`Gamer "16" No. 1H
`Completion Procedure
`Sheffield, SE (Devonian) Field
`Terrell County, Texas
`October 15, 2001
`
`Executive Summarr
`
`The Gamer 16 No. has been drilled to a total MD ofl1,563' (2,627' ofhorizontal
`lateral). The horizontal lateral will be acid fraced in 5 stages. Open hole packers will
`provide zone isolation. The well will be acid fraced using ZCA acid with 40 Quality
`C02. The workstring and packers will be pulled after the job. 2-3/8" production tubing
`will be installed at the bottom of the curve, which is the low point in the lateral.
`
`Procedure:
`1. Run Packers Plus open hole packers and FracPort tools on 3-1/2" tubing.
`2. Prior to setting the packers, run GR-CCL on wire line to get top packer on depth.
`To allow the upper Devonian chert zone to be completed in the future, the top packer
`will be set below the zone of interest.
`3. Acid frac the Devonian horizontal lateral in 5 separate stages.
`Each stage will be 18,000 gals of 17% ZCA and 7200 gals of 17% slick acid.
`The total job size is 90,000 gals 17% ZCA acid and 5f,OOO gals 17% slick acid.
`Frac down 3-1/2" tubing at 35 BPM at ±7500 psi.
`3 isotope RA tag will be used.
`4. Flow back well to pit and/or test tank for several days.
`5. TOH with 3-1/2" tubing and packers.
`6. Run Afterfrac log on 3-1/2" tubing, then lay down 3-112" tubing.
`7. Run 2-3/8" production tubing to the bottom ofthe lateral.
`8. Return well to production.
`/{ <!fJ/.Aw e ~
`/I>Us !zotJt
`'Date
`K. Glenn Carter
`
`Prepared by:
`
`Distribution:
`
`Howard Kemp
`Bil1y Helms
`Scott Campbell Craig Rohwer
`
`Randy Lewellen
`DoeMngr
`
`1 of 8
`
`Ex. 2102
`IPR2017-01236
`
`
`
`Gamer 16 No. 1H- Completion Procedure for ])evonian Horizontal Lateral
`October 15, 2001
`Page 2 of5
`
`Well Information
`
`TD: 11,563'
`
`KB_' (18' AGL)
`
`GL
`
`AFENo.
`APE Amount:
`Rig Release Cost:
`
`10-2251
`$2,237,050
`$1,523,858
`
`Estimated Completion Cost:
`Estimated Facilities Cost:
`Estimated Total Well Cost:
`
`Casing:
`
`13-3/8" set at 1130'. Circulated cement.
`9-5/8" set at 2821 '. Circulated cement.
`T' 26# HC-180 LTC casing set at 9035'. Calculated TOC 7000'.
`
`Tubing - workstring to frac down:
`
`3-112" 9.3# 180 Srd. EUE tubing.
`'\ ~ '• :'
`
`Production Tubing:
`
`2-3/8" 4.7# 180 8rd EUE
`
`Wellhead:
`
`SM production tree (regular trim) with extended neck hanger.
`Back pressure valve capabilities.
`
`Reservoir Pressure: BHP ± 4,000 psi.
`Maximum anticipated SITP = 3000-3400 psi.
`
`H2S: NoH2S.
`
`2 of 8
`
`Ex. 2102
`IPR2017-01236
`
`
`
`Garner 16 No. 1H- Completion Procedure for Devonian Horizontal Lateral
`October 15, 2001
`Page 3 ofS
`
`I. a) MIRU pulling unit.
`b) TIH with Packers Plus RockSeal openhole packers and FracPort tools on 3-1/2"
`9.3# L80 Srd EUE tubing. See attachmeflt for Depths for packers and FracPort
`tools.
`c) With packers on depth using tubing tally,
`1) RU wireline truck. Run GR-CCL to get the top packer on depth with
`the open hole logs, to ensure that the upper Devonian can be completed
`in the future.
`d) Set all 5 packers (hydraulic set packers). Each to set at a different pressure.
`e) TOH with tubing and setting tool.
`f) TIH with latch seal assembly. Latch into packer.
`g) Land tubing with extended neck hanger, with 40,000 lbs compression on top
`packer.
`h) ND BOP. NU 7-1/16" 10k frac valve. Test frac valve and tubing head to
`10,000 psi.
`Use BPV in mandrel hanger to provide isolation and to test surface equipment.
`i) Load 7" x 9-5/8" annulus.
`j) Test the 3-112" x 7" annulus to 4,000 psi.
`k) Rig up flowback company on frac valve. Install dual choke manifold to flow
`back through. Install ball catcher. Stake down all lines.
`
`2.
`
`a) Rig up Halliburton frac equipment to frac down 3-112" tubing.
`I bank of equipment for liquid.
`I bank of equipment for C02. Set anchbts for high pressure C02 lines.
`b) Rig up RA tagging company. Hook RA lines up to 4 PurrtP trucks.
`c) Test all surface lines to 10,000 psi.
`Install pop-offvalve on 3-112 x 7" annulus. Set and test to 4,000 psi on location.
`d)
`
`3. Acid frac the Devonian horizontal lateral down 3-112" tubing with a total of
`90,000 gals 17% ZCA acid and 5#,000 gals 17% HCL, all foamed with C02.
`
`The lateral will be treated in 5 stages.
`The job will be tagged with 3 isotope RA material.
`The acid in each stage will be tagged with a different material. (A,B,C,A,B)
`
`Design Rate:
`
`35BPM Foam
`
`7,500 psi
`Anticipated Treating Pressure:
`Maximum Allowable Treating Pressure: 10,000 psi
`
`Limiting fuctor on Max Treating Pressure is the wellhead rating.
`
`'.')
`
`3 of 8
`
`Ex. 2102
`IPR2017-01236
`
`
`
`Garner 16 No. lH- Completion Procedure for Devo11ian Horizontal Lateral
`October 15, 2001
`Page 4 of5
`
`The lateral will be treated in 5 stages. Each Stage to be pumped as foUows:
`1) Pump tbe stage as shown below.
`2) At the end of the overflush, drop the appropriate size FracPort ball in 40# linear
`gel. Pump _ bbls of 40# linear gel behind ball.
`3) Repeat Steps 1) and 2) until all 5 stages have been pumped.
`
`Pump Schedule For Each Stage:
`
`Foam Gals
`3,000
`3,000
`9,500
`30,000
`12,000
`10,000
`
`Type of Fluid
`17% slick acid
`slick water spacer
`linear gel pad
`17%ZCA
`17%HCL
`Flush and Overflush
`
`Liguid Gals
`2,550
`2,550
`7,600
`18,000
`7,200
`8,500
`
`C02
`15%
`15%
`20%
`40%
`40%
`15%
`
`Discuss with Packers Plus what rate to be pumping when.tbe ball lands in the FracPort
`tool.
`··
`
`Craig Rohwer to obtain floppy disk of job.
`
`4.
`
`5.
`
`a) Rig down Halliburton prior to beginning flowback.
`b) Flow back well until it cleans up good.
`c) Using ballcatcher, catch and keep all the FracPort balls.
`d) Monitor C02 and H2S levels 4 times per day.
`e) Produce well through rental stackpack. Turn well to sales after well cleans up,
`and when gas meets pipeline specs.
`f) Obtain gas sample as soon as well cleans up good.
`g)
`Install EOG stack pack ASAP, and release rental equipment.
`
`a) MIRU pulling unit 4-5 days after tbe acid frac.
`b) Kill tubing with treated fresh water.
`c) ND frac valve. NU SM BOP. Use BPV in mandrel hanger for isolation.
`d) Release latch seal assembly on packer. TOH with same.
`e) TIH with retrieving tool.
`f) Release the top packer. Shear release the openhole packers.
`g) TOH with 3-1/2" tubing and packers.
`
`6.
`
`a) Run After Frac log on 3-1/2" tubing.
`b) Run Protechnics memory tool on 3-1/2" tubing to the end ofthe lateral
`c) TOH with same.
`d) Lay down 3-1/2" tubing while TOH.
`
`4 of 8
`
`Ex. 2102
`IPR2017-01236
`
`
`
`Garner 16 No. lH- Completion Procedure for Devonian Horizontal Lateral
`October 15, 2001
`Page 5 of5
`
`7.
`
`a) TIH with SN and 2-3/8" 4.7# L80 Brd EUE production tubing to 9400' MD.
`b) Land tubing with donut and tubing adaptor (tubing bonnet).
`c) ND BOP, NU production tree.
`
`Vendors List
`
`Acid Frac Halliburton
`
`RA tag
`
`Protechnics
`
`Flowback Supervision- Field Discretion
`
`Packers and FracPort Tools
`
`Packers Plus
`
`Make sure all vendors that are bid out are on the Approved Vendors List.
`
`'II'
`
`KGC 10/15/2001
`m:\Files\Horizontal Wells\Devonian\Garner 16 No lH Acid Frac Procedure.doc
`
`5 of 8
`
`Ex. 2102
`IPR2017-01236
`
`
`
`Jlo,.lzottt.fal bt~ta<tl W•ll
`refftll &"""~' ~~-~
`
`·
`.AdJtirbYt~ ~ BeM.J-Pilt
`l)pru-,.. ll f 1"0'1\hv\ .,.t vrt~ -~' me ,)1 Cu.I'V€.
`Sin~....,.... 'iSitr '?~,1/,
`
`(
`
`1 tA~,'i:J..
`
`7" u' lfe~t..1D '-T'-
`c.s~ .se-c @
`fr;JS'
`'Z-7° r.~+' e<-t.I"V< bwl~• /OC: calc.. Cfl ?()()D:
`
`6 of 8
`
`Ex. 2102
`IPR2017-01236
`
`
`
`I /-1
`Ga.rl\ er I~ No 1
`lo/}-z./ZC<Jl );:.el'i~s ~ P(t ci=:4-r.!'
`~c. .
`
`a.~'">J F'r-ttc P~r--t
`
`'70o Is
`
`?a.c~tr:
`
`. . ,CN c. jJ,,..t
`
`. 'f:f)/0~
`
`·.' ' ' ' ' '
`
`' " "-'"""'""""
`
`I
`
`..3
`
`951J{) I
`
`1()1 o~'
`
`/01 1!-IPo
`
`l'D I '/"itO I
`ff/ftxJ I
`
`-r~
`
`. . .
`
`.
`
`111 s~ ~~ /'11/;)
`
`"'
`s- ;
`
`(o
`
`'
`
`I
`
`9 2 ~()I .
`
`.
`
`9f3J) I
`
`IO,Z'!D I
`
`.
`
`/01 ?~o '
`
`111 /lo'
`
`2 \'f
`
`z
`
`;}'f
`
`,v~
`
`. bo fl.of Set ~a,c,/c.ar ab(JII'e..
`'!.:?1.0 '
`ls .. uAe 6elv'r.J. ;;tp.c_
`. fi-r a'f~~rs1 .flt.e,.e.
`• c,.n. Wo:t-t't -tD C!cwpf~-6'-
`1'tl... Z-3 mo~.r.
`
`u~ G~ -tJv....
`
`tb;
`
`-6, ¥Dt- pa.clu·.
`
`I
`j,
`
`7 of 8
`
`Ex. 2102
`IPR2017-01236
`
`
`
`Do It Once.
`Do It Right.
`
`Completion Proposal
`
`EOG
`
`t
`
`7"' casing set just into the target zone
`4.00" RSB seal assembly c/w latch unit c;~nd 2 ft bonded
`7" x 4.00" RSB retrievable seal bore packer w/
`selective release and tubing crossover
`
`3-1/2" 9.3# EUE NBO tubing as require<!
`J-.1/2" Rockseal FracPort tootw/ bali seat sub and internal lock
`3-1/2" 9.3# El)E NBO tubing as require<!
`
`....,__._ 7" x 3-1f2" Rocksea/11 open hole hydraulic set packer
`
`3-1/2" 9.3# EUE NBO tubing as require<!
`3-112" Rockseal FracPort taolw/ ball seat sub and Internal lock
`3-1/2" 9,3# EUE N80 tubing as required
`
`2 "
`
`7" x 3-1/2" Rocksealll open hole hydraulic set packer
`
`3-1/2" 9.3# EUE NBO tubing as require<!
`3-1/2" Rockseal FracPort toolw/ ball seat sub and lntemallock
`3-1/2" 9.3# EUE N80 tubing as required
`
`,,
`3
`I~
`
`~ 7" x 3-112" Rocksealll open hole hydmullc set packer
`
`J.-1/2" 9.3# EUE N80 tubing as required
`
`3-1/2" Rockseal FracPort toolw/ ball seat sub an<l intemalloc!(
`3-1/2" 9.3# EUE NBO tubing as required
`
`Y. "
`1 ~
`
`7" x 3~112" Rockseal US open hole packer 1 anchor wl solid shear release
`
`J-.1 12~ tubing as required
`
`...___ 7" x 3-1/2" Rockseal centralizer
`,...__ Ball and seat pump-out sub
`
`6-1/B" Open Hole
`
`eog0930
`
`8 of 8
`
`Ex. 2102
`IPR2017-01236
`
`