throbber
AFFIDAVIT OF ROBERTO PELLEGRINO
`
`
`
`RAPID COMPLETIONS LLC,
`
`
`
`Plaintiff,
`
`Civil Action No. 6:15-cv-724-RWS-KNM
`
`
`
`JURY TRIAL
`
`v.
`
`BAKER HUGHES INCORPORATED,
`BAKER HUGHES OILFIELD
`OPERATIONS, INC., WEATHERFORD
`INTERNATIONAL, LLC,
`WEATHERFORD/LAMB, INC.,
`WEATHERFORD US, LP,
`WEATHERFORD ARTIFICIAL LIFT
`SYSTEMS, LLC, PEAK COMPLETION
`TECHNOLOGIES, INC., PEGASI
`ENERGY RESOURCES CORPORATION,
`PEGASI OPERATING, INC., AND TR
`RODESSA, INC.,
`
`Defendant.
`
`
`
`PACKERS PLUS ENERGY SERVICES,
`INC., RAPID COMPLETIONS LLC,
`
`Counterclaim Defendants.
`
`
`
`I, Roberto Pellegrino, declare as follows:
`
`
`
`
`1.
`I am over the age of 18, have never been convicted of a felony or crime of moral
`turpitude and am legally competent to make this declaration. I have personal knowledge of the
`matter stated herein.
`
`
`I am currently employed in the Interlibrary Loans department at the Alberta
`2.
`Innovates – Technology Futures Library.
`
`
`I am familiar with the ordinary record-keeping practices of the Alberta Innovates
`3.
`– Technology Futures Library.
`
`
`
`

`
`
`4.
`When a book is donated to the library, the date on which it is received is
`inscribed or recorded on the book within a couple of days of its receipt. On the same day
`or as soon as possible thereafter, typically no later than a few days after the date is
`inscribed, the book is shelved for public access.
`
`
`5.
`Accordingly, the date inscribed on the proceedings of the Seventh One
`Day Conference on Horizontal Well Technology, November 3, 1999, which contains the
`reference article Production Control of Horizontal Wells in a Carbonate Reef Structure
`by Bill Ellsworth et al., reflects that the book was donated to the library on or about July
`23, 2001.
`
`
`6.
`I have no reason to believe that the book was not publicly available at
`other libraries or through the publisher soon after it was published in 1999.
`
`
`I have reviewed the above-listed reference in Exhibit A to this Affidavit,
`7.
`and it reflects a true and accurate copy of the corresponding reference maintained at the
`library.
`
`
`
`______________________________
`Roberto Pellegrino
`Interlibrary Loans
`Alberta Innovates - Technology Futures Library
`250 Karl Clark Road
`Edmonton, AB T6N 1E4
`Canada
`
`Tel: (780) 450-5057
`Fax: (780) 450-8996
`Email: Roberto.Pellegrino@albertainnovates.ca
`Visit us at http://albertatechfutures.ca/
`
`
`
`

`
`EXHIBIT A
`
`EXHIBIT A
`
`
`
`

`
`7th ONE—DAY
`
`WELL TECHNOLOGY
`
`CONFERENCE ON
`
`HORIZONTAL
`
`“Horizontal Well Technology
`Operational Excellence”
`
`Wednesday, November 3, 1999
`Telus Convention Centre
`
`Calgary, Alberta, Canada
`
`PRESENTED BY:
`
`0 Canadian Section of the
`
`Society of Petroleum Engineers
`
`0 The Petroleum Society of C/M —
`Horizontal Well Special Interest Group
`
`r.
`. If! ..T.‘.'
`£3? '1
`éalfi
`twee
`Mntm
`
`(int;
`
`SPE CIM
`
`

`
`
`
`The Petroleum Society of ClM — Horizontal Well Special lnterest Group
`
`and
`
`The Canadian Section of the Society of Petroleum Engineers
`
`7th One Day Conference
`ALBERTA RESEARCH COUl\§ClL
`
`0“
`
`LlBRARY SEW/l:‘3§:IS DEF2*1;:‘iTlviENT
`
`250 iiaat
`Eomonroa, AL1"3EFiTA,
`raw‘ 3:54}
`
`HORIZONTAL WELL Technology
`
`Operational Excellence
`
` U
`
`V
`
`Wednesday, November 3, 1999
`
`Telus Convention Centre
`
`Calgary, Alberta, Canada
`
`Alberta Research Council Library
`
`
`
`
`
`ll
`
`
`
`
`
`lll l l
`
` lll Ill
`
`0 1630 2010 0307
`
`
`
`
`
`
`
`llllllll
`
`

`
`Production Control of Horizontal
`
`Wells in a Carbonate Reef
`
`Structure
`
`Bill Ellsworth — Husky Oil
`Marty Muir — Husky Oil
`John Gray — AI/ore Petroleum Management
`Dan Themig — Ha//iburton/Guiberson AVA
`
`THIS PAPER IS TO BE PRESENTED AT THE SEVENTH ONE DAY CONFERENCE ON HORIZONTAL WELL
`TECHNOLOGY, CALGARY, ALBERTA, CANADA, NOVEMBER 3, 1999.
`
`Abstract
`
`Introduction
`
`Open hole completions have been the accepted practice for
`horizontal wells in the Rainbow Lake area of Northern
`Alberta. As these fields mature, and the
`oil bank in these structures thin,
`the use
`
`75.? Rainbow Lake
`
`control
`production
`efiective
`of
`become particularly
`technology
`has
`important.
`The design of the well
`trajectory,
`the ability to intervene to
`control
`production,
`and
`the
`in
`incorporation
`of horizontals
`a
`strategic producing plan for the area has
`pushed the edge of technology. Many
`aspects of the planned exploitation of
`these reef pools have changed based
`upon successful applications of evolving
`horizontal
`well
`technologies.
`Production control issues are paramount
`to these changes.
`This paper presents
`several well case histories that illustrate
`
`in
`application of advancements
`the
`establishing isolation in the open hole
`horizontal completions
`to accomplish
`various objectives
`in
`the
`successful
`application of horizontal wells in the
`Rainbow Lake field.
`
`The Rainbow Lake area of northern Alberta contains several
`
`pools with carbonate reef structures. The formation tends to
`be a prolific producer due to high matrix
`permeability and porosity. Vertical wells have
`generally served as the primary producers and
`injectors. However, as drilling capabilities have
`improved, the use of directional, horizontal, and
`multi—leg well geometry’s have been utilized to
`both
`accelerate
`production,
`and
`improve
`ultimate recovery. While these wells have
`allowed
`improvements
`in
`the
`producing
`strategy of the field,
`it has also provided
`challenges, mainly
`concerning
`production
`methods
`and procedures.
`One of
`these
`challenges is providing long-term isolation in
`these mostly open hole horizontal completions.
`
`
`
`Figure 1 - The Rainbow Lake
`Field in Northern Alberta,
`Canada.
`
`Field Background
`
`Banff Oil and Gas discovered the first Keg
`River Pool of Rainbow Lake Field in the late
`
`series of ownership
`Through a
`l960’s.
`changes, this pool
`is now operated by Husky
`Oil.
`The field consists of several separate
`producing pools that are located in the Rainbow
`Lake area of Alberta. Some of the producing
`pools
`in
`the
`field
`contain
`vaulted
`
`I999 CIM Horizontal Well Conference
`
`
`
`

`
`Production control of horizontal wells in a carbonate reef structurl
`
`reef structures (see figure 2), each with variations in horizontal
`and vertical permeability as well as substantial reserves of oil
`and gas. The field was initially produced through primary
`production, mainly using gas lift. Both gas re-injection and
`water injection have been used as recovery mechanisms and to
`provide pressure maintenance for
`the field.
`Part of the
`Rainbow Lake Field is now under tertiary recover utilizing a
`solvent
`flooding procedure (See figure 3).
`This process
`requires that rich solvent gas be injected into the upper portion
`of the reservoir followed by chase gas. The chase gas moves
`through the structure pushing solvent through the rock, and
`sweeps incremental oil from the reservoir. During the process,
`the solvent front is moved either up or down using both water
`and gas injection to move the oil/water and the gas/oil contacts
`vertically through the reservoir.
`
`Rainbow Horizontal Program
`
`Although many parts of the reservoir are prolific, with high
`expected recovery, there are portions of the field that contain
`significant reserves, but are held in lower quality reservoir
`rock. Also, some of these areas may not be effectively drained
`during the primary production or the solvent flooding process.
`The objectives of some of the horizontal wells drilled to date
`have been to access these portions of the reservoir. Some of
`these segments could not be reached economically using
`vertical wells due to surface and facilities costs. Producing
`unswept oil is a primary application of these horizontal wells.
`Innovative designs of well geometry and configuration are
`required to reach these segments of the reserves.
`
`Improving the efficiency of the tertiary recovery is also a
`primary objective in the application of horizontal technology.
`This application is somewhat more difficult due to the vertical
`mobility and movement of the oil
`layer in the reservoir.
`Utilization of horizontal wells within the active solvent flood
`
`requires timing as well as precise well placement and segment
`isolation in the horizontal leg.
`
`Challenges
`
`The application of horizontals creates several challenges. The
`primary challenge is to produce oil without excessive gas or
`water breakthrough (coning). While most of the horizontal
`wells lie in the lower segment of the reservoir,
`the build
`section of the well must pass through the upper gas cap,
`sometimes in two or more formations.
`Isolation of the gas has
`historically been accomplished using liners and cement. New
`drill horizontal wells are generally cased through these gas
`layers. However, an added challenge in re—entry horizontal
`wells is to isolate these zones without
`the benefit of the
`
`\s\n\\wmmwmm\mm\~‘\1%W-
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`primary casing string. When possible, a 114mm (4-l/2”) liner
`is run and cemented through these gas intervals, and then the
`ability to establish long term isolation of segments within the
`
`
`Figure 3 - Part of the field is under solvent flood,
`which is used to increase oil recovery.
`
`
`
`Figure 2 - Vertical injectors and producers have
`historically been used in the Rainbow Lake Field reef
`arch structures.
`
`remainder of the horizontal is drilled with 98.4mm (3-7/8”)
`slim hole MWD. This produces a smaller borehole, but is
`effective in isolating the gas while still allowing effective
`packer seats in the horizontal.
`
`Achieving Isolation
`
`With several hundred meters of open hole horizontal wellbore
`exposed, water or gas breakthrough can be a problem for some
`of these wells. Also, during drilling, the trajectory of a well
`may be low or high within the structure, causing a problem
`with premature coning of gas or water in the reservoir. The
`
`
`
`
`
`
`
`
`
`
`
`
`llflflllflll
`
`GAS ..
`
`l»
`
`
`
` mass’
`GA5«——'
`
`
`.
`SOLVENT
`
`'
`
`-
`
`,
`
`.
`
`V
`
`r:
`
`,,
`
`

`
`reservoir is key to controlling and optimizing production from
`these horizontal wells.
`
`Historically, inflatable packers were used for water shut—off,
`stimulation, and segment testing. More recently, solid body
`packers (SBP’s)
`(see Figure 4) have been used to establish
`open hole isolation. These tools provide a mechanical packing
`element that is hydraulically activated. The objective of using
`this type of tool is to provide a long~term solution to open hole
`isolation without the aid of cemented liners. Although the
`expansion ratios
`for
`these packers are as
`large as
`for
`inflatables, the carbonate formation in Rainbow Lake generally
`drills very close to gauge hole, and effective isolation is
`possible with these SBP’s. Effective isolation in open hole
`greatly increases the capability to incorporate horizontal wells
`into the producing strategy for the Rainbow Lake field.
`
`is
`seats)
`(packer
`isolation points
`Establishing effective
`approached both from a reservoir and a mechanical standpoint.
`First, the reservoir objectives are established.
`Issues such as
`seismic, log data, and drilling fluid losses and production are
`considered.
`Based upon this data, general areas of low
`porosity are selected to set packers in.
`The secondary
`consideration is the mechanical sealing of the SBP’s.
`If a
`caliper log is available, it is used to choose competent packer
`seats. The formations in Rainbow Lake often contain vugs and
`fractures. When possible,
`the packers are run in pairs to
`minimize the chance of failure due to setting in a vug. When
`caliper
`logs
`for
`the horizontal wells
`are not available,
`alternative data is used including drilling ROP’s and log data.
`
`Case Histories
`
`Case history #1 - Rainbow 14-12-110-8W6
`
`This well was drilled in 1993, and was cased to 90 degrees
`using 245mm (9-5/8”) casing. The producing leg was drilled
`using 216mm (8-1/2") bit from casing shoe to TD.
`Initially,
`the well produced clean oil. At the time of this workover, the
`well had excessive (unwanted) gas production. The objective
`of the workover was to isolate a segment of the well,
`to
`attempt reduce gas production. The well was to be segmented
`into three sections, with the ability to produce any or all of
`these sections.
`
`Welland Completion Design
`
`Two isolation points were selected and the SBP's were
`configured in pairs in order to improve the effectiveness of the
`isolation points. The tailpipe assembly consisted of a 73mm
`pump-out plug and no-go style profile nipple. The packers
`were supported with centralizers to aid in run-in. Between the
`
`Production Control of Horizontal Wells in a Carbonate Reef Structure
`
`sets of packers was a 73mm (2-7/8”) sliding sleeve. This
`allows for either producing or shutting off the center segment
`of the well. 73mm tubing was run throughout the lateral. The
`tubing was crossed over to 88.9mm (3-1/2”) inside the casing.
`An expansion joint was run to allow for testing of the open
`hole packers. A sliding sleeve was run in the vertical potion of
`the well. This provided an inflow point for the heel portion of
`the well.
`It also allows non-rig intervention (slickline) to
`control two of the three well segments. A cased hole double
`grip packer and on-off tool was run in the 244mm (9-5/8”)
`casing to anchor the assembly as well as to provide well
`control. (Figure 5)
`
`Installation and Operations
`
`The assembly was run into the well, and tubing pressure was
`applied to selectively set all of the open hole packers. Once
`they were set, tubing weight was applied to confirm the set.
`The cased hole packer was then set, and the on-off tool was
`used to circulate inhibited fluid into the annulus.
`
`Setting Cylinder
`
`Setting Shear
`
`Mandrel Lock
`
`Five Piece
`
`Packing
`Flnmnni
`
`Shear Release
`
`it
`
`Figure 4 - The solid body packer is
`hydraulic set instead of inflatable
`(Guiberson / Halliburton Wizard 11
`packer shown)
`
`
`
`

`
`Production Control of Horizontal Wells in a Carbonate Reef Structure
`
`
`
`if
`
`is iE i lll 2ii
`
`ll
`i\
`.«
`
`l1
`
`ll. i1
`
`'il1. l6l\4
`
`. é
`
`
`
`ii.
`2-1 ‘
`
`Cased Hole Packer
`W/ On—Off Tool
`
`‘ <— Sliding Sleeve
`l
`.‘
`3
`
`Expansion
`Joint
`
`‘
`
`Open Hole Packers
`
`Sliding Sleeve /
`
`Figure 5 - The Solid Body Packers were used to segment the well, and provide isolation of the center portion of
`the well.
`
`Results
`
`This was the first installation of SBP’s for Husky in Rainbow
`Lake. Although the radial clearance between packer OD and
`
`E]Gas (E3m3/d)
`
`Water (m3/d)
`Oil (m3/d)
`
`After
`
`Figure 6 - Testing indicates change in production.
`
`drilled hole was small, the packers were successfully run and
`set. Some operational problems were encountered in the use of
`
`a mule—shoe re—entry guide that hung up near the casing shoe.
`This
`item was
`changed
`on
`subsequent
`installations.
`Production testing afterwards indicted that successful isolation
`was achieved as fluid ratios changed with changes in inflow
`sleeve selection (figure 6).
`
`The well initially had a high (uneconomic) GOR. After the
`workover, the well was produced only from a single interval
`(section 3).
`The GOR was initially lowered and water
`production increased. Eventually,
`the high GOR returned.
`Later, a sleeve was shifted to add section 2 to production. The
`GOR remained unchanged, but
`the water production was
`reduced.
`
`Case History #2 - Rainbow 13-32-109-8W6
`
`it.”
`
`from the
`Well #2 was designed to produce unswept oil
`reservoir structure.
`Based upon reservoir modeling, and
`seismic, it was determined that several "fingers" were present
`with recoverable reserves, that would not be swept with the
`existing recovery modes due to their location within the pool.
`This re-entry well included a 1 l4.3mm (4-l/2”) liner that was
`run and cemented through the build section to isolate
`unwanted productive intervals. The remainder of the well was
`drilled after the liner was set using a 98mm (3—7/8”) bit.
`
`
`
`ii
`
`l i i
`
`f
`
`

