throbber
3GPP TSG RAN Working Group 1
`(Layer 1)
`List of WG1 Temporary Documents
`
`R1 #45 (May2006)
`
`Available
`
`Yes
`Yes
`
`Tdoc
`Number
`R1-061105
`R1-061106
`
`Title
`
`Draft Agenda for RAN1#45
`Draft Report from RAN1#44bis Meeting
`
`Yes
`
`R1-061107
`
`E-UTRA Physical Layer Framework for Evaluation
`
`Source
`
`RAN1 Chairman
`MCC Support
`
`Vodafone,
`DoCoMo,
`Orange, TIM, T-
`Mobile, Ericsson,
`Qualcomm,
`Motorola, Nokia,
`Nortel, Samsung,
`Siemens
`
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`R1-061108
`R1-061109
`
`R1-061110
`
`R1-061111
`
`R1-061112
`
`MCC Support
`Draft Report from RAN1/RAN2 Joint Meeting in Athens
`RAN WG2,
`LS on UE measurement and reception capabilities for LTE
`Motorola
`(To: RAN1, RAN4)
`TR25.814 v.1.2.3 Physical Layer Aspects for Evolved UTRA Editor, NTT
`DoCoMo
`Text proposals on LTE Physical Layer Description for TR
`NTT DoCoMo
`25.912, Chapter 7
`Downlink System Evaluation Results -User Throughput,
`Mitsubishi
`Spectrum Efficiency
`Electric
`Mitsubishi
`R1-061113 Ordered transmission scheme for LDPC-coded symbols
`Electric
`Panasonic
`Panasonic
`ETRI
`
`R1-061114
`R1-061115
`R1-061116
`
`R1-061117
`
`Random access design for E-UTRA uplink
`System level simulation result on SC-FDMA
`Diversity for Random Access
`Comparison of One-SCH and Two-SCH Schemes for
`EUTRA Cell Search
`
`ETRI
`
`Vodafone,
`DoCoMo,
`Orange,Telecom
`Italia, T-Mobile,
`Ericsson,
`Qualcomm,
`Motorola, Nokia,
`Nortel, Samsung,
`Siemens,
`Cingular
`
`Agenda
`Item
`2
`3
`
`Type
`
`Decision
`Approval
`
`Rrevised to
`(from)
`
`R1-061118
`
`Conclusion/Decision
`
` Treated
`Date
`5/8/2006 Approved
`5/8/2006 Approved in R1-061641
`Revised in R1-061118
`
`11
`
`Decision
`
`3
`4
`
`11
`
`Approval
`
`Incoming LS
`
`Approval
`
`11.6.2
`
`Discussion
`
`11.6.2
`
`11.1.2
`11.6.2
`11.1.2
`
`11.1.3
`
`Discussion
`
`Discussion/
`Decision
`Information
`Discussion/
`Decision
`Discussion/
`Decision
`
`11
`
`Decision
`
` = R2-061101
`
`5/8/2006 Approved in R1-061642
`5/8/2006 Noted
`
`5/10/2006 Endorsed as v1.3.0 in R1-061582
`
`5/12/2006 After the disuccsion on the reflector,
`revised in R1-061646
`5/11/2006 Noted
`
`11.8
`
`Approval
`
`R1-061646
`
`Withdrawn
`
`Not treated
`5/10/2006 Noted
`Not treated
`5/9/2006 Noted
`
`(R1-061107)
`
`5/10/2006 noted
`
`Yes
`
`R1-061118
`
`E-UTRA Physical Layer Framework for Evaluation
`
`Yes
`Yes
`
`D-TxAA and PARC performance comparison with LMMSE
`R1-061119
`receiver
`HSDPA MIMO system performance results
`R1-061120
`R1-061121 Way forward for Rel-7 MIMO
`
`Nokia
`Nokia
`Nokia
`
`7
`7
`7
`
`Disucssion
`
`Discussion
`Discussion/
`Decision
`
`Page 1
`
`5/8/2006 Noted
`
`5/8/2006 Noted
`Withdrawn
`
`SAMSUNG 1024-0001
`
`

`
`Performance evaluation of STBC/SFBC schemes in E-UTRA
`Uplink
`Effect of different ST/SF coding and mapping schemes on
`the PAPR of the SC-FDMA in E-UTRA Uplink
`Text proposal for reference signal design in Downlink MIMO Intel Corporation
`Text proposal for modulation and power adaptation of MIMO
`systems
`Scalable precoding and implementation complexities
`Comparison between single and multiple codewords for
`R1-061127
`precoded MIMO
`System-level Evaluation of MIMO with Unitary Precoding
`R1-061128
`Stem-level Evaluation of Open-loop Transmit Diversity
`R1-061129
`Schemes
`R1-061130 Modify puncturing pattern to improve performance and
`iterations of release 6 turbo coding
`A simple inter-block permutation in channel coding to provide
`backward compatiblility and secure trasmission
`Implementation complexity and power consumption concerns
`in channel coding
`System performance impact of release 6 turbo coding tail-
`bits removal
`Security and service differentiation in MBMS from physical
`layer perspective
`Cell Search Scheme in E-UTRA Downlink
`UE Identity in L1/L2 Downlink Control Signalling
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`R1-061122
`
`R1-061123
`
`R1-061124
`
`R1-061125
`
`R1-061126
`
`R1-061131
`
`R1-061132
`
`R1-061133
`
`R1-061134
`R1-061135
`R1-061136
`
`R1-061137
`
`Alcatel
`11.2.3
`R1 #45 (May2006)
`
`Alcatel
`
`Intel Corporation
`
`Intel Corporation
`
`Intel Corporation
`Intel Corporation
`Intel Corporation
`HighDimention
`Ltd, CCL/ITRI
`HighDimention
`Ltd
`HighDimention
`Ltd
`HighDimention
`Ltd
`HighDimention
`Ltd
`Sharp
`Sharp
`
`Discussion/
`Decision
`Discussion/
`Decision
`Text
`Proposal
`Text
`Proposal
`Text
`Proposal
`
`Discussion
`
`Discussion
`
`Discussion
`
`Discussion/
`Decision
`
`11.2.3
`
`11.2.3
`
`11.2.3
`
`11.2.3
`
`11.6.2
`11.6.2
`11.6.5
`
`11.6.2
`
`11.6.2
`
`Discussion
`
`11.6.5
`
`Discussion
`
`11.6.2
`
`Discussion
`
`11.6.3
`11.1.3
`11.1.1
`
`6.1
`
`Discussion
`
`Discussion
`Discussion/
`Decision
`
`Decision
`
`Not treated
`
`Not treated
`
`Not treated
`
`5/9/2006 Noted
`
`5/9/2006 Noted
`Not treated
`
`5/9/2006 Noted
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`5/9/2006 Noted
`
`Not treated
`Not treated
`5/8/2006 Noted
`
`Random access control for 1.28Mcps TDD Enhanced Uplink ZTE
`Random access physical channel for 1.28Mcps TDD
`Enhanced Uplink
`Enhanced uplink power control for 1.28Mcps TDD Enhanced
`Uplink
`Consideration on Multi-cell Interference for SCH Design in
`Cell Search and TP
`Performance of Transmit Antenna Switch for Random
`Access
`Solution to mitigate the ACK/NACK misinterpretation
`Reconfiguration of EUDCH
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`
`R1-061138
`
`R1-061139
`
`R1-061140
`
`R1-061141
`
`R1-061142
`R1-061143
`
`Yes
`
`R1-061144
`
`Three-Step Initial Cell Search and System Acquisition for E-
`UTRA
`
`Yes
`
`R1-061145
`
`Aspects of Cell Search for E-UTRA Downlink
`
`Yes
`
`R1-061146
`
`Impact of Mobility on the Performance of LTE MIMO
`Schemes
`
`Yes
`
`R1-061147
`
`System Evaluation of Intra-Cell Macro Diversity Schemes for
`E-UTRA Downlink
`
`Yes
`
`R1-061148
`
`BCH Simulation Results for Capacity Estimation
`
`ZTE
`
`ZTE
`
`SHRCWC, RITT
`
`SHRCWC, RITT
`
`SHRCWC, RITT
`Panasonic
`Chunghwa
`Telecom
`Laboratories
`(CHTTL)
`Chunghwa
`Telecom
`Laboratories
`(CHTTL)
`Chunghwa
`Telecom
`Laboratories
`(CHTTL)
`Chunghwa
`Telecom
`Laboratories
`(CHTTL)
`Page 2
`Siemens
`
`6.1
`
`6.1
`
`11.1.3
`
`11.1.2
`
`11.3.4
`5.4
`
`11.1.3
`
`Decision
`
`Decision
`
`Discussion/
`Decision
`
`Disucssion
`
`Discussion/
`Decision
`Decision
`
`Discussion/
`Decision
`
`11.1.3
`
`Discussion
`
`11.1.5
`
`Discussion/
`Decision
`
`11.6.2
`
`Discussion
`
`11.3.1
`
`Discussion
`
`5/8/2006 TP was not agreed.
`
`5/8/2006 TP was not agreed.
`
`Not treated
`
`Not treated
`
`Not treated
`5/8/2006 Agreed
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`SAMSUNG 1024-0002
`
`

`
`Text Proposal for downlink OFDMA resource allocation and
`mapping rules for distributed mode users in E-UTRA, with
`discussion on control information
`Interference-aware MIMO feedback: A Text Proposal
`R1-061150
`R1-061151 MIMO resource definition for E-UTRA
`Simulation Results of Coded MIMO-OFDM for E-UTRA
`Downlink
`Uplink Reference Signal Design Based on TTI Grouping
`Discussion and draft answers on LS R1-061109
`Uplink reference signal for channel quality measurement
`Performance comparison of localized and distributed SC-
`FDMA
`Simulation results for uplink fast frequency domain
`scheduling
`TP on simulation results for uplink fast frequency domain
`scheduling
`TD Tech
`Random access preamble design for EUTRA TDD
`TD Tech
`Cell search and identification of Cell ID for EUTRA TDD
`LG Electronics
`TP on localized and distributed SC-FDMA
`ITRI
`Improving Spectral Efficiency by Dispersive Coding
`Motorola
`Downlink Control Channel Coding
`Motorola
`Downlink Control Channel Modulation and Coding
`Downlink Acknowledgement and Group Transmit Indicator
`Motorola
`Channels
`Motorola
`Random Access Payload Size
`Motorola
`Synchronized Random Access Channel Design
`Preamble Sequence Design for Random Access of E-UTRA Motorola
`LTE Uplink System Performance and comparison to HSUPA
`and TP
`LTE Downlink System Performance Evaluation Results
`R1-061170
`R1-061171 Overhead Analysis and Resource Assignment for Uplink CQI
`Feedback Channel and TP
`R1-061172
`EUTRA Uplink Control Signaling + TP
`EUTRA Downlink Distributed Multiplexing and Mapping
`Rules TP
`Text proposal for uplink sounding in EUTRA
`Text proposal for direct channel feedback in EUTRA
`E-UTRA SC-FDMA Uplink Pilot/Reference Signal Design &
`TP
`Summary of RACH e-mail reflector discussion
`Combination of ICI cancellation and coordination:
`performance and TP
`System Simulation Results for the LTE Uplink
`Investigation on Throughput Improvement by Rel. 7 MIMO
`
`Yes
`
`Yes
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`
`R1-061149
`
`R1-061152
`
`R1-061153
`R1-061154
`R1-061155
`R1-061156
`
`R1-061157
`
`R1-061158
`
`R1-061159
`R1-061160
`R1-061161
`R1-061162
`R1-061163
`R1-061164
`R1-061165
`R1-061166
`R1-061167
`R1-061168
`
`R1-061169
`
`R1-061173
`
`R1-061174
`R1-061175
`
`R1-061176
`R1-061177
`R1-061178
`R1-061179
`R1-061180
`
`Discussion/
`Decision
`
`Text
`Proposal
`Discussion/
`Decision
`
`Discussion
`
`Discussion/
`Decision
`Decision
`Decision
`
`Discussion
`
`11.1.5
`11.1.5
`
`11.1.5
`
`11.2.1
`4
`11.2.1
`11.2.3
`
`11.6.2
`
`Discussion
`
`11.5
`
`11.1.2
`11.1.3
`11.2.3
`11.6.2
`11.1.1
`11.1.1
`11.1.1
`11.1.2
`11.1.2
`11.1.2
`
`11.6.2
`
`11.6.2
`
`11.2.3
`
`11.2.3
`
`11.2.3
`
`11.2.1
`11.2.1
`
`11.2.1
`11.1.2
`11.2.2
`11.6.2
`7
`
`Decision
`
`Discussion/
`Decision
`Discussion/
`Decision
`Text
`Proposal
`Discussion/
`Decision
`Discussion
`Discussion
`Discussion/
`Decision
`Discussion
`Discussion
`Discussion/
`Decision
`Text
`Proposal
`Discussion/
`Decision
`Text
`Proposal
`Discussion/
`Decision
`
`Dicussion
`
`Text
`Proposal
`Text
`Proposal
`Discussion/
`Decision
`Discussion
`
`Decision
`
`Discussion
`Discussion/
`Decision
`
`Not treated
`
`5/9/2006 Noted
`Not treated
`Not treated
`
`Not treated
`
`5/8/2006 Noted
`Not treated
`Not treated
`
`5/10/2006 Noted
`
`Not treated
`
`Not treated
`Not treated
`Not treated
`Not treated
`5/9/2006 Noted
`Not treated
`Not treated
`
`5/9/2006 Noted
`Not treated
`Not treated
`
`R1-061550
`
`R1-061626
`
`Revised in R1-061550
`
`Revised in R1-061626
`Not treated
`
`Not treated
`Not treated
`
`Not treated
`Not treated
`Not treated
`
`R1-061543
`
`5/9/2006 Noted
`Not treated. Revised in R1-051543
`
`5/10/2006 Noted
`5/8/2006 Noted
`
`R1 #45 (May2006)
`Intel Corporation
`11.2.3
`
`Intel Corporation
`Philips
`
`Philips
`Mitsubishi
`Electric
`LG Electronics
`LG Electronics
`LG Electronics
`
`LG Electronics
`
`LG Electronics
`
`Motorola
`
`Motorola
`
`Motorola
`
`Motorola
`Motorola, NTT
`DoCoMo
`Motorola
`Motorola
`
`Motorola
`Motorola
`RITT, Huawei
`RITT, Huawei
`NTT DoCoMo
`
`Page 3
`
`SAMSUNG 1024-0003
`
`

`
`NTT DoCoMo,
`R1 #45 (May2006)
`Fujitsu,
`Mitsubishi
`Electric, NEC,
`Panasonic,
`Sharp, Toshiba
`Corporation
`NTT DoCoMo,
`Ericsson, Fujitsu,
`Mitsubishi
`Electric,
`Motorola, NEC,
`Nokia,
`Panasonic,
`Sharp, Toshiba
`Corporation
`NTT DoCoMo,
`Fujitsu,
`Mitsubishi
`Electric, NEC,
`Sharp, Toshiba
`Corporation
`NTT DoCoMo,
`Fujitsu,
`Mitsubishi
`Electric, NEC,
`Sharp, Toshiba
`Corporation
`NTT DoCoMo
`
`Yes
`
`R1-061181
`
`L1/L2 Control Channel Structure for E-UTRA Downlink
`
`Yes
`
`R1-061182
`
`Distributed FDMA Transmission for Shared Data Channel in
`E-UTRA Downlink
`
`Yes
`
`R1-061183
`
`L1/L2 Control Channel Structure for E-UTRA Uplink
`
`Yes
`
`R1-061184
`
`Random Access Channel Structure for E-UTRA Uplink
`
`Yes
`
`Yes
`
`R1-061185
`
`R1-061186
`
`Text Proposal on Cell Search Proposal
`SCH Structure and Cell Search Method for E-UTRA
`Downlink
`
`Yes
`
`R1-061187
`
`Comparison on Cell Search Time Performance between
`SCH-Replica Based and Auto-Correlation Based Detections
`in E-UTRA Downlink
`
`Yes
`
`R1-061188
`
`Neighboring Cell Search Method for Connected and Idle
`Mode in E-UTRA Downlink
`
`Yes
`
`R1-061189
`
`Investigations on Cell-Common Pilot Channel Structure for
`MBMS in E-UTRA Downlink
`
`Yes
`
`R1-061190 MIMO Scheme in E-UTRA Downlink - Signaling Aspect
`
`Yes
`
`R1-061191
`
`Reference Signal Structure for Uplink MIMO in E-UTRA
`
`NTT DoCoMo
`NTT DoCoMo,
`Fujitsu,
`Mitsubishi
`Electric, NEC,
`Panasonic,
`Toshiba
`Corporation
`NTT DoCoMo
`NTT DoCoMo,
`Fujitsu,
`Mitsubishi
`Electric, NEC,
`Panasonic,
`Sharp, Toshiba
`Corporation
`NTT DoCoMo,
`Fujitsu,
`Mitsubishi
`Electric, NEC,
`Sharp, Toshiba
`Corporation
`NTT DoCoMo
`Page 4
`
`11.1.5
`
`Discussion/
`Decision
`
`(R1-060032)
`
`5/9/2006 Noted
`
`(R1-060305)
`
`Not treated
`
`(R1-060320)
`
`Not treated
`
`5/9/2006 Noted
`
`(R1-060042)
`
`(R1-060781)
`
`5/9/2006 Agreed
`Not treated
`
`5/9/2006 Noted
`
`Not treated
`
`Noted
`
`Not treated
`
`Discussion/
`Decision
`
`Discussion/
`Decision
`
`Discussion/
`Decision
`
`Discussion/
`Decision
`
`Text
`Proposal
`Discussion/
`Decision
`Discussion/
`Decision
`
`Discussion/
`Decision
`Discussion/
`Decision
`
`Discussion/
`Decision
`
`11.1.1
`
`11.1.1
`
`11.1.1
`
`11.1.2
`
`11.1.3
`
`11.1.3
`
`11.1.3
`
`11.1.3
`
`11.1.4
`
`11.1.5
`
`SAMSUNG 1024-0004
`
`

`
`Yes
`
`Yes
`
`Channel Dependent Scheduling with Cyclic Delay Diversity NTT DoCoMo
`11.1.5
`R1-061192
`R1 #45 (May2006)
`R1-061193 Multiplexing Method for Orthogonal Reference signals for E-
`UTRA Uplink
`
`NTT DoCoMo
`
`11.2.1
`
`Yes
`
`R1-061194 Orthogonal Reference Signal Structure for Sectored Beams
`in E-UTRA Downlink
`
`Yes
`
`R1-061195
`
`Link Adaptation Scheme for Single-antenna Transmission in
`E-UTRA Downlink
`
`Yes
`
`R1-061196
`
`Link Adaptation Scheme for MIMO Transmission in E-UTRA
`Downlink
`
`Yes
`
`R1-061197
`
`TP on Fast Transmission Power Control for L1/L2 Control
`Channel in E-UTRA Uplink
`
`Yes
`
`R1-061198
`
`Broadcast Channel Structure for E-UTRA Downlink
`
`Yes
`
`R1-061199
`
`Paging Channel Structure for E-UTRA Downlink
`
`NTT DoCoMo,
`Ericsson, Fujitsu,
`Mitsubishi
`Electric, NEC,
`Panasonic,
`Sharp
`
`NTT DoCoMo,
`Ericsson, Fujitsu,
`Mitsubishi
`Electric, NEC,
`Panasonic,
`Sharp, Toshiba
`Corporation
`
` NTT DoCoMo,
`Ericsson, Fujitsu,
`Mitsubishi
`Electric, NEC,
`Panasonic,
`Sharp, Toshiba
`Corporation
`NTT DoCoMo,
`Fujitsu,
`Mitsubishi
`Electric, NEC,
`Sharp,
` Toshiba
`Corporation
`NTT DoCoMo,
`Mitsubishi
`Electric, NEC,
`Sharp, Toshiba
`Corporation
`NTT DoCoMo,
`Fujitsu,
`Mitsubishi
`Electric, NEC,
`Toshiba
`Corporation
`
`11.2.3
`
`11.2.3
`
`11.2.3
`
`11.2.3
`
`11.3.1
`
`11.3.2
`
`Yes
`
`R1-061200
`
`Comparison of Signaling Overhead between Asynchronous
`and Synchronous Hybrid ARQ for E-UTRA Downlink
`
`NTT DoCoMo
`
`11.3.4
`
`Yes
`
`R1-061201
`
`Performance Comparison between Turbo Code and LDPC
`Code for Shared Data Channel in E-UTRA Downlink
`
`NTT DoCoMo,
`NEC, Sharp,
`Toshiba
`Corporation
`
`11
`
`Page 5
`
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`
`(R1-060991)
`
`(R1-060300)
`
`Not treated
`
`Not treated
`
`Not treated
`
`Discussion/
`Decision
`
`(R1-060306)
`
`Not treated
`
`Discussion/
`Decision
`
`(R1-060307)
`
`5/9/2006 Noted
`
`Text
`Proposal
`
`(R1-060050)
`
`Not treated
`
`Discussion/
`Decision
`
`Discussion/
`Decision
`
`Discussion/
`Decision
`
`Discussion/
`Decision
`
`Not treated
`
`Not treated
`
`Not treated
`
`(R1-060037)
`
`Not treated
`
`SAMSUNG 1024-0005
`
`

`
`Yes
`
`R1-061202
`
`UE Capability in E-UTRA Downlink
`
`Yes
`
`R1-061203
`
`Frequency Domain Channel-Dependent Scheduling with
`Adaptive Transmission Bandwidth of Pilot Channel for CQI
`Measurement for E-UTRA Uplink
`
`Yes
`
`R1-061204
`
`Investigations on Adaptive Control of Roll-off Factor for DFT-
`Spread OFDM based SC-FDMA in Uplink
`
`Yes
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`R1-061207
`R1-061208
`R1-061209
`
`R1-061210
`
`Yes
`
`R1-061211
`
`Yes
`
`R1-061212
`
`R1-061213
`
`NTT DoCoMo,
`R1 #45 (May2006)
`Ericsson, Fujitsu,
`Mitsubishi
`Electric, NEC,
`Sharp, Toshiba
`Corporation
`NTT DoCoMo,
`Fujitsu,
`Mitsubishi
`Electric, NEC,
`Sharp,
`Toshiba
`Corporation
`NTT DoCoMo,
`NEC, Sharp,
`Toshiba
`Corporation
`Motorola
`Motorola
`
`11
`
`11
`
`11
`
`7
`7
`
`11.2.3
`11.6.1
`11.1.5
`
`11.1.5
`
`11.1.5
`
`11.1.5
`
`Discussion
`
`Discussion
`
`Discussion/
`Decision
`Discussion
`Discussion/
`Decision
`Discussion/
`Decision
`
`Discussion/
`Decision
`
`Discussion/
`Decision
`
`11.6.2
`
`Discussion
`
`Discussion/
`Decision
`
`(R1-060044)
`
`Not treated
`
`Discussion/
`Decision
`
`(R1-060787)
`
`Not treated
`
`Discussion/
`Decision
`
`(R1-060993)
`
`Not treated
`
`5/8/2006 Noted
`5/8/2006 Noted
`
`Not treated
`
`5/10/2006 Noted
`5/9/2006 Noted
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`R1-061205 W-CDMA MIMO with FTP Traffic
`D-TxAA, PARC, and Single Antenna Systems in Urban
`R1-061206
`Microcells
`Interference and Open Loop Transmit Diversity Reception
`(with TP)
`Peak Rate with Precoded MIMO in E-UTRA
`Evaluation of localized and distributed carrier mappings for
`EUTRA Downlink MIMO and text proposal
`Evaluation of EUTRA schemes for Downlink Open loop
`MIMO and text proposal
`Evaluation of Antenna Selection for Downlink Open loop
`MIMO schemes with four transmit antennas and text
`proposal
`Evaluation of Synchronous and Asynchronous HARQ for
`Downlink MIMO
`System Level Evaluation of localized and distributed carrier
`mapping for Uplink SC-FDMA
`Text proposal on carrier mapping for Uplink SC-FDMA
`System Level Evaluation of Synchronous and Asynchronous
`HARQ for Uplink SC-FDMA
`Evaluation of E-UTRA downlink MIMO
`reference-signal structures and text proposal
`Evaluation of E-MBMS MIMO reference-signal
`structures and text proposal
`25.225 CR0080 (Rel-6, F)"Clarify the reference point for LCR
`TDD TA"
`25.225 CR0081 (Rel-7, A)"Clarify the reference point for LCR
`TDD TA"
`Draft TR Physical Layer Aspects for 1.28Mcps TDD HSUPA CATT
`Text Proposal for basic physical layer structure for 1.28Mcps
`TDD Enhanced Uplink
`Support for Node-B Controlled Uplink Scheduling and Text
`R1-061222
`Proposal for TR 25.XXX
`HARQ schemes for 1.28Mcps TDD Enhanced Uplink
`R1-061223
`R1-061224 Modulation for 1.28Mcps TDD Enhanced Uplink
`
`Motorola
`Motorola
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`CATT
`
`CATT
`
`CATT
`
`CATT
`CATT
`CATT
`
`Page 6
`
`R1-061214
`
`R1-061215
`
`R1-061216
`
`R1-061217
`
`R1-061218
`
`R1-061219
`
`R1-061220
`
`R1-061221
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`11.5
`
`Text
`Proposal
`
`11.3.4
`
`Discussion
`
`11.1.5
`
`11.1.4
`
`Decision
`
`Discussion/
`Decision
`
`5.4
`
`5.4
`
`6.1
`
`6.1
`
`6.1
`6.1
`6.1
`
`CR
`
`CR
`
`Decision
`
`Decision
`
`Discussion/
`Decision
`Discussion
`Discussion/
`Decision
`
`Withdrawn
`
`5/10/2006 Noted
`
`R1-061583
`
`Not treated, Revised in R1-061583
`
`Withdrawn
`
`5/8/2006 Agreed
`
`5/8/2006 Agreed
`
`5/8/2006 Agreed
`
`5/8/2006 Agreed.
`
`5/8/2006 Agreed.
`
`5/8/2006 Noted
`5/8/2006 Agreed
`
`SAMSUNG 1024-0006
`
`

`
`CATT
`LCR TDD: E-HICH structure and coding
`R1-061225
`R1 #45 (May2006)
`CATT
`LCR TDD E-HICH: Simulation Results
`R1-061226
`Nortel
`R1-061227 On the design of non-synchronized RACH
`Nortel
`R1-061228 On the period of L1 synchronization RACH
`R1-061229
`DL Adaptive STTD/SM Performance Evaluation for E-UTRA Nortel
`Text Proposal for System Performance of DL Adaptive MIMO
`for E-UTRA
`SC-FDMA based Multi-user MIMO System Level
`Performance Evaluation for E-UTRA UL
`Text Proposal for System level simulation for UL virtual
`MIMO
`Performance evaluation of STTD and cyclic shift diversity in
`the presence of Inter-cell/sector interference in Downlink
`MIMO systems for LTE
`STBC-HARQ for UMTS LTE Downlink MIMO with TP
`Uplink Adaptive Transmission with TP
`Fulfilment of LTE Complexity Requirements, L1 aspects
`LTE Cell Search
`LTE Evaluation results
`Further evaluation results for SC-FDMA
`UL reference signal structure and text proposal
`DL control signaling for LTE
`Text proposal for synchronisation aspects for TR 25.912, L1
`aspects
`Impact of DL control signaling overhead on LTE throughput
`R1-061243
`and coverage
`PCH and Paging indicator presence on LTE Layer 1
`R1-061244
`R1-061245 On 2 Antenna Open Loop Downlink TX Diversity
`R1-061246
`Unified uplink CQI signaling by efficient labeling
`System performances of RACH preamble designs for E-
`R1-061247
`UTRA
`Cell search times of hierarchical and non-hierarchical SCH
`signals
`Benefits of the generalized CSD scheme in E-UTRA
`Evaluation of DL control channel for multiple antenna Node
`B’s
`Text proposal on RACH preamble design for E-UTRA
`Text proposal on comparison of SCH structures
`Text proposal for TR25.814, Section 7.1.3
`
`6.1
`6.1
`11.1.2
`11.1.2
`11.1.5
`
`11.5
`
`11.1.5
`
`11.5
`
`11.1.5
`
`11.3.4
`11.2.1
`11.6.5
`11.1.3
`11.6.2
`11.5
`11.2.1
`11.1.1
`11.7.6
`
`11.6.2
`11.3.2
`11.1.5
`11.1.1
`11.1.2
`
`11.1.3
`11.1.5
`11.1.5
`
`11.2.3
`11.2.3
`11.2.3
`
`Nortel
`
`Nortel
`
`Nortel
`
`Nortel
`
`Nortel
`Nortel
`Nokia
`Nokia
`Nokia
`Nokia
`Nokia
`Nokia
`Nokia
`
`Nokia
`Nokia
`Nokia
`Huawei
`Huawei
`
`Huawei
`Huawei
`Huawei
`
`Huawei
`Huawei
`Huawei
`
`R1-061230
`
`R1-061231
`
`R1-061232
`
`R1-061233
`
`R1-061234
`R1-061235
`R1-061236
`R1-061237
`R1-061238
`R1-061239
`R1-061240
`R1-061241
`R1-061242
`
`R1-061248
`R1-061249
`R1-061250
`
`R1-061251
`R1-061252
`R1-061253
`
`R1-061255
`
`R1-061254
`
`SF reduction on compressed mode for 10ms TTI E-DCH
`25.212CR0233(Rel-6,F)"Clarification of compressed mode
`by reducing the spreading factor by 2 for E-DCH"
`25.212CR0234(Rel-7,A)"Clarification of compressed mode
`R1-061256
`by reducing the spreading factor by 2 for E-DCH"
`Considerations on downlink shared control signalling
`R1-061257
`TP: Downlink Control Signalling resource division
`R1-061258
`R1-061259 Measurement at the Network Side
`R1-061260
`Random access preamble and message
`
`ZTE
`
`ZTE
`
`ZTE
`ZTE
`ZTE
`ZTE
`ZTE
`
`Page 7
`
`5.4
`
`5.4
`
`5.4
`11.1.1
`11.1.1
`11.2.3
`11.1.2
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion
`
`Discussion
`
`Text
`Proposal
`
`Discussion
`
`Text
`Proposal
`
`Discussion
`
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion
`Decision
`Discussion/
`Decision
`Disucssion
`Discussion
`Text
`Proposal
`
`Discussion
`
`Discussion
`Discussion
`Discussion
`
`Discussion
`
`Discussion/
`Decision
`Discussion
`Discussion/
`Decision
`Text
`Proposal
`Text
`Proposal
`Text
`Proposal
`
`Discussion
`
`CR
`
`CR
`
`Discussion
`Text
`Proposal
`Discussion/
`Decision
`Discussion/
`Decision
`
`Withdrawn
`Withdrawn
`5/9/2006 Noted
`
`Not treated
`
`Not treated
`
`5/9/2006 Noted
`
`R1-061605
`
`5/10/2006 Revised in R1-061605
`
`(R1-060802)
`
`(R1-061555)
`
`Not treated
`
`Not treated
`Not treated
`5/11/2006 Revised in R1-061620
`Not treated
`5/11/2006 Noted
`5/10/2006 Noted
`Not treated
`Withdrawn
`Revised in R1-061555
`
`Not treated
`
`Not treated
`Not treated
`Not treated
`Not treated
`
`5/9/2006 Noted
`
`Not treated
`Not treated
`
`Not treated
`Not treated
`Not treated
`5/8/2006 Agreed that that SF/2 method is not
`supported for E-DCH
`5/8/2006 Rejected
`
`5/8/2006 Rejected
`
`Not treated
`Not treated
`Not treated
`Not treated
`
`SAMSUNG 1024-0007
`
`

`
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`R1-061261
`R1-061262
`R1-061263
`
`R1-061264
`R1-061265
`R1-061266
`
`R1-061267
`
`R1-061268
`
`R1-061269
`
`R1-061270
`
`R1-061271
`
`R1-061272
`
`R1-061273
`
`R1-061274
`
`ZTE
`11.1.2
`TP: Random access preamble and message
`R1 #45 (May2006)
`Siemens
`11.1.5
`Load dependent feedback for MIMO LTE
`Reference-signal arrangement for E-UTRA Downlink MIMO LG Electronics
`11.1.5
`Toshiba
`Corporation
`ZTE
`ZTE
`
`11.1.4
`11.1.3
`11.2.1
`
`ZTE
`
`CATT, RITT
`
`CATT, RITT
`
`CATT
`
`11.2.1
`
`11.1.3
`
`11.1.2
`
`11.1.5
`
`Text
`Proposal
`Decision
`
`Discussion
`
`Discussion
`
`Discusison
`Discussion/
`Decision
`Text
`Proposal
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`
`CATT
`CATT, RITT, TD-
`Tech
`CATT, RITT
`
`CATT, RITT
`
`11.1.3
`
`Discussion
`
`11.2
`
`11.2.1
`
`11.1.5
`
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`
`Not treated
`Not treated
`Not treated
`
`5/9/2006 Noted
`
`Not treated
`Not treated
`
`Not treated
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`5/9/2006 Noted
`
`Further Study on Reference Signal Structure for MBMS
`Further considerations on cell search information mapping
`Interference Mitigation Comparisons between FDM and CDM
`in Uplink Reference Design
`TP: Interference Mitigation for Uplink Reference Design
`SCH Structure and Cell Search Method for E-UTRA TDD
`system
`Further on the non-synchronization random access
`procedure for EUTRA TDD
`Further consideration on the reference symbol of
`Beamforming for EUTRA TDD
`The impact of frequency offset on modulation performance
`for EUTRA TDD
`The numerology of 1.6MHz bandwidth for EUTRA LCR-
`based TDD frame structure
`Further clarifications of the uplink reference signal
`requirement for downlink pre-coding in TDD mode
`Clarifications of the dynamic beam-forming/pre-coding
`method in TDD mode and text proposal
`Performance comparison between beam-forming and CDD
`for control channel
`Peak data rates for LCR TDD base Frame Structure
`System Performance Evaluation Results for LCR TDD base
`Frame Structure
`Optimum Combination of Channel Coding Rate and
`Repetition Factor for L1/L2 Control Channel in E-UTRA
`Downlink
`Link-Level Simulations on peak data rate in E-UTRA
`Downlink
`Link-Level Simulations on peak data rate in E-UTRA Uplink NTT DoCoMo
`System-Level Simulations on Spectrum Efficiency, User
`Throughput, and Coverage in E-UTRA Downlink
`System-Level Simulations on Spectrum Efficiency, User
`Throughput, and Coverage in E-UTRA Uplink
`Initial cell search and long-CP sub-frame structure
`Cubic Metric properties of CAZAC sequences
`
`NTT DoCoMo
`
`NTT DoCoMo
`
`NTT DoCoMo
`
`NTT DoCoMo
`Fujitsu
`Fujitsu
`
`CATT
`CATT
`CATT
`
`Yes
`Yes
`Yes
`
`R1-061275
`R1-061276
`R1-061277
`
`Yes
`
`R1-061278
`
`R1-061279
`
`R1-061280
`
`R1-061281
`
`R1-061282
`R1-061283
`R1-061284
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`Yes
`
`R1-061285
`R1-061286
`R1-061287
`R1-061288
`
`Introduction of the shortened code concept in Turbo coding
`Downlink resource multiplexing
`Signalling for downlink resource allocation
`TP on downlink resource allocation signalling
`Joint coding vs individual coding for downlink resource
`R1-061289
`allocation
`Signalling in DL for UL resource allocation
`R1-061290
`TP on Signalling in DL for UL resource allocation
`R1-061291
`R1-061292 MBMS throughput performance
`
`Fujitsu
`Siemens
`Siemens
`Siemens
`
`Siemens
`Siemens
`Siemens
`Siemens
`
`Page 8
`
`11.1.1
`11.6.1
`11.6.2
`
`11.1.1
`
`11.6.1
`
`11.6.1
`
`11.6.2
`
`11.6.2
`11.1.3
`11.2.1
`
`11.2.3
`11.2.3
`11.1.1
`11.1.1
`
`11.1.1
`11.1.1
`11.1.1
`11.6.3
`
`Discussion
`
`Discussion
`
`Discussion
`
`Discussion/
`Decision
`
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion
`Discussion/
`Decision
`
`Decision
`
`Decision
`Discussion
`Text
`Proposal
`
`Discussion
`
`Discussion
`Text
`Proposal
`Decision
`
`5/9/2006 Noted
`
`5/10/2006 Noted
`5/10/2006 Noted
`
`5/9/2006 Noted
`
`5/10/2006 Noted
`
`5/10/2006 Noted
`5/11/2006 Noted
`
`5/10/2006 Noted
`
`Not treated
`Not treated
`Not treated
`
`Not treated
`5/9/2006 Noted
`Not treated
`Not treated
`
`Not treated
`Not treated
`5/10/2006 Noted
`
`SAMSUNG 1024-0008
`
`

`
`Yes
`
`R1-061293
`
`25.212CR0235 (Rel-6, F)"Clarification of E-TFCI
`terminology"
`
`Yes
`
`R1-061294
`
`25.212CR0236 (Rel-7, A)"Clarification of E-TFCI
`terminology"
`
`Yes
`
`R1-061295
`
`25.214CR0419 (Rel-6, F)"Clarification of E-TFCI
`terminology"
`
`Yes
`
`R1-061296
`
`25.214CR0420 (Rel-7, A)"Clarification of E-TFCI
`terminology"
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`
`R1-061297
`
`L1 UE measurement to support intra E-UTRA mobility
`
`R1-061298
`
`R1-061299
`
`R1-061300
`R1-061301
`R1-061302
`R1-061303
`R1-061304
`
`R1-061305
`R1-061306
`R1-061307
`
`R1-061308
`R1-061309
`R1-061310
`
`R1-061311
`
`R1-061312
`
`R1-061313
`
`R1-061314
`R1-061315
`R1-061316
`R1-061317
`R1-061318
`
`R1-061319
`
`R1-061320
`
`R1-061321
`
`R1-061322
`R1-061323
`
`Proposed response to RAN2 LS in [R1-061109]
`25.211CR0228(Rel-6, F)"Clarification of the signature
`sequence index allocation for E-HICH and E-RGCH"
`25.211CR0229(Rel-7, A)"Clarification of the signature
`sequence indexallocation for E-HICH and E-RGCH"
`Consideration on UTRA MIMO scheme
`Comments on the proposals to modify HS-SCCH for VoIP
`TP on Clarification for "HS-SCCH less operation
`TP on Clarification for "Restricted HS-SCCH operation
`TP on further simplification for "Restricted HS-SCCH
`operation
`Power balancing mechanism with DPCCH gating
`Physical channel mapping & power control for SCCH
`
`Resource Allocation Signalling for EUTRA
`Consideration on LTE MIMO scheme
`Reference signal multiplexing for EUTRA uplink
`Considerations on uplink pilot design using CAZAC
`sequences
`CQI reporting
`UE capabilities and spectrum allocation scenarios
`concerning the LS R1-061109
`Uplink ACK/NACK performance: FDM vs TDM
`Downlink Control Signalling Overhead Evaluation
`DL ACK/NACK signalling performance evaluation
` Random access message transmission
`Cell search issues and views
`Performance Comparison between 1.25 MHz and 5 MHz
`BCH Transmission Bandwidths
`Link Performance of Multi-User MIMO
`Performance Evaluation of PU2RC with Different Codebook
`Sizes
`TP on Cyclic Delay Diversity for Scheduling Gains
`Dynamic Switching between Single and Multi-User MIMO
`
`Siemens,
`R1 #45 (May2006)
`Panasonic,
`Samsung
`Siemens,
`Panasonic,
`Samsung
`Siemens,
`Panasonic,
`Samsung
`Siemens,
`Panasonic,
`Samsung
`NEC Group, NTT
`DoCoMo
`NEC Group, NTT
`DoCoMo
`NEC Group
`
`NEC Group
`NEC Group
`NEC Group
`NEC Group
`NEC Group
`
`NEC Group
`NEC Group
`NEC Group, NTT
`DoCoMo
`NEC Group
`NEC Group
`NEC Group, NTT
`DoCoMo
`NEC Group
`
`NEC Group
`
`Samsung
`
`Samsung
`Samsung
`Samsung
`Samsung
`Samsung
`
`Samsung
`
`Samsung
`
`Samsung
`Samsung, ETRI,
`NTT DoCoMo
`Page 9
`Samsung
`
`5.4
`
`5.4
`
`5.4
`
`5.4
`
`4
`
`4
`5.4
`
`5.4
`
`7
`8
`8
`8
`
`8
`8
`11.1.1
`
`11.1.1
`11.1.5
`11.2.1
`
`11.2.1
`
`11.2.3
`
`4
`
`11.1.1
`11.1.1
`11.1.1
`11.1.2
`11.1.3
`
`11.1.3
`
`11.1.5
`
`11.1.5
`
`11.1.5
`11.1.5
`
`CR
`
`CR
`
`CR
`
`CR
`
`Discussion
`
`Discussion
`
`CR
`
`CR
`Discussion R1-061548
`R1-061545
`Discussion/
`Decision
`Text
`Proposal
`Text
`Proposal
`Text
`Proposal
`Discussion
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Text
`Proposal
`Discussion
`
`R1-061577
`
`5/8/2006 Agreed
`
`5/8/2006 Agreed
`
`5/8/2006 Agreed
`
`5/8/2006 Agreed
`
`5/8/2006 Noted
`
`5/8/2006 Noted
`
`5/8/2006 Rejected
`
`5/8/2006 Rejected
`
`Revised in R1-061548
`Revised in R1-061545
`Not treated
`Not treated
`Not treated
`
`5/9/2006 Noted
`Not treated
`
`Not treated
`Not treated
`Not treated
`
`Not treated
`
`Not treated
`5/8/2006 Noted
`
`Not treated
`5/9/2006 Noted
`Not treated
`5/9/2006 Noted
`Not treated
`Not treated
`
`Not treated
`5/9/2006 Noted
`
`Not treated. Revised in R1-061577
`
`5/9/2006 Noted
`
`SAMSUNG 1024-0009
`
`

`
`R1-061324
`
`R1-061325
`R1-061326
`R1-061327
`R1-061328
`R1-061329
`
`R1-061330
`
`R1-061331
`R1-061332
`R1-061333
`
`R1-061334
`
`R1-061335
`R1-061336
`R1-061337
`R1-061338
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`R1-061339
`
`Text Proposal on Downlink System Performance Evaluation Samsung
`
`R1-061340
`
`R1-061341
`
`R1-061342
`
`R1-061343
`
`Samsung
`
`Samsung
`
`Samsung
`
`Siemens
`
`Performance Evaluation of Multi-User vs. Single User MIMO Samsung
`11.1.5
`R1 #45 (May2006)
`Samsung
`11.1.5
`Samsung
`11.2.1
`Samsung
`11.2.3
`Samsung
`11.2.3
`Samsung
`11.2.3
`
`Summary of LTE MIMO email discussion
`Reference signal structure for EUTRA uplink and TP
`TP on HARQ
`Link Adaptation in Evolved UTRA Downlink and TP
`TP on uplink ACK/NACK signaling
`Bandwidth and Power Efficiency Evaluation for pi/2-BPSK
`and QPSK, and TP
`TP on BCH Transmission Bandwidth
`TP on Downlink Control Signalling Multiplexing
`Link performance of DL distributed transmission
`System throughput of DL localized transmission with
`existence of distributed transmission
`TP on downlink data multiplexing
`TP on DL ACK/NACK signalling
`Evaluation of BCH cost vs bit rate
`Low Overhead Asynchronous Adaptive Hybrid ARQ
`
`Samsung
`
`Samsung
`Samsung
`Samsung
`
`Samsung
`
`Samsung
`Samsung
`Samsung
`Samsung
`
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Text
`Proposal
`Discussion/
`Decision
`Text
`Proposal
`Discussion/
`Decision
`Text
`Proposal
`Text
`Proposal
`Discussion/
`Decision
`Discussion/
`Decision
`Text
`Proposal
`Text
`Proposal
`Discussion/
`Decision
`Discussion/
`Decision
`Text
`Proposal
`Text
`Proposal
`Discussion/
`Decision
`Discussion/
`Decision
`
`Discussion
`
`CR
`
`5/9/2006 Noted
`
`5/9/2006 Noted
`Not treated
`Not treated
`Not treated
`Not treated
`Not treated
`
`Not treated
`Not treated
`Not treated
`Not treated
`
`Not treated
`Not treated
`Not treated
`Not treated
`Withdrawn
`
`R1-061549
`
`5/10/2006 Noted
`Revised in R1-061549
`
`5/10/2006 Noted
`
`5/8/2006 Noted
`
`R1-061616
`
`5/8/2006 Revised in R1-061616
`
`11.2.3
`
`11.2.3
`11.2.3
`11.2.3
`
`11.2.3
`
`11.2.3
`11.2.3
`11.3.1
`11.3.4
`
`11.4
`
`11.5
`
`11.6.2
`
`11.6.2
`
`5.5
`
`R1-061344
`
`Text Proposal on Uplink System Performance Evaluation
`LTE downlink system simulation results concerning the LTE
`target fulfillment
`LTE uplink system simulation results concerning the LTE
`target fulfillment
`Introduction of an E-DCH related Node B measurement for
`RRM purposes
`25.215CR0170(Rel-7, C) "Introduction of a Node B
`measurement for E-DCH RRM"
`E-UTRA UE Measurements and Capabilities
`Impact of MIMO transmission on the performance of legacy
`channel reception in a non-MIMO capable UE
`Complexity and performance trade-offs of MIMO
`R1-061347
`transmission schemes
`Link level evaluation of D-TxAA
`R1-061348
`System level results for Rel-7 MIMO schemes
`R1-061349
`R1-061350 On MIMO for HSDPA
`
`R1-061345
`
`R1-061346
`
`Siemens
`
`Ericsson
`
`Ericsson
`
`Ericsson
`Ericsson
`Ericsson
`Ericsson
`
`5.5
`
`4
`
`7
`
`7
`7
`7
`7
`
`8
`
`8
`
`8
`
`8
`
`8
`8
`
`Discussion/
`Decision
`
`Discussion
`
`Discussion
`
`Discussion
`Discussion R1-061553
`Discussion/
`Decision
`
`Decision
`
`Discussion/
`Decision
`Discussion/
`Decision
`
`Discussion
`
`Discussion
`
`Discussion
`
`5/8/2006 Noted
`5/8/2006 Noted
`
`5/8/2006 Noted
`
`5/8/2006 Noted
`Revised in R1-061

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket