DEVELOPMENT and APPLICATION of "FRAC" TREATMENTS
`in the PERMIAN BASIN
`
`R. E. HURST
`
`J. M. MOORE
`MEMBERS AIME
`
`D. E. RAMSEY
`JUNIOR MEMBER AIME
`
`DOWELL INCORPORATED
`MIDLAND, TEX.
`
`T. P.4032
`
`ABSTRACT
`The "frac" method of well stimulation has been
`applied successfully to all producing formations in the
`Permian Basin area. During the five years since its
`development, many changes and improvements have
`been made in treating materials, procedures, and equip(cid:173)
`ment.
`A number of fluid carrying agents, having different
`physical and chemical properties, have been developed
`to meet various well requirements. The current trend is
`toward larger gallonage treatments, employing higher
`injection rates. The use of "down-the-casing" techniques
`ha~ greatly reduced high surface working pressures,
`attributable to friction losses resulting from injection
`through tubing.
`Petrographic studies of various Permian Basin forma(cid:173)
`tions, coordinated with laboratory and well log data,
`have been found a valuable guide in planning frac treat(cid:173)
`ments. A knowledge of the extent and orientation of
`naturally occurring fractures and planes of weakness in
`the formation, aid in predicting the ultimate drainage
`pattern resulting from the frac treatment.
`
`INTROI:)UCTION
`The South Permian Basin covers an area in West
`Texas and New Mexico about one-half the size of the
`state of Texas. This vast region has been called the
`
`Manuscript received in Petroleum Bra1].ch office on Oct. 1, 1954.
`Paper presented at Petroleum Branch Fall Meeting in San Antonio,
`Oct. 17-20, 1954.
`Discussion of this and all following technical papers is invited.
`Discussion in writing (3 copies) may be sent to the offices of the
`Journal of Petroleum Technology. Any discussion offered after Dec.
`31, 1955, should be in the form of a new paper.
`SPE 405-G
`
`58
`
`"Permian Basin" for so long that the term will be used
`here. It includes an area south of the Matador Arch,
`approximately 250 miles wide and 300 miles long. Struc(cid:173)
`tural features of importance within the basin are the
`Northwest Shelf, Eastern Platform, Midland Basin, Cen(cid:173)
`tral Basin Platform, and Delaware Basin. The principal
`producing formations include sand, limestone and dolo(cid:173)
`mite, with lesser amounts of shale, anhydrite, chert, and
`various silicates.
`All of the producing formations in the Permian Basin
`have responded to some type of frac treatment. Essen(cid:173)
`tially, a frac treatment may be defined as the injection,
`into a formation, of a fluid carrying agent containing
`a particulated solid (usually sand), for the purpose of
`increasing production. The application of this method of
`well stimulation to many differing Permian Basin reser(cid:173)
`voirs has necessitated numerous changes and improve(cid:173)
`ments in carrying agents, solids, service equipment, well
`equipment, and treating techniques.
`
`CARRYING AGENTS
`A number of different types of fluid carrying agents
`have been developed since the introduction of the frac
`method of well stimulation. These agents have different
`physical and chemical properties, and in many cases the
`extent of production increase derived from the frac
`treatment depends on the choice of fluid carrier. Un(cid:173)
`fortunately, due to many different systems of nomencla(cid:173)
`ture used in the oil field, these differences are not always
`recognized by the oil operator. In general, carrying
`agents may be divided into the following broad classi-
`
`PETROLEUM TRANSACTIO~S, AIME
`
`1 of 8
`
`Ex. 2088
`IPR2016-01517
`
`

`

`ncations: (1) hydrocarbon gels, (2) aqueous gels (acid
`or water), (3) emulsions, (4) refined oil, (5) lease oil,
`and (6) miscellaneous fluids.
`
`HYDROCARBON GELS
`Most hydrocarbon gels used as carrying agents are
`quite similar, whether made from gasoline, kerosene,
`diesel oil, or crude oil. They are produced by adding
`a gelling or thickening agent (usually a metallic soap or
`the salt of a fatty acid) to the hydrocarbon. This re(cid:173)
`sults in materially increasing the viscosity of the fluid,
`the extent depending upon the concentration of gelling
`agent added. The ability of hydrocarbon gel to suspend
`sand is a function of the viscosity and density of the gel,
`and the size and shape of the sand grains.
