`
` Treated
`
`2/13/2006Noted
`2/13/2006Approved in R1-060756
`2/13/2006Approved in R1-060755
`2/13/2006Noted
`2/13/2006Approved
`Date
`
`2/14/2006Agreed
`
`Not treated
`
`2/16/2006Noted
`
`2/15/2006Noted
`
`2/16/2006Revised in R1-060730
`2/15/2006Noted
`2/14/2006Noted
`2/16/2006Noted
`
`Not treated
`
`Not treated
`Not treated
`Withdrawn
`Not treated
`Withdrawn
`Noted in teleconference
`Noted
`Noted in teleconference
`
`2/14/2006Noted
`
`Withdrawn
`
`2/13/2006Noted
`
` = S4-050840
`
`2/13/2006Noted
`
` = S4-050798
`
`2/13/2006Noted
`
` = R5-052171
`
`2/13/2006Noted
`
` = R4-051413
`
`2/13/2006Noted
`
` = R2-053171
`
` = R2-053142
`
`Proposal
`
`Text
`
`Decision
`Proposal
`
`Text
`
`Proposal
`
`Text
`
`Decision
`Decision
`Discussion
`Decision
`Discussion/
`Decision
`Discussion/
`
`13.2.3.6
`13.2.3.4
`13.2.3.1
`
`13.2.2.3
`13.2.2.2
`13.2.2.1
`13.2.2
`13.1.3
`13.1.3
`
`Decision
`
`13.1.3
`
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Decision
`Discussion/
`Discussion
`Discussion
`Discussion
`
`Discussion
`
`Decision
`Discussion/
`
`Incoming LS
`
`Incoming LS
`
`Incoming LS
`
`Incoming LS
`
`Incoming LS
`
`Incoming LS
`
`Approval
`Approval
`Information
`Decision
`
`13.1.3
`13.1.3
`13.1.3
`13.1.2
`13.1.2
`13.1.2
`13.1.2
`
`2
`4
`3
`3
`
`5
`
`5
`
`5
`
`5
`
`5
`
`5
`
`9
`
`9
`
`Rrevised to
`
`(from)
`
`Type
`
`Agenda
`
`Item
`
`Source
`
`Title
`
`R1 #44 (February2006)
`
`List of WG1 Temporary Documents
`(Layer 1)
`3GPP TSG RAN Working Group 1
`
`Page 1
`
`Nokia
`Nokia
`Nokia
`
`Nokia
`Nokia
`Nokia
`Nokia
`Nokia
`Nokia
`
`Nokia
`
`Uplink Inter-cell interference mitigation and text proposal
`Uplink power control
`Random access message – text proposal
`Proposal
`Channel dependent Scheduling in E-UTRA uplink and Text
`UL Reference Signal Structure
`UL Modulation scheme
`
`R1-060295
`R1-060294
`R1-060293
`R1-060292Multiplexing between D-FDMA and L-FDMA
`R1-060291OFDMA Downlink inter-cell interference mitigation
`R1-060290
`
`EUTRA UE bandwidth capability
`
`R1-060298
`R1-060297
`R1-060296
`
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`
`cell identification
`EUTRA Cell Search for initial synchronization and neighbor
`
`R1-060289
`
`Yes
`
`R1-060288OFDMA Downlink L1/L2 control signalling
`Nokia
`R1-060287
`Nokia
`R1-060286
`Nokia
`R1-060285
`Nokia
`R1-060284MIMO Link adaptation for DL and UL E-UTRA
`Nokia
`R1-060283
`Nokia
`R1-060282On open loop MIMO with 4 Tx antennas
`Nokia
`R1-060281MIMO scheme for consideration in UTRA MIMO evaluations Nokia
`
`Downlink Link Adaptation - Power Allocation
`Resource block allocation - mapping rules
`Closed loop DL MIMO
`
`Single vs. multiple codewords for DL MIMO
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`
`mobile
`SA WG4, BenQ
`Ericsson, Nokia
`SA WG4,
`Ericsson
`RAN WG5,
`Nokia
`RAN WG4,
`Electronics
`RAN WG2, LG
`Qualcomm
`LS on Reference RAB Configurations for MBMS (To: RAN1)RAN WG2,
`Draft Report from RAN1 LTE Ad Hoc Meeting
`Draft Report from RAN1#43 Meeting
`Report from TSG RAN#30 and RAN1 LTE Ad Hoc
`Draft Agenda
`
`RAN1 Secretary
`RAN1 Secretary
`RAN1 Chairman
`RAN1 Chairman
`
`HSDPA MIMO Evaluation
`HSDPA/EUL (To: RAN2, Cc: RAN1, RAN4, RAN5, SA1)
`profile for the performance characterization of VoIMS over
`Liaison Statement from RAN2 on RAB and the error-delay-
`RAN1)
`LS on Higher data rates in MBMS user service (To: SA1, Cc:
`+ Interactive 0 kbps (To: RAN1)
`LS on Puncturing limit for Conversational / speech 12.2 kbps
`HSDPA/HSUPA (To: RAN2, RAN1, Cc: RAN3)
`Improved Support of IMS Realtime Services using
`Value range for Qoffmbms (To: RAN1, RAN4)
`
`Nokia
`
`R1-060280
`
`R1-060279
`
`Yes
`
`R1-060278
`
`R1-060277
`
`R1-060276
`
`R1-060275
`
`R1-060274
`R1-060273
`R1-060272
`R1-060271
`R1-060270
`Number
`Tdoc
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Available
`
`ZTE/SAMSUNG 1021-0001
`
`1
`
`APPLE 1021
`
`
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Noted
`
`Decision
`Discussion/
`
`Decision
`Discussion/
`
`Decision
`Discussion/
`
`Decision
`Discussion/
`
`Decision
`Discussion/
`
`Decision
`Discussion/
`
`Discussion
`
`Decision
`Discussion/
`
`13.1.3
`
`Page 2
`
`Corporation
`Sharp, Toshiba
`Panasonic,
` NEC,
`Electric,
`Intel, Mitsubishi
`Ericsson, Fujitsu,
` NTT DoCoMo,
`
`13.1.3
`
`13.1.3
`
`13.1.3
`
`13.1.2
`
`Corporation
`Sharp, Toshiba
`Panasonic,
`Nokia,
`Electric, NEC,
`Mitsubishi
`Ericsson, Fujitsu,
`NTT DoCoMo,
`Sharp
`Panasonic,
`NTT DoCoMo,
`Corporation
`Toshiba
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`Corporation
` Sharp, Toshiba
`Panasonic,
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`Corporation
`Sharp, Toshiba
`Panasonic,
`Electric, NEC,
`Mitsubishi
`Ericsson, Fujitsu,
`NTT DoCoMo,
`Sharp
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`Inc.
`Semiconductor
`R1 #44 (February2006)
`Freescale
`
`13.1.3
`
`13.1.3
`
`13.1.3
`
`E-UTRA Downlink
`Link Adaptation Scheme for Single-antenna Transmission in
`
`R1-060306
`
`Yes
`
`E-UTRA Downlink
`Distributed FDMA Transmission for Shared Data Channel in
`
`R1-060305
`
`Yes
`
`R1-060304MBMS Channel Structure for E-UTRA Downlink
`
`Yes
`
`Paging Channel Structure for E-UTRA Downlink
`
`R1-060303
`
`Yes
`
`Broadcast Channel Structure for E-UTRA Downlink
`
`R1-060302
`
`Yes
`
`L1/L2 Control Channel Structure for E-UTRA Downlink
`
`R1-060301
`
`Yes
`
`R1-060300Orthogonal Pilot Channel Structure for Sectored Beams in E-
`
`UTRA Downlink
`
`Yes
`
`EUTRA Downlink MIMO configurations and comparisons
`
`R1-060299
`
`Yes
`
`ZTE/SAMSUNG 1021-0002
`
`2
`
`
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Decision
`Discussion/
`
`13.1.3
`
`Decision
`Discussion/
`
`13.1.3
`
`Decision
`Discussion/
`
`13.1.3
`
`Decision
`Discussion/
`
`13.1.3
`
`Proposal
`
`Text
`
`13.1.3
`
`Proposal
`
`Text
`
`13.1.3
`
`Proposal
`
`Text
`
`13.1.3
`
`Page 3
`
`Corporation
`Toshiba
`NEC, Sharp,
`NTT DoCoMo,
`Corporation
`Toshiba
`Panasonic,
`Fujitsu, NEC,
`NTT DoCoMo,
`Sharp
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`NEC, Sharp
`NTT DoCoMo,
`Corporation
`Sharp, Toshiba
`Panasonic,
`Motorola, NEC,
`Electric,
`Mitsubishi
`Ericsson, Fujitsu,
`NTT DoCoMo,
`
`Corporation
`Toshiba
`Sharp, Siemens,
`Panasonic,
`Nokia,
`Electric, NEC,
`Mitsubishi
`Ericsson, Fujitsu,
`NTT DoCoMo,
`
`Corporation
`Toshiba
`Sharp, Siemens,
`Panasonic,
`Motorola, NEC,
`Electric,
`Mitsubishi
`Ericsson, Fujitsu,
`NTT DoCoMo,
`
`Code for Shared Data Channel in E-UTRA Downlink
`Performance Comparison between Turbo Code and LDPC
`
`R1-060314
`
`Yes
`
`Downlink
`Cell Search Method for Connected and Idle Mode in E-UTRA
`
`R1-060313
`
`Yes
`
`Cell Search Method for MIMO Node B in E-UTRA Downlink
`
`R1-060312
`
`Yes
`
`Downlink
`SCH Structure and Cell Search Method for E-UTRA
`
`R1-060311
`
`Yes
`
`Procedure
`Frequency Domain Structure and Basic Cell Search
`Text Proposal on Cell Search in Evolved UTRA(3):
`
`R1-060310
`
`Yes
`
`Structure
`Text Proposal on Cell Search in E-UTRA(2): Sub-frame
`
`R1-060309
`
`Yes
`
`Structure
`Text Proposal on Cell Search in E-UTRA(1): Radio Frame
`
`R1-060308
`
`Yes
`
`Decision
`Discussion/
`
`13.1.3
`
`Corporation
`Sharp, Toshiba
` Panasonic,
`Electric, NEC,
`Mitsubishi
`Ericsson, Fujitsu,
`R1 #44 (February2006)
`NTT DoCoMo,
`
`Downlink
`Link Adaptation Scheme for MIMO Transmission in E-UTRA
`
`R1-060307
`
`Yes
`
`ZTE/SAMSUNG 1021-0003
`
`3
`
`
`
`Not treated
`
`2/15/2006Revised in R1-060724 merged with
`
`text from R1-050355
`
`2/15/2006Noted
`
`2/16/2006Noted
`
`2/15/2006Noted
`
`Not treated
`
`Not treated
`
`2/16/2006Noted
`
`2/16/2006Noted
`
`Not treated
`
`Not treated
`
`Decision
`13.2.3.4Discussion/
`
`Decision
`13.2.3.3Discussion/
`
`Decision
`13.2.3.2Discussion/
`
`Decision
`13.2.3.1Discussion/
`
`Decision
`13.2.2.4Discussion/
`
`Decision
`13.2.2.3Discussion/
`
`Decision
`13.2.2.2Discussion/
`
`Decision
`13.2.2.1Discussion/
`
`Page 4
`
`Corporation
`Sharp, Toshiba
`Fujitsu, NEC,
`NTT DoCoMo,
`Corporation
`Sharp,Toshiba
`NEC, Panasonic,
`Ericsson, Fujitsu,
`NTT DoCoMo,
`Sharp
`Panasonic,
`Fujitsu, NEC,
`NTT DoCoMo,
`Corporation
`Sharp, Toshiba
`Panasonic,
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`Corporation
`Sharp, Toshiba
`Panasonic,
`Fujitsu,
`NTT DoCoMo,
`Corporation
`Toshiba
`NEC, Sharp,
`NTT DoCoMo,
`Corporation
`Sharp, Toshiba
`Panasonic,
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`NTT DoCoMo
`
`Decision
`13.2.2.1Discussion/
`
`Corporation
`Sharp, Toshiba
`Panasonic,
`Electric, NEC,
`Mitsubishi
`Ericsson, Fujitsu,
`NTT DoCoMo,
`Corporation
`Toshiba
`Fujitsu, Sharp,
`NTT DoCoMo,
`Corporation
`Toshiba
`Fujitsu, Sharp,
`R1 #44 (February2006)
`NTT DoCoMo,
`
`Decision
`Discussion/
`
`Decision
`Discussion/
`
`13.1.3
`
`13.1.3
`
`Channel in E-UTRA Uplink
`CQI-Based Transmission Power Control for L1/L2 Control
`
`R1-060325
`
`Yes
`
`Link Adaptation for E-UTRA Uplink
`
`R1-060324
`
`Yes
`
`Channel-dependent Scheduling for E-UTRA Uplink
`
`R1-060323
`
`Yes
`
`Random Access Channel Structure for E-UTRA Uplink
`
`R1-060322
`
`Yes
`
`R1-060321Mappings between Transport Channels and Physical
`
`Channels for E-UTRA Uplink
`
`Yes
`
`L1/L2 Control Channel Structure for E-UTRA Uplink
`
`R1-060320
`
`Yes
`
`R1-060319Orthogonal Pilot Channel Structure for E-UTRA Uplink
`
`Yes
`
`R1-060318Optimum Roll-off Factor for DFT-Spread OFDM Based SC-
`
`FDMA in Uplink
`
`Yes
`
`Uplink
`Comparisons on 16QAM Modulation Schemes for E-UTRA
`
`R1-060317
`
`Yes
`
`UE Capability in E-UTRA Downlink
`
`R1-060316
`
`Yes
`
`R1-060315Mappings between Transport Channels and Physical
`
`Channels for E-UTRA Downlink
`
`Yes
`
`ZTE/SAMSUNG 1021-0004
`
`4
`
`
`
`2/15/2006Merged into R1-060724
`2/15/2006Agreed
`2/15/2006Noted
`
`Not treated
`Not treated
`
`Proposal
`
`Text
`
`Proposal
`
`Text
`
`Text
`
`2/15/2006Revised in R1-060718
`
`R1-060718
`
`Text
`
`2/15/2006Noted
`
`Not treated
`Not treated
`
`Not treated
`Not treated
`Not treated
`Not treated
`
`Not treated
`Not treated
`Revised in R1-060717
`Noted
`Noted
`
`Revised in R1-060715
`Noted
`Noted
`Not treated
`
`R1-060717
`
`R1-060715
`
`2/14/2006Revised in R1-060710
`
`R1-060710
`
`2/14/2006Noted
`
`2/13/2006Rejected
`
`2/13/2006Rejected
`
`2/16/2006Text proposal was agreed.
`
`Not treated
`Not treated
`
`Not treated
`
`Text
`
`Decision
`Discussion/
`Proposal
`
`Proposal
`
`Text
`
`Text
`
`Proposal
`
`Text
`
`13.1.3
`
`13.1.3
`
`13.1.3
`13.1.3
`13.1.3
`
`13.1.3
`
`Decision
`Discussion/
`Proposal
`
`Text
`
`Decision
`Discussion/
`Proposal
`
`Text
`
`Proposal
`
`Text
`
`13.1.2
`
`Decision
`Discussion/
`Discussion
`Proposal
`
`Proposal
`
`Text
`
`Text
`
`Decision
`Discussion/
`
`CR
`
`CR
`
`6.3
`
`6.3
`
`Decision
`Discussion/
`
`13.2.5
`
`13.2.3.3
`13.2.3.2
`Decision
`13.2.3.2Discussion/
`Proposal
`13.2.3.1
`Decision
`13.2.3.1Discussion/
`Proposal
`13.2.2.4
`
`Decision
`13.2.2.4Discussion/
`
`13.2.2.3Discussion
`Decision
`Discussion/
`Proposal
`
`13.1.3
`13.1.2
`13.1.2
`13.1.2
`
`13.1.2
`13.1.2
`13.1.3
`13.1.1
`
`13.1.1
`
`Samsung
`
`Samsung
`
`Samsung
`
`Samsung
`Samsung
`Samsung
`
`Samsung
`
`Samsung
`Samsung
`Samsung
`Samsung
`
`Samsung
`
`Samsung
`Samsung
`Samsung
`Chairman
`MIMO AH
`Chairman
`MIMO AH
`Agere Systems
`
`Agere Systems
`
`Decision
`13.2.3.4Discussion/
`13.2.3.1Discussion
`Decision
`13.1.3
`Discussion/
`
`Huawei
`Huawei
`Huawei
`Corporation
` Toshiba
`Sharp,
`Panasonic,
`Electric,
`Mitsubishi
`Fujitsu,
`R1 #44 (February2006)
`NTT DoCoMo,
`
`
`
`Page 5
`
`Samsung
`Samsung
`Samsung
`Samsung
`Samsung
`Samsung
`
`Link adaptation for uplink and text proposal
`Text proposal on uplink scheduling
`Uplink scheduling
`Text proposal on physical random access procedure
`Physical random access procedure
`Text proposal on resource unit
`and text proposal
`LFDMA and DFDMA multiplexing in evolved UTRA uplink
`L1/L2 Control Signalling Multiplexing in Evolved UTRA UplinkSamsung
`
`UE Capability in E-UTRA Uplink
`
`R1-060326
`
`Yes
`
`R1-060347Multiplexing of Broadcast and Unicast Traffic
`
`and Text Proposal
`Link Adaptation Considerations for Evolved UTRA Downlink
`Text proposal on rules for mapping VRBs to PRBs
`Rules for mapping VRBs to PRBs
`Text proposal on downlink ACK channel
`mapping
`Text proposal on cell search and related physical channel
`Cell search and related physical channel mapping
`Text Proposal on MIMO for E-MBMS
`
`Text Proposal on MIMO Beamforming for Evolved UTRA
`UTRA
`Text Proposal on Open-Loop Transmit Diversity for Evolved
`Text Proposal on MIMO for Evolved UTRA
`Downlink MIMO for Evolved UTRA
`LTE channel coding
`discussion
`Text proposal incorporating LTE MIMO teleconference
`Summary of LTE MIMO teleconference discussion
`HS-PDSCH"
`25214 CR0415 (Rel-6, A) "Clarification of Power Control for
`HS-PDSCH"
`25214 CR0414 (Rel-5, F) "Clarification of Power Control for
`functions for PAPR reduction
`Cubic metric performances of optimum spectrum-shaping
`RACH design for E-UTRA
`Non-hierarchical cell search for E-UTRA
`
`R1-060337
`
`R1-060336
`R1-060335
`R1-060334
`R1-060333
`
`R1-060332
`
`R1-060331
`
`R1-060330
`
`R1-060329
`R1-060328
`R1-060327
`
`R1-060341
`R1-060340
`R1-060339MIMO for E-MBMS
`R1-060338
`
`R1-060355
`R1-060354
`R1-060353
`R1-060352
`R1-060351
`R1-060350
`
`R1-060349
`
`R1-060348
`
`R1-060346
`
`R1-060345
`R1-060344
`R1-060343
`
`R1-060342
`
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`ZTE/SAMSUNG 1021-0005
`
`5
`
`
`
`Not treated
`Not treated
`Not treated
`
`2/15/2006Noted
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`2/14/2006Noted
`
`2/14/2006Noted
`
`2/14/2006Noted
`
`Not treated
`Withdrawn
`
`Revised in R1-060671
`
` = R1-060154
`
`R1-060365
`
`Not treated
`
` = R1-060155
`
`2/15/2006Endorsed as v1.1.0 in R1-060714
`
`Noted
`
`Noted
`
`Not treated
`
`2/14/2006Noted. Text proposal was reivsed in
`
`R1-060702
`
`Not treated
`
`2/13/2006Agreed
`2/16/2006Noted
`
`Decision
`13.2.2.2Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Proposal
`
`Text
`
`13.1.3
`
`Decision
`Discussion/
`Decision
`Discussion/
`Proposal
`
`Text
`
`13.1.3
`13.1.3
`13.1.3
`
`Decision
`13.2.3.2Discussion/
`
`Decision
`13.2.3.1Discussion/
`Proposal
`
`13.2.2.3
`
`Text
`
`Proposal
`
`Text
`
`13.2.2.2
`
`13.1.3
`
`13.1.3
`
`Decision
`Discussion/
`
`13.1.3
`
`Discussion
`
`13.1.3
`
`Decision
`13.1.3
`Discussion/
`Decision
`13.2.2.1Discussion/
`13.2.2.5Discussion
`
`Decision
`13.2.2.3Discussion/
`
`TR
`
`13
`
`Decision
`Discussion/
`
`Proposal
`
`Text
`
`13.1.2
`
`13.1.2
`
`Decision
`13.2.2.4Discussion/
`
`Proposal
`
`Text
`
`13.1.3
`
`Decision
`Discussion/
`Decision
`Discussion/
`13.2.3.5Discussion
`
`13.1.3
`
`10
`
`Feedback for Single Carrier FDMA in Evolved UTRA Uplink
`Scheduling and Multiplexing of CQI and ACK/NACK
`TR25.814 v.1.0.3 Physical Layer Aspects for Evolved UTRAEditor (NTT
`and Simulation results
`NEC Group
`Inc.
`Semiconductor
`Freescale
`Orange
`France Telecom,
`
`Number of codewords in DL MIMO and text proposal
`
`Duo-Binary Turbo Codes for evolved UTRA
`
`InterDigital
`
`DoCoMo)
`
`R1-060362MIMO techniques for Downlink E-UTRA: Detailed description
`
`Mobile, Vodafone
`IPWireless, T-
`Wireless,
`Orange, Cingular
`France Telecom,
`
`Interference cancellation for LTE & TP for TR25.814
`
`R1-060359
`
`Yes
`
`Siemens
`Siemens
`R1 #44 (February2006)
`Samsung
`
`Considerations on E-UTRA Cell Search and Initial Access
`Beta boosting for SIR target lowering concept
`Uplink HARQ consideration
`
`R1-060358
`R1-060357
`R1-060356
`
`Yes
`Yes
`Yes
`
`R1-060370
`
`R1-060369
`
`Yes
`
`R1-060368
`
`R1-060367
`R1-060366
`
`Yes
`
`Yes
`
`R1-060365
`
`Yes
`
`R1-060364
`
`Yes
`
`R1-060363
`
`Yes
`
`Yes
`
`R1-060361
`
`Yes
`
`R1-060360
`
`Yes
`
`Page 6
`
`Motorola
`Motorola
`Motorola
`
`Localized Transmission for E-MBMS
`Cell Search and Initial Acquisition for EUTRA
`E-UTRA Downlink Control Channel Structure and TP
`
`SC-FDMA
`Uplink Throughput Comparison of Localized and Distributed
`
`RACH preamble design for E-UTRA
`
`Text Proposal for Downlink CQI Reporting Timing for EUTRATexas
`
`Instruments
`Texas
`Instruments
`Texas
`Instruments
`
`Instruments
`Texas
`Instruments
`Texas
`Instruments
`Texas
`Instruments
`Texas
`Instruments
`Texas
`Instruments
`Texas
`Instruments
`Texas
`InterDigital
`InterDigital
`
`InterDigital
`
`Considerations
`EUTRA Downlink Unicast Pilot Frequency Spacing
`EUTRA
`Text Proposal for Inter-cell Interference Mitigation for
`Downlink
`Planning for Inter-Cell Interference Mitigation in EUTRA
`Signaling Requirements to Support Semi-Static Frequency
`Semi-Static Frequency Planning for EUTRA Downlink
`Performance of Inter-Cell Interference Mitigation with
`Considerations on SCH for Cell Search in E-UTRA
`
`Rate Matching Using Mixed Modulation Method
`Simulation results
`Extension of Uplink MIMO SC-FDMA with Preliminary
`
`Text Proposal for Uplink Reference Signal Structure
`OFDMA
`Comparison of Proposed Uplink Pilot Structures for SC-
`MBMS for EUTRA Downlink
`R1-060372Multiplexing of Unicast Pilot and Control Channels in E-
`R1-060371
`
`R1-060374
`
`R1-060373
`
`R1-060380
`R1-060379
`R1-060378
`
`Yes
`Yes
`Yes
`
`R1-060377
`
`Yes
`
`R1-060376
`
`R1-060375
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`ZTE/SAMSUNG 1021-0006
`
`6
`
`
`
`Noted in teleconference
`Noted
`
`2/13/2006Revised in R1-060693
`
`2/13/2006Revised in R1-060696
`
`2/13/2006Revised in R1-060692
`
`R1-060692
`
`2/13/2006Agreed
`
`Withdrawn
`
`2/14/2006Noted
`
`2/16/2006Noted
`2/16/2006Noted
`
`Not treated
`Withdrawn
`
`2/14/2006Agreed
`
`Not treated
`
`2/14/2006Agreed
`2/15/2006Noted
`
`Text
`
`Proposal
`
`Text
`
`Proposal
`
`Text
`
`Decision
`Discussion/
`Discussion
`Proposal
`
`Text
`
`Text
`
`Discussion
`Proposal
`
`Text
`
`Proposal
`
`Text
`
`Proposal
`
`Text
`
`10
`
`10
`
`10
`
`10
`
`5
`
`6.5
`
`2/16/2006Text proposal was Revised in R1-
`
`Revised in R1-060698
`Not treated
`060737
`
`R1-060698
`
`Text
`
`R1-050737
`
`2/16/2006some part of text proposal included
`
`Not treated
`Not treated
`in R1-060730
`
`Not treated
`
`Not treated
`
`2/15/2006Noted
`
`Not treated
`Not treated
`
`Text
`
`Proposal
`
`Text
`
`Decision
`Discussion/
`Proposal
`
`Text
`
`Proposal
`
`Text
`
`2/16/2006Noted
`
`Text
`
`2/15/2006Revised in R1-060716
`
`Not treated
`
`Not treated
`
`2/16/2006Noted
`
`13.2.2.5Discussion
`13.1.2
`Discussion
`Decision
`Discussion/
`Proposal
`
`Page 7
`LG Electronics
`LG Electronics
`NEC Group
`
`Siemens
`Siemens
`Nokia, Philips,
`Siemens
`Qualcomm,
`Nokia, Philips,
`Ericsson, Lucent,
`
`13.2.3.5
`Decision
`13.2.3.5Discussion/
`Proposal
`13.2.2.3
`13.1.3
`13.2.3.6
`
`13.1.3
`
`Decision
`Discussion/
`13.2.3.5Discussion
`Decision
`13.2.2.4Discussion/
`Proposal
`13.2.3.4
`
`13.2.2.4
`13.2.3.2Discussion
`Proposal
`13.2.3.5
`13.1.3
`
`13.2.3.4
`
`13.2.5
`
`13.2.2.2
`
`13.2.2.4
`
`Siemens
`ZTE
`Motorola
`Motorola
`Motorola
`Motorola
`Motorola
`
`Motorola
`
`Motorola
`Motorola
`Motorola
`Motorola
`
`Motorola
`
`Motorola
`Motorola
`
`Motorola
`
`Motorola
`
`Motorola
`
`Motorola
`
`13.2.2.2Discussion
`13.2.3.1Discussion
`Proposal
`13.2.3.4
`13.2.3.4Discussion
`13.1.3
`Discussion
`13.1.3
`Discussion
`Decision
`13.1.3
`Discussion/
`13.1.3
`Discussion
`
`Motorola
`Motorola
`Motorola
`Motorola
`Motorola
`Motorola
`Motorola
`R1 #44 (February2006)
`Motorola
`
`R1-060413Orthogonal Collaborative Spatial Multiplexing (OCSM) for
`Further Simulation Result of High-Rate Space-Time Codes
`R1-060412
`Radio link synchronisation in SIR_target reduction
`R1-060411
`summary tables
`Text proposal to TR 25.903 to Continuous Connectivity
`Connectivity concepts
`Text proposal to TR 25.903 to comparing Continuous
`
`Uplink E-UTRA
`
`R1-060410
`
`R1-060409
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Continuous Connectivity
`Text proposal to TR 25.903 to clarify terminology for
`
`R1-060408
`
`Yes
`
`for LTE
`Draft LS answer to RAN3 R3-060085 (=R1-060004) on RRM
`Intra-frame Code Hopping for 1.28Mcps TDD
`TP“Uplink H-ARQ timing and number of processes”
`Uplink H-ARQ timing and number of processes
`E-UTRA Uplink Control Channel Design and TP
`CSD and STBC performance
`Allocation and UE Alignment for E-UTRA +TPs
`Interference Mitigation via Power Control, FDM Resource
`Resource Allocation mapping rules and TP
`channel
`Text proposal for frequency mapping for uplink physical
`VoIP Group scheduling
`VoIP and HARQ for E-UTRA + TP
`Downlink Localized and Distributed Multiplexing
`
`R1-060407
`R1-060406
`R1-060405
`R1-060404
`R1-060403
`R1-060402
`R1-060401
`
`R1-060400
`
`R1-060399
`R1-060398
`R1-060397
`R1-060396
`
`HARQ considerations fro E-UTRA
`
`R1-060395
`
`Variable TTI for LTE
`UE Power Management for E-UTRA + TP
`TP
`PA power de-rating reduction scheme for DFT-SOFDM and
`Uplink UE Capability
`TP
`E-UTRA SC-FDMA Uplink Pilot/Reference Signal Design &
`Allocation & TP
`E-UTRA SC-FDMA Uplink Resource Block, Resource
`Structures for E-UTRA Uplink SC-FDMA
`Performance Comparison of Pilot/Reference Signal
`RACH Design for E-UTRA
`25.814
`Text proposal for replacing "PAPR" with "Power De-rating" in
`Cubic Metric in 3GPP-LTE
`LDPC codes for EUTRA
`EUTRA FEC Enhancements
`Downlink UE Capability
`Frequency Domain Scheduling for E-UTRA
`
`R1-060394
`R1-060393
`
`R1-060392
`
`R1-060391
`
`R1-060390
`
`R1-060389
`
`R1-060388
`R1-060387
`R1-060386
`R1-060385
`R1-060384
`R1-060383
`R1-060382
`R1-060381
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`
`ZTE/SAMSUNG 1021-0007
`
`7
`
`
`
`Not treated
`Not treated
`
`2/17/2006Agreed
`
`Noted
`
`Not treated
`
`Not treated
`
`Not treated
`
`Noted
`
`Not treated
`
`Not treated
`
`Noted
`Noted
`2/14/2006Noted
`
`Not treated
`Not treated
`
`Withdrawn
`
`Withdrawn
`
`Withdrawn
`
`Not treated
`
`Noted
`
`2/16/2006Noted
`
`2/14/2006Noted
`
`(R1=060072)
`
`2/14/2006Revised in R1-060704
`
`R1-060704
`
`2/14/2006Agreed
`
`2/14/2006Text proposal was revised in R1-
`
`0060703
`
`2/14/2006Noted
`
`R1-060703
`
`Discussion
`Discussion
`Decision
`Discussion/
`
`13.2.5
`13.1.3
`13.1.2
`
`Decision
`Discussion/
`
`13.1.3
`
`Decision
`Discussion/
`
`13.1.3
`
`Decision
`Discussion/
`
`13.1.3
`
`Decision
`Discussion/
`
`13.1.2
`
`Discussion
`
`13.1.3
`
`Decision
`Discussion/
`
`Discussion
`
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Proposal
`
`Text
`
`Decision
`Discussion/
`Decision
`Discussion/
`Proposal
`
`Text
`
`Proposal
`
`Text
`
`Proposal
`
`Text
`
`Proposal
`
`Text
`
`Proposal
`
`Text
`
`13.1.3
`
`13.1.2
`
`13.1.2
`
`9
`
`13.1.3
`13.1.3
`
`13.2.2
`
`13.2.2
`
`13.1.2
`
`13.1.2
`
`13.1.2
`
`13.1.3
`
`2/14/2006Noted
`
`Discussion
`
`13.1.3
`
`Decision
`13.2.2.5Discussion/
`
`Samsung
`Samsung
`ETRI
`Corporation
`Toshiba
`NEC, Sharp,
`NTT DoCoMo,
`Corporation
`NEC, Toshiba
`NTT DoCoMo,
`Sharp
`Electric, NEC,
`Fujitsu, Mitsubishi
` NTT DoCoMo,
`Panasonic, Sharp
`Mitsubishi Electric,
`NTT DoCoMo,
`Corporation
`Toshiba
`NEC, Sharp,
`NTT DoCoMo,
`Texas Instruments
`
`Page 8
`
`Texas Instruments
`
`Texas Instruments
`
`Texas Instruments
`
`ETRI
`
`ETRI
`
`SHRCWC
`
`SHRCWC
`
`13.2.2
`
`13.2.3.6
`
`13.2.3.6
`
`13.1.3
`
`13.1.3
`
`SHRCWC
`SHRCWC
`RITT, CATT,
`SHRCWC
`RITT, CATT,
`SHRCWC
`RITT, CATT,
`CATT
`RITT, Huawei,
`CATT
`RITT, Huawei,
`RITT
`CATT
`RITT, Huawei,
`CATT
`RITT, Huawei,
`R1 #44 (February2006)
`RITT
`
`procedure for E-UTRA
`Timing and cell-specific info detection in cell search
`Aspects and Design of DL SYNC channel (SCH) for E-UTRATexas Instruments
`Strategies for MIMO E-UTRA Systems
`System Level Evaluation of Scheduling and Decoding
`Impact of TX diversity on MIMO E-MBMS
`Further Consideration of MIMO for Rel.7 WCDMA
`Text Proposal for Cell Search and SCH Structure
`Cell Search Scheme for EUTRA
`Estimation
`Initial Performance of DFT-S-GMC with Real Channel
`Clustered DFT-S-OFDM
`Comparison of PAPR/CM Performance of DFT-S-GMC with
`Scheme
`Some Simulation Results for OOC Space Time Diversity
`CSI feedback for EUTRA MIMO
`
`R1-060420Offset DFT-Spread OFDM with Generalized Raised-Cosine
`R1-060419
`
`Eigen-mode close-loop transmission for EUTRA MIMO
`Filters for Pulse Shaping
`
`with cancellation in uplink and TP
`Combining Inter-cell-interference co-ordination/avoidance
`TP on uplink inter-cell interference cancellation
`interleave-division multiple access
`
`with cancellation in downlink and TP
`Combining Inter-cell-interference co-ordination/avoidance
`detection/subtraction and TP
`Requirements of downlink Inter-cell interference
`interference cancellation
`Further simulation results of IDMA-based inter-cell
`
`R1-060415
`
`R1-060414
`
`R1-060417On generation and allocation of interleaver patterns for
`R1-060416
`
`Uplink UE bandwidth capability
`Downlink UE bandwidth capability
`antennas
`Combined STBC/CDD transmission scheme for multiple
`
`R1-060440
`R1-060439
`R1-060438
`
`Yes
`Yes
`Yes
`
`Basic Schemes in Uplink MIMO Channel Transmissions
`
`R1-060437
`
`Yes
`
`UTRA Downlink
`Comparison of SCH Structures for Timing Detection in E-
`
`R1-060436
`
`Yes
`
`Hybrid ARQ Scheme for E-UTRA Downlink
`
`R1-060435
`
`Yes
`
` in E-UTRA Downlink
`Investigations on Pilot Channel Structure for MBMS
`
`R1-060434
`
`Yes
`
`Basic Schemes in Downlink MIMO Channel Transmissions
`
`R1-060433
`
`Yes
`
`R1-060432
`
`R1-060431
`
`R1-060430
`
`R1-060429
`R1-060428
`R1-060427
`R1-060426
`
`R1-060425
`
`R1-060424
`
`R1-060423
`
`R1-060422
`
`R1-060421
`
`R1-060418
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`ZTE/SAMSUNG 1021-0008
`
`8
`
`
`
`Not treated
`
`2/14/2006Noted
`
`2/14/2006Noted
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Noted
`
`Noted
`
`Noted
`
`Noted
`
`Noted
`
`Noted
`
`Noted
`
`1/13/2006Noted.
`
`2/17/2006Text proposal was agreed.
`
`2/13/2006Noted
`
`2/17/2006Noted
`
`2/14/2006Noted
`
`2/14/2006Noted
`
`Merged into R1-060568
`
`1/13/2006Noted.
`
`Revised in R1-060739
`
`Revised in R1-060672
`Not treated
`
`2/14/2006Revised in R1-060707
`
`Revised in R1-060680
`
`R1-060739
`
`R1-060672
`
`R1-060707
`
`R1-060680
`
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`
`13.1.3
`
`13.1.3
`
`13.1.3
`
`Discussion
`
`13.1.3
`
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`
`13.1.3
`
`13.1.3
`
`13.1.2
`
`13.1.2
`
`Discussion
`
`13.1.2
`
`Discussion
`
`13.1.2
`
`Discussion
`
`13.1.2
`
`Decision
`Discussion/
`
`13.1.2
`
`Discussion
`
`13.1.2
`
`Information
`
`Decision
`Discussion/
`Decision
`Discussion/
`
`Discussion
`
`Discussion
`
`Discussion
`
`Discussion
`
`Decision
`Discussion/
`Decision
`Discussion/
`
`Proposal
`
`Text
`
`Decision
`Discussion/
`Proposal
`
`Text
`
`Approval
`Discussion/
`
`6.5
`
`10
`
`10
`
`10
`
`9
`
`9
`
`9
`
`6.5
`
`5
`
`13.1.3
`
`13.1.3
`
`13.1.2
`
`13.1.3
`
`13.1.3
`
`13.2.2.5
`
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Research
`Infocomm
`Institute for
`TD Tech
`
`Nokia
`
`R1 #44 (February2006)
`Nokia
`
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Further details on HS-SCCH-less operation for VoIP traffic Qualcomm
`legacy Rel-5 UEs
`Compatibility analysis: Impact of 2x2 MIMO operation on
`increase over 1x2 Type III receiver
`2x2 MIMO with Interference Cancellation: Complexity
`upcoming evaluation phase
`Proposal for selection of a Rel-7 MIMO scheme for the
`
`R1-060446On the power control for Rel. 6
`
`Draft LS reply to SA4 on Delay Profiles for VoIP
`
`R1-060445
`
`UTRA
`Text Proposal on Uplink Transmit Antenna Selection for E-
`
`R1-060444
`
`Yes
`
`R1-060443
`R1-060442OFDMA Downlink Physical Layer Measurements - Text
`R1-060441Micro cell scenario for early evaluation of MIMO in EUTRA
`
`Downlink cell search design for E-UTRA TDD
`proposal
`
`Multiple Access
`
`Yes
`
`Yes
`
`Yes
`
`Page 9
`
`DL UE capability: RF and Baseband Limitations
`
`Inter-cell Interference Mitigation on E-UTRA Downlink
`
`Inter-cell Interference Suppression in E-UTRA Downlink
`
`R1-060468
`
`R1-060467
`
`R1-060466
`
`DL Acquisition for E-UTRA
`Downlink
`RV and Modulation Order for Synchronous HARQ in
`R1-060463Multiplexing DL Multicast and Unicast Transmissions
`
`R1-060465
`
`R1-060464
`
`DL PHY channels - Channel Multiplexing
`
`DL PHY channels - Overall structure
`
`DL SDMA in E-UTRA
`
`Implications of MCW MIMO on DL HARQ
`Precoding
`Link Analysis of Single and Multi Codeword Schemes -
`Precoding
`Description of Single and Multi Codeword Schemes with
`Precoding
`Link Analysis of Single and Multi Codeword Schemes - No
`Control Channel Issues for DL MIMO
`
`R1-060454Overview of DL Spatial Multiplexing Schemes for E-UTRA
`
`F-DPCH support in early Rel-6 UE
`
`Further details of DRX proposal
`
`Demodulation impact of DPCCH gating
`
`R1-060462
`
`R1-060461
`
`R1-060460
`
`R1-060459
`
`R1-060458
`
`R1-060457
`
`R1-060456
`
`R1-060455
`
`R1-060453
`
`R1-060452
`
`R1-060451
`
`R1-060450
`
`R1-060449
`
`R1-060448
`
`R1-060447
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`ZTE/SAMSUNG 1021-0009
`
`9
`
`
`
`Withdrawn
`
`Noted
`
`Noted
`
`2/13/2006Noted
`Noted
`
`2/13/2006Approved as final version
`
`2/14/2006Noted
`
`Not treated
`
`2/14/2006Text proposal was revised in R1-
`
`2/14/2006Noted
`060706
`
`2/14/2006Text proposal was revised in R1-
`
`Not treated
`060705
`
`R1-060722
`persistent scheduling description in
`2/15/2006include a shortened version of the
`
`2/15/2006Noted. Text proposal in R1-060725
`
`2/15/2006Noted
`
`Not treated
`
`Not treated
`
`2/15/2006Noted
`
`2/15/2006Noted
`
`2/15/2006Noted
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`2/16/2006Noted
`
`2/16/2006Noted
`
`2/15/2006Noted
`
`Decision
`Discussion/
`
`13.1.3
`
`Discussion
`
`13.1.2
`
`Discussion
`
`13.1.2
`
`Page 10
`
`ETRI
`
`Huawei
`
`Huawei
`
`Discussion
`
`Discussion
`Outgoing LS = R1-060254
`Discussion
`
`10
`
`13.1.2
`
`5
`
`5
`
`R1-060706
`
`R1-060705
`
`Decision
`Discussion/
`Decision
`13.2.3.6Discussion/
`Decision
`13.2.3.6Discussion/
`Decision
`13.2.3.4Discussion/
`Decision
`13.2.3.4Discussion/
`Decision
`13.2.3.3Discussion/
`
`13.2.5
`
`Decision
`13.2.3.2Discussion/
`
`Decision
`13.2.3.2Discussion/
`Decision
`Discussion/
`Decision
`13.2.3.1Discussion/
`Decision
`13.2.2.4Discussion/
`Decision
`13.2.2.4Discussion/
`Decision
`13.2.2.4Discussion/
`Decision
`13.2.2.3Discussion/
`Decision
`13.2.2.3Discussion/
`Decision
`13.2.2.2Discussion/
`
`5
`
`13.2.2.2Discussion
`
`13.2.2.2Discussion
`
`13.2.2.1Discussion
`
`13.2.2.1Discussion
`Decision
`13.2.2.1Discussion/
`
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`R1 #44 (February2006)
`Qualcomm
`
`TP on Scheduling for Real Time Services
`
`Subband Scheduling in E-UTRA Uplink
`
`Draft LS Reply for RACH Related Questions
`
`Principles of RACH
`
`Resource Block Allocation for UL Data Transmission
`
`UL PHY Channels - Channel Multiplexing
`
`UL PHY Channels - Overall Structure
`
`Need for Data Associated Control in E-UTRA Uplink
`
`Infineon
`RITT
`RAN WG1
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Uplink Inter-cell Interference Mitigation using Load Indication Qualcomm
`HARQ in Uplink
`TP on Fixed Modulation and RV Sequence with Synchronous
`
`TP on UL Interference Suppression Techniques
`
`E-UTRA Uplink Intra-cell Power Control
`
`R1-060482
`
`R1-060481
`
`R1-060480
`
`R1-060479
`
`R1-060478
`
`R1-060477
`
`R1-060476
`
`UL Scheduling
`
`R1-060475
`
`Uplink Broadband Pilot Structure
`
`R1-060474
`
`Link Analysis of Uplink ACK Channel
`
`R1-060473
`
`Link Analysis of Uplink CQI Channel
`
`R1-060472
`
`Circular 16QAM: PAR and Link issues
`Shaping
`PAR Reduction through Frequency Domain Spectrum
`Waveforms
`Link Analysis of Uplink Interleaved and Localized FDM
`
`R1-060471
`
`R1-060470
`
`R1-060469
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Measurements using Sync Channel
`Link-Level Simulation Results for SINR and SIR
`macro cells
`Precoded MIMO concept with system simulation results in
`distributed and broadcast channels
`Further results of transmit diversity schemes for common,
`transitions
`Alternative approach to the terminology for phase
`A simplified TxBF MIMO scheme
`LS on RAN1 discussion about the introduction of 1.6MHz
`
`Draft LS Reply for Inter-Cell RRM
`
`UL UE capability: RF and Baseband Limitations
`
`TP on UL Interference Mitigation Techniques
`
`R1-060496
`
`R1-060495
`
`R1-060494
`
`R1-060493
`R1-060492
`R1-060491
`
`R1-060490
`
`R1-060489
`
`R1-060488
`
`R1-060487
`
`R1-060486
`
`R1-060485
`
`R1-060484
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`R1-060483
`
`Yes
`
`ZTE/SAMSUNG 1021-0010
`
`10
`
`
`
`2/13/2006Revised in R1-060679
`
`R1-060679
`
`2/13/2006Rejected
`
`Not treated
`
`Noted
`
`Not treated
`
`2/16/2006Agreed
`
`2/14/2006Noted
`
`2/14/2006Noted
`
`Not treated
`
`Not treated
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`Noted
`Withdrawn
`Not treated
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`Not treated
`Not treated
`
`2/14/2006Noted
`
`Not treated
`Not treated
`Not treated
`Withdrawn
`
`CR
`
`CR
`
`6.4
`
`6.4
`
`Decision
`13.2.2.2Discussion/
`
`Decision
`Discussion/
`Decision
`13.2.3.1Discussion/
`
`13.1.2
`
`Decision
`Discussion/
`
`Proposal
`
`Text
`
`13.2.2
`
`13.1.3
`
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`13.2.2.4Discussion/
`Proposal
`13.2.2.4
`
`13.1.3
`
`13.1.3
`
`Text
`
`13.2.2.4Discussion
`Decision
`13.2.3.1Discussion/
`Decision
`13.1.2
`Discussion/
`13.1.2
`Information
`Decision
`13.2.3.5Discussion/
`13.1.3
`Information
`13.1.3
`Information
`Proposal
`13.1.3
`
`Text
`
`Proposal
`
`Text
`
`13.1.3
`
`CATT, RITT
`RITT
`CATT, TD-Tech,
`RITT
`CATT, TD-Tech,
`
`CATT, RITT
`
`CATT
`
`CATT, RITT
`
`CCL/ITRI
`
`CCL/ITRI
`
`CCL/ITRI
`
`TDD enhanced uplink"
`TR25.804CR0001r2(Rel-6, B) "Simulation results of LCR
`Scrambling Code hopping for LCR TDD Enhanced Uplink"
`TR25.804CR0002(Rel-6, B) "Analysis of intra-frame
`mode
`downlink dynamic beam-forming and pre-coding in TDD
`Further clarifications of the reference signal requirement for
`in E-UTRA downlink
`Views on the High Level Principles of MIMO for unicast traffic
`EUTRA TDD Random Access Procedure
`25.814
`LCR Uplink based on SC-FDMA and text proposal for TR
`Numerology of EUTRA TDD co-existing with UTRA TDD
`interference mitigation approaches
`TP for combining beam-forming with other inter-cell
`mitigation with beam-forming
`Further analysis of the performance of inter-cell interference
`synchronization
`Cell Search procedure of EUTRA TDD system for the initial
`turbo coding
`Puncturing effect for the component code of UTRA release 6
`Text Proposal for Channel