`
`
`
`
`
`Isolation Packers
`
` _
`
`_
`Undrained Reservoir
`Segments \
`
`Cased Hole Packer
`
`‘
`
`Sliding Sleeve
`
`Sliding Sleeve
`
`Figure 7 - Horizontal well profile and isolation packers provide the ability to produce unswept oil within the field
`
`Production Control of Horizontal Wells in a Carbonate Reef Structure
`
`Well and Completion Design
`
`wireline.
`
`A horizontal well path was designed to pass through each of
`these unswept
`traps to allow existing injection and field
`pressurization to push production to these drainage points.
`Since the reservoir segments were not homogeneous,
`isolation
`points were selected to facilitate zonal shut—off and production
`optimization, should it be necessary (Figure 7).
`
`Installation and Operations
`
`Prior to running the production assembly, SBP’s were run to
`acidize the toe of the well. These were pulled, and the
`production assembly was run. The assembly was run into the
`well, and tubing pressure was applied to selectively set all of
`the open hole packers. Once they were set, tubing weight was
`applied to confirm the set. The cased hole packer was then set,
`and the on—off tool was used to circulate inhibited fluid into the
`
`completion design contained two isolation points
`The
`positioned between the reservoir segments. Each isolation
`point was established using two SBP’s separated by a full joint
`(IOM) of tubing.
`The tailpipe assembly
`consisted of a no-go profile nipple and a
`pump-out glass plug to allow pressurizing the
`tubing. The glass plug was utilized (instead
`of metal
`pump-out
`plug)
`to
`eliminate
`equipment debris (the expended plug) in the
`borehole, while allowing mechanical access
`to the toe of the well. The open hole packers
`were run on 60.3mm tubing and anchored to
`a mechanical
`cased hole packer.
`An
`expansion joint was used to allow for testing
`of the SBP’s before setting the cased hole
`packer.
`A sliding sleeve was
`installed
`between the isolation points to allow an
`inflow point for the middle well interval. A
`second sliding sleeve was run below the
`cased hole packer
`to provide access
`to
`production from the heel of the well. This
`sleeve was run in the vertical portion of the
`well
`so that
`it would be serviceable via
`
`
`
`<1
`3i
`
`li <
`
`5f ir
`
`1.t
`
`iI
`i.
`E(
`E<
`
`tY<E(
`
`Ti
`
`, ig
`
`t,
`
`2*
`E
`
`T
`
`
`
` Water (m3/d)
`E Oil (m3ld)
`
`El Gas (E3m3Id)
`
`
`
`8‘-roe
`
`Figure 8 - Wireline changes allow for isolation of separate producing
`intervals and production optimization.
`
`
`
`

`
`Production Control of Horizontal Wells in a Carbonate Reef Structure
`
`
`
`
`
`3.
`
`t {
`
`i
`
`t E
`
`t if
`
`é‘
`
`.
`
`
`
`I l E
`
`Isolation Packers
`
`New Lateral
`xisting Lateral
`
`
` Open Hole
`
`Juncture
`
`Figure 9 - When a new lateral is added to an existing open hole horizontal well, solid body packers isolate and allow
`selective production of either lateral.
`
`annulus.
`
`Results
`
`the tools
`indicated that
`The initial acid job using SBP’s
`successfully provided isolation during the job. The acidizing
`assembly was pulled, and some rubber was left in the hole.
`
`This required a c1ean—out trip before running the production
`assembly. The production packer assembly was successfully
`run, and mechanical confirmation indicated that
`the SBP’s
`were holding.
`
`Production testing afterwards, as well as sleeve changes during
`the first 18 months indicted that successful
`isolation was
`
`D Gas (E3m3/d)
`
`Water (m3/d)
`
`I Oil (m3/d)
`
`Month 1
`
`Figure 10 - Isolation of the existing and the new leg provides the ability to select
`production from either or both laterals (rigless intervention).
`
`
`
`oil/water/gas
`as
`achieved
`ratios during production have
`been changed
`significantly
`following changes in inflow
`selection
`points.
`The
`production
`has
`been
`alternated between producing
`the toe only and adding the
`heel. Changes were made in
`months 3, 8 and 16.
`The
`chart
`shown
`contains
`
`production results following
`downhole
`flow
`control
`
`changes. (Figure 8).
`
`
`
`

`
`Production Control of Horizontal Wells in a Carbonate Reef Structure
`
`Case History #3 Rainbow - 102/3-9-109-8 W6
`
`Well #3 was an existing horizontal well with a single leg. The
`purpose of the workover was to add a second producing leg.
`A hybrid service/drilling rig was used to sidetrack off the
`existing open hole leg, and to drill a directional well to access
`another portion of the reservoir.
`
`Well and Completion Design
`
`Well #3 has 178mm (7”) casing run to horizontal and
`cemented in place to isolate upper gas intervals. (Figure 9) A
`horizontal well path was designed to drill a sidetrack open hole
`leg to an undrained portion of the reservoir. After drilling the
`lateral, it was necessary to isolate the old leg from the new
`one,
`in order to produce either. The selected completion
`design established an isolation point just past the open hole
`lateral juncture. This was done using two SBP's separated by a
`full joint (l0M) of tubing. The tailpipe assembly consisted of
`a no—go profile nipple and a pump-out glass plug to allow
`pressurizing the tubing. The glass plug was utilized (instead of
`metal pump-out plug)
`to eliminate equipment debris (the
`
`expended plug) in the borehole, while allowing mechanical
`access to the toe of the well. The open hole packers were run
`on 73mm (2-7/8”) tubing and anchored to a mechanical cased
`hole packer. An expansion joint was used to allow for testing
`of the SBP's before setting the cased hole packer. A sliding
`sleeve was run below the cased hole packer to provide access
`to production from either lateral #1 or lateral #2 (the newly
`drilled lateral). This sleeve was run in the vertical portion of
`the well so that it would be serviceable via wireline.
`
`Installation and Operations
`
`Prior to running the production assembly, a clean—out trip was
`made with a bit and tubing (no directional equipment). The
`objective was to install the packer assembly in the new lateral.
`When the assembly was run.
`it entered the old lateral by
`mistake. The assembly was pulled and a second clean-out trip
`was made. The packer assembly was then re-run and entered
`the second leg as planned. Tubing pressure was applied to
`selectively set all of the open hole packers. Once they were
`set, tubing weight was applied to confirm the set. The cased
`hole packer was then set, and the on—off tool was used to
`
`‘— Cased Hole Packer
`
`
`
`1--it 4—— Sliding Sleeve
`)3
`
`
`
`
`Isolation Packers
`
`‘
`
`Sulphur Point Gas
`
`Zone Segregation
`
`/
`
`'/m ///',
`/
`/V//'/..'
`
`
`
`5.,._..A..*(-...R...“rV\/r~1l~I4-.a\.«.,..¢-,4...._\M»a
`
`
`
`
`
`
`//// /
`
`/
`
`Sliding Sleeves
`
`Figure 11 - Lining the build section for re-entry horizontal wells using tubing and solid body isolation packers has proven
`feasible to isolate upper gas sands.
`
`
`
`

`
`circulate inhibited fluid into the annulus. The glass plug was
`expended, and the well produced from the toe of the leg #2.
`Results
`
`Some problems were encountered while attempting to get into
`the correct lateral. However, the production packer assembly
`was successfully run, and mechanical confirmation indicated
`that the SBP’s were holding.
`
`Production testing afterwards, as well as sleeve changes during
`the first 6 months indicated that successful
`isolation was
`
`achieved as oil/water/gas ratios during production have been
`changed significantly following changes in inflow selection to
`the different laterals.
`In particular, the gas production changed
`significantly during this process. The chart shown contains
`production results following downhole flow control changes
`(figure 10).
`
`Case History #4 - Rainbow 16-20-110-7 W6
`
`Well #4 was a re-entry horizontal well from 139mm (5-1/2”)
`casing. The sidetrack was done from an existing well, and the
`build section of this well drilled through unwanted productive
`intervals. Two horizontal legs were drilled into the producing
`formation. The completion assembly was designed to isolate
`between these legs and within the build section of the well.
`It
`also required testing of the interval
`in the build section to
`verify isolation.
`
`Well and Completion Design
`
`This well was originally a vertical producer. A sidetrack
`window was cut
`in the 139mm casing, and both the build
`section and horizontal legs were drilled using a l20.6mm (4-
`3/4") bit. The target producing segment of the well had a
`second open hole lateral drilled using an open hole sidetrack.
`A single isolation point was selected in the primary producing
`leg (leg #2) to allow selective production from either or both
`legs. This was done using two SBP's separated by a full joint
`(l0M) of tubing placed in the primary producing leg (Figure
`11).
`
`The build section of the well was segmented into two separate
`intervals using two SBP's. These were separately spaced using
`tubing joints and pups and included sliding sleeves to permit
`flow tests to confirm isolation within the build section. The
`
`tailpipe assembly consisted of a no—go profile nipple and a
`pump—out glass plug to allow pressurizing the tubing, while
`allowing mechanical access to the toe of leg #2. The open
`hole packers were run on 73mm tubing and anchored to a
`mechanical cased hole packer. A downhole tubing swivel was
`installed just below the cased hole packer to facilitate setting
`and releasing.
`
`Production Control 0fH0riz0ntal Wells in a Carbonate ReefStructure
`
`Installation and Operations
`
`Prior to running the production assembly, a clean—out trip was
`made with a bit, reamer and drill pipe. The packers were
`spaced using tubing to place them at the appropriate isolation
`points, with the spacing of the build section packers being
`particularly crucial. The assembly was run and logged on
`depth. The mechanical cased hole packer was set to place the
`SBP's at the chosen isolation points. The cased hole packer
`was then pressure tested (annulus
`test)
`to insure casing
`integrity. After the casing packer was set, tubing pressure was
`applied to selectively set all of the open hole packers and the
`glass plug was left in place to plug the toe during production
`testing, then later expended to open the toe.
`
`
`
`To confirm that the packers were providing zonal isolation, a
`series of production flow tests were performed. The flow tests
`were conducted using wireline plugs and shifting tools to
`provide rigless intervention.
`
`Results
`
`The top sliding sleeve was opened, and the Sulfur Point was
`tested. Gas and water
`inflow was recorded, with pressure to
`flow to surface. The sleeve was closed; sliding sleeve #2 was
`opened, and the Muskeg was tested. Pressure bled off, and the
`formation was swabbed dry to indicate isolation. Sleeve #2
`was closed, and the tubing was pressured to blow out (expend)
`the glass pump—out plug. Lateral #2 was produced with oil
`cuts of 35-50%. The leg was then acidized through the tubing
`string, and swabbed back. Slickline was rigged up, and the
`sliding sleeve for leg #1 was opened, with this production
`added to leg #2. The ‘well was put on production. Long term
`production results were not available at the time this paper was
`written, but the primary objective of zonal segmentation in the
`build section of this well was clearly demonstrated (figure 12).
`
`Summary
`
`The ability to establish long—term zonal isolation in open hole
`producers opens the door
`to many new well producing
`configurations. The goal of cost effective use of horizontals
`can be enhanced with the ability to segment, and control
`production without the need to run and cement liners.
`It is
`also possible to change producing configurations by working
`over the well, and changing the production intervals as some
`future date.
`
`Another key to the completion design is to configure the
`installation to minimize well
`intervention costs.
`In the
`
`Rainbow Lake area, coiled tubing costs are quite expensive.
`Where possible, the flow control devices were moved to the
`near vertical portion of the well
`to allow for
`slick—line
`changing of
`inflow devices
`(sliding sleeves or ported
`mandrels). This strategy has proven very effective when it is
`
`
`
`

`
`Production Control ofHoriz0ntal Wells in a Carbonate ReefStructure
`
`operationally feasible. Other considerations such as sour
`service
`equipment
`requirements,
`scale
`and
`asphaltines
`deposition, and corrosion have been addressed in job designs.
`
`experience as a drilling engineer include both domestic and
`international operations. land and offshore projects. Bill is a
`member of APEGGA, SPE and CADE.
`
`a Petroleum Engineering Consultant with
`John Grey is
`extensive drilling and completion experience. He has a B.Sc.
`degree in Mechanical Engineering from the University of
`Saskatchewan and is a Registered Professional Engineer as
`well as a member of SPE.
`
`for Guiberson AVA /
`Dan Themig is Account Leader
`Halliburton Energy Services. He has served in various job
`responsibilities in Canada and the U.S. including team leader
`for Multilateral Development Projects for Dresser Oil Tools in
`Dallas, Texas. He received a BS in Engineering from the
`University of Illinois and an MBA from Oklahoma State
`University. He is a Registered Professional Engineer,
`is a
`member of SPE, and has authored various articles and SPE
`papers on completion related subjects.
`
`These case histories illustrate examples some of the various
`production control applications in horizontal wells using
`SBP’s.
`These types of completion capabilities are now
`considered during the well planning stages. As capabilities
`have beep successfully verified,
`the
`aggressive use of
`horizontal drilling technology in conjunction with innovative
`completion and depletion strategies have enhanced the ability
`to produce the Rainbow Lake Field.
`
`Conclusions
`
`0
`
`0
`
`0
`
`The horizontal well design is often predicated on
`completion capabilities
`
`SBP’s have successfully provided zonal isolation
`
`The potential use of horizontal wells has been enhanced
`
`0 When designing a producing installation, minimizing
`intervention costs is an important consideration
`
`0
`
`Candidate selection is important
`
`Acknowledgments
`
`The authors of this paper wish to thank the management of
`Husky Oil, Mobil Oil and Halliburton Energy Service for the
`permission to present and publish this paper.
`
`Authors
`
`Marty Muir is a Completion’s Staff Engineer with Husky Oil
`Operations Ltd. He is a Professional Engineer, and a member
`of both SPE and the Petroleum Society of CIM.
`Prior to
`joining Husky Oil he held positions
`in production and
`reservoir engineering with a senior Canadian Oil and Gas
`Exploration and Production Company. Previous to that as a
`field engineer with an international wireline company. He has
`a B.Sc. degree in Mechanical Engineering from the University
`of Calgary
`
`Bill Ellsworth, P.Eng., is Engineering Manager, Drilling and
`Completions for Husky Oil Operations Ltd. He has a Bachelor
`of Chemical Engineering from Nova Scotia Technical College,
`Halifax (TUNS/DALTECH) and an Engineering Diploma
`from St Francis Xavier University (STFXU Antigonish). Work
`
`
`
`
`
`,.,.,.«~'--»-,»,...,»..«...~«M.,...a..,.,.e......ag.W.,,,w...,.....:c.,,-.,..m..-...m.».»~.,¢.»5.~.«,.o.A..,,;Ma5,,,,,~..w,_«.smwa.._4...,.»..;.»,»~.,..,o~.x.-.,fi.A-.«r~.\.._.~....__ &._,.a..,.,,_,g.
`
`
`
`

`
`4.
`
`When a book is donated to the library, the date on which it is received is
`
`inscribed or recorded on the book within a couple of days of its receipt. On the same day
`
`or as soon as possible thereafter, typically no later than a few days after the date is
`
`inscribed, the book is shelved for public access.
`
`5.
`
`Accordingly, the date inscribed on the proceedings of the Seventh One
`
`Day Conference on Horizontal Well Technology, November 3, 1999, which contains the
`
`reference article Production Control of Horizontal Wells in a Carbonate Reef Structure
`
`by Bill Ellsworth et al., reflects that the book was donated to the library on or about July
`
`23, 2001.
`
`6.
`
`I have no reason to believe that the book was not publicly available at
`
`other libraries or through the publisher soon after it was published in 1999.
`
`7.
`
`I have reviewed the above-listed reference in Exhibit A to this Affidavit,
`
`and it reflects a true and accurate copy of the corresponding reference maintained at the
`
`library.
`
`
`
`oberto ellegrino
`lnterlibrary Loans
`Alberta lnnovates - Technology Futures Library
`250 Karl Clark Road
`
`Edmonton, AB T6N 1E4
`Canada
`
`Tel: (780) 450-5057
`Fax: (780) 450-8996
`Email: Roberto.Pellegrino@albertainnovates.ca
`Visit us at http://albertatechfutures.ca/

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket