`
`5/8/2006Noted
`
`5/8/2006Noted
`
`Decision
`Discussion/
`Discussion
`
`Disucssion
`
`7
`
`7
`
`7
`
`Page 1
`
`Nokia
`Nokia
`Nokia
`
`HSDPA MIMO system performance results
`receiver
`D-TxAA and PARC performance comparison with LMMSE
`
`R1-061121Way forward for Rel-7 MIMO
`R1-061120
`R1-061119
`
`Yes
`Yes
`
`5/12/2006After the disuccsion on the reflector,
`
`revised in R1-061646
`
`5/11/2006Noted
`
`R1-061646
`
`Approval
`
`11.8
`
`5/10/2006Endorsed as v1.3.0 in R1-061582
`
`5/8/2006Noted
`5/8/2006Approved in R1-061642
`
` = R2-061101
`
`Approval
`
`Incoming LS
`
`Approval
`
`11
`
`3
`
`4
`
`Decision
`
`11
`
`5/10/2006noted
`
`(R1-061107)
`
`5/9/2006Noted
`
`Not treated
`
`5/10/2006Noted
`
`Not treated
`
`Withdrawn
`
`Decision
`
`11
`
`Decision
`Discussion/
`Decision
`Discussion/
`Information
`Decision
`Discussion/
`
`Discussion
`
`11.1.3
`
`11.1.2
`11.6.2
`11.1.2
`
`11.6.2
`
`Discussion
`
`11.6.2
`
`Revised in R1-061118
`5/8/2006Approved in R1-061641
`5/8/2006Approved
`
`R1-061118
`
`Conclusion/Decision
`
` Treated
`
`Date
`
`Rrevised to
`
`(from)
`
`Siemens
`Nortel, Samsung,
`Motorola, Nokia,
`Qualcomm,
`Mobile, Ericsson,
`Orange, TIM, T-
`DoCoMo,
`Vodafone,
`
`E-UTRA Physical Layer Framework for Evaluation
`
`R1-061107
`
`Yes
`
`Approval
`Decision
`
`Type
`
`
`
`23
`
`MCC Support
`RAN1 Chairman
`
`Agenda
`
`Item
`
`Source
`
`Draft Report from RAN1#44bis Meeting
`Draft Agenda for RAN1#45
`
`Title
`
`R1-061106
`R1-061105
`Number
`Tdoc
`
`Yes
`Yes
`
`Available
`
`R1 #45 (May2006)
`
`List of WG1 Temporary Documents
`(Layer 1)
`3GPP TSG RAN Working Group 1
`
`Cingular
`Siemens,
`Nortel, Samsung,
`Motorola, Nokia,
`Qualcomm,
`Ericsson,
`Italia, T-Mobile,
`Orange,Telecom
`DoCoMo,
`Vodafone,
`
`ETRI
`
`ETRI
`Panasonic
`Panasonic
`Electric
`Mitsubishi
`Electric
`Mitsubishi
`NTT DoCoMo
`DoCoMo
`
`Motorola
`RAN WG2,
`MCC Support
`
`Spectrum Efficiency
`Downlink System Evaluation Results -User Throughput,
`25.912, Chapter 7
`Text proposals on LTE Physical Layer Description for TR
`TR25.814 v.1.2.3 Physical Layer Aspects for Evolved UTRAEditor, NTT
`(To: RAN1, RAN4)
`LS on UE measurement and reception capabilities for LTE
`Draft Report from RAN1/RAN2 Joint Meeting in Athens
`
`R1-061112
`
`R1-061111
`
`R1-061110
`
`R1-061109
`R1-061108
`
`E-UTRA Physical Layer Framework for Evaluation
`
`R1-061118
`
`Yes
`
`EUTRA Cell Search
`Comparison of One-SCH and Two-SCH Schemes for
`Diversity for Random Access
`System level simulation result on SC-FDMA
`Random access design for E-UTRA uplink
`
`R1-061117
`
`R1-061116
`R1-061115
`R1-061114
`
`R1-061113Ordered transmission scheme for LDPC-coded symbols
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`
`1
`
`APPLE 1024
`
`
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`5/8/2006Agreed
`
`Not treated
`
`Not treated
`
`Not treated
`
`5/8/2006TP was not agreed.
`
`5/8/2006TP was not agreed.
`
`5/8/2006Noted
`
`Not treated
`Not treated
`
`5/9/2006Noted
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`5/9/2006Noted
`
`Not treated
`
`5/9/2006Noted
`
`5/9/2006Noted
`
`Not treated
`
`Not treated
`
`Not treated
`
`Discussion
`
`Discussion
`
`Decision
`Discussion/
`
`11.1.5
`
`Discussion
`
`11.1.3
`
`Decision
`Discussion/
`
`Decision
`Decision
`Discussion/
`
`Disucssion
`
`Decision
`Discussion/
`
`Decision
`
`Decision
`
`Decision
`
`Decision
`Discussion/
`Discussion
`
`Discussion
`
`11.1.3
`
`5.4
`
`11.3.4
`
`11.1.2
`
`11.1.3
`
`6.1
`
`6.1
`
`6.1
`
`11.1.1
`11.1.3
`11.6.3
`
`Discussion
`
`11.6.2
`
`Discussion
`
`11.6.5
`
`Discussion
`
`11.6.2
`
`Decision
`Discussion/
`
`Discussion
`
`Discussion
`
`Discussion
`
`Proposal
`
`Text
`
`Proposal
`
`Text
`
`Proposal
`
`Text
`
`Decision
`Discussion/
`Decision
`Discussion/
`
`11.6.2
`
`11.6.5
`11.6.2
`11.6.2
`
`11.2.3
`
`11.3.1
`
`11.6.2
`
`11.2.3
`
`11.2.3
`
`11.2.3
`
`11.2.3
`
`Sharp
`Sharp
`Ltd
`HighDimention
`Ltd
`HighDimention
`Ltd
`HighDimention
`Ltd
`HighDimention
`Ltd, CCL/ITRI
`HighDimention
`Intel Corporation
`Intel Corporation
`Intel Corporation
`
`Intel Corporation
`
`Intel Corporation
`
`Alcatel
`
`R1 #45 (May2006)
`
`Alcatel
`
`Siemens
`(CHTTL)
`Laboratories
`Telecom
`Chunghwa
`(CHTTL)
`Laboratories
`Telecom
`Chunghwa
`(CHTTL)
`Laboratories
`Telecom
`Chunghwa
`(CHTTL)
`Laboratories
`Telecom
`Chunghwa
`Panasonic
`SHRCWC, RITT
`
`Page 2
`
`SHRCWC, RITT
`
`SHRCWC, RITT
`
`ZTE
`
`ZTE
`
`Reconfiguration of EUDCH
`Solution to mitigate the ACK/NACK misinterpretation
`Access
`Performance of Transmit Antenna Switch for Random
`Cell Search and TP
`Consideration on Multi-cell Interference for SCH Design in
`Uplink
`Enhanced uplink power control for 1.28Mcps TDD Enhanced
`Enhanced Uplink
`Random access physical channel for 1.28Mcps TDD
`Random access control for 1.28Mcps TDD Enhanced UplinkZTE
`
`BCH Simulation Results for Capacity Estimation
`
`R1-061148
`
`Yes
`
`E-UTRA Downlink
`System Evaluation of Intra-Cell Macro Diversity Schemes for
`
`R1-061147
`
`Yes
`
`Schemes
`Impact of Mobility on the Performance of LTE MIMO
`
`R1-061146
`
`Yes
`
`Aspects of Cell Search for E-UTRA Downlink
`
`R1-061145
`
`Yes
`
`UTRA
`Three-Step Initial Cell Search and System Acquisition for E-
`
`R1-061144
`
`Yes
`
`Schemes
`Stem-level Evaluation of Open-loop Transmit Diversity
`System-level Evaluation of MIMO with Unitary Precoding
`precoded MIMO
`Comparison between single and multiple codewords for
`Scalable precoding and implementation complexities
`systems
`Text proposal for modulation and power adaptation of MIMO
`Text proposal for reference signal design in Downlink MIMOIntel Corporation
`the PAPR of the SC-FDMA in E-UTRA Uplink
`Effect of different ST/SF coding and mapping schemes on
`Uplink
`Performance evaluation of STBC/SFBC schemes in E-UTRA
`
`UE Identity in L1/L2 Downlink Control Signalling
`Cell Search Scheme in E-UTRA Downlink
`layer perspective
`Security and service differentiation in MBMS from physical
`bits removal
`System performance impact of release 6 turbo coding tail-
`in channel coding
`Implementation complexity and power consumption concerns
`backward compatiblility and secure trasmission
`A simple inter-block permutation in channel coding to provide
`iterations of release 6 turbo coding
`
`R1-061130Modify puncturing pattern to improve performance and
`R1-061129
`R1-061128
`R1-061127
`
`R1-061143
`R1-061142
`
`R1-061141
`
`R1-061140
`
`R1-061139
`
`R1-061138
`
`R1-061137
`
`R1-061136
`R1-061135
`R1-061134
`
`R1-061133
`
`R1-061132
`
`R1-061131
`
`R1-061126
`
`R1-061125
`
`R1-061124
`
`R1-061123
`
`R1-061122
`
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`2
`
`
`
`5/8/2006Noted
`5/10/2006Noted
`
`Not treated. Revised in R1-051543
`
`5/9/2006Noted
`
`R1-061543
`
`Decision
`Discussion/
`Discussion
`
`Decision
`
`7
`
`11.2.1
`11.2.1
`
`11.2.3
`
`11.2.3
`
`11.2.3
`
`Not treated
`Not treated
`Not treated
`
`Not treated
`Not treated
`
`Not treated
`Revised in R1-061626
`
`Revised in R1-061550
`
`Not treated
`Not treated
`
`5/9/2006Noted
`
`Not treated
`Not treated
`
`5/9/2006Noted
`
`Not treated
`Not treated
`Not treated
`Not treated
`
`Not treated
`
`5/10/2006Noted
`
`Not treated
`Not treated
`
`5/8/2006Noted
`
`Not treated
`
`Not treated
`Not treated
`
`5/9/2006Noted
`
`Not treated
`
`Discussion
`Decision
`Discussion/
`Proposal
`
`Proposal
`
`Text
`
`Text
`
`R1-061626
`
`R1-061550
`
`Dicussion
`
`Decision
`Discussion/
`Proposal
`
`Text
`
`Decision
`Discussion/
`Proposal
`
`Text
`
`Decision
`Discussion/
`Decision
`Discussion/
`
`Text
`
`Decision
`Discussion/
`Discussion
`Discussion
`Decision
`Discussion/
`Discussion
`Discussion
`Decision
`Discussion/
`Proposal
`
`Decision
`
`11.5
`
`Discussion
`
`Discussion
`
`Decision
`Decision
`Decision
`Discussion/
`
`Discussion
`
`Decision
`Discussion/
`Proposal
`
`Text
`
`Decision
`Discussion/
`
`4
`
`11.6.2
`11.2.2
`11.1.2
`11.2.1
`
`11.6.2
`
`11.6.2
`
`11.1.2
`11.1.2
`11.1.2
`11.1.1
`11.1.1
`11.1.1
`11.6.2
`11.2.3
`11.1.3
`11.1.2
`
`11.6.2
`
`11.2.3
`11.2.1
`
`11.2.1
`
`11.1.5
`
`11.1.5
`11.1.5
`
`Page 3
`
`NTT DoCoMo
`RITT, Huawei
`RITT, Huawei
`Motorola
`Motorola
`
`Motorola
`Motorola
`DoCoMo
`Motorola, NTT
`Motorola
`
`Motorola
`
`Motorola
`
`Motorola
`
`LG Electronics
`
`LG Electronics
`
`LG Electronics
`LG Electronics
`LG Electronics
`Electric
`Mitsubishi
`Philips
`
`Philips
`Intel Corporation
`
`11.2.3
`
`R1 #45 (May2006)
`
`Intel Corporation
`
`Interference-aware MIMO feedback: A Text Proposal
`discussion on control information
`mapping rules for distributed mode users in E-UTRA, with
`Text Proposal for downlink OFDMA resource allocation and
`
`R1-061151MIMO resource definition for E-UTRA
`R1-061150
`
`R1-061149
`
`Yes
`
`LTE Downlink System Performance Evaluation Results
`and TP
`LTE Uplink System Performance and comparison to HSUPA
`Preamble Sequence Design for Random Access of E-UTRAMotorola
`Motorola
`Synchronized Random Access Channel Design
`Motorola
`Random Access Payload Size
`Channels
`Motorola
`Downlink Acknowledgement and Group Transmit Indicator
`Motorola
`Downlink Control Channel Modulation and Coding
`Motorola
`Downlink Control Channel Coding
`ITRI
`Improving Spectral Efficiency by Dispersive Coding
`LG Electronics
`TP on localized and distributed SC-FDMA
`TD Tech
`Cell search and identification of Cell ID for EUTRA TDD
`TD Tech
`Random access preamble design for EUTRA TDD
`scheduling
`TP on simulation results for uplink fast frequency domain
`scheduling
`Simulation results for uplink fast frequency domain
`FDMA
`Performance comparison of localized and distributed SC-
`Uplink reference signal for channel quality measurement
`Discussion and draft answers on LS R1-061109
`Uplink Reference Signal Design Based on TTI Grouping
`Downlink
`Simulation Results of Coded MIMO-OFDM for E-UTRA
`
`R1-061172
`R1-061171Overhead Analysis and Resource Assignment for Uplink CQI
`R1-061170
`
`Investigation on Throughput Improvement by Rel. 7 MIMO
`System Simulation Results for the LTE Uplink
`performance and TP
`Combination of ICI cancellation and coordination:
`Summary of RACH e-mail reflector discussion
`TP
`E-UTRA SC-FDMA Uplink Pilot/Reference Signal Design &
`Text proposal for direct channel feedback in EUTRA
`Text proposal for uplink sounding in EUTRA
`Rules TP
`EUTRA Downlink Distributed Multiplexing and Mapping
`EUTRA Uplink Control Signaling + TP
`Feedback Channel and TP
`
`R1-061180
`R1-061179
`R1-061178
`R1-061177
`R1-061176
`
`R1-061175
`R1-061174
`
`R1-061173
`
`R1-061169
`
`R1-061168
`R1-061167
`R1-061166
`R1-061165
`R1-061164
`R1-061163
`R1-061162
`R1-061161
`R1-061160
`R1-061159
`
`R1-061158
`
`R1-061157
`
`R1-061156
`R1-061155
`R1-061154
`R1-061153
`
`R1-061152
`
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`Yes
`
`3
`
`
`
`Decision
`Discussion/
`
`11.1.5
`
`Not treated
`
`Noted
`
`Not treated
`
`Decision
`Discussion/
`
`Decision
`Discussion/
`Decision
`Discussion/
`
`5/9/2006Noted
`
`Not treated
`
`5/9/2006Agreed
`
`(R1-060781)
`
`(R1-060042)
`
`Decision
`Discussion/
`Decision
`Discussion/
`Proposal
`
`Text
`
`11.1.5
`
`11.1.4
`
`11.1.3
`
`11.1.3
`
`11.1.3
`
`11.1.3
`
`5/9/2006Noted
`
`Not treated
`
`(R1-060320)
`
`Not treated
`
`(R1-060305)
`
`5/9/2006Noted
`
`(R1-060032)
`
`Decision
`Discussion/
`
`11.1.2
`
`Decision
`Discussion/
`
`11.1.1
`
`Decision
`Discussion/
`
`11.1.1
`
`Decision
`Discussion/
`
`11.1.1
`
`R1 #45 (May2006)
`
`Page 4
`NTT DoCoMo
`Corporation
`Sharp, Toshiba
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`Corporation
`Sharp, Toshiba
`Panasonic,
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`NTT DoCoMo
`Corporation
`Toshiba
`Panasonic,
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`NTT DoCoMo
`
`NTT DoCoMo
`Corporation
`Sharp, Toshiba
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`Corporation
`Sharp, Toshiba
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`Corporation
`Sharp, Toshiba
`Panasonic,
`Nokia,
`Motorola, NEC,
`Electric,
`Mitsubishi
`Ericsson, Fujitsu,
`NTT DoCoMo,
`Corporation
`Sharp, Toshiba
`Panasonic,
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`
`Reference Signal Structure for Uplink MIMO in E-UTRA
`
`R1-061191
`
`Yes
`
`R1-061190MIMO Scheme in E-UTRA Downlink - Signaling Aspect
`
`Yes
`
`MBMS in E-UTRA Downlink
`Investigations on Cell-Common Pilot Channel Structure for
`
`R1-061189
`
`Yes
`
`Mode in E-UTRA Downlink
`Neighboring Cell Search Method for Connected and Idle
`
`R1-061188
`
`Yes
`
`in E-UTRA Downlink
`SCH-Replica Based and Auto-Correlation Based Detections
`Comparison on Cell Search Time Performance between
`
`R1-061187
`
`Yes
`
`Downlink
`SCH Structure and Cell Search Method for E-UTRA
`Text Proposal on Cell Search Proposal
`
`R1-061186
`
`R1-061185
`
`Yes
`
`Yes
`
`Random Access Channel Structure for E-UTRA Uplink
`
`R1-061184
`
`Yes
`
`L1/L2 Control Channel Structure for E-UTRA Uplink
`
`R1-061183
`
`Yes
`
`E-UTRA Downlink
`Distributed FDMA Transmission for Shared Data Channel in
`
`R1-061182
`
`Yes
`
`L1/L2 Control Channel Structure for E-UTRA Downlink
`
`R1-061181
`
`Yes
`
`4
`
`
`
`Not treated
`
`(R1-060037)
`
`Not treated
`
`Not treated
`
`Not treated
`
`Decision
`Discussion/
`
`Decision
`Discussion/
`
`Decision
`Discussion/
`
`Decision
`Discussion/
`
`Not treated
`
`(R1-060050)
`
`Proposal
`
`Text
`
`5/9/2006Noted
`
`(R1-060307)
`
`Decision
`Discussion/
`
`Not treated
`
`(R1-060306)
`
`Decision
`Discussion/
`
`Not treated
`
`Not treated
`
`Not treated
`
`(R1-060300)
`
`(R1-060991)
`
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`
`11.3.2
`
`11.3.1
`
`11.2.3
`
`11.2.3
`
`11.2.3
`
`11.2.3
`
`Corporation
`Toshiba
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`Corporation
`Sharp, Toshiba
`Electric, NEC,
`Mitsubishi
`NTT DoCoMo,
`Corporation
` Toshiba
`Sharp,
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`Corporation
`Sharp, Toshiba
`Panasonic,
`Electric, NEC,
`Mitsubishi
`Ericsson, Fujitsu,
` NTT DoCoMo,
`
`Corporation
`Sharp, Toshiba
`Panasonic,
`Electric, NEC,
`Mitsubishi
`Ericsson, Fujitsu,
`NTT DoCoMo,
`
`Sharp
`Panasonic,
`Electric, NEC,
`Mitsubishi
`Ericsson, Fujitsu,
`NTT DoCoMo,
`
`11.2.1
`
`NTT DoCoMo
`
`Page 5
`
`11
`
`Corporation
`Toshiba
`NEC, Sharp,
`NTT DoCoMo,
`
`Code for Shared Data Channel in E-UTRA Downlink
`Performance Comparison between Turbo Code and LDPC
`
`R1-061201
`
`Yes
`
`11.3.4
`
`NTT DoCoMo
`
`and Synchronous Hybrid ARQ for E-UTRA Downlink
`Comparison of Signaling Overhead between Asynchronous
`
`R1-061200
`
`Yes
`
`Paging Channel Structure for E-UTRA Downlink
`
`R1-061199
`
`Yes
`
`Broadcast Channel Structure for E-UTRA Downlink
`
`R1-061198
`
`Yes
`
`Channel in E-UTRA Uplink
`TP on Fast Transmission Power Control for L1/L2 Control
`
`R1-061197
`
`Yes
`
`Downlink
`Link Adaptation Scheme for MIMO Transmission in E-UTRA
`
`R1-061196
`
`Yes
`
`E-UTRA Downlink
`Link Adaptation Scheme for Single-antenna Transmission in
`
`R1-061195
`
`Yes
`
`11.1.5
`
`R1 #45 (May2006)
`
`Channel Dependent Scheduling with Cyclic Delay DiversityNTT DoCoMo
`
`R1-061194Orthogonal Reference Signal Structure for Sectored Beams
`
`in E-UTRA Downlink
`
`R1-061193Multiplexing Method for Orthogonal Reference signals for E-
`R1-061192
`
`UTRA Uplink
`
`Yes
`
`Yes
`
`Yes
`
`5
`
`
`
`5/8/2006Agreed
`5/8/2006Noted
`
`5/8/2006Agreed.
`
`5/8/2006Agreed.
`
`5/8/2006Agreed
`
`5/8/2006Agreed
`
`5/8/2006Agreed
`
`Withdrawn
`
`Not treated, Revised in R1-061583
`
`R1-061583
`
`5/10/2006Noted
`
`Withdrawn
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`5/9/2006Noted
`5/10/2006Noted
`
`Not treated
`
`5/8/2006Noted
`5/8/2006Noted
`
`Decision
`Discussion/
`Discussion
`Decision
`Discussion/
`
`Decision
`
`Decision
`
`CR
`
`CR
`
`Decision
`Discussion/
`
`Decision
`
`Discussion
`
`Proposal
`
`Text
`
`Discussion
`
`Decision
`Discussion/
`
`Decision
`Discussion/
`
`Decision
`Discussion/
`Decision
`Discussion/
`Discussion
`Decision
`Discussion/
`
`Discussion
`
`Discussion
`
`Not treated
`
`(R1-060993)
`
`Decision
`Discussion/
`
`Not treated
`
`(R1-060787)
`
`Decision
`Discussion/
`
`Not treated
`
`(R1-060044)
`
`Decision
`Discussion/
`
`6.1
`6.1
`6.1
`
`6.1
`
`6.1
`
`5.4
`
`5.4
`
`11.5
`
`7
`
`7
`
`11
`
`11
`
`11
`
`Page 6
`
`CATT
`CATT
`CATT
`
`CATT
`
`CATT
`
`11.1.4
`
`11.1.5
`
`11.3.4
`
`11.6.2
`
`11.1.5
`
`11.1.5
`
`11.1.5
`
`11.1.5
`11.6.1
`11.2.3
`
`CATT
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Motorola
`Motorola
`
`R1 #45 (May2006)
`
`Motorola
`Motorola
`Corporation
`Toshiba
`NEC, Sharp,
`NTT DoCoMo,
`Corporation
`Toshiba
`Sharp,
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`Corporation
`Sharp, Toshiba
`Electric, NEC,
`Mitsubishi
`Ericsson, Fujitsu,
`NTT DoCoMo,
`
`R1-061224Modulation for 1.28Mcps TDD Enhanced Uplink
`R1-061223
`R1-061222
`
`R1-061221
`
`R1-061220
`
`R1-061219
`
`R1-061218
`
`R1-061217
`
`R1-061216
`
`R1-061215
`
`R1-061214
`
`R1-061213
`
`R1-061212
`
`R1-061210
`
`R1-061209
`R1-061208
`R1-061207
`
`R1-061211
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`Yes
`
`HARQ schemes for 1.28Mcps TDD Enhanced Uplink
`Proposal for TR 25.XXX
`Support for Node-B Controlled Uplink Scheduling and Text
`TDD Enhanced Uplink
`Text Proposal for basic physical layer structure for 1.28Mcps
`Draft TR Physical Layer Aspects for 1.28Mcps TDD HSUPACATT
`TDD TA"
`25.225 CR0081 (Rel-7, A)"Clarify the reference point for LCR
`TDD TA"
`25.225 CR0080 (Rel-6, F)"Clarify the reference point for LCR
`structures and text proposal
`Evaluation of E-MBMS MIMO reference-signal
`reference-signal structures and text proposal
`Evaluation of E-UTRA downlink MIMO
`HARQ for Uplink SC-FDMA
`System Level Evaluation of Synchronous and Asynchronous
`Text proposal on carrier mapping for Uplink SC-FDMA
`mapping for Uplink SC-FDMA
`System Level Evaluation of localized and distributed carrier
`Downlink MIMO
`Evaluation of Synchronous and Asynchronous HARQ for
`proposal
`MIMO schemes with four transmit antennas and text
`Evaluation of Antenna Selection for Downlink Open loop
`MIMO and text proposal
`Evaluation of EUTRA schemes for Downlink Open loop
`EUTRA Downlink MIMO and text proposal
`Evaluation of localized and distributed carrier mappings for
`Peak Rate with Precoded MIMO in E-UTRA
`(with TP)
`Interference and Open Loop Transmit Diversity Reception
`Microcells
`D-TxAA, PARC, and Single Antenna Systems in Urban
`
`R1-061206
`R1-061205W-CDMA MIMO with FTP Traffic
`
`Spread OFDM based SC-FDMA in Uplink
`Investigations on Adaptive Control of Roll-off Factor for DFT-
`
`R1-061204
`
`Yes
`
`Measurement for E-UTRA Uplink
`Adaptive Transmission Bandwidth of Pilot Channel for CQI
`Frequency Domain Channel-Dependent Scheduling with
`
`R1-061203
`
`Yes
`
`UE Capability in E-UTRA Downlink
`
`R1-061202
`
`Yes
`
`6
`
`
`
`Not treated
`Not treated
`Not treated
`Not treated
`
`5/8/2006Rejected
`
`5/8/2006Agreed that that SF/2 method is not
`
`supported for E-DCH
`
`5/8/2006Rejected
`
`Not treated
`Not treated
`Not treated
`
`Not treated
`Not treated
`
`5/9/2006Noted
`
`Not treated
`Not treated
`Not treated
`Not treated
`
`Not treated
`
`Revised in R1-061555
`Withdrawn
`Not treated
`
`Not treated
`
`5/10/2006Noted
`5/11/2006Noted
`
`5/11/2006Revised in R1-061620
`
`(R1-061555)
`
`(R1-060802)
`
`Not treated
`Not treated
`
`Not treated
`
`5/10/2006Revised in R1-061605
`
`R1-061605
`
`5/9/2006Noted
`
`Not treated
`
`Not treated
`
`5/9/2006Noted
`
`Withdrawn
`Withdrawn
`
`Decision
`Discussion/
`Decision
`Discussion/
`Proposal
`
`Text
`
`Discussion
`
`CR
`
`CR
`
`Discussion
`
`5.4
`
`Proposal
`
`Text
`
`Proposal
`
`Proposal
`
`Text
`
`Text
`
`Decision
`Discussion/
`Discussion
`Decision
`Discussion/
`
`Discussion
`
`Discussion
`Discussion
`Discussion
`
`Discussion
`
`Proposal
`
`Text
`
`Discussion
`Disucssion
`Decision
`Discussion/
`Decision
`Discussion
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`
`Discussion
`
`Proposal
`
`Text
`
`Discussion
`
`Proposal
`
`Text
`
`Discussion
`
`Discussion
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`
`6.1
`6.1
`
`11.1.2
`11.2.3
`11.1.1
`11.1.1
`
`5.4
`
`5.4
`
`11.2.3
`11.2.3
`11.2.3
`
`11.1.5
`11.1.5
`11.1.3
`
`11.1.2
`11.1.1
`11.1.5
`11.3.2
`11.6.2
`
`11.7.6
`11.1.1
`11.2.1
`11.5
`11.6.2
`11.1.3
`11.6.5
`11.2.1
`11.3.4
`
`11.1.5
`
`11.5
`
`11.1.5
`
`11.5
`
`11.1.5
`11.1.2
`11.1.2
`
`Page 7
`
`ZTE
`ZTE
`ZTE
`ZTE
`ZTE
`
`ZTE
`
`ZTE
`
`Huawei
`Huawei
`Huawei
`
`Huawei
`Huawei
`Huawei
`
`Huawei
`Huawei
`Nokia
`Nokia
`Nokia
`
`Nokia
`Nokia
`Nokia
`Nokia
`Nokia
`Nokia
`Nokia
`Nortel
`Nortel
`
`Nortel
`
`Nortel
`
`Nortel
`
`Nortel
`
`PCH and Paging indicator presence on LTE Layer 1
`and coverage
`Impact of DL control signaling overhead on LTE throughput
`aspects
`Text proposal for synchronisation aspects for TR 25.912, L1
`DL control signaling for LTE
`UL reference signal structure and text proposal
`Further evaluation results for SC-FDMA
`LTE Evaluation results
`LTE Cell Search
`Fulfilment of LTE Complexity Requirements, L1 aspects
`Uplink Adaptive Transmission with TP
`STBC-HARQ for UMTS LTE Downlink MIMO with TP
`MIMO systems for LTE
`the presence of Inter-cell/sector interference in Downlink
`Performance evaluation of STTD and cyclic shift diversity in
`MIMO
`Text Proposal for System level simulation for UL virtual
`Performance Evaluation for E-UTRA UL
`SC-FDMA based Multi-user MIMO System Level
`for E-UTRA
`Text Proposal for System Performance of DL Adaptive MIMO
`DL Adaptive STTD/SM Performance Evaluation for E-UTRA Nortel
`Nortel
`Nortel
`CATT
`CATT
`
`R1 #45 (May2006)
`
`R1-061229
`R1-061228On the period of L1 synchronization RACH
`R1-061227On the design of non-synchronized RACH
`R1-061226
`R1-061225
`
`LCR TDD E-HICH: Simulation Results
`LCR TDD: E-HICH structure and coding
`
`TP: Downlink Control Signalling resource division
`Considerations on downlink shared control signalling
`by reducing the spreading factor by 2 for E-DCH"
`25.212CR0234(Rel-7,A)"Clarification of compressed mode
`by reducing the spreading factor by 2 for E-DCH"
`25.212CR0233(Rel-6,F)"Clarification of compressed mode
`SF reduction on compressed mode for 10ms TTI E-DCH
`
`Random access preamble and message
`
`R1-061260
`R1-061259Measurement at the Network Side
`R1-061258
`R1-061257
`R1-061256
`
`R1-061255
`
`R1-061254
`
`Text proposal for TR25.814, Section 7.1.3
`Text proposal on comparison of SCH structures
`Text proposal on RACH preamble design for E-UTRA
`B’s
`Evaluation of DL control channel for multiple antenna Node
`Benefits of the generalized CSD scheme in E-UTRA
`signals
`Cell search times of hierarchical and non-hierarchical SCH
`UTRA
`R1-061247
`System performances of RACH preamble designs for E-
`R1-061246
`Unified uplink CQI signaling by efficient labeling
`R1-061245On 2 Antenna Open Loop Downlink TX Diversity
`R1-061244
`R1-061243
`
`R1-061253
`R1-061252
`R1-061251
`
`R1-061250
`R1-061249
`R1-061248
`
`R1-061242
`R1-061241
`R1-061240
`R1-061239
`R1-061238
`R1-061237
`R1-061236
`R1-061235
`R1-061234
`
`R1-061232
`
`R1-061231
`
`R1-061230
`
`R1-061233
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`7
`
`
`
`5/10/2006Noted
`
`Not treated
`Not treated
`
`Not treated
`Not treated
`
`Not treated
`
`5/9/2006Noted
`
`Not treated
`Not treated
`Not treated
`
`5/10/2006Noted
`
`5/11/2006Noted
`5/10/2006Noted
`
`5/10/2006Noted
`
`5/9/2006Noted
`
`5/10/2006Noted
`5/10/2006Noted
`
`5/9/2006Noted
`
`5/9/2006Noted
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`Not treated
`
`Not treated
`Not treated
`
`5/9/2006Noted
`
`Not treated
`Not treated
`Not treated
`
`Decision
`Proposal
`
`Text
`
`Discussion
`
`Discussion
`
`Proposal
`
`Text
`
`Discussion
`Decision
`
`Decision
`
`Decision
`Discussion/
`Discussion
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`
`Decision
`Discussion/
`
`Discussion
`
`Discussion
`
`Discussion
`
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`
`11.6.3
`11.1.1
`11.1.1
`11.1.1
`
`11.1.1
`11.1.1
`11.2.3
`11.2.3
`
`11.2.1
`11.1.3
`11.6.2
`
`11.6.2
`
`11.6.2
`11.6.1
`11.1.1
`
`11.1.5
`
`11.2.1
`
`11.2
`
`Discussion
`
`11.1.3
`
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Proposal
`
`Text
`
`Decision
`Discussion/
`Discusison
`
`Discussion
`
`Discussion
`
`Decision
`Proposal
`
`Text
`
`11.1.5
`
`11.1.2
`
`11.1.3
`
`11.2.1
`
`11.2.1
`11.1.3
`11.1.4
`
`11.1.5
`11.1.5
`11.1.2
`
`11.6.1
`
`11.6.1
`
`11.1.1
`
`Page 8
`
`Siemens
`Siemens
`Siemens
`Siemens
`
`Siemens
`Siemens
`Siemens
`Fujitsu
`
`Fujitsu
`Fujitsu
`NTT DoCoMo
`
`NTT DoCoMo
`
`NTT DoCoMo
`
`NTT DoCoMo
`
`TP on Signalling in DL for UL resource allocation
`Signalling in DL for UL resource allocation
`allocation
`Joint coding vs individual coding for downlink resource
`TP on downlink resource allocation signalling
`Signalling for downlink resource allocation
`Downlink resource multiplexing
`Introduction of the shortened code concept in Turbo coding
`
`R1-061292MBMS throughput performance
`R1-061291
`R1-061290
`R1-061289
`
`CATT
`CATT
`CATT
`
`CATT, RITT
`
`CATT, RITT
`Tech
`CATT, RITT, TD-
`CATT
`
`CATT
`
`CATT, RITT
`
`CATT, RITT
`
`ZTE
`
`ZTE
`ZTE
`Corporation
`Toshiba
`
`Cubic Metric properties of CAZAC sequences
`Initial cell search and long-CP sub-frame structure
`Throughput, and Coverage in E-UTRA Uplink
`System-Level Simulations on Spectrum Efficiency, User
`Throughput, and Coverage in E-UTRA Downlink
`System-Level Simulations on Spectrum Efficiency, User
`Link-Level Simulations on peak data rate in E-UTRA UplinkNTT DoCoMo
`Downlink
`Link-Level Simulations on peak data rate in E-UTRA
`Downlink
`Repetition Factor for L1/L2 Control Channel in E-UTRA
`Optimum Combination of Channel Coding Rate and
`Frame Structure
`System Performance Evaluation Results for LCR TDD base
`Peak data rates for LCR TDD base Frame Structure
`for control channel
`Performance comparison between beam-forming and CDD
`method in TDD mode and text proposal
`Clarifications of the dynamic beam-forming/pre-coding
`requirement for downlink pre-coding in TDD mode
`Further clarifications of the uplink reference signal
`based TDD frame structure
`The numerology of 1.6MHz bandwidth for EUTRA LCR-
`for EUTRA TDD
`The impact of frequency offset on modulation performance
`Beamforming for EUTRA TDD
`Further consideration on the reference symbol of
`procedure for EUTRA TDD
`Further on the non-synchronization random access
`system
`SCH Structure and Cell Search Method for E-UTRA TDD
`TP: Interference Mitigation for Uplink Reference Design
`in Uplink Reference Design
`Interference Mitigation Comparisons between FDM and CDM
`Further considerations on cell search information mapping
`Further Study on Reference Signal Structure for MBMS
`
`R1 #45 (May2006)
`
`Reference-signal arrangement for E-UTRA Downlink MIMOLG Electronics
`Load dependent feedback for MIMO LTE
`TP: Random access preamble and message
`
`Siemens
`ZTE
`
`R1-061288
`R1-061287
`R1-061286
`R1-061285
`
`R1-061284
`R1-061283
`R1-061282
`
`R1-061281
`
`R1-061280
`
`R1-061279
`
`R1-061278
`
`Yes
`
`R1-061277
`R1-061276
`R1-061275
`
`R1-061274
`
`R1-061273
`
`R1-061272
`
`R1-061271
`
`R1-061270
`
`R1-061269
`
`R1-061268
`
`R1-061267
`
`R1-061266
`R1-061265
`R1-061264
`
`R1-061263
`R1-061262
`R1-061261
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`8
`
`
`
`5/9/2006Noted
`
`Not treated. Revised in R1-061577
`
`R1-061577
`
`5/9/2006Noted
`
`Not treated
`
`Not treated
`Not treated
`
`5/9/2006Noted
`
`Not treated
`
`5/9/2006Noted
`
`Not treated
`
`5/8/2006Noted
`
`Not treated
`
`Not treated
`
`Not treated
`Not treated
`Not treated
`
`Not treated
`
`5/9/2006Noted
`
`Not treated
`Not treated
`Not treated
`Revised in R1-061545
`Revised in R1-061548
`
`5/8/2006Rejected
`
`5/8/2006Rejected
`
`5/8/2006Noted
`
`5/8/2006Noted
`
`5/8/2006Agreed
`
`5/8/2006Agreed
`
`5/8/2006Agreed
`
`5/8/2006Agreed
`
`Discussion
`Proposal
`
`Text
`
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Discussion
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Discussion
`Decision
`Discussion/
`Decision
`Discussion/
`Discussion
`Proposal
`
`Text
`
`Proposal
`
`Text
`
`Decision
`R1-061545
`Discussion/
`DiscussionR1-061548
`
`Text
`
`Proposal
`
`CR
`
`CR
`
`Discussion
`
`Discussion
`
`CR
`
`CR
`
`CR
`
`CR
`
`11.1.5
`
`11.1.3
`
`11.1.3
`11.1.2
`11.1.1
`11.1.1
`11.1.1
`
`4
`
`7
`
`8
`
`8
`
`8
`
`8
`
`8
`
`5.4
`
`5.4
`
`4
`
`4
`
`5.4
`
`5.4
`
`5.4
`
`5.4
`
`11.1.5
`11.1.5
`
`11.1.5
`
`Samsung
`Page 9
`NTT DoCoMo
`Samsung, ETRI,
`Samsung
`
`Samsung
`
`Samsung
`
`Samsung
`Samsung
`Samsung
`Samsung
`Samsung
`
`Samsung
`
`11.2.3
`
`11.2.1
`
`11.2.1
`11.1.5
`11.1.1
`
`11.1.1
`
`NEC Group
`
`NEC Group
`DoCoMo
`NEC Group, NTT
`NEC Group
`NEC Group
`DoCoMo
`NEC Group, NTT
`NEC Group
`NEC Group
`
`NEC Group
`NEC Group
`NEC Group
`NEC Group
`NEC Group
`
`R1 #45 (May2006)
`
`NEC Group
`DoCoMo
`NEC Group, NTT
`DoCoMo
`NEC Group, NTT
`Samsung
`Panasonic,
`Siemens,
`Samsung
`Panasonic,
`Siemens,
`Samsung
`Panasonic,
`Siemens,
`Samsung
`Panasonic,
`Siemens,
`
`Dynamic Switching between Single and Multi-User MIMO
`TP on Cyclic Delay Diversity for Scheduling Gains
`Sizes
`Performance Evaluation of PU2RC with Different Codebook
`Link Performance of Multi-User MIMO
`BCH Transmission Bandwidths
`Performance Comparison between 1.25 MHz and 5 MHz
`Cell search issues and views
` Random access message transmission
`DL ACK/NACK signalling performance evaluation
`Downlink Control Signalling Overhead Evaluation
`Uplink ACK/NACK performance: FDM vs TDM
`concerning the LS R1-061109
`UE capabilities and spectrum allocation scenarios
`CQI reporting
`sequences
`Considerations on uplink pilot design using CAZAC
`Reference signal multiplexing for EUTRA uplink
`Consideration on LTE MIMO scheme
`Resource Allocation Signalling for EUTRA
`
`Physical channel mapping & power control for SCCH
`Power balancing mechanism with DPCCH gating
`operation
`TP on further simplification for "Restricted HS-SCCH
`TP on Clarification for "Restricted HS-SCCH operation
`TP on Clarification for "HS-SCCH less operation
`Comments on the proposals to modify HS-SCCH for VoIP
`Consideration on UTRA MIMO scheme
`sequence indexallocation for E-HICH and E-RGCH"
`25.211CR0229(Rel-7, A)"Clarification of the signature
`sequence index allocation for E-HICH and E-RGCH"
`25.211CR0228(Rel-6, F)"Clarification of the signature
`Proposed response to RAN2 LS in [R1-061109]
`
`R1-061323
`R1-061322
`
`R1-061321
`
`R1-061320
`
`R1-061319
`
`R1-061318
`R1-061317
`R1-061316
`R1-061315
`R1-061314
`
`R1-061313
`
`R1-061312
`
`R1-061311
`
`R1-061310
`R1-061309
`R1-061308
`
`R1-061307
`R1-061306
`R1-061305
`
`R1-061304
`R1-061303
`R1-061302
`R1-061301
`R1-061300
`
`R1-061299
`
`R1-061298
`
`L1 UE measurement to support intra E-UTRA mobility
`
`R1-061297
`
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`terminology"
`25.214CR0420 (Rel-7, A)"Clarification of E-TFCI
`
`R1-061296
`
`Yes
`
`terminology"
`25.214CR0419 (Rel-6, F)"Clarification of E-TFCI
`
`R1-061295
`
`Yes
`
`terminology"
`25.212CR0236 (Rel-7, A)"Clarification of E-TFCI
`
`R1-061294
`
`Yes
`
`terminology"
`25.212CR0235 (Rel-6, F)"Clarification of E-TFCI
`
`R1-061293
`
`Yes
`
`9
`
`
`
`5/9/2006Noted
`
`5/9/2006Noted
`
`5/9/2006TP2 was agreed and TP1 was
`
`revised in R1-061571
`
`5/9/2006Noted
`5/9/2006Agreed
`
`Revised in R1-061553
`
`5/9/2006Agreed
`5/8/2006Noted
`
`5/8/2006Noted
`
`Discussion
`
`Discussion
`
`Discussion
`
`Decision
`Discussion/
`Decision
`Discussion/
`
`Decision
`
`Decision
`Discussion/
`DiscussionR1-061553
`Discussion
`
`5/8/2006Noted
`
`5/8/2006Noted
`5/8/2006Noted
`
`5/8/2006Revised in R1-061616
`
`R1-061616
`
`5/8/2006Noted
`
`5/10/2006Noted
`
`Revised in R1-061549
`
`R1-061549
`
`5/10/2006Noted
`
`Withdrawn
`Not treated
`Not treated
`Not treated
`Not treated
`
`Not treated
`Not treated
`Not treated
`Not treated
`
`Not treated
`Not treated
`Not treated
`Not treated
`Not treated
`
`5/9/2006Noted
`
`5/9/2006Noted
`
`Discussion
`
`Discussion
`
`Decision
`Discussion/
`
`CR
`
`Discussion
`
`Decision
`Discussion/
`Decision
`Discussion/
`Proposal
`
`Text
`
`Proposal
`
`Text
`
`Decision
`Discussion/
`Decision
`Discussion/
`Proposal
`
`Proposal
`
`Text
`
`Text
`
`Decision
`Discussion/
`Decision
`Discussion/
`Proposal
`
`Proposal
`
`Text
`
`Text
`
`Decision
`Discussion/
`Proposal
`
`Text
`
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`
`Text
`
`Decision
`Discussion/
`Proposal
`
`4
`
`7
`
`7
`
`
`
`77
`
`7
`
`8
`
`8
`
`8
`
`8
`
`8
`
`8
`
`5.5
`
`5.5
`
`11.6.2
`
`11.5
`
`11.4
`
`11.2.3
`
`11.2.3
`
`11.1.5
`
`11.6.2
`
`11.3.4
`11.3.1
`11.2.3
`11.2.3
`
`11.2.3
`11.2.3
`11.2.3
`
`11.2.3
`11.2.3
`11.2.3
`11.2.1
`11.1.5
`
`Text Proposal on Downlink System Performance EvaluationSamsung
`
`R1-061339
`
`Samsung
`Samsung
`Samsung
`Samsung
`
`Samsung
`
`Samsung
`Samsung
`Samsung
`
`Samsung
`
`Samsung
`Samsung
`Samsung
`Samsung
`Samsung
`
`Low Overhead Asynchronous Adaptive Hybrid ARQ
`Evaluation of BCH cost vs bit rate
`TP on DL ACK/NACK signalling
`TP on downlink data multiplexing
`existence of distributed transmission
`System throughput of DL localized transmission with
`Link performance of DL distributed transmission
`TP on Downlink Control Signalling Multiplexing
`TP on BCH Transmission Bandwidth
`and QPSK, and TP
`Bandwidth and Power Efficiency Evaluation for pi/2-BPSK
`TP on uplink ACK/NACK signaling
`Link Adaptation in Evolved UTRA Downlink and TP
`TP on HARQ
`Reference signal structure for EUTRA uplink and TP
`Summary of LTE MIMO email discussion
`
`R1 #45 (May2006)
`
`Performance Evaluation of Multi-User vs. Single User MIMOSamsung
`
`Page 10
`
`UL DPCCH Gating: Impact of Gating Gap Length
`Results
`UL DPCCH Gating: Further System-Level Performance
`UL DPCCH Gating: Further Link-Level Performance ResultsEricsson
`
`Ericsson
`Ericsson
`
`R1-061356
`R1-061355
`
`R1-061354
`
`Ericsson
`
`Ericsson
`
`UL DPCCH Gating: Realistic VoIP Example
`
`R1-061353
`
`New DPCCH Slot Format: Link-Level Performance
`
`R1-061352
`
`Replace the Abbreviation 'ConCon' with 'CPC' in TR 25.903Ericsson
`
`R1-061351
`
`Ericsson
`Ericsson
`Ericsson
`Ericsson
`
`Ericsson
`
`Ericsson
`
`Siemens
`
`Siemens
`
`Samsung
`
`Samsung
`
`Samsung
`
`System level results for Rel-7 MIMO schemes
`Link level evaluation of D-TxAA
`transmission schemes
`Complexity and performance trade-offs of MIMO
`channel reception in a non-MIMO capable UE
`Impact of MIMO transmission on the performance of legacy
`E-UTRA UE Measurements and Capabilities
`measurement for E-DCH RRM"
`25.215CR0170(Rel-7, C) "Introduction of a Node B
`RRM purposes
`Introduction of an E-DCH related Node B measurement for
`target fulfillment
`LTE uplink system simulation results concerning the LTE
`t