`These hydrocarbon gels may be caused to "break" or
`lose their viscosity in several different ways, depending
`upon the type of gelling agent used. The presence of an
`electrolyte, such as salt water or a mineral acid, will
`cause most of these gels to break. Thinning of the gel
`may also be accomplished by dilution with additional
`quantities of hydrocarbon fluid.
`
`AQUEOUS GELS
`Water-base gels, such as thickened hydrochloric acid,
`are similar in many respects to hydrocarbon gels. The
`type of gelling agent used (usually a carbohydrate or
`cellulose derivative) determines how the gel breaks and
`what will break it. As a rule, a gelling agent is chosen
`which will permit the gel to break on contact with the
`reaction products of the acid and the formation, or as
`a result of bacterial growth within the gel itself. Care
`should be taken not to use a gelling agent that will
`precipitate out in insoluble form after the acid has be(cid:173)
`come spent. The sand suspending ability and fluid loss
`characteristics of these aqueous gels are related to their
`viscosity and density, as in the case of the hydrocarbon
`gels.
`Gelled acids are adaptable to a wider variety of well
`conditions than are hydrocarbon gels, since the type
`of acid and concentration may be varied, dependent
`on the solubility of the formation. Additional agents,
`which minimize emulsifying and silicate-swelling ten(cid:173)
`dencies of the acid, have been used to advantage in
`many areas. The viscosity of the gel may be varied
`over a wide range as desired.
`The use of gelling agents for the thickening of
`fresh water or brine is desirable for frac treatments
`on fresh water wells or water injection wells, where
`the injection of oily fluids might be undesirable. Such
`gels are thinned by bacterial action or by dilution
`with formation fluid.
`
`EMULSIONS
`The term "emulsion" until recently has been synon(cid:173)
`ymous with trouble in
`the oil fields. When prop(cid:173)
`erly used, however, emulsions have been found ex(cid:173)
`tremely helpful. Emulsions have a number of advan(cid:173)
`tages and disadvantages when compared with the gels
`as possible carrying agents. Although they have high
`fluid loss in comparison with the true gels, they possess
`excellent sand carrying characteristics.
`Essentially, an emulsion consists of a homogeneous
`mixture of two immiscible fluids, one of which exists
`in the form of tiny droplets as the inner phase, sur(cid:173)
`rounded by the other fluid known as the outer phase.
`Normally such mixtures rapidly separate into
`two
`distinct layers; however, certain types of chemical
`compounds, known as emulsifying agents, have the
`
`ability to keep such liquids in emulsion form tor In(cid:173)
`definite periods of time. Such emulsifying agents fre(cid:173)
`quently occur naturally in crude oils,
`resulting
`in
`troublesome emulsions of crude oil and brine. Such
`emulsions are thick and gooey, and interfere with the
`production of oil from a well.
`in frac
`The emulsions used as carrying agents
`treatments are physically similar to these naturally
`occurring emulsions; however, the emulsifying agents
`used produce relatively unstable emulsions which tend
`to break down, once they have entered the formation.
`The two principal emulsion type carrying agents used
`in frac treatments are acid/kerosene emulsions, and
`crude oil/water emulsions.
`The physical and chemical properties of an emul(cid:173)
`sion are determined by the emulsifying agent,
`the
`volumetric ratio of the two liquids in the emulsion,
`and the amount of agitation given the mixture.
`Acid/kerosene emulsion type carrying fluids will
`break down on contact with acid reaction products,
`or because the emulsifying agent is adsorbed onto
`type emulsions may be
`formation. Oil/ water
`the
`broken by the presence of any material tending to
`reverse the emulsion, so that water becomes the outer
`phase. Most emulsions are sensitive to heat. Regular
`crude oil treating compounds will usually break emul(cid:173)
`sion type carrying agents. Dilution of the outer phase
`will thin the emulsion to a lower viscosity.
`One of the chief advantages of this type carrying
`fluid is that an external gel-breaker is not required to
`cause the viscous fluid to revert to a thin, free-flowing
`liquid. This is particularly advantageous in low bot(cid:173)
`tom-hole pressure wells, where lengthy cleanup pe(cid:173)
`riods are required after other type frac treatments.
`In most crude oil/water type emulsions, the water
`and emulsifying agent make up less than 4 per cent
`of the total volume. Such emulsions break down in
`the presence of an electrolyte such as brine or acid.
`They are readily thinned by dilution with crude oil.
`If a low fluid
`loss carrying agent is desired,
`the
`aqueous phase of the emulsion may be made from
`thickened fluids. Inert solid particles also may he
`added to reduce the fluid loss.
`
`REFINED OILS
`The term "refined oils" as used here refers to any
`crude oil from which the very light and very heavy
`hydrocarbons have been removed. This would include
`kerosene, heavy fuel oils, and all intermediate prod(cid:173)
`ucts. Since the heavier oil fractions are more com(cid:173)
`monly used in frac treatments, they will be discussed
`first.
`Certain green, paraffin-base crude oils when re(cid:173)
`fined properly, will yield a dark green viscous prod(cid:173)
`uct which boils between 350 0 P and 750 0 P at atmos(cid:173)
`pheric pressure. This oil fraction, commonly called
`"fuel oil" by refinery personnel, can be made into an
`ideal frac fluid by blending with a high analine point
`hydrocarbon, such as kerosene or diesel oil, to thin to
`desired viscosity.
`Kerosene and diesel oil have been used as carrying
`agents in wells already having open fractures. Such
`treatments are valuable in removing paraffin deposits
`from the formation and wellbore or to clean up emul(cid:173)
`sions caused by a previous treatment, drilling fluid,
`or formation water. When used in wells where emul(cid:173)
`sion difficulties have been encountered, a demulsify-
`
`VOL. 204, 1955
`
`59
`
`2 of 8
`
`Ex. 2088
`IPR2016-01517
`
`

`

`ing agent usually is added to the kerosene or fuel
`oil. It is important that preliminary tests be run to
`determine the proper agent to be used. Most refined
`oils have less tendency to form emulsions than does
`lease oil, due to the removal of fine solid particles by
`the refining process.
`Care should be taken when using refined oil as a
`carrying agent to choose one having a pour point at
`least 20 degrees below the formation temperature of the
`well in order to avoid precipitation of wax crystals from
`the oil, a phenomenon taking place at 12 to 15 degrees
`above the pour point of the oil.
`
`LEASE OILS
`At the start of most frac treatments, a volume of
`crude oil is pumped into the formation in order to deter(cid:173)
`mine the "breakdown" and feeding pressures, and the
`injection rate. In some cases it is possible to follow this
`with sand-laden crude oil, utilizing the crude oil as
`a carrying agent.
`Such a procedure has certain advantages. For one
`thing, if the crude oil is from the well in which it is
`used, no emulsion trouble should be experienced. If
`a high gravity crude is used, the well should clean up
`readily.
`Such advantages are, however, more than offset by
`the disadvantages attendant the use of crude oil as a car(cid:173)
`rying agent:
`1. Most crude oils have very poor sand-suspending
`properties. Low concentrations of sand must be used or
`the crude will be difficult to pump and "screen-outs" are
`likely to occur. As a result, larger gallonage treatments
`and higher pumping rates are required to displace a
`given amount of sand into the formation.
`2. The fluid loss of most crude oils is very high.
`Higher injection rates are required in order to accom(cid:173)
`plish the same fracture penetration obtained through the
`use of more viscous fluids.
`3. Sand screen-outs or bridging frequently occurs
`when attempts are made to pump sand and crude oil
`through casing perforations.
`4. Crude oils not native to the formation in which
`they are used may cause emulsion problems and difficult
`"clean-up."
`5. A definite fire hazard exists when crude oils are
`handled in open tanks around pumping equipment.
`Sand settling rates are much higher than those of the
`refined oil carrying agents. At formation temperatures
`the fluid loss of most crude oils is too high to be meas(cid:173)
`ured with standard equipment.
`
`SAND
`The exact function of the solids used during a frac
`treatment is somewhat controversial. Several theories
`have been proposed, namely, that:
`1. The solid particles penetrate planes of weakness,
`propping them open after the carrying agent has been
`removed.
`2. The particles act to scour or erode the walls of the
`passages through which they are displaced.
`The solids used in a frac treatment are chosen on the
`basis of the following properties: particle size, shape,
`hardness, compression strength, permeability of a packed
`column, reaction with well fluid, availability, and econ(cid:173)
`omy. Silica sand that has been washed and screened
`appears to be the most practical material for this use.
`The most popular size is 20-40 mesh, which consists of
`sand grains having diameters from 0.015 to 0.030 in
`(0.4 to 0.8 mm).
`
`60
`
`The Humble Oil and Refining Co. has suggested the
`adoption of a visual roundness evaluation chart origi(cid:173)
`nally proposed by Krumbein." This is shown in Fig. 1.
`Roundness is thus defined as the ratio of the average
`curvature of the several corners to the radius of curva(cid:173)
`ture of the largest inscribed circle on the projected
`image of the sand grain.
`The commonly used 20-40 mesh, round grain sand
`(see picture .6 on roundness chart, Fig. 1) has a packed
`permeability of 105 Darcys. In general, the larger the
`grain size, the greater the permeability, with angular
`shaped grains having a somewhat lower permeability
`than round grains of equal size. Field data indicate that
`a high degree of roundness is desirable in order to place
`more sand into a formation without bridging.
`The concentration of sand carried in the frac fluid is
`governed by the equipment through which it must be
`pumped, the type of carrying agoot, and the nature of
`the formation being treated. The quantities of sand and
`carrying agent should be carefully chosen when plan(cid:173)
`ning a frac treatment.
`In general, the more sand displaced into the forma(cid:173)
`tion, the better the results will be. This holds true
`whether either the propping or scouring theory is ap(cid:173)
`plied. The maximum concentration of sand that can be
`handled by any particular carrying agent is dependent
`upon: (1) the agent's ability to support sand; (2) its
`fluid loss in relation to the permeability of the matrix;
`and (3) the anticipated injection rate.
`Field experience has shown that the percentage of
`screen-outs has been reduced by the use of high injec(cid:173)
`tion rates. Another method of minimizing screen-outs
`has been to lower the fluid loss of the carrying agent,
`with respect to the formation. This is dependent upon
`the ability of the formation to accept the fluid being
`used as a carrying agent. Unfortunately, this latter fac(cid:173)
`tor is usually determinable only by trial and error.
`The most practical approach to the problem of
`screen-outs is now indicated from field experience. The
`first step is the classification of formations into two
`groups: (1) those that will accept high rates of injec(cid:173)
`tion, and (2) those that will accept only low rates of
`injection, under the pressure limitations of well equip(cid:173)
`ment. For the first group, high injection rates are in
`most cases sufficient to avoid screen-out difficulties.
`When treating formations which require low rates of
`injection, however, care must be taken to choose a car(cid:173)
`rying agent with excellent sand-supporting propertIes, III
`order to avoid the accumulation of high sand concentra(cid:173)
`tions opposite the formation. Such an accumulation
`usually results in a complete shut-down, due to a fill-up
`of sand in the well bore.
`
`lReferenees given at end of paper.
`
`ROUNDNESS- .1
`
`2
`
`3
`
`.4
`
`,~~ .t~ ~ •• e't let
`I,a ,&~ .., 'tt ,--
`·~f ~t' ,. . ,. ~t •
`t9. 1,-• •• lie II.
`eat _ t, -" " _ ,t-.a
`et. 1._ 'I' .,e .
`
`.6
`
`.7
`
`.8
`
`.9
`
`.
`
`BROKEN
`SANO
`
`FIG. 1 -
`
`ROUNDNESS CHART FOR SAND.
`
`j'ETROLEUM TRAi'"SACTIONS, .HME
`
`3 of 8
`
`Ex. 2088
`IPR2016-01517
`
`

`

`In evaluating the sand-supporting properties of a car(cid:173)
`iymg agent, the factor of temperature should not be
`overlooked. The majority of carrying agents, which de(cid:173)
`pend upon viscosity for their sand-supporting ability,
`tend to thin down at elevated temperatures. Thus, the
`sand-suspending ability of the proposed carrying agent
`under conditions of bottom-hole temperature must be
`taken into consideration. In general, where temperatures
`exceeding 175 0 F are anticipated, and where injection
`rates are low due to pressure limitations of the well, it
`is necessary to use emulsion type carrying agents, de(cid:173)
`signed for high temperature use.
`
`EQUIPMENT
`The development of frac methods of well stimulation
`has resulted in many changes in wellhead equipment,
`bottom-hole tools, pumping equipment, mixing equip(cid:173)
`ment, and transporting equipment. Although at times
`the transition may have seemed slow, actually the
`change has taken place in record breaking time.
`Pumping equipment has been advanced from units
`capable of pumping 40 gal/min at 5,000 psi, to units
`capable of pumping as high as 300 gal/min at 5,000 psi.
`These units are designed to operate for long periods of
`time at high pressures ~ up to 15,000 psi, whereas
`previously such pressures could be tolerated only for
`short intervals.
`The changes in types of carrying agents employed
`have required the handling of highly inflammable fluids.
`Adequate safety precautions must definitely be made a
`part in the planning of any treatment. Thus far, the
`industry's record has been excellent, but there is still
`room for improvement. Specially designed fire fighting
`equipment is now made available on location in the
`form of improved extinguishers, coverings, and truck(cid:173)
`mounted fire fighting equipment. The demand for more
`and better personnel protective equipment is constantly
`increasing. The increase in monetary loss and extent of
`personal injury has arisen sharply for each accident,
`making it essential that a cooperative and respectful
`attitude toward safety be prevalent among servicing per(cid:173)
`sonnel and personnel in charge of well equipment.
`
`APPLICATION TECHNIQUES
`A study of Permian Basin wells indicates that the two
`basic problems in applying various types of frac treat(cid:173)
`ments are: (1) to inject the sand-laden fluid into the
`producing formation; and (2) to recover the carrying
`agent, while leaving the sand in place and the openings
`free from undesirable materials.
`During early treatments, the accepted method of
`application employed the use of tubing, with several
`types of pack-off tools. These tools varied from single
`casing pack-off elements used primarily for protection
`of casing from high pressures, to complicated multi(cid:173)
`pack-offs used to isolate various zones as well as protect(cid:173)
`ing the casing. The use of these small treating strings
`(normally, 2-in tubing) limited the injection rates and
`consumed valuable horsepower in overcoming friction
`losses of the sand-laden fluid being pumped. Screen-outs
`of sand in the well bore were always a hazard that had
`to be taken into consideration. It was believed that if
`higher injection rates could be obtained, larger volumes
`of sand could be injected before screen-outs would
`occur. However, the high pressures due to friction loss,
`prohibited the use of such high injection rates through
`tubing.
`
`The first producer in the Permian Basin to use high
`injection rate techniques for injecting larger amounts of
`sand into the formation, was the Southern Production
`Co. Instead of applying the frac treatment through tub(cid:173)
`ing, the materials were injected down the casing. Under
`these conditions, even though the injection rate was four
`times that normally used on frac treatments, the surface
`working pressure necessary to inject the sand-laden fluid
`was decreased by 50 per cent. These treatments showed
`that, not only was the mechanical efficiency of applica(cid:173)
`tion improved, but the resulting production indicated
`that the effective increase in bottom-hole working pres(cid:173)
`sures, the increased volume of materials injected, and
`the increased rate of injection were all beneficial to the
`well. As a result, these "down-casing" treatments have
`been extensively employed in the Permian Basin area
`with favorable results. On wells which contained bad
`casing, or had zones requiring isolation which made it
`necessary to inject the frac materials down the tubing,
`the use of larger diameter tubing (normally 3-in) was
`initiated by oil operators.
`Field results have substantiated the fact that large
`volume treatments (10,000 gal or more) result in better
`"conditioning" of many reservoirs because:
`1. Commercial producers have been obtained by
`large volume treatments in wells where smaller treat(cid:173)
`ments failed.
`2. Greater production increases have been secured
`with increases in the size of treatment.
`3. Production declines have been slower as greater
`drainage area was obtained in the well.
`Such higher gallonage treatments have been made
`possible by the use of higher injection rates during frac
`treatments. Such high injection rates also yield the fol(cid:173)
`lowing advantages: (l) deeper penetration of sand(cid:173)
`laden fluids; (2) prevention of screen-outs or lock-ups
`at the wellbore; and (3) reduction of the effect of tem(cid:173)
`perature changes on the physical properties of the car(cid:173)
`rying agent during the treatment.
`It should not be inferred that frac treatments are a
`cure-all that eventually will replace other methods of
`well stimulation, such as acidizing. Some formations,
`especially those in a plugged condition, require an acid
`treatment preceding the frac treatment. Almost any zone
`will be benefitted by a spearhead of regular or mud
`acid. Such a pretreatment results in lowering injection
`pressures and dissolving materials that may cause re(cid:173)
`striction to flow.
`Another controversial question is whether or not an
`overflush following a frac treatment is beneficial, and,
`if so, the amount of overflush which should be em(cid:173)
`ployed. It is believed that some overflush is beneficial
`because it:
`1. Moves the sand back from the well bore, to keep it
`from being produced.
`2. Breaks emulsions that may have formed in the
`formation.
`3. Thins refinery oil, when such has been used as
`a carrying agent.
`4. Benefits the critical area when acid overflush is
`used in carbonate reservoirs. Carbon dioxide gas pro(cid:173)
`duced by the chemical reaction will tend to give the
`well initial life, reducing swab time. It is also believed
`that acid used for overflush will enter small "feeder"
`planes, further conditioning the reservoir for increased
`production.
`Although
`treatments has
`the application of frac
`solved many well problems, it has also created some
`
`VOl .. 204, 1955
`
`61
`
`4 of 8
`
`Ex. 2088
`IPR2016-01517
`
`

`

`TABLE 1 - RESULTS OF FRACTURING TREATMENTS IN THE PERMIAN BASIN
`
`Well
`
`Pay Zone
`
`Pool
`
`County Well Data
`
`Treatment Data
`
`Before
`
`Results
`After
`
`A
`
`Keystone
`Rustler
`(sandy lime) Colby
`
`Winkler
`
`Open hole
`882'-1050'
`
`20,000 gal acid
`5,000 gal gelled acid
`2,500 Ib sand
`
`Pumped of!
`in 8 min
`
`10,000 SWPO
`
`B
`
`Delaware
`(sand)
`
`Tunstill
`
`loving
`
`c
`
`Yates
`(sand)
`
`South
`Wickett
`
`Ward
`
`5-year-old well
`Nitro-shot
`3299' -3328'
`
`6,000 gal lease oil/
`water emulsion
`9,000 Ib sand
`Inj. rate-7 b~l/min
`
`20-month-old well
`"frac" completion
`2568'-2758'
`
`9,000 gal refined oil
`18,000 Ib sand
`Inj. rate-12 bbl/min
`down casing
`
`D
`
`Queen
`(sand)
`
`la.lglie-
`Mattix
`
`Lea
`
`a-year-old well
`Nitro (300 qts)
`3410'-3587'
`
`5,000 gal lease oil/
`wafer emulsion
`10,000 Ib sand
`Inj. rate-10 bbl/min
`down casing
`
`12 SO PO
`pumping
`
`70 SOPO
`flowing
`
`7 SOPO
`
`3 SOPO
`
`518 BOPO
`potential
`40 SO PO
`(after 8 mo.)
`
`147 BOPO
`flowing
`through
`27/64" choke
`
`Remarks
`
`fresh water well used for injec(cid:173)
`tion program.
`Six alternate slugs of acid and
`. 'frac" materials used during
`treatment.
`
`Test 17 days after treatment.
`
`Originally completed with 2000
`gal "frac"
`treatment
`for 35
`BOPO.
`
`No cJeanout necessary after treat·
`ment in shot hole.
`
`E
`
`San Andres Wasson
`(dolomite)
`
`Gaines
`
`New well
`10,000 gal acid
`completion
`5002'-5140'
`
`10,000 gal refined oil
`10,000 Ib sand
`Inj. rate-18 bbl/min
`down casing
`
`500 BOPO
`3000/1 GOR
`
`1400 BOPO
`potential
`400/1 GOR
`
`Inside location in old pool. Ex(cid:173)
`perimental
`job, following acid
`with "frac" treatment.
`
`F
`
`Glorieta
`San Angelo
`(dolomite)
`
`Howard-
`Glasscock
`
`Howard
`
`New well
`Open hole
`2775'-2995'
`
`Show
`
`88 BOPO
`after 14 days
`
`Field extension-old pool. Sur(cid:173)
`face working pressure-350 psi,
`
`G
`
`Clearfork
`(dolomitic
`lime)
`
`H
`
`Spraberry
`(sand and
`shale)
`
`TXl
`
`Ector
`
`Pembrook
`
`Upton
`
`2-year-old well
`10,000 gal acid
`completion
`5460'-5910'
`
`New well
`Perforated
`6,000 gal
`hydrocarbon gel
`completion
`7000'-7050'
`
`1,000 gal acid
`3,000 gal acid/oil
`emulsion
`6,000 Ib sand
`Inj, rate-5 bbl/min
`down cosing
`
`8,000 gal acid/oil
`emulsion
`24,000 Ib sand
`Inj. rate-24 bbl/min
`down casing
`
`20,000 gal refined oil
`30,000 Ib sand
`down casing
`
`19 SOPO
`
`187 BOPO
`flowing
`
`Test on 7th day following recov(cid:173)
`ery of treating fluids. No diffi(cid:173)
`culty encountered.
`
`50 BOPO
`
`342 BOPO
`flowing
`220 BOPO
`after 18 days
`
`three days after
`Retreatment,
`original completion.
`
`Cisco
`
`Cisco
`
`Scurry
`
`J
`
`Canyon
`(sand)
`
`Pardue
`
`Fisher
`
`2-year-old well
`500 gal Mud Acid
`completion
`6180'-6212'
`
`6,000 gal lease oil/
`water emulsion
`12,000 Ib sand
`down tubing
`
`1% -year-old well
`Open hole
`Natural completion
`4424'-4450'
`
`250 gal Mud Acid
`3,000 gal refined oil
`1,800 Ib sand
`Inj. rate-2 bbl/min
`down tubing
`
`7 SOPO
`
`112 BOPO
`after 54 days
`
`below packer. 40-60
`Treated
`mesh sand used. Previous treat(cid:173)
`ments in area, using 20-40 mesh
`sand, screened out.
`
`40 BOPO
`
`118 BOPO
`through
`12/64" choke
`after 5 days
`
`treatment of offset
`In "frac"
`well, without Mud Acid, forma(cid:173)
`tion would not accept desired
`amount of sand,
`
`K
`
`Devonian
`(lime)
`
`South
`Andrews
`
`Andrews 3 1j,-month-old well 20,000 gal acid/
`6,000 gal acid
`kerosene emulsion
`completion
`30,000 Ib sand
`10,864'-11 ,059'
`down casing
`
`55 BOPO
`
`310 BOPO
`potential
`
`Deepest well treated down cas(cid:173)
`ing, to dote.
`
`l
`
`Waddell
`(sand)
`
`Abell
`
`Pecos
`
`New well
`Perforated
`5516'-5542'
`
`3,000 gal lease oil/
`water emulsion
`3,000 Ib sand
`250 gal Mud Acid
`Ini. rate-3 bbl/min
`down tubing
`
`Show
`
`192 SO PO
`
`Previous treatments ;n this sec(cid:173)
`tion with other carrying agents
`resulted
`in slow "clean·ups,"
`
`new ones. One such problem which has been accentu(cid:173)
`ated by frac work is that of controlling gas and water
`ratios.
`In many cases, where relatively close orientation of
`water zones to the bottom of the well bore exists, the
`use of special types of bottom-hole plugs has prevented
`increases in water production_ One of the most effective
`procedures has been the use of a high concentration of
`sand in a very thick carrying liquid, spotted across the
`zone expected to contain planes of weakness leading to
`water, More recently, the introduction of oil and cement
`slurry squeezes has aided in this type of control by
`blocking off such water leading planes and diverting
`the frac materials into planes of weakness within the
`oil bearing zone,
`
`FIELD RESULTS
`A tabulation of a number of Permian Basin frac
`treatments is given in Table 1. This table includes well
`data, treatment data, and treatment results, These par-
`
`ticular wells were chosen as being representative al(cid:173)
`though the type materials and size of treatment are not
`necessarily recommended for these individual pools, The
`results are as reported from the field and are subject to
`correction, Some wells in these various formations re(cid:173)
`sponded better and others less favorably than these ex(cid:173)
`amples; however, the wells cited are fairly typicaL Frac
`treatments have met with equal success in gas wells,
`High surface pressures apparently are not necessary
`in order to obtain sustained production increases, as evi(cid:173)
`denced by a number of these case histories. One ex(cid:173)
`ample was a San Andres well in the Howard-Glasscock
`Pool, with broken pay from 2,115 ft to 2,220 ft
`The well, originally completed with acid in 1952, was
`retreated with 9,000 gal of refined oil containing 12,000
`lb of sand, in May, 1954, Surface working pressure was
`150 psi, at 20 bbl per minute, with the well going on
`vacuum when the pumps were shut down, Originally
`producing 2 BOPD, the well was still making 60 BOPD
`with some water 45 days after the treatment
`
`62
`
`PETROLEUM TRANSACTIONS, AIME
`
`5 of 8
`
`Ex. 2088
`IPR2016-01517
`
`

`

`BlK. 30
`SE:C. 33
`U NI V ERSI T Y L EASE
`McELRO Y PO O L
`((j R .... VBURG)
`
`7WELLS TAtAUD
`NEW TANKS INSTALLED
`TOTAL COST •• U.OOO
`ACO'L PROD. · IZ,IZS 88LS.
`
`2Wf:LL S 'tREATED
`NEW TANr(S
`INSTALLED
`TOTAL COS T * 12,000
`AOD'L PROO . - 6,940 88LS
`
`•
`
`•
`
`II1IIIIlI1I1IIm PROJEC.TtD PRODUCTION
`IIIIIlIIIIIIlli 8ASED ON TOP ALLOWABLE
`
`FIG. 2 - MONTHLY PRODUCTION ON LEASE, CONSISTING
`OF NINE WELLS
`
`An example of how frac treatments have helped lease
`recovery in an old field is presented in graphic form in
`Fig.2.
`Each of the wells on this lease was treated with
`approximately 15,000 gal of refined oil and 30,000 lb
`of sand, at injection rates from 10 bbl per minute down
`3-in tubing, to 20 bbl per minute down casing. To
`determine which method of treatment was to be used,
`a gauge log was run on each string of casing. Those
`indicated to be in good condition were treated down the
`casing.
`Spinner surveys frequently are conducted when the
`desired results are not obtained following the frac treat(cid:173)
`ment. These may reveal channeling, either around the
`bottom of the casing shoe or behind perforations. Cor(cid:173)
`rection steps then may be taken accordingly.
`Also, spinner surveys will reveal what portion of the
`open hole was conditioned during the treatment. For
`example, spinner surveys were run on four wells in the
`Sprabeny, before and after 20,000 gal refinery oil-sand
`treatments with both the upper and lower Spraberry
`open (separated by about 800 ft). In all four wells, the
`surveys revealed that only about 10 per cent of the
`spinner fluid entered the lower Spraberry. Although the
`wells responded favorably, it is indicated that further
`stimulation work, following decline, should be concen(cid:173)
`trated on the lower zone to obtain additional produc(cid:173)
`tion.
`
`SECONDARY RECOVERY
`Many operators have been hesitant to perform frac
`treatments on wells in secondary recovery projects, for
`fear of early breakthrough of repressuring fluids result(cid:173)
`ing in by-passing of oil. It is conceivable that, under
`perfect flood conditions, the application of frac treat(cid:173)
`ments might be a hindrance; however, such an ideal
`condition is rarely encountered. Many times when a
`flood has been established, it will be found that one or
`more of the injection wells failed to accept the requisite
`amount of water. It is frequently necessary to increase
`the system pressure, requiring the expenditure of exces(cid:173)
`sive horsepower.
`The treatment of water injection wells in waterflood
`projects is a sizeable operation that requires special car(cid:173)
`rying agents. Aqueous gels have been used in fracturing
`
`VOL. 204, 1955
`
`FIG. 3 -
`PHOTOMICROGRAPH OF CORE FROM GLORIETA
`FOHMATlON. OPEN FRACT URE (LOWER LEFT TO RIGHT
`CENTER) IN ANHYDRITIC DOLOMITE.
`
`A number of these narrow. short fractures are present in the rock.
`Anhydrite crystals are white, however, some additional anhydrite
`crys

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket