`Executive Summarr
`
`The Gamer 16 No. has been drilled to a total MD ofl1,563' (2,627' ofhorizontal
`lateral). The horizontal lateral will be acid fraced in 5 stages. Open hole packers will
`provide zone isolation. The well will be acid fraced using ZCA acid with 40 Quality
`C02. The workstring and packers will be pulled after the job. 2-3/8" production tubing
`will be installed at the bottom of the curve, which is the low point in the lateral.
`
`Procedure:
`1. Run Packers Plus open hole packers and FracPort tools on 3-1/2" tubing.
`2. Prior to setting the packers, run GR-CCL on wire line to get top packer on depth.
`To allow the upper Devonian chert zone to be completed in the future, the top packer
`will be set below the zone of interest.
`3. Acid frac the Devonian horizontal lateral in 5 separate stages.
`Each stage will be 18,000 gals of 17% ZCA and 7200 gals of 17% slick acid.
`The total job size is 90,000 gals 17% ZCA acid and 5f,OOO gals 17% slick acid.
`Frac down 3-1/2" tubing at 35 BPM at ±7500 psi.
`3 isotope RA tag will be used.
`4. Flow back well to pit and/or test tank for several days.
`5. TOH with 3-1/2" tubing and packers.
`6. Run Afterfrac log on 3-1/2" tubing, then lay down 3-112" tubing.
`7. Run 2-3/8" production tubing to the bottom ofthe lateral.
`8. Return well to production.
`/{ <!fJ/.Aw e ~
`/I>Us !zotJt
`'Date
`K. Glenn Carter
`
`Prepared by:
`
`Distribution:
`
`Howard Kemp
`Bil1y Helms
`Scott Campbell Craig Rohwer
`
`Randy Lewellen
`DoeMngr
`
`1 of 8
`
`Ex. 2102
`IPR2017-01232
`
`

`

`Gamer 16 No. 1H- Completion Procedure for ])evonian Horizontal Lateral
`October 15, 2001
`Page 2 of5
`
`Well Information
`
`TD: 11,563'
`
`KB_' (18' AGL)
`
`GL
`
`AFENo.
`APE Amount:
`Rig Release Cost:
`
`10-2251
`$2,237,050
`$1,523,858
`
`Estimated Completion Cost:
`Estimated Facilities Cost:
`Estimated Total Well Cost:
`
`Casing:
`
`13-3/8" set at 1130'. Circulated cement.
`9-5/8" set at 2821 '. Circulated cement.
`T' 26# HC-180 LTC casing set at 9035'. Calculated TOC 7000'.
`
`Tubing - workstring to frac down:
`
`3-112" 9.3# 180 Srd. EUE tubing.
`'\ ~ '• :'
`
`Production Tubing:
`
`2-3/8" 4.7# 180 8rd EUE
`
`Wellhead:
`
`SM production tree (regular trim) with extended neck hanger.
`Back pressure valve capabilities.
`
`Reservoir Pressure: BHP ± 4,000 psi.
`Maximum anticipated SITP = 3000-3400 psi.
`
`H2S: NoH2S.
`
`2 of 8
`
`Ex. 2102
`IPR2017-01232
`
`

`

`Garner 16 No. 1H- Completion Procedure for Devonian Horizontal Lateral
`October 15, 2001
`Page 3 ofS
`
`I. a) MIRU pulling unit.
`b) TIH with Packers Plus RockSeal openhole packers and FracPort tools on 3-1/2"
`9.3# L80 Srd EUE tubing. See attachmeflt for Depths for packers and FracPort
`tools.
`c) With packers on depth using tubing tally,
`1) RU wireline truck. Run GR-CCL to get the top packer on depth with
`the open hole logs, to ensure that the upper Devonian can be completed
`in the future.
`d) Set all 5 packers (hydraulic set packers). Each to set at a different pressure.
`e) TOH with tubing and setting tool.
`f) TIH with latch seal assembly. Latch into packer.
`g) Land tubing with extended neck hanger, with 40,000 lbs compression on top
`packer.
`h) ND BOP. NU 7-1/16" 10k frac valve. Test frac valve and tubing head to
`10,000 psi.
`Use BPV in mandrel hanger to provide isolation and to test surface equipment.
`i) Load 7" x 9-5/8" annulus.
`j) Test the 3-112" x 7" annulus to 4,000 psi.
`k) Rig up flowback company on frac valve. Install dual choke manifold to flow
`back through. Install ball catcher. Stake down all lines.
`
`2.
`
`a) Rig up Halliburton frac equipment to frac down 3-112" tubing.
`I bank of equipment for liquid.
`I bank of equipment for C02. Set anchbts for high pressure C02 lines.
`b) Rig up RA tagging company. Hook RA lines up to 4 PurrtP trucks.
`c) Test all surface lines to 10,000 psi.
`Install pop-offvalve on 3-112 x 7" annulus. Set and test to 4,000 psi on location.
`d)
`
`3. Acid frac the Devonian horizontal lateral down 3-112" tubing with a total of
`90,000 gals 17% ZCA acid and 5#,000 gals 17% HCL, all foamed with C02.
`
`The lateral will be treated in 5 stages.
`The job will be tagged with 3 isotope RA material.
`The acid in each stage will be tagged with a different material. (A,B,C,A,B)
`
`Design Rate:
`
`35BPM Foam
`
`7,500 psi
`Anticipated Treating Pressure:
`Maximum Allowable Treating Pressure: 10,000 psi
`
`Limiting fuctor on Max Treating Pressure is the wellhead rating.
`
`'.')
`
`3 of 8
`
`Ex. 2102
`IPR2017-01232
`
`

`

`Garner 16 No. lH- Completion Procedure for Devo11ian Horizontal Lateral
`October 15, 2001
`Page 4 of5
`
`The lateral will be treated in 5 stages. Each Stage to be pumped as foUows:
`1) Pump tbe stage as shown below.
`2) At the end of the overflush, drop the appropriate size FracPort ball in 40# linear
`gel. Pump _ bbls of 40# linear gel behind ball.
`3) Repeat Steps 1) and 2) until all 5 stages have been pumped.
`
`Pump Schedule For Each Stage:
`
`Foam Gals
`3,000
`3,000
`9,500
`30,000
`12,000
`10,000
`
`Type of Fluid
`17% slick acid
`slick water spacer
`linear gel pad
`17%ZCA
`17%HCL
`Flush and Overflush
`
`Liguid Gals
`2,550
`2,550
`7,600
`18,000
`7,200
`8,500
`
`C02
`15%
`15%
`20%
`40%
`40%
`15%
`
`Discuss with Packers Plus what rate to be pumping when.tbe ball lands in the FracPort
`tool.
`··
`
`Craig Rohwer to obtain floppy disk of job.
`
`4.
`
`5.
`
`a) Rig down Halliburton prior to beginning flowback.
`b) Flow back well until it cleans up good.
`c) Using ballcatcher, catch and keep all the FracPort balls.
`d) Monitor C02 and H2S levels 4 times per day.
`e) Produce well through rental stackpack. Turn well to sales after well cleans up,
`and when gas meets pipeline specs.
`f) Obtain gas sample as soon as well cleans up good.
`g)
`Install EOG stack pack ASAP, and release rental equipment.
`
`a) MIRU pulling unit 4-5 days after tbe acid frac.
`b) Kill tubing with treated fresh water.
`c) ND frac valve. NU SM BOP. Use BPV in mandrel hanger for isolation.
`d) Release latch seal assembly on packer. TOH with same.
`e) TIH with retrieving tool.
`f) Release the top packer. Shear release the openhole packers.
`g) TOH with 3-1/2" tubing and packers.
`
`6.
`
`a) Run After Frac log on 3-1/2" tubing.
`b) Run Protechnics memory tool on 3-1/2" tubing to the end ofthe lateral
`c) TOH with same.
`d) Lay down 3-1/2" tubing while TOH.
`
`4 of 8
`
`Ex. 2102
`IPR2017-01232
`
`

`

`Garner 16 No. lH- Completion Procedure for Devonian Horizontal Lateral
`October 15, 2001
`Page 5 of5
`
`7.
`
`a) TIH with SN and 2-3/8" 4.7# L80 Brd EUE production tubing to 9400' MD.
`b) Land tubing with donut and tubing adaptor (tubing bonnet).
`c) ND BOP, NU production tree.
`
`Vendors List
`
`Acid Frac Halliburton
`
`RA tag
`
`Protechnics
`
`Flowback Supervision- Field Discretion
`
`Packers and FracPort Tools
`
`Packers Plus
`
`Make sure all vendors that are bid out are on the Approved Vendors List.
`
`'II'
`
`KGC 10/15/2001
`m:\Files\Horizontal Wells\Devonian\Garner 16 No lH Acid Frac Procedure.doc
`
`5 of 8
`
`Ex. 2102
`IPR2017-01232
`
`

`

`Jlo,.lzottt.fal bt~ta<tl W•ll
`refftll &"""~' ~~-~
`

`.AdJtirbYt~ ~ BeM.J-Pilt
`l)pru-,.. ll f 1"0'1\hv\ .,.t vrt~ -~' me ,)1 Cu.I'V€.
`Sin~....,.... 'iSitr '?~,1/,
`
`(
`
`1 tA~,'i:J..
`
`7" u' lfe~t..1D '-T'-
`c.s~ .se-c @
`fr;JS'
`'Z-7° r.~+' e<-t.I"V< bwl~• /OC: calc.. Cfl ?()()D:
`
`6 of 8
`
`Ex. 2102
`IPR2017-01232
`
`

`

`I /-1
`Ga.rl\ er I~ No 1
`lo/}-z./ZC<Jl );:.el'i~s ~ P(t ci=:4-r.!'
`~c. .
`
`a.~'">J F'r-ttc P~r--t
`
`'70o Is
`
`?a.c~tr:
`
`. . ,CN c. jJ,,..t
`
`. 'f:f)/0~
`
`·.' ' ' ' ' '
`
`' " "-'"""'""""
`
`I
`
`..3
`
`951J{) I
`
`1()1 o~'
`
`/01 1!-IPo
`
`l'D I '/"itO I
`ff/ftxJ I
`
`-r~
`
`. . .
`
`.
`
`111 s~ ~~ /'11/;)
`
`"'
`s- ;
`
`(o
`
`'
`
`I
`
`9 2 ~()I .
`
`.
`
`9f3J) I
`
`IO,Z'!D I
`
`.
`
`/01 ?~o '
`
`111 /lo'
`
`2 \'f
`
`z
`
`;}'f
`
`,v~
`
`. bo fl.of Set ~a,c,/c.ar ab(JII'e..
`'!.:?1.0 '
`ls .. uAe 6elv'r.J. ;;tp.c_
`. fi-r a'f~~rs1 .flt.e,.e.
`• c,.n. Wo:t-t't -tD C!cwpf~-6'-
`1'tl... Z-3 mo~.r.
`
`u~ G~ -tJv....
`
`tb;
`
`-6, ¥Dt- pa.clu·.
`
`I
`j,
`
`7 of 8
`
`Ex. 2102
`IPR2017-01232
`
`

`

`Do It Once.
`Do It Right.
`
`Completion Proposal
`
`EOG
`
`t
`
`7"' casing set just into the target zone
`4.00" RSB seal assembly c/w latch unit c;~nd 2 ft bonded
`7" x 4.00" RSB retrievable seal bore packer w/
`selective release and tubing crossover
`
`3-1/2" 9.3# EUE NBO tubing as require<!
`J-.1/2" Rockseal FracPort tootw/ bali seat sub and internal lock
`3-1/2" 9.3# El)E NBO tubing as require<!
`
`....,__._ 7" x 3-1f2" Rocksea/11 open hole hydraulic set packer
`
`3-1/2" 9.3# EUE NBO tubing as require<!
`3-112" Rockseal FracPort taolw/ ball seat sub and Internal lock
`3-1/2" 9,3# EUE N80 tubing as required
`
`2 "
`
`7" x 3-1/2" Rocksealll open hole hydraulic set packer
`
`3-1/2" 9.3# EUE NBO tubing as require<!
`3-1/2" Rockseal FracPort toolw/ ball seat sub and lntemallock
`3-1/2" 9.3# EUE N80 tubing as required
`
`,,
`3
`I~
`
`~ 7" x 3-112" Rocksealll open hole hydmullc set packer
`
`J.-1/2" 9.3# EUE N80 tubing as required
`
`3-1/2" Rockseal FracPort toolw/ ball seat sub an<l intemalloc!(
`3-1/2" 9.3# EUE NBO tubing as required
`
`Y. "
`1 ~
`
`7" x 3~112" Rockseal US open hole packer 1 anchor wl solid shear release
`
`J-.1 12~ tubing as required
`
`...___ 7" x 3-1/2" Rockseal centralizer
`,...__ Ball and seat pump-out sub
`
`6-1/B" Open Hole
`
`eog0930
`
`8 of 8
`
`Ex. 2102
`IPR2017-01232
`
`

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket