate use of a first
`
`and a second radio interface standard, the radio system comprising stations which
`
`operate in accordance with a first radio interface standard and/or a second radio
`
`interface standard, respectively, a control station being provided which controls the
`
`alternate use of the frequency band. Based on the idea of providing a comprehensive
`
`standard exchange of implicit or explicit control information in systems that have
`
`the same radio transmission methods but different radio transmission protocols. This
`
`makes a simple and efficient use possible of a radio channel via a plurality of radio
`
`interface standards. EX1001, 2:14-28.
`
`A first number of stations preferably forms a wireless local area network in
`
`accordance with a first radio interface standard and a second number of stations
`
`2
`
`

`

`IPR2019-01116
`U.S. Patent 7,016,676
`
`
`forms a wireless network in accordance with a second radio interface standard. The
`
`control station is preferably a station that operates in accordance with both the first
`
`and the second radio interface standard. The control station can utilize the common
`
`radio channel more effectively when the demand for transmission capability in
`
`accordance with the first and second radio standard varies. The control station may
`
`release the common frequency band for access by stations operating under the
`
`second radio interface if stations operating in accordance with the first radio
`
`interface standard do not request access to the frequency band. The control station
`
`controls the alternate access by the first wireless network and the second wireless
`
`network to the common frequency band. The control station receives requests for
`
`capacity from various stations and assigns capacity accordingly. The release of the
`
`common frequency band for the second radio interface standard may be effected, for
`
`example, by explicitly sending control information to the stations of the second radio
`
`interface standard. As another example, control can be effected in that the control
`
`station determines the respective duration in which the stations operating in
`
`accordance with the second radio interface standard can utilize the common
`
`frequency band. EX1001, 2:36-4:26.
`
`III. RELATED PROCEEDINGS
`
`The following proceedings are currently pending cases concerning U.S. Pat.
`
`No. 7,016,676 (EX1001).
`
`Case Name
`Google, LLC v. Uniloc 2017 LLC
`Ericsson Inc. et al v. Uniloc 2017
`
`Case Number
`IPR2019-01541
`IPR2019-01550
`
`Filing Date
`Court
`PTAB Aug. 29, 2019
`PTAB Aug. 29, 2019
`
`3
`
`

`

`LLC
`Marvell Semiconductor, Inc. v.
`Uniloc 2017 LLC
`Marvell Semiconductor, Inc. v.
`Uniloc 2017 LLC
`Microsoft Corporation et al v.
`Uniloc 2017 LLC
`Uniloc 2017 LLC et al v. Google
`LLC
`Uniloc 2017 LLC v. Verizon
`Communications Inc. et al
`Uniloc 2017 LLC v. AT&T Services,
`Inc. et al
`
`IPR2019-01116
`U.S. Patent 7,016,676
`
`
`IPR2019-01349
`
`PTAB
`
`Jul. 22, 2019
`
`IPR2019-01350
`
`PTAB
`
`Jul. 22, 2019
`
`IPR2019-01125
`
`2-18-cv-00495
`
`PTAB
`
`
`May. 29, 2019
`TXED Nov. 17, 2018
`
`2-18-cv-00513
`
`TXED Nov. 17, 2018
`
`2-18-cv-00514
`
`TXED Nov. 17, 2018
`
`IV. THE LEVEL OF ORDINARY SKILL IN THE ART
`
`The Petition alleges that “[t]he person of ordinary skill in the art at the time
`
`the ’676 application was filed (“POSITA”) would have had a Bachelor’s Degree in
`
`Electrical Engineering, Computer Science, or a related subject and one or more years
`
`of experience working with wireless networks and related standards, and would have
`
`had an understanding of work being done by companies within the field of wireless
`
`networks and related standards, including, e.g., systems or protocols for shared
`
`access of wireless networks by different protocols.” Pet. 19. Given that Petitioner
`
`fails to meet its burden of proof in establishing prima facie anticipation or
`
`obviousness when applying its own definition of a person of ordinary skill in the art
`
`(“POSITA”), Patent Owner does not offer a competing definition for POSITA at this
`
`preliminary stage, though it reserves the right to do so in the event that trial is
`
`instituted.
`
`4
`
`

`

`IPR2019-01116
`U.S. Patent 7,016,676
`
`
`V.
`
`PETITIONER DOES NOT PROVE A REASONABLE LIKELIHOOD
`OF UNPATENTABILITY FOR ANY CHALLENGED CLAIM
`
`Petitioner has the burden of proof to establish entitlement to relief. 37 C.F.R.
`
`§42.108(c) (“review shall not be instituted for a ground of unpatentability unless
`
`. . . there is a reasonable likelihood that at least one of the claims challenged . . . is
`
`unpatentable”). The Petition should be denied as failing to meet this burden.
`
`The raises the following obviousness challenges under 35 U.S.C. § 103:
`
`Ground
`1
`2
`3
`
`1 and 2
`1 and 2
`1 and 2
`
`4
`
`1 and 2
`
`Claims
`
`Reference(s)
`
`HomeRF1
`HomeRF and HomeRF Tutorial2
`Home RF and HomeRF Tutorial and
`HomeRF Liaison Report3
`Lansford4 (obviousness)
`
`A. Claim Construction
`
`At this preliminary stage, Patent Owner submits that the Board need not
`
`construe any claim term in a particular manner in order to arrive at the conclusion
`
`that the Petition is substantively deficient. Wellman, Inc. v. Eastman Chem. Co., 642
`
`F.3d 1355, 1361 (Fed. Cir. 2011) (“need only be construed to the extent necessary
`
`to resolve the controversy”). However, some of Petitioner’s proposed constructions
`
`are addressed below. Further, in the event that trial is instituted, however, Patent
`
`
`
` 1
`
` EX1006, “HomeRF: Wireless Networking for the Connected Home”, by Kevin J.
`Negus et al.
`2 EX1008, “HomeRF: Bringing Wireless Connectivity Home”, by Jim Lansford
`3 EX1009, “HomeRF™ Working Group 3rd Liaison Report”, by Tim Blaney
`4 EX1012, U.S. Patent No. 6,937,158
`
`5
`
`

`

`IPR2019-01116
`U.S. Patent 7,016,676
`
`
`Owner reserves the right to object to Petitioner’s proposed construction and provide
`
`Patent Owner’s proposed construction.
`
`1.
`
`“Stations Which Operate In Accordance With A First Radio
`Interface Standard And/Or A Second Radio Interface
`Standard”
`
`At this preliminary stage, Patent Owner submits that the Board need not
`
`construe this claim term in order to arrive at the conclusion that the Petition is
`
`substantively deficient. Wellman, Inc. v. Eastman Chem. Co., 642 F.3d 1355, 1361
`
`(Fed. Cir. 2011) (“need only be construed to the extent necessary to resolve the
`
`controversy”). In the event that trial is instituted, however, Patent Owner reserves
`
`the right to object to Petitioner’s proposed construction and provide Patent Owner’s
`
`proposed construction.
`
`2.
`
`“Respective Duration In Which The Stations Working In
`Accordance With The Second Radio Interface Standard Are
`Allowed To Utilize The Frequency Band”
`
`At this preliminary stage, Patent Owner submits that the Board need not
`
`construe this claim term in order to arrive at the conclusion that the Petition is
`
`substantively deficient. Wellman, Inc. v. Eastman Chem. Co., 642 F.3d 1355, 1361
`
`(Fed. Cir. 2011) (“need only be construed to the extent necessary to resolve the
`
`controversy”). In the event that trial is instituted, however, Patent Owner reserves
`
`the right to object to Petitioner’s proposed construction and provide Patent Owner’s
`
`proposed construction.
`
`6
`
`

`

`3.
`
`IPR2019-01116
`U.S. Patent 7,016,676
`
`“Renders The Frequency Band Available For Access By The
`Stations Working In Accordance With The Second Radio
`Interface Standard If Stations Working In Accordance With
`The First Radio Interface Standard Do Not Request Access
`To The Frequency Band”
`
`As the Petition acknowledges, the Petition may not challenge claims on the
`
`basis of indefiniteness under this proceeding. Pet. 22. Therefore, Patent Owner does
`
`not address Petitioner’s allegations. For the remaining proposed construction(s) in
`
`this section, Patent Owner submits that the Board need not construe this claim term
`
`in order to arrive at the conclusion that the Petition is substantively deficient.
`
`Wellman, 642 F.3d at 1361. Nonetheless, to the extent Petitioner seeks to improperly
`
`limit availability for “access” of the frequency band to only “transmitting” within
`
`the frequency band (Pet 23-24), the Board should not adopt Petitioner’s proposed
`
`construction that improperly seeks to import limitations from the specification. See
`
`Vitronics Corp. v. Conceptronic, 90 F.3d 1576, 1584-85 (Fed. Cir. 1996). Moreover,
`
`Petitioner’s proposed construction is further erroneous because the specification
`
`itself makes clear the term “access” is not so limiting. “Access” in light of the
`
`specification allows for both sending an receiving (the expecting of) information.
`
`See EX1001, 4:5-18.
`
`Finally, Patent Owner disagrees with Petitioner that there is no antecedent
`
`basis for “the stations” in this claim term. Here, “the stations” refers back to the
`
`previous claim term which recites “stations which operate in accordance with a first
`
`radio standard and/or a second radio interface standard”. As the Petition points out,
`
`the previous claim limitation only requires a plurality of stations operating under a
`
`7
`
`

`

`IPR2019-01116
`U.S. Patent 7,016,676
`
`
`first and/or second radio interface standard. And here, in this limitation, “the
`
`stations” refers back to the entire and original set of stations, and then the limitation
`
`further narrows that set of stations to just the stations “working in accordance to the
`
`second radio interface standard”. Whether that number of stations is one or more
`
`than one, there is no issue with antecedent basis.
`
`B. None of HomeRF, HomeRF Tutorial, and HomeRF Liaison
`Report (collectively “the HomeRF references”) Discloses “stations
`which operate in accordance with a first radio interface standard
`and/or a second radio interface standard” (Claim 1) (Grounds 1-3)
`
`None of the HomeRF references discloses stations operating under “a first
`
`radio interface standard and/or a second radio interface standard”, as required by
`
`the claim language. Instead, HomeRF only discloses a single standard – the
`
`“HomeRF Shared Wireless Access Protocol (‘SWAP’)”. Pet. 41. This is shown by
`
`HomeRF itself in numerous places. For example, HomeRF’s Abstract recites: “The
`
`SWAP specification for wireless voice and data networking within the home will
`
`enable a new class or mobile consumer devices that draw from the power and content
`
`of the Internet and home PC.” EX1006, Abstract. As stated by the Abstract, HomeRF
`
`discloses a single standard – SWAP – and devices operating under that single
`
`standard encompass both “voice and data networking”. HomeRF goes on to describe
`
`“a SWAP network connection” (EX1006, at 20, column 2), in the singular.
`
`Furthermore, that HomeRF’s SWAP happens to operate with isochronous
`
`devices and asynchronous devices does not change the fact that all SWAP devices
`
`(isochronous or asynchronous) are operating under a single radio interface standard
`
`8
`
`

`

`IPR2019-01116
`U.S. Patent 7,016,676
`
`
`(i.e. SWAP). In fact, HomeRF itself describes SWAP as a “hybrid” protocol
`
`(EX1006, at 22, column 1), further confirming that SWAP is a single radio interface
`
`standard.
`
`Additionally, HomeRF refers to its devices (again, whether isochronous or
`
`asynchronous) as simply “SWAP devices”:
`
`
`
`EX1006, 22, column 2 (highlighting and underlining added).
`
`
`
`Finally, that HomeRF’s SWAP only discloses a single radio interface standard
`
`is further confirmed by the Petition itself and the Lansford reference. As Petitioner
`
`admits, under Lansford, in order to meet the limitation requiring “stations which
`
`operate in accordance with a first radio interface standard and/or a second radio
`
`interface standard”, the Petition points to two devices, one device (“Device B”)
`
`which is a “HomeRF device”, and another device (“Device C”) which is a
`
`“Bluetooth device”. Pet. 72. As seen by the Petition’s own admission, the “HomeRF
`
`9
`
`

`

`IPR2019-01116
`U.S. Patent 7,016,676
`
`
`device”, or SWAP device, is a device operating under a single radio interface
`
`standard.
`
`Therefore, the Petition fails because none of the HomeRF references discloses
`
`“stations which operate in accordance with a first radio interface standard and/or
`
`a second radio interface standard”, as required by the claim language.
`
`C. None of HomeRF, HomeRF Tutorial, and HomeRF Liaison
`Report (collectively “the HomeRF references”) Discloses “a
`control station which controls the alternate use of the frequency
`band” / “wherein the control station controls the access to the
`common frequency band for stations working in accordance with
`the first radio interface standard” (Claim 1) (Grounds 1-3)
`
`As discussed above, in Section V.B, the Petition fails because none of the
`
`HomeRF references discloses “stations which operate in accordance with a first
`
`radio interface standard and/or a second radio interface standard”, as required by
`
`the claim language. However, to the extent the Board will consider Petitioner’s
`
`arguments regarding HomeRF’s so-called “I-nodes” and “A-nodes” as being
`
`separate radio interface standards (which they are not), the Petition still fails for the
`
`reasons below.
`
`The Petition points to HomeRF’s “control point” or “CP” as being the required
`
`control station. Further, the Petition points to HomeRF’s the so-called “I-nodes”
`
`(voice devices or isochronous data devices) as operating in accordance with a first
`
`radio interface standard and points to the so-called “A-nodes” (asynchronous data
`
`devices based on the CSMA/802.11 standard) as operating in accordance with a
`
`second radio interface standard. See Pet. 39-41. And according to HomeRF, the
`
`10
`
`

`

`IPR2019-01116
`U.S. Patent 7,016,676
`
`
`common frequency band is the “2.5 GHz band”. EX1006, at 26, column 1.
`
`The Petition fails because HomeRF’s “control point” or “CP” does not
`
`“control[] the alternate use of the frequency band” or, alternatively, “control[] access
`
`to the common frequency band for stations working in accordance with the first radio
`
`interface standard” as required by the claim language. Specifically, under the
`
`HomeRF system and the HomeRF references, because there is always a contention
`
`period for the A-nodes, and because the A-nodes may communicate directly with
`
`one another thereby bypassing the “control point” entirely, the “control point” has
`
`no ability to control the alternate use of the frequency band; or under the Petition’s
`
`alternative scenario, for the same reasons, nothing in any of the HomeRF references
`
`discloses the ability to control access to the common frequency band to the stations
`
`working in accordance with the first radio interface standard.
`
`1.
`
`The Petition’s primary scenario
`
`In the Petition’s primary scenario, the use by HomeRF’s “A-nodes” are
`
`considered the alternate use of the frequency band. And as the Petition
`
`acknowledges, in the HomeRF system, the use of the frequency band, including the
`
`alternate use by the “A-nodes”, are defined by HomeRF’s superframe. However,
`
`HomeRF’s own description of its superframe confirms that its “control point” has
`
`no control over the alternate use of the frequency band. Specifically, HomeRF states
`
`that its protocol “incorporates two contention-free periods (CFPs) and a contention
`
`period.” EX1006, at 23, column 2.In other words, according to HomeRF itself, there
`
`will always be some available time for the contention period for the A-nodes (i.e.
`
`11
`
`

`

`IPR2019-01116
`U.S. Patent 7,016,676
`
`
`the alternate use of the frequency band).5 And therefore, HomeRF’s control point
`
`does not control the alternate use of the frequency band, because the HomeRF
`
`control point is not able to restrict the alternate use of the frequency band, or grant
`
`the alternate use of the frequency band. For example, the HomeRF control point does
`
`not have the ability to deny the alternate use of the frequency band, even if there is
`
`no primary traffic, and the HomeRF control point does not have the ability to grant
`
`the alternate use of the frequency band, even if there is enough primary traffic to
`
`occupy the entire superframe. This is further confirmed by HomeRF’s discussion of
`
`its Figure 1 “SWAP networking vision”:
`
`
`
`
`
`
`
` 5
`
` To the extent the Board may consider the testimony of Petitioner’s declarant, little
`to no weight should be given because Petitioner’s declarant merely parrots the
`same conclusory statements of the Petition. Compare e.g. Pet. 42 with EX1004, ¶
`100. This is insufficient. 37 C.F.R. § 42.65(a).
`
`12
`
`

`

`IPR2019-01116
`U.S. Patent 7,016,676
`
`
`EX1006, at 21, column 1 (highlighting and underlining added).
`
`As shown by the passage above, because asynchronous communication can
`
`take place directly between two peers, that communication is not being controlled
`
`by the control point. Therefore, HomeRF’s CP (or control point) does not disclose
`
`“a control station which controls the alternate use of the frequency band” because
`
`HomeRF’s control point cannot restrict the alternate use of the frequency band, or
`
`grant the alternate use of the frequency band.
`
`And nothing in HomeRF Tutorial or HomeRF Liaison Report shows
`
`otherwise. The Petition includes both HomeRF Tutorial and HomeRF Liaison
`
`Report merely for the proposition that “if there is no use of the shared network by
`
`the voice (first radio interface system) traffic, HomeRF Tutorial explains that the
`
`entire superframe is available for data (second radio interface standard) traffic.” Pet.
`
`54; see also Pet. 59. However, the Petition still fails because HomeRF Tutorial and
`
`HomeRF Liaison Report merely discloses allowing for more contention period if
`
`there is no voice traffic – this does nothing to change the fact that there is still no
`
`disclosure anywhere that shows the control point has any ability to restrict the
`
`alternate use of the frequency band, or grant the alternate use of the frequency band.
`
`Specifically here, as disclosed by HomeRF shown above, there is always a
`
`contention period in the superframe. And there is nothing in HomeRF Tutorial and
`
`HomeRF Liaison Report that discloses the ability to grant the alternate use of the
`
`frequency band, even if there is enough primary traffic to occupy the entire
`
`superframe. Additionally, HomeRF Tutorial and HomeRF Liaison Report also still
`
`13
`
`

`

`IPR2019-01116
`U.S. Patent 7,016,676
`
`
`does not disclose the ability to deny the alternate use of the frequency band, even if
`
`there are no primary traffic.
`
`In sum, nothing in any of HomeRF, HomeRF Tutorial, or HomeRF Liaison
`
`Report discloses “a control station which controls the alternate use of the frequency
`
`band” as the claim language requires.
`
`2.
`
`The Petition’s alternative scenario
`
`As a throwaway, the Petition merely makes the conclusory statement in a
`
`single sentence that: “Alternatively, in view of the disclosure of the CP managing
`
`when each node should send and receive data, and the presence of different slots
`
`within the contention-free period for the various I-nodes to transmit to and receive
`
`data from the CP, it would have been obvious that the CP “controls the access to the
`
`common frequency band” for these stations.” 6 Pet. 42-43.
`
`From what Patent Owner can discern from that single sentence, in the
`
`alternative Petitioner proposes HomeRF’s “A-node” to be the first radio interface
`
`standard, and the “I-node” to be the second radio interface standard, making the use
`
`by the “I-node” the alternate use of the frequency band.
`
`However, even under that alternative scenario, the Petition must still fail
`
`because in that case, HomeRF fails to disclose “wherein the control station controls
`
`
`
` 6
`
` To the extent the Board may consider the testimony of Petitioner’s declarant, little
`to no weight should be given because Petitioner’s declarant merely parrots the
`same conclusory statements of the Petition. Compare e.g. Pet. 42-43 with EX1004,
`¶ 101. This is insufficient. 37 C.F.R. § 42.65(a).
`
`14
`
`

`

`IPR2019-01116
`U.S. Patent 7,016,676
`
`
`the access to the common frequency band for stations working in accordance with
`
`the first radio interface standard”.
`
`As shown above in discussion the Petition’s primary scenario, HomeRF
`
`always provides for a contention period (for the “A-nodes”, and under the Petition’s
`
`alternative scenario,
`
`the first radio
`
`interface), and because
`
`in HomeRF,
`
`asynchronous communication can take place directly between two peers, that
`
`communication is not being controlled by the control point. There is nothing in
`
`HomeRF Tutorial or HomeRF Liaison Report that shows otherwise, in fact, those
`
`additional references only show that the contention period can only grow larger. See
`
`EX1008, p. 22; EX1009, p. 8.
`
`Thus, under the Petition’s alternative scenario, the Petition must still fail
`
`because there is nothing in the Petition or any of the HomeRF references that
`
`discloses the control point’s ability to control access to common frequency band to
`
`the stations working in accordance with the first radio interface standard (in the
`
`Petition’s alternative scenario, the “A-nodes” during the contention period),
`
`especially where HomeRF itself shows that asynchronous communications (e.g.
`
`communications between the A-nodes) is direct and that communication is not
`
`being controlled by the control point. Therefore, the Petition has failed to show
`
`that the HomeRF references discloses “wherein the control station controls the
`
`access to the common frequency band for stations working in accordance with the
`
`first radio interface standard”.
`
`D. Lansford Does Not Disclose “a control station which controls the
`alternate use of the frequency band” (Claim 1) (Ground 4)
`
`15
`
`

`

`IPR2019-01116
`U.S. Patent 7,016,676
`
`
`Lansford describes a system of three devices – Device A, Device B, and
`
`Device C, and the Petition assigns the stations of the first radio interface standard
`
`and second radio interface standard as such:
`
`• Device A is referred to as the controller;
`
`• Device C is a Bluetooth device, and the Petition points to Device C
`
`as “a first radio interface standard ‘station’”;
`
`• Device B is a HomeRF device, and the Petition points to Device B
`
`as “a second radio interface standard ‘station’”.
`
`See Pet. 71; EX1012, 4:4-39.
`
`Further, according to Lansford, Device C communicates with Device A
`
`during the “contention-free” period and therefore, Device B communicates after, or
`
`outside of the “contention-free” period. EX1012, 4:51-52 (“During this contention-
`
`free period, communication between Device A and Device B is suspended.”).
`
`Therefore, under Lansford, Device C communicates with Device A during
`
`the “contention-free” period, and according to the Petition, Device C operates as a
`
`first radio interface standard station. And communication with Device A and
`
`Device B is suspended during the “contention-free” period, and according to the
`
`Petition, Device B operates as a second radio interface standard.
`
`With the above established by Lansford and the Petition, Lansford does not
`
`disclose “a control station which controls the alternate use of the frequency band”
`
`because Device A of Lansford cannot deny alternate use of the frequency band (by
`
`Device B), even if there is no traffic from Device C (on the first radio interface
`
`16
`
`

`

`IPR2019-01116
`U.S. Patent 7,016,676
`
`
`standard), nor can Device A of Lansford grant sole alternate use of the frequency
`
`band (by Device B), even if there is traffic from Device C.
`
`This is shown by Figure 4 of Lansford:
`
`
`
`EX1012, Fig. 4.
`
`As by the above flow-chart of the operation of the Lansford system, Device
`
`A has no control over the alternate use of the frequency band (i.e. communicating or
`
`not with Device B). For example, Device A cannot choose to simply block all
`
`alternate use of the frequency band and never communicate with Device B because
`
`every path through the flow chart runs through box 425 (“communicate with second
`
`device at second hopping frequency” – i.e. outside the contention-free period).
`
`Similarly, Device A cannot choose to block all communication with Device C and
`
`17
`
`

`

`IPR2019-01116
`U.S. Patent 7,016,676
`
`
`grant exclusively alternate use of the frequency band to Device B because so long
`
`as “the first device [Device C] desires communication”, Device A is compelled to
`
`communicate with Device C and provide a contention-free period. EX1012, Fig. 4,
`
`6:6-49.
`
`Thus, the Petition fails because Lansford does not disclose “a control station
`
`which controls the alternate use of the frequency band”.
`
`E.
`
`The Petition Fails As To The Challenged Dependent Claim 2
`
`Because challenged dependent Claim 2 depends from the challenged
`
`independent Claim 1, the Petition should be denied in its entirety.
`
`VI. CONCLUSION
`
`For at least the reasons set forth above, Uniloc respectfully requests that the
`
`Board deny all challenges in the instant Petition.7
`
`Date: September 6, 2019
`
`
`
`
`
`Respectfully submitted,
`
`By: /s/ Brett A. Mangrum
`
`Brett A. Mangrum; Reg. No. 64,783
`
`Attorney for Patent Owner
`
`
`
` 7
`
` Patent Owner does not concede, and specifically denies, that there is any legitimacy
`to any arguments in the instant Petition that are not specifically addressed herein.
`
`18
`
`

`

`IPR2019-01116
`U.S. Patent 7,016,676
`
`
`CERTIFICATE OF COMPLIANCE
`
`
`
`Pursuant to 37 C.F.R. § 42.24(d), we certify that this Preliminary Response
`
`to Petition complies with the type-volume limitation of 37 C.F.R. § 42.24(b)(1)
`
`because it contains fewer than the limit of 14,000 words, as determined by the
`
`word-processing program used to prepare the brief, excluding the parts of the
`
`brief exempted by 37 C.F.R. § 42.24(a)(1).
`
`Date: September 6, 2019
`
`
`
`
`
`Respectfully submitted,
`
`By: /s/ Brett A. Mangrum
`
`Brett A. Mangrum; Reg. No. 64,783
`
`Attorney for Patent Owner
`
`
`
`
`
`i
`
`

`

`IPR2019-01116
`U.S. Patent 7,016,676
`
`
`CERTIFICATE OF SERVICE
`
`
`
`Pursuant to 37 C.F.R. §§ 42.6(e), we certify that we served an electronic copy
`
`of the foregoing PATENT OWNER’S PRELIMINARY RESPONSE PURSUANT
`
`TO 37 C.F.R. § 42.107(a) along with any accompanying exhibits via the Patent
`
`Review Processing System (PRPS) to Petitioner’s counsel at the following
`
`addresses identified in the Petition’s consent to electronic service:
`Lead Counsel:
`Derrick W. Toddy, Reg. No. 74,591
`derrick.toddy@klarquist.com
`
`Backup Counsel:
`Andrew M. Mason, Reg. No. 64,034
`Todd M. Siegel, Reg. No. 73,232
`andrew.mason@klarquist.com
`todd.siegel@klarquist.com
`
`Date: September 6, 2019
`
`
`
`
`
`Respectfully submitted,
`
`By: /s/ Brett A. Mangrum
`
`Brett A. Mangrum; Reg. No. 64,783
`
`Attorney for Patent Owner
`
`
`
`ii
`
`

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket