`
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Tdoc
`Number
`R1-060765
`R1-060766
`R1-060767
`R1-060768
`R1-060769
`
`R1-060770
`R1-060771
`R1-060772
`R1-060773
`
`R1-060774
`
`Title
`
`Draft Agenda for RAN1#44bis
`Draft Agenda for RAN1/RAN2 Joint meeting in Athens
`Report from TSG RAN#31
`Draft Report from RAN1#44 Meeting
`LS on support for different E-DCH and HS-DSCH serving
`cells (To: RAN1, Cc: RAN3, RAN4)
`LS to RAN1 on Alternative reference RB configurations for
`MBMS (To: RAN1)
`Interference-aware MIMO mode adaptation
`Interference-aware MIMO feedback: a text proposal
`Text Proposal of Prioritizing Non-synchronized Random
`Access in E-UTRA Uplink
`Evaluation of Downlink MIMO Transmission Mode Selection ITRI
`
`RAN1 Chairman
`RAN1/RAN2
`Chairmen
`RAN1 Chairman
`RAN1 Secretary
`RAN WG2,
`Qualcomm
`RAN WG2,
`Ericsson
`Intel Corporation
`Intel Corporation
`ITRI
`
`Agenda
`R1 #44bis (March2006)
`Source
`Item
`2
`2
`
`Type
`
`Decision
`Decision
`
`Information
`Approval
`
`incoming LS
`
`incoming LS
`
`Discussion
`TP
`Discussion/
`TP
`Discussion/
`Decision
`
`4
`3
`5
`
`5
`10.1.8
`10.1.8
`10.2.3
`
`10.1.8
`
`Rrevised to
`(from)
`
`Conclusion/Decision
`
` Treated
`Date
`3/27/2006 Approved
`3/27/2006 Noted
`
` = R2-060769
`
`3/27/2006 Noted
`3/27/2006 Approved in R1-061099
`3/27/2006 Noted
`
` = R2-060796
`
`3/27/2006 Noted
`
`Not treated
`Not treated
`Not Treated
`
`Not treated
`
`Withdrawn
`
`R1-060775
`
`UE Capability in E-UTRA Downlink
`
`Yes
`
`R1-060776
`
`L1/L2 Control Channel Structure for E-UTRA Downlink
`
`Yes
`
`R1-060777
`
`Distributed FDMA Transmission for Shared Data Channel in
`E-UTRA Downlink
`
`Yes
`
`R1-060778 MBMS Channel Structure for E-UTRA Downlink
`
`Yes
`
`R1-060779
`
`Investigations on Pilot Channel Structure for MBMS in E-
`UTRA Downlink
`
`Yes
`
`R1-060780
`
`SCH Structure and Cell Search Method for E-UTRA
`Downlink
`
`NTT DoCoMo,
`Ericsson, Fujitsu,
`Mitsubishi
`Electric, Sharp,
`Toshiba
`Corporation
`NTT DoCoMo,
`Fujitsu,
`Mitsubishi
`Electric, NEC,
`Panasonic,
`Sharp, Toshiba
`Corporation
`NTT DoCoMo,
`Ericsson, Fujitsu,
`Mitsubishi
`Electric,
`Motorola, NEC,
`Nokia,
`Panasonic,
`Sharp, Toshiba
`Corporation
`NTT DoCoMo,
`Mitsubishi
`Electric, NEC,
`Panasonic,
`Sharp,
` Toshiba
`Corporation
`NTT DoCoMo,
`Mitsubishi
`Electric, NEC,
`Sharp, Toshiba
`Corporation
`NTT DoCoMo,
`NEC
`Page 1
`
`(R1-060316)
`
`10.1
`
`Discussion/
`Decision
`
`(R1-060032)
`
`Not treated
`
`(R1-060305)
`
`Not treated
`
`(R1-060304)
`
`3/30/2006 Noted
`
`10.1.1
`
`Discussion/
`Decision
`
`10.1.1
`
`Discussion/
`Decision
`
`10.1.2
`
`Discussion/
`Decision
`
`10.1.2
`
`Discussion/
`Decision
`
`10.1.3
`
`Discussion/
`Decision
`
`(R1-060042)
`
`Not treated
`
`Not treated
`
`SAMSUNG 1021-0001
`
`
`
`Yes
`
`R1-060781
`
`Cell Search Time Performance of Three-step Cell Search
`Method
`
`Yes
`
`R1-060782
`
`Cell Search Method for MIMO Node B in E-UTRA Downlink
`
`Yes
`
`R1-060783
`
`Cell Search Method for Connected and Idle Mode in E-UTRA
`Downlink
`
`Yes
`
`R1-060784 Orthogonal Pilot Channel Structure for E-UTRA Uplink
`
`Yes
`
`R1-060785
`
`L1/L2 Control Channel Structure for E-UTRA Uplink
`
`Yes
`
`R1-060786
`
`Random Access Channel Structure for E-UTRA Uplink
`
`Yes
`
`R1-060787
`
`Frequency Domain Channel-Dependent Scheduling with
`Adaptive Transmission Bandwidth of Pilot Channel for CQI
`Measurement for E-UTRA Uplink
`
`Yes
`
`R1-060788
`
`TP on Fast Transmission Power Control for L1/L2 Control
`Channel in E-UTRA Uplink
`
`Yes
`
`R1-060789 Orthogonal Pilot Channel Structure for Sectored Beams in E-
`UTRA Downlink
`
`Yes
`
`R1-060790
`
`Performance Comparison between Turbo Code and LDPC
`Code for Shared Data Channel in E-UTRA Downlink
`
`R1-060791
`R1-060792
`
`Yes
`
`A Proposal for an Improved Reference Symbol Positioning in
`EUTRA
`Random access burst evaluation in E-UTRA uplink
`
`NTT DoCoMo,
`R1 #44bis (March2006)
`Fujitsu,
`10.1.3
`Mitsubishi
`Electric, NEC
`NTT DoCoMo,
`Fujitsu,
`Mitsubishi
`Electric, NEC
`NTT DoCoMo,
`Fujitsu,
`Mitsubishi
`Electric, NEC,
`Panasonic,
`Toshiba
`Corporation
`NTT DoCoMo,
`Fujitsu,
`Mitsubishi
`Electric, NEC,
`Panasonic,
`Sharp
`NTT DoCoMo,
`Fujitsu,
`Mitsubishi
`Electric, NEC,
`Sharp, Toshiba
`Corporation
`NTT DoCoMo
`NTT DoCoMo,
`Fujitsu,
`Mitsubishi
`Electric, NEC,
`Sharp,
`Toshiba
`Corporation
`NTT DoCoMo,
`Fujitsu,
`Mitsubishi
`Electric, NEC,
`Sharp,
` Toshiba
`Corporation
`NTT DoCoMo,
`Ericsson, Fujitsu,
`Mitsubishi
`Electric, NEC,
` Panasonic,
`Sharp
`NTT DoCoMo,
`NEC, Sharp,
`Toshiba
`Corporation
`Alcatel
`Page 2
`Panasonic
`
`Not treated
`
`(R1-060043)
`
`Not treated
`
`(R1-060163)
`
`Not treated
`
`(R1-060046)
`
`3/30/2006 Revised in R1-061088
`
`(R1-060320)
`
`Not Treated
`
`Not Treated
`Not Treated
`
`(R1-060050)
`
`Not treated
`
`(R1-060300)
`
`Not Treated
`
`(R1-060037)
`
`Not Treated
`
`Withdrawn
`
`Not Treated
`
`Discussion/
`Decision
`
`Discussion/
`Decision
`
`Discussion/
`Decision
`
`Discussion/
`Decision
`
`Discussion/
`Decision
`
`Discussion/
`Decision
`
`Discussion/
`Decision
`
`Discussion/
`TP
`
`Discussion/
`Decision
`
`Discussion/
`Decision
`
`Discussion
`
`Discussion
`
`10.1.3
`
`10.1.3
`
`10.2.1
`
`10.2.2
`
`10.2.3
`
`10.2.5
`
`10.2.6
`
`10.4.1
`
`10.4.1
`
`10.2.1
`10.2.3
`
`SAMSUNG 1021-0002
`
`
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`R1-060793
`
`Indication of combination between L1/L2 control signaling
`and uplink data
`Channel Coding Structure for LTE downlink
`R1-060794
`Feedback of UE measurement for MIMO
`R1-060795
`Performances of non-hierarchical cell search for E-UTRA
`R1-060796
`RACH design for E-UTRA
`R1-060797
`Power balancing mechanism with DPCCH gating
`R1-060798
`R1-060799 WCDMA MIMO Performance
`R1-060800
`HSDPA system performance with CL transmit diversity
`R1-060801 MBMS options in LTE
`R1-060802
`Further evaluation results for SC-FDMA
`R1-060803
`Downlink signaling for UTRA LTE
`R1-060804
`Uplink signaling for UTRA LTE
`R1-060805
`Further on EUTRA Cell Search
`Text proposal to incorporate agreed micro cell scenario
`R1-060806
`to the RAN1 TR
`Downlink cell search design for E-UTRA TDD
`Rules for mapping VRBs to PRBs
`Text proposal on rules for mapping VRBs to PRBs
`Text proposal on downlink ACK channel
`Downlink Control Signaling
`Cell search procedure and channel structure
`Link Adaptation Considerations for Evolved UTRA Downlink
`and Text Proposal
`Performance comparison of EUTRA open loop transmit
`diversity techniques
`
`R1-060807
`R1-060808
`R1-060809
`R1-060810
`R1-060811
`R1-060812
`
`R1-060813
`
`R1-060814
`
`Yes
`
`R1-060815
`
`Text Proposal on MIMO for E-MBMS
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`R1-060816
`
`R1-060817
`
`R1-060818
`
`R1-060819
`R1-060820
`R1-060821
`R1-060822
`R1-060823
`
`R1-060824
`
`R1-060825
`
`R1-060826
`R1-060827
`R1-060828
`
`Text Proposal on Cyclic Shift Diversity for Scheduling
`Gains
`Bandwidth and Power Efficiency Evaluation for pi/2-BPSK
`and QPSK
`Reference signal structure for EUTRA uplink
`L1/L2 Control Signalling Multiplexing in Evolved UTRA
`Uplink
`DL resource block allocation and DL signaling
`Downlink adaptation/scheduling guided by an efficient
`CQI-feedback scheme
`Precoding and multiuser MIMO
`Cell Search Scheme for EUTRA
`Combined spatial multiplexing and CSD transmission for rate
`2 with 4 transmit antennas
`Diversity for Random Access
`Link-Level Simulation Results for SINR Measurements using
`Pilot Channel and Sync Channel
`Text Proposal on UE Measurements
`Text proposal for mapping of symbol on QAM constellation
`
`Panasonic
`10.2.2
`R1 #44bis (March2006)
`Panasonic
`10.1.6
`Panasonic
`10.3.1
`Huawei
`10.1.3
`Huawei
`10.2.3
`NEC Group
`9
`Nokia
`8
`Nokia
`8
`Nokia
`10.1.2
`Nokia
`10.4.2
`Nokia
`10.1.1
`Nokia
`10.2.2
`Nokia
`10.1.3
`Nokia
`10.4.1
`
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion
`Discussion/
`Decision
`Discussion
`
`Discussion
`
`Discussion
`Discussion
`Discussion
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion
`
`TP
`
`Discussion/
`Decision
`Discussion/
`Decision
`TP
`TP
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`TP
`
`10.1.3
`10.1
`10.1
`10.1.1
`10.1.1
`10.1.3
`
`10.1.6
`
`10.1.8
`
`Discussion
`
`10.1.8
`
`10.1.8
`
`10.2
`
`10.2.1
`
`10.2.2
`10.1.1
`10.1.6
`10.1.8
`10.1.3
`
`10.1.8
`
`10.2.3
`
`10.3.1
`10.3.1
`10.1
`
`TP
`
`TP
`
`Discussion/
`Decision
`Discussion/
`Decision
`
`Discussion
`
`Decision
`
`Discussion
`
`Discussion
`Discussion/
`Decision
`
`Discussion
`
`Discussion/
`Decision
`Discussion/
`Decision
`TP
`TP
`
`TD Tech
`Samsung
`Samsung
`Samsung
`Samsung
`Samsung
`
`Samsung
`
`Samsung
`Samsung,
`Ericsson, Texas
`Instruments
`Samsung
`
`Samsung
`
`Samsung
`
`Samsung
`Nokia
`Huawei
`Huawei
`ETRI
`
`ETRI
`
`ETRI
`
`ETRI
`ETRI
`NEC Group
`Page 3
`
`Not Treated
`
`Not Treated
`Not Treated
`3/28/2006 Revised in R1-061081
`Not Treated
`3/27/2006 The conclusion in this document was
`captured in R1-061077
`3/27/2006 Noted
`3/27/2006 Noted
`3/30/2006 Revised in R1-061090
`Not Treated
`Not treated
`Withdrawn
`3/28/2006 Noted
`3/30/2006 Agreed with the correction in table A
`2.1.2-1
`Not treated
`Not treated
`Not treated
`Not treated
`Not treated
`Not treated
`Not Treated
`
`Not treated
`
`Revised in R1-061085 merged with
`R1-060981
`
`Not treated
`
`Not treated
`
`Not treated
`Not Treated
`
`Not treated
`Not Treated
`
`Not treated
`Not treated
`Not treated
`
`Not Treated
`Withdrawn
`
`Withdrawn
`Not treated
`
`SAMSUNG 1021-0003
`
`
`
`Yes
`
`Yes
`Yes
`
`Yes
`
`Yes
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`R1-060829
`
`Physical channel mapping & power control for SCCH
`
`R1-060830
`R1-060831
`
`Resource Allocation Signalling for E-UTRA
`Considerations on uplink pilot design using CAZAC
`
`R1-060832
`
`R1-060833
`R1-060834
`
`Evaluation of frame efficiency with UE-specific idle period
`reservation for half duplex communications
`Signaling for downlink scheduling
`Joint coding vs individual coding of UE information for
`downlink scheduling
`Signaling for downlink scheduling: Dynamic allocation of
`R1-060835
`distributed and localized configuration with no signaling
`Text proposal for downlink scheduling signalling
`R1-060836
`Signalling in DL for uplink scheduling
`R1-060837
`TP on Signalling in DL for uplink scheduling
`R1-060838
`Downlink resource multiplexing
`R1-060839
`R1-060840 Open Loop multiple antenna schemes and results
`for EUTRA
`R1-060841
`Evaluation of slot formats for Continuous Connectivity
`R1-060842
`Update of summary tables for Continuous Connectivity
`R1-060843
`Distributed transmission in E-UTRA downlink
`R1-060844 MIMO resource definition for E-UTRA
`Initial Simulation Results of Coded MIMO-OFDM Schemes
`for E-UTRA Downlink
`CQI Signalling Occasions
`
`R1-060845
`
`R1-060846
`
`R1-060847
`
`Considerations on Pilot Design for the LTE Uplink
`
`NEC Group, NTT
`10.1.1
`R1 #44bis (March2006)
`DoCoMo
`NEC Group
`10.1.1
`NEC Group
`10.2.1
`Mitsubishi
`Electric,
`IPWireless
`Siemens
`Siemens
`
`10.1.1
`10.1.1
`
`10.4.1
`
`Siemens
`Siemens
`Siemens
`Siemens
`Siemens
`Freescale
`Semiconductor
`Philips
`Philips
`Philips
`Philips
`
`Philips
`
`10.1.1
`10.1.1
`10.1.1
`10.1.1
`10.1.1
`10.1.8
`
`9
`9
`10.1.5
`10.1.8
`
`10.1.8
`
`10.2.2
`
`10.2.1
`
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`
`Discussion/
`Decision
`
`Discussion
`
`Discussion
`
`Discussion
`
`TP
`Discussion
`TP
`Decision
`
`Discussion
`
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`
`Discussion
`
`Discussion/
`Decision
`
`Discussion
`
`Not treated
`
`Not treated
`Not treated
`Not Treated
`
`Not treated
`Not treated
`
`Not treated
`
`Not treated
`Not treated
`Not treated
`Not treated
`Withdrawn
`
`R1-061075
`
`3/27/2006 Noted
`3/27/2006 Revised in R1-061075
`Not Treated
`Not treated
`Not treated
`
`Not Treated
`Not treated
`
`Not Treated
`
`Not Treated
`
`R1-060848
`
`LTE Power De-Rating with a State-of-the-Art PA Module
`
`10.4.2
`
`Discussion
`
`Discussion
`
`R1-060849
`
`System Simulation Results for the LTE uplink
`
`Philips
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`InterDigital
`
`InterDigital
`
`InterDigital
`
`InterDigital
`InterDigital
`Texas
`Instruments
`Texas
`Instruments
`Texas
`Instruments
`Texas
`Instruments
`Texas
`Instruments
`Texas
`Page 4
`Instruments
`
`10.4.2
`
`10.1.3
`
`10.1.4
`
`10.2.2
`
`10.2.8
`10.2.8
`10.1.1
`
`10.1.2
`
`10.1.2
`
`10.1.2
`
`10.1.2
`
`10.1.3
`
`Discussion/
`TP
`
`Discussion
`
`Discussion/
`TP
`
`Discussion
`
`Discussion
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`
`TP
`
`Discussion/
`Decision
`Discussion/
`Decision
`
`Not treated
`Not treated
`
`Not Treated
`
`Not Treated
`
`Not Treated
`Not treated
`
`Not treated
`
`3/30/2006 Noted
`
`Not treated
`
`3/30/2006 Noted
`
`Not treated
`
`Considerations on Cell Search for Evolved UTRA
`Channel Coding Dependent Constellation Remapping for
`EUTRA Downlink HARQ
`Scheduling and Multiplexing of CQI and ACK/NACK
`Feedback for Single Carrier FDMA in Evolved UTRA Uplink
`
`Uplink MIMO SC-FDMA with Adaptive Modulation and
`Coding
`E-UTRA Downlink Pilot/Reference Signal Design
`Location Signaling Avoidance for Distributed Resource Block
`Allocation
`E-MBMS Reference Signal Structure
`
`Transmit Diversity Performance for E-MBMS
`
`Text Proposal for E-MBMS Reference Signal Structure
`
`Further Study on Multi-Antenna Schemes for E-MBMS
`
`Aspects and Design of DL SYNC Channel (SCH) for E-
`UTRA
`
`Yes
`
`Yes
`
`Yes
`
`R1-060850
`
`R1-060851
`
`Yes
`
`R1-060852
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`R1-060853
`R1-060854
`R1-060855
`
`R1-060856
`
`R1-060857
`
`R1-060858
`
`R1-060859
`
`R1-060860
`
`SAMSUNG 1021-0004
`
`
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`
`R1-060861
`
`R1-060862
`
`Timing and cell-specific info detection in cell search
`procedure for E-UTRA
`Comparison between repetitive and non-repetitive SCH
`structure for E-UTRA
`Transmit diversity schemes for SCH E-UTRA
`
`R1-060863
`R1-060864 Overview of Resource Management Techniques
`for Interference Mitigation in EUTRA
`Downlink CQI Reporting Timing in EUTRA Uplink and TP
`RACH Preamble Design for E-UTRA
`
`R1-060865
`
`R1-060866
`
`R1-060867
`
`R1-060868
`R1-060869
`R1-060870
`R1-060871
`
`A New Preamble Shape for the Random Access Preamble
`in E-UTRA
`Performance and complexity of scaleable Precoded MIMO
`(LLS & SLS)
`Text proposal for scaleable precoded MIMO
`Text proposal for modulation and power adaptation of MIMO
`systems
`Reference signal design for downlink MIMO
`
`Yes
`
`R1-060872
`
`Parallelism Limitations for Turbo Codes
`
`Yes
`
`R1-060873
`
`Downlink OFDMA resource allocation and mapping rules for
`distributed mode users in E-UTRA
`
`Yes
`
`R1-060874
`
`Complexity Comparison of LDPC Codes and Turbo Codes
`
`R1-060875
`
`R1-060876
`R1-060877
`R1-060878
`
`R1-060886
`
`R1-060887
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`EUTRA Downlink Distributed Multiplexing and Mapping
`Rules TP
`Further Evaluation of Cell Search and Initial Acquisition for E-
`UTRA
`Frequency Domain Scheduling for E-UTRA
`E-UTRA SC-FDMA Uplink Pilot/Reference Signal Design &
`TP
`Performance Comparison of Pilot/Reference Signal
`R1-060879
`Structures for E-UTRA Uplink SC-FDMA
`Text proposal for uplink sounding in EUTRA
`R1-060880
`R1-060881 Overhead Analysis and Resource Assignment for Uplink CQI
`Feedback + TP
`Motorola
`R1-060882
`E-UTRA Uplink Control Signaling + TP
`Motorola
`R1-060883
`Non-Synchronized Random Access for E-UTRA
`Motorola
`R1-060884
`Random access sequence design
`E-UTRA Random Access Channel TP from Email Discussion Motorola, CATT,
`R1-060885
`ITRI, IIR
`Table Summary of Random Access proposals provided to
`Motorola
`email reflector
`Distributed and Localized Data Performance for E-UTRA
`Uplink SC-FDMA
`Data Multiplexing for E-UTRA Uplink SC-FDMA & TP
`R1-060888
`R1-060889 MIMO and SDMA for EUTRA UL
`System level performance of per group rate control (PGRC)
`R1-060890
`for downlink E-UTRA
`
`10.2.3.1 Discussion
`
`10.2.5
`
`10.2.5
`10.2.8
`10.1.3
`
`Discussion
`
`Discussion
`/TP
`Discussion
`
`Discussion
`
`Motorola
`
`Motorola
`Motorola
`Texas
`Page 5
`Instruments
`
`Texas
`10.1.3
`R1 #44bis (March2006)
`Instruments
`Texas
`Instruments
`Texas
`Instruments
`Texas
`Instruments
`Texas
`Instruments
`Texas
`Instruments
`Texas
`Instruments
`Intel Corporation
`Intel Corporation
`Intel Corporation
`Intel Corporation
`Intel, ITRI, LG,
`Mitsubishi,
`Motorola,
`Samsung, ZTE
`Intel Corporation
`Samsung,
`Mitsubishi,
`Motorola, LG,
`Intel, ZTE, ITRI
`Motorola, NTT
`DoCoMo
`Motorola
`Motorola
`Motorola
`
`10.1.3
`
`10.1.3
`
`10.1.7
`
`10.2.2
`
`10.2.3
`
`10.2.3
`
`10.1.8
`10.1.8
`10.1.6
`10.1.8
`
`10.1
`
`10.1.5
`
`10.1
`
`10.1.1
`
`10.1.3
`10.1.5
`10.2.1
`
`Motorola
`Motorola
`Motorola
`
`10.2.1
`10.2.1
`10.2.2
`
`10.2.2
`10.2.3
`10.2.3
`10.2.3.1
`
`Not treated
`
`Not treated
`
`Not treated
`
`3/30/2006 Noted
`
`Not Treated
`
`Not Treated
`
`Not Treated
`
`R1-061079
`
`Revised in R1-061079
`
`Discussion
`
`Discussion
`
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`TP
`Discussion/
`Decision
`
`Discussion
`
`Discussion/
`Decision
`TP
`
`TP
`Discussion R1-061067
`
`Discussion
`
`Discussion
`
`Discussion
`
`Discussion/
`TP
`Discussion/
`TP
`Discussion
`Discussion/
`TP
`
`Discussion
`
`TP
`Discussion/
`TP
`Discussion
`/TP
`Discussion
`Discussion
`
`TP
`
`Not Treated
`Not Treated
`
`Revised in R1-061067
`Not treated
`
`Not Treated
`
`Not treated
`
`Not treated
`
`3/28/2006 Noted
`
`Withdrawn
`Not treated
`
`3/30/2006 Noted
`
`Not treated
`Not Treated
`
`Not Treated
`3/28/2006 Noted
`Not Treated
`3/28/2006 Agreed
`
`3/28/2006 Noted
`
`Not Treated
`
`Not Treated
`Not Treated
`Not treated
`
`SAMSUNG 1021-0005
`
`
`
`Texas
`10.1.8
`R1 #44bis (March2006)
`Instruments
`RITT, Huawei,
`CATT
`RITT, Huawei,
`CATT
`RITT, SHRCWC
`
`10.1.1
`
`10.2.2
`
`R1-060891
`
`R1-060892
`
`Evaluation of downlink MIMO pre-coding for E-UTRA with 2-
`antenna Node B
`Signalling for downlink inter-cell interference cancellation
`
`R1-060893
`
`R1-060894
`
`R1-060895
`
`R1-060896
`
`Signalling for uplink inter-cell interference cancellation
`Performance evaluation of eigen-mode close-loop MIMO
`transmission
`Performance of IDMA-based inter-cell interference
`cancellation
`Performance comparison between Diversity Physical
`Resource Block (PRB) and Localised PRB
`STBC based HARQ with Simulation Comparison
`R1-060897
`Dynamic and Fixed Resetting for a Differential Encoder
`R1-060898
`R1-060899 On MIMO-OFDM Downlink Pilots and Presoding index
`Feedback
`Performance evaluation of STTD and cyclic shift diversity in
`Downlink MIMO systems for LTE
`Synchronization channel design for E-UTRA
`Synchronization performance evaluation for E-UTRA
`Broadcast channel design for E-UTRA
`Intra node B Soft Handover
`Adaptive Fractional Frequency Reuse
`
`R1-060900
`
`R1-060901
`R1-060902
`R1-060903
`R1-060904
`R1-060905
`
`RITT
`
`Nortel
`
`Nortel
`Nortel
`Nortel
`
`Nortel
`
`Nortel
`Nortel
`Nortel
`Nortel
`Nortel
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`SC-FDMA based Multi-user MIMO System Level
`Performance Evaluation for E-UTRA UL (Contribution + TP) Nortel
`Sounding channel for UL channel-dependent scheduling
`Nortel
`R1-060907
`R1-060908 On the performances of LTE RACH
`Nortel
`R1-060909
`Consideration on the issues of LTE RACH
`Nortel
`Performance improvement of the rate-compatible LDPC
`codes
`Comparison of CQI feedback schemes
`PU2RC performance evaluation
`Further Evaluation of R-OFDM Scheme for Downlink
`OFDMA Concept
`Twin Turbo Performance with Swapping Constellation Re-
`Arrangement for Repetition Transmission
`
`R1-060906
`
`R1-060910
`R1-060911
`R1-060912
`
`R1-060913
`
`R1-060914
`
`Mitsubishi Electric
`
`Mitsubishi Electric
`Samsung
`
`KDDI
`
`KDDI
`CATT, China
`Mobile, RITT, ZTE,
`Mitsubishi Electric
`Corporation,
`Huawei, Motorola,
`LG Electronics,
`Samsung, ITRI,
`Intel
`LG Electronics
`
`LG Electronics
`
`LG Electronics
`
`LG Electronics
`
`LG Electronics
`Page 6
`
`Yes
`
`R1-060915
`
`Text Proposal for Channel coding
`
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Downlink transmission to support 10 MHz UE reception
`R1-060916
`capability
`R1-060917 Multiplexing of multi-cell MBMS and unicast transmission
`Uplink transmission to support 10 MHz UE transmission
`R1-060918
`capability
`R1-060919
`Uplink pilot for channel quality measurement
`L1/L2 signaling for CQI reporting considering multiple
`R1-060920
`streams transmission
`
`10.1.8
`
`10.1.7
`
`10.1.5
`
`10.1.4
`10.1.8
`10.1.8
`
`10.1.8
`
`10.1.3
`10.1.3
`10.1.3
`10.1.7
`10.1.7
`
`10.2.8
`
`10.2.2
`10.2.3
`10.2.3
`
`10.4.1
`10.2.2
`10.1.8
`
`10.1
`
`Discussion
`
`TP
`
`TP
`
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion
`Discussion/
`Decision
`
`Discussion
`
`Discussion/
`Decision
`Discussion
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`
`Discussion/
`TP
`
`Discussion/
`Decision
`Discussion
`Discussion/
`Decision
`
`Discussion
`
`Discussion
`Discussion/
`Decision
`Discussion/
`Decision
`
`Not Treated
`
`Not treated
`
`Not Treated
`
`Not Treated
`
`3/30/2006 Noted
`
`Not Treated
`
`3/28/2006 Noted
`Not Treated
`Not Treated
`
`Not Treated
`
`Not treated
`3/28/2006 Noted
`Not treated
`Withdrawn
`Not treated
`Not Treated
`
`Not Treated
`3/28/2006 Noted
`Not Treated
`Not Treated
`
`Not Treated
`Not Treated
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`3/30/2006 Noted
`Not treated
`
`Not treated
`Not Treated
`
`10.1.4
`
`Information
`
`(R1-060505)
`
`10.1
`
`TP
`
`10.1
`10.1.2
`10.2
`10.2.1
`10.2.2
`
`Decision
`
`Decision
`
`Decision
`
`Decision
`Discussion/
`Decision
`
`SAMSUNG 1021-0006
`
`
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`R1-060921 Multiplexing of data and control in E-UTRA Uplink
`R1-060922
`Uplink resource request for uplink scheduling
`Simulation results for uplink fast frequency domain
`R1-060923
`scheduling
`Boosting the Uplink Pilot Transmission Power for Higher
`Mobility UEs
`Comparison of Proposed Uplink Pilot Structures for SC -
`OFDMA
`PAPR Reduction using Subcarrier Reservation in SC-FDMA
`Uplink
`25.214CR0417(Rel-6, F) "Clarification of synchronization
`procedure"
`25.214CR0418(Rel-7, A) "Clarification of synchronization
`procedure"
`Evaluation of DL control channel for multiple antenna Node
`B's
`Cell Search procedure of EUTRA TDD system for the initial
`synchronization
`Further clarifications of the reference signal requirement for
`downlink dynamic beam-forming and pre-coding in TDD
`mode
`EUTRA TDD Random Access Procedure
`
`R1-060924
`
`R1-060925
`
`R1-060926
`
`R1-060927
`
`R1-060928
`
`R1-060929
`
`R1-060930
`
`R1-060931
`
`R1-060932
`
`R1-060933
`
`R1-060934
`
`R1-060935
`
`10.2.2
`LG Electronics
`R1 #44bis (March2006)
`10.2.2
`LG Electronics
`10.2.5
`
`LG Electronics
`Texas
`Instruments
`Texas
`Instruments
`Texas
`Instruments
`Panasonic
`
`Panasonic
`
`Huawei
`
`CATT, RITT
`
`10.2.1
`
`10.2.1
`
`10.2.2
`
`6.4
`
`6.4
`
`10.1.8
`
`10.1.3
`
`CATT, RITT
`
`10.2.1
`
`CATT, RITT, TD-
`Tech
`CATT, RITT, TD-
`Tech
`CATT, RITT
`
`10.2.3
`
`10.1
`
`10.1.8
`
`Discussion
`Decision
`
`Discussion
`
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`
`CR
`
`CR
`
`Discussion/
`Decision
`Discussion/
`Decision
`
`Discussion/
`Decision
`
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`
`10.1.3
`
`Discussion
`
`Not Treated
`Not Treated
`Not Treated
`
`Not treated
`
`Not treated
`
`Not Treated
`
`Withdrawn
`
`Withdrawn
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not Treated
`
`Not treated
`
`Not Treated
`
`Not treated
`
`The numerology of 1.6MHz bandwidth for EUTRA LCR-
`based TDD frame structure
`Clarifications of the dynamic beam-forming/pre-coding
`method in TDD mode and text proposal
`The impact of frequency offset on modulation performance
`CATT
`for EUTRA TDD
`Qualcomm
`Draft LS reply to SA4 on Delay Profiles for VoIP
`Europe
`Performance of MIMO in Rel-7 with new evaluation scenario Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Incremental complexity of SIC receivers for PARC
`Europe
`Qualcomm
`Preliminary Cell and User Throughput Comparison for 2x2
`Europe
`MIMO: D-TxAA and PARC
`Demodulation impact of DPCCH gating over active periods Qualcomm
`Europe
`Demodulation impact of DPCCH gating over inactive periods Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`
`D-TxAA for MIMO in Rel-7
`
`HS-SCCH demodulation impact of DRX at UE
`
`Further evaluation of HS-SCCH-less operation
`
`5
`
`8
`
`8
`
`8
`
`8
`
`9
`
`9
`
`9
`
`9
`
`9
`
`9
`
`Discussion/
`Decision
`
`Discussion
`
`Discussion
`
`Discussion
`
`Discussion
`
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discission/D
`ecision
`
`Revised in R1-061068
`
`3/27/2006 Noted
`
`3/27/2006 Noted
`
`3/27/2006 Noted
`
`3/27/2006 Noted
`
`3/27/2006 Noted. The results was captured in
`R1-061076
`3/27/2006 Noted. The results was captured in
`R1-061076
`3/27/2006 Agreed
`
`3/27/2006 Noted
`
`Not treated
`
`R1-061078
`
`3/27/2006 Revised in R1-061078
`
`10.1.2
`
`Discussion
`
`10.1.4
`
`Discussion
`
`Not treated
`
`3/28/2006 Noted
`
`Page 7
`
`R1-060936
`
`R1-060937
`
`R1-060938
`
`R1-060939
`
`R1-060940
`
`R1-060941
`
`R1-060942
`
`R1-060943
`
`R1-060944
`
`R1-060945
`
`R1-060946
`
`R1-060947
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Further details of DRX proposal
`TP for HS-SCCH less operation for Continuous Packet
`Connectivity
`Link Analysis of Reference Signals for SFN (Multi-Cell)
`MBMS
`R1-060948 Operating Point for DL Control Channel
`
`SAMSUNG 1021-0007
`
`
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`R1-060949
`
`Link Analysis of DL HARQ Related Overhead in UL
`
`R1-060950
`
`R1-060951
`
`R1-060952
`
`Link Analysis of DL Scheduling Related Overhead in UL
`
`Link Analysis of Single User MIMO - S-VAP vs. S-PARC
`Link Analysis of Single User MIMO - Impact of Precoding on
`S-VAP
`Link Analysis of Single User MIMO - Single Codeword vs.
`Multi Codeword with HARQ Resynchronization
`Link Analysis of LFDM and IFDM Waveforms
`
`R1-060953
`
`R1-060954
`
`R1-060955
`
`R1-060956
`
`R1-060957
`
`R1-060958
`
`R1-060959
`
`R1-060960
`
`Discussion
`
`10.1.5
`
`Discussion
`
`10.1.5
`
`Discussion
`
`10.1.5
`
`Discussion
`
`10.1.8
`
`Discussion
`
`10.1.8
`
`Discussion
`
`10.1.8
`
`Discussion
`
`10.2.1
`
`Discussion
`
`10.2.4
`
`Discussion
`
`10.2.5
`
`Discussion
`
`10.4.1
`
`Discussion
`
`10.4.1
`
`Discussion
`
`3/28/2006 Noted
`
`Not Treated
`
`Not Treated
`
`Not Treated
`
`Not Treated
`
`Not Treated
`
`Not Treated
`
`Not treated
`
`3/28/2006 Noted
`
`Not Treated
`
`Not Treated
`
`Not Treated
`
`Qualcomm
`10.1.4
`R1 #44bis (March2006)
`Europe
`Qualcomm
`Link Analysis of DL Control Channel Overhead for Unicast
`Europe
`Link Analysis of DL Control Channel Overhead for Multicast Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`Qualcomm
`Europe
`SHRCWC, RITT
`SHRCWC, RITT
`SHRCWC, RITT
`Toshiba
`Research
`Europe
`Samsung
`LG Electronics
`LG Electronics
`
`Link Analysis of UL HARQ Related Overhead in DL
`Link Analysis of UL Scheduling Related Overhead for
`Unicast
`System Analysis of the Impact of CQI Reporting Period in DL
`SIMO OFDMA
`System Analysis of the Impact of Number of Sub-bands in
`DL SIMO OFDMA
`R1-060961 Multiplexing DL Multicast and Unicast Transmissions
`R1-060962 Multi-cell interference mitigation on the Cell Search in E-
`UTRA
`R1-060963
`Impacts of ACK/NACK misinterpretation
`R1-060964
`Considerations of HARQ for PARC
`
`R1-060965
`
`Design of Uplink Reference Signals
`
`R1-060966
`R1-060967
`R1-060968
`
`R1-060969
`
`R1-060970
`
`R1-060971
`R1-060972
`R1-060973
`R1-060974
`
`R1-060975
`
`R1-060976
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`RACH message transmission
`High-rate STC for Open-loop MIMO with 2Tx antennas
`Adaptive insertion of 2nd reference symbol for downlink
`HARQ
`Performance Comparison of D-FDMA and L-FDMA with
`Frequency Hopping for E-UTRA Uplink + TP
`Initial cell search procedure and Long-CP sub-frame
`structure
`Considerations on CAZAC reference signal for E-UTRA
`Uplink
`Pilot Design for E-UTRA Uplink
`Further details on Fully DTXed solution for ConCon
`System simulation results on Fully DTXed solution for
`ConCon
`TP for 25.903 on Fully DTXed solution for ConCon
`Evaluation on Frequency Hopping for DL Shared Data
`Channel
`E-UTRA Downlink Control Signaling Transmission Scheme Huawei
`R1-060977
`Impact of MBMS sub-frames on HARQ
`Huawei
`R1-060978
`R1-060979 MBMS service Multiplexing
`Huawei
`R1-060980 Multiplexing of Unicast and MBMS
`Huawei
`
`10.1.2
`
`10.1.3
`10.1.4
`10.1.8
`
`10.2.1
`
`10.2.3
`10.1.8
`10.1.4
`
`10.2
`
`Discussion
`
`Discussion/
`Decision
`Discussion
`Discussion
`
`Discussion
`
`Discussion/
`Decision
`Discussion
`
`Discussion
`
`Discussion/
`TP
`
`NEC Group
`
`Fujitsu
`
`Fujitsu
`RITT
`Huawei
`Huawei
`
`Huawei
`
`Huawei
`
`10.1.3
`
`Discussion
`
`10.2.1
`10.2.1
`9
`9
`
`Discussion
`
`Discussion
`Discussion
`
`Discussion
`
`9
`
`TP
`
`10.1
`
`10.1.1
`10.1.2
`10.1.2
`10.1.2
`
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion
`Discussion/
`Decision
`Discussion
`
`Page 8
`
`3/30/2006 Noted
`
`Not treated
`
`3/28/2006 Noted
`Not Treated
`Not treated
`
`Not Treated
`Not Treated
`3/28/2006 Noted
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`3/27/2006 Noted
`3/27/2006 Noted
`
`3/27/2006 Noted. Continue discussion until next
`meeting
`Not treated
`
`Not treated
`Not treated
`3/30/2006 Noted
`Withdrawn
`
`SAMSUNG 1021-0008
`
`
`
`Yes
`Yes
`Yes
`
`Yes
`Yes
`
`Huawei
`10.1.2
`R1-060981 Multi-antenna Node B criteria for E-MBMS and TP
`R1 #44bis (March2006)
`Huawei
`10.1.2
`R1-060982 MBMS Transmission under Soft Frequency Reuse
`R1-060983
`Evaluation on Inter-cell Interference Co-ordination Scheme Huawei
`10.1.7
`Transmit diversity for control channel in E-UTRA
`Huawei
`10.1.8
`R1-060984
`R1-060985
`Impacts of Uplink FDM Pilot Density
`Huawei
`10.2.1
`R1-060986
`Uplink Reference Signal Structure with TP
`Huawei
`10.2.1
`
`Discussion/
`TP
`Discussion
`Discussion/
`Decision
`Discussion
`Discussion/
`Decision
`Discussion/
`TP
`
`Yes
`
`R1-060987
`
`Link Adaptation Scheme for Single-antenna Transmission in
`E-UTRA Downlink
`
`Yes
`
`R1-060988
`
`Link Adaptation Scheme for MIMO Transmission in E-UTRA
`Downlink
`
`R1-060989
`
`Revised in R1-061085 merged with
`R1-060815
`Not treated
`Not treated
`
`Withdrawn
`Not treated
`Not treated
`Not Treated
`
`(R1-060306)
`
`(R1-060307)
`
`Not Treated
`
`Withdrawn
`3/30/2006 Revised in R1-061095
`
`Not Treated
`
`Not Treated
`
`Not Treated
`
`3/28/2006 Noted
`3/28/2006 Agreed with a correction
`3/28/2006 Agreed
`3/28/2006 Noted
`
`3/28/2006 Noted
`Not treated
`
`Not treated
`
`3/30/2006 Noted
`3/30/2006 Agreed
`Not Treated
`Not Treated
`3/27/2006 Noted
`3/27/2006 Noted
`3/27/2006 Noted
`3/27/2006 Noted
`3/27/2006 Noted
`3/27/2006 Agreed
`3/27/2006 Noted
`
`NTT DoCoMo,
`Ericsson, Fujitsu,
`Mitsubishi
`Electric, NEC,
` Panasonic,
`Sharp, Toshiba
`Corporation
`
`NTT DoCoMo,
`Ericsson, Fujitsu,
`Mitsubishi
`Electric, NEC,
`Sharp, Toshiba
`Corporation
`
`NTT DoCoMo
`NTT DoCoMo,
`NEC
`NTT DoCoMo
`NTT DoCoMo,
`NEC
`NTT DoCoMo,
`NEC
`Ericsson
`Ericsson
`Ericsson
`Ericsson
`
`Ericsson
`
`Ericsson
`
`Ericsson
`Ericsson
`Ericsson
`Ericsson
`Ericsson
`Ericsson
`Ericsson
`Ericsson
`Ericsson
`Ericsson
`Ericsson
`Page 9
`Ericsson
`
`10.1.6
`
`Discussion/
`Decision
`
`10.1.6
`
`Discussion/
`Decision
`
`10.1.7
`
`10.1.8
`
`10.1.8
`
`10.2.3
`
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`10.4.2
`Decision
`10.1.1.1 Information
`10.2.2.1
`TP
`10.1.1.1
`TP
`10.1.1.1 Discussion
`Discussion/
`Decision
`
`10.2.3
`
`10.1
`
`Discussion
`
`10.1
`10.1.8
`10.1.8
`10.1.8
`10.2.8
`9
`9
`9
`9
`9
`9
`8
`
`TP
`
`Discussion
`TP
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion
`Discussion
`Discussion
`Discussion
`Discussion/
`Decision
`TP
`Discussion
`
`Interference Mitigation in E-UTRA Downlink
`Basic Schemes of Downlink MIMO Channel Transmissions
`R1-060990
`for E-UTRA
`R1-060991 Multi-Degree Cyclic Delay Diversity with Frequency-domain
`Channel Dependent Scheduling
`Investigations on Random Access Channel Structure for E-
`UTRA Uplink
`Investigations on Adaptive Control of Roll-off Factor for DFT-
`Spread OFDM Based SC-FDMA in Uplink
`Summary of email discussion on control signaling
`E-UTRA Uplink Control Signaling – Text Proposal
`E-UTRA Downlink Control Signaling – Text Proposal
`Downlink Control Signaling – Mapping to Physical Channel
`Resources
`E-UTRA Random Access Preamble Design
`E-UTRA Coverage Optimization (impact on reference-signal
`structure and common channels)
`E-UTRA Coverage Optimization (impact on reference-signal
`structure), text proposal
`LTE Channel Models and link simulations
`E-UTRA MIMO channel models - text proposal
`E-UTRA downlink MIMO
`E-UTRA uplink MIMO
`UL DPCCH Gating - Link Level Performance
`UL DPCCH Gating - System Level Performance
`HSDPA/HSUPA VoIP Capacity Simulation Results
`DL VoIP Capacity Gain from F-DPCH Gating
`UL DPCCH Slot Format for Active and Inactive Periods
`Text Proposal to TR 25.903 Summary Tables
`Comments on the complexity of SIC-based receivers
`
`R1-060992
`
`R1-060993
`R1-060994
`R1-060995
`R1-060996
`R1-060997
`
`R1-060998
`
`R1-060999
`
`R1-061000
`R1-061001
`R1-061002
`R1-061003
`R1-061004
`R1-061005
`R1-061006
`R1-061007
`R1-061008
`R1-061009
`R1-061010
`R1-061011
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`
`SAMSUNG 1021-0009
`
`
`
`Yes
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`Yes
`
`R1-061012
`R1-061013
`R1-061014
`R1-061015
`
`R1-061016
`R1-061017
`R1-061018
`R1-061019
`
`Draft LS on PL for Conversational / speech (12.65, 8.85, 6.6)
`Ericsson
`6.6
`R1 #44bis (March2006)
`kbps + Interactive 0 kbps
`ETRI
`10.1.2
`Text proposal on macro diversity for MBMS
`Synchronization Channels and Tr-BCH mapping
`ZTE
`10.1.3
`Further Consideration on Transmission timing of BCH and
`ZTE
`10.1.3
`SCH
`E-URTA Uplink Reference Multiplexing
`Random Access Preamble and Message
`Uplink Timing Resource Allocation
`Structured LDPC Coding with Rate Matching
`
`10.2.1
`10.2.3
`10.2.3
`10.4.1
`
`(R1-051408)
`
`Discussion/
`Decision
`TP
`Discussion
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion
`(R1-060503)
`Discussion/
`Decision
`Discussion (R1-060499)
`
`3/27/2006 Approved in R1-061073
`
`Not treated
`Not treated
`Not treated
`
`Not treated
`Not Treated
`Not Treated
`Not Treated
`3/28/2006 Agreed
`
`10.1.3.1
`
`TP
`
`9
`9
`9
`9
`9
`9
`9
`5
`
`5
`
`9
`
`10.1
`
`10.1.7
`
`TP
`
`TP
`
`Discussion
`
`TP
`
`Discussion
`Discussion
`Discussion
`Discussion/
`Decision
`Discussion/
`Decision
`
`TP
`
`Discussion/
`Decision
`
`Discussion/
`Decision
`
`10.2.1
`
`Discus