`
`eatherlordg
`
`. ._-I-u. ::
`:n-In. "--.
`...=:==:" ‘-'---
`..._.1=::.
`
`
`
`Openhole Completion Systems
`
`1 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V Openhole Completion Systems - Components
`
`
`
`Openhole
`.
`Completion
`compre'ofsmn I
`inflatable
`meChanlca'
`Swellable packers
`ackers
`packers 7
`-
`P
` n . ’—
`'
`
`'I‘I" ' m H .
`I
`'
`I
`-
`I
`'
`-'
`‘
`
`Sliding leeves
`
`
`. u .
`---—--
`I
`—
`I
`' I
`H —
`U
`I
`—
`-
`_ H -‘i WHIT
`"‘
`"a
`
`'
`
`Openhole
`combination
`packers
`
`Openhole :
`
`anChm?)
`
`Modular systems designed to meet the needs of the customer
`
`2 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V Openhole Completion Systems
`
`
`
`Completion
`inflatable
`
`packers
`
`
`
`A packer that is inflated with fluid or cement to isolate zones in the open hole.
`
`3 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V Production Inflatable - BULLDOG“VI HD Inflate
`
`
`
`BULLDOG HD inflatable packers are a tough new breed of inflatable
`packers that provide reliable, consistent isolation protection and
`security, even under the extreme forces of fracing a well.
`
`Features/Benefits
`
`
`
`- The discontinuous-rib element provides superior openhole
`isolation by expanding up to 3.5 times its original diameter to
`conform to borehole irregularities and provide total contact with
`the formation.
`
`' The protective seal shield prevents premature element expansion
`during run-in.
`
`Availability
`4—1/2" X 6.25”
`
`4 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V Openhole Completion Systems
`
`
`
`Swellable packers
`
`
`
`If no well fluids
`A packer that swells when it is in contact with well bore fluids.
`are present that we can carry our own expansion fluid.
`
`5 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V Swellable Packer — What Is It?
`
`
`
`- A rubber that swells when immersed in well fluids (water, hydrocarbon, or
`mixture of both)
`
`' Rubber volume increases proportionally as liquid diffuses into rubber
`
`° Swell time and volume can be controlled
`
`Benefits of swellables
`
`— Will swell into over-sized or odd shape holes
`
`— As long as there is activation fluid, it will continue to re-seal
`— There are no mechanical parts
`— Simply place in the string where needed
`
`— Saves money on personnel
`
`
`
`6 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`v Elastomeric Properties- Controlling Swell Rate
`
`
`
`Swell rate is controlled to give more contingency time while RIH and
`the ability to use oil-based muds in the completion.
`
`Anti-diffusion layer (the other guys)
`
`- Can rub off allowing the packer to prematurely swell, thus
`increasing the possibility of getting stuck
`
`- Random thickness
`
`Elastomer compound design (Weatherford’s design)
`
`- Can’t rub off since it is homogenous through-out the rubber
`
`° Swell properties are known and consistent
`
`7 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V Elastomeric Properties - Three Families of Rubber
`
`
`
`Water Swellable
`
`Hybrid
`
`Water Swellable
`
`Swells in water
`
`Oil Swellable
`
`Oil Swellable
`
`Swells in oil
`
`
`
`Swells faster at higher
`temperatures
`
`Swells faster at higher
`temperatures
`
`Swells faster at higher
`temperatures and low salinity
`
`Swells 2 to 3 times its original
`volume in oil
`
`Swells 1.5 times its original
`volume in oil or water
`
`Swells 2 to 3 times its original
`volume in water
`
`Average time to swell enough
`to seal is 8 days
`
`Average time to swell enough
`to seal is 12 days
`
`Average time to swell enough
`to seal is 20 days
`
`8 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V Swellable Packers — Product Summary
`
`
`
`500
`
`psi
`
`3,000
`
`psi
`
`5,000
`
`psi
`
`6,000
`
`psi
`
`7,500
`
`psi
`
`10,000
`
`psi
`
`
`
`
`I
`l
`
`10‘
`10‘
`
`10‘
`
`
`
`
`
`Fraxsis (high pressure)
`
`
`
`-—I‘
`
`ComboFrac (combination of compression and swellable)
`9 of 53
`
`
`5‘
`
`Ex. 2047
`IPR2016-01380
`
`
`
`
`Morphisis
`(slide on) 18”
`
`Genisis‘E' (industry Std.)5’
`
`
`
`SweliCat (feed thru)
`
`5’
`
`Self Actuated (SA)
`
`5"
`
`I
`
`
`
`V Swellable Packers — Genisis®
`
`
`
`SWELLABLE ELASTOMER ELEMENT
`
`'Bonded to base pipe
`-Activated by oil, water or mixture
`
`*Swelling 8: volume customizable
`
`
`
`PACKER MANDREL
`
`-Standard API tubular
`
`CROSSOVER END RING
`
`-Focus radial swelling
`-Anti-extrusion ring
`-Rated to tubing shear
`-Available with all connections
`
`-Size, grade 8: weight
`
`Ex. 2047
`IPR2016-01380
`
`Available now in most popular
`tubing / casing sizes
`
`
`
`10 of 53
`
`
`
`V Swellable Packers — Fraxsis®
`
`
`
`SWELLABLE ELASTOMER ELEMENT
`
`-Bonded to base pipe
`tActivated by oil, water or mixture
`-Swelling 8: volume customizable
`
`
`
`PACKER MANDREL
`
`-Standard API tubular
`
`-Size, grade & weight
`
`
`
`Available in 4-1/2” x 6. 25 ”
`
`8. 5-1/ “x 8.50”
`
`PROPRIETARY BACK UP SYSTEM
`
`'Swelling of rubber energizes the back
`UP
`11 of 53
`-Back up holds rubber in place
`increasing the pressure rating
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V Fraxsis® -1 Foot Packer Test
`
`
`
`- All these tests performed on 1 packer without redressing
`
`- 8.75" fixture ID to simulate washed out hole
`
`- 3,000 psi pressure test (15 minutes — both sides)
`
`° Cool test fixture from 135°C to 65°C, perform 3,000 psi
`pressure tests from above every 10‘C
`
`- Pull packer and re-install in 9.00” fixture ID
`
`- 100 pressure reversals at 3,000 psi
`
`° 5,000 psi pressure test (15 minutes — both sides)
`
`- 100 pressure reversals at 5,000 psi (305 each way)
`
`- 3,000 psi pressure test (15 minutes — both sides)
`
`- Finally failed while attempting 5,000 psi pressure test in
`9.00" fixture (all on the same packer)
`
`12 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V Swellable Packers — Morphisis®
`
`
`
`SWELLABLE ELASTOMER ELEMENT
`
`-Activated by oil, water or mixture
`-Swelling 8: volume customizable
`
`FE:—
`
`°Holds the packer onto
`the CD of the pipe
`
`Available in Q4 2009
`
` Pipe Grippers
`
`
`Inner Metal body
`Supports the rubber
`
`13 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`VTesting the Swell Rate While You Wait - SwellProTM
`
`
`
`- Swell time can be customized for each well installation
`
`- Swell time and volume is dependant on well temperature and activation fluid
`composition
`
`— Different for each well
`
`- Accurate swell profiles generated for each well application using proprietary
`SweIIPro testing unit
`
`—— Test at well temperatures
`using real well fluids
`
`— Accurater define elastomer
`performance envelope
`
`— No simulated predictions!
`
`14 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V Openhole Completion Systems
`
`
`
`Openhole
`compression i
`mechanical
`
`pac
`
`I
`
`fl
`
`.
`
`_
`
`A packer that compresses rubber to seal in the open hole, design is very close
`to a traditional casing packer.
`
`15 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V Compression Element Packer - ARES
`
`
`
`
`
`Available in 4-1/ ”x 6.25”
`
`16 of 53
`
`Ex. 2047
`IPR2016-01380
`
`Weatherford’s ARES packer is a patented
`mechanical packer that pushes the element out
`before it is compressed. Designed specifically for
`the openhole multi-zone frac completion.
`
`Features/Benefits
`
`- Full bore
`
`- Short length
`- Adjustable setting pressure
`- Long element
`- Two stage setting operation
`- Built-in anti-preset device
`- No mandrel travel during setting
`
`
`
`V Compression Element Packer - ARES
`
`
`
`RIH closed
`
`
`
`
`
`% P
`
`ressure up to shift element expansion sleeve
`
`
`
`Element pack off and set
`
`17 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V Openhole Packers - Cup Seal Isolation (CSI)
`
`
`
`The Petrowell CSI Openhole permanent packer employs an entirely new
`design that utilizes a self energizing cup seal element system.
`
`-
`
`It is particularly suited to horizontal
`Openhole wells where discrete
`intervals exist and need to be isolated
`
`during the life of the well.
`
`irregularity is expected.
`
`- Also ideal for low UCS rock formations
`
`and/or where hole geometry
`
`_petrowell
`18 of 53
`dasrgn Lawful In: corrrpromrsc
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V Openhole Packers - Cup Zonal Isolation (CZI)
`
`
`
`The CZI openhole permanent packer employs an entirely new design to overcome
`the challenge of packing off in openhole sections of wells by utilizing a self
`energizing cup seal element system and openhole anchor.
`
`-
`
`-
`
`Ideal for low UCS rock formations and/or
`
`where hole geometry irregularity is expected
`and injection wells where thermal loading is
`expected
`
`an internal expansion joint.
`
`it may be used in either single or multiple
`packer installations as no mandrel
`movement occurs during setting, because of
`
`- The CZI incorporates the Petrowell ROk-
`ANkOR® system to anchor the packer in
`open hole.
`
`J?tf9W€"..
`19 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V Openhole Completion Systems
`
`
`
`
`
`penhole :
`';
`
`anchors
`
`Atool that is hydraulically actuated and holds on to the formation with slips
`preventing the liner from moving
`
`20 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`.- m w u |_
`
`-=-'_ilI -i—ifl_ -iI=IIiI -III_._
`I
`-
`I
`I -
`I
`I
`—
`fl
`I
`-
`I
`
`. '— m
`
`
`
`:'
`
`
`
`V Openhole Anchor — ROk ANkOR®
`
`
`
`Petrowell’s ROk—ANkOR is a patented slip system designed to
`secure a liner in the open hole section of a well. The limited
`penetration of slips while providing a large footprint minimizes
`any damage to the formation when set, but provides a stable
`platform to handle the load required.
`
`Features / Benefits
`
`
`
`' Anti-preset mechanism
`' Irregular hole compliance
`- Integrated centralization
`- Can be place anywhere in the completion
`- Multiple tools can be stacked for additional load carrying
`capabmfles
`
`Jaws"
`
`21 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V Openhole Completion Systems
`
`
`
`
`
`Openhole
`combination
`
`A packer that uses both a compression element and a swellable element.
`
`22 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V Openhole Combination Packer - ComboFrac
`
`
`
`The patent pending design of the ComboFrac provides a
`combination or “combo” of a conventional compression—set
`element as well as a conforming swellable elastomer.
`
`
`
`Features/Benefits
`
`- 10,000 psi ISO V5 tested
`- Five feet of effective seal area
`
`- Compression-set element for instant isolation and pressure
`integrity
`0 Swellable elastomer system for non-uniform, openhole
`environments
`
`- Interlock feature locks setting device during deployment
`- High-pressure differential capability required for frac
`stimulations
`
`Available in 4-1/2” x 6.25”
`23 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V Openhole Combination Packer - ComboFrac
`
`
`
`Step #1
`
`Step #1 - RIH - The interlock system eliminates chance of pre-set of the tool.
`Step #2 - Applied differential pressure at the packer unlocks the setting piston allowing the
`compression element to set. Force from the piston is applied to the compression element through a
`thin sleeve under the top swellable element.
`Step #3 - Compression element is set.
`Step #4 - Swellable element packs off against the wellbore using the well fluids to activate the
`24 of 53
`swellable elastomer.
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V Openhole Completion Systems
`
`
`
`
`
`
`
`Sliding sleeves
`
`Downhole tool that provides communication between the tubing/liner and
`open hole.
`
`25 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`v ZoneSelectT'V' Sleeves - Monobore
`
`
`
`The Monobore sleeve is designed to be open and closed with
`shifting tools rather than with a dropped ball. By utilizing shifting
`tools there is no restriction from the ball seats, thus eliminating the
`maximum number that can be run together.
`
`Features / Benefits
`
`- Any of the sliding sleeves can be closed and reopened with a
`
`conventional shifting tool through out the life ofthe well.
`' Optional composite cover over the ports protects the sleeve if it is
`cemented in place.
`
`i
`
`_ E
`I
`
`- Ability to stimulate many more zones than a ball seat system. Only
`limitation is the ability of coiled tubing to reach the sleeves in the toe.
`
`26 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V ZoneSeIectT'V' Sleeves - Monobore
`
`""--——_—
`
`‘—
`
`"
`
`"_ “
`
`RIH shown with optional composite cover
`
`
`
`III—IIIIEI—I-Iig-fll—
`
`- —-—— “a
`
`Sleeve open after fracing and composite cover is gone
`
`27 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
` v ZoneSelectT'V' Sleeves — SingleShot
`
`
`
`
`The SingleShot sliding sleeve is designed to open when a ball
`lands on the landing seat and tubing pressure is applied to shear it
`open. This process locks the sleeve in the open position, and
`cannot be re-closed. After the frac and clean-up, the ball seats and
`remaining balls are milled out to complete the process.
`
`Features / Benefits
`
`
`
`Ex. 2047
`IPR2016-01380
`
`- Maximizes flow area through the flow ports thus reducing erosion
`at the ports and providing more volume for stimulation
`- Simple operation
`- Optional composite cover over the ports protects the sleeve if it is
`cemented in place.
`
`
`
`28 of 53
`
`
`
`V ZoneSelectT'V' Sleeves — SingleShot
`
`II-II_IHI_li|II-I_IHI—
`
`29 of 53
`Sleeve open after fracing and seat milled out
`
`Ex. 2047
`IPR2016-01380
`
`
`
`v Why You Don’t Want to Set Your Shear Too Low
`
`
`
`Rate that Ball Seats will Shear with Flow Only
`
`80,000
`
`70,000
`
`60.000
`
`mD O C!0
`'
`
`40:000
`
`30,000
`
`
`
`
`
`AxialForcefromFlow(lb!)
`
`—1" Ball Seat
`
`---1.25 Ball Seat
`
`— 1.5 Ball Seat
`
`.
`
`3000 psi Shear
`
`2000 psi Shear
`
`1000 psi Shear
`
`10.000
`
`51 bbvmin
`
`41 bbllmin
`
`'
`
`‘J
`
`0
`
`10
`
`20
`
`30
`
`30 of 53
`40
`
`so
`
`00
`
`Ex. 2047
`IPR2016-01380
`
`
`
`.i.
`
`v ZoneSelectT'V' Sleeves — MultiShift
`
`_
`
`il
`
`I
`
`I
`
`I E
`
`l
`
`MultiShiftslidingsleeveisdesignedtoopenwhenaballlandson
`
`the landing seat in the tool and has the ability to be shifted
`multiple times closed or opened with a standard “B” shifting tool
`after the seat is milled out.
`
`Features/Benefits
`
`keep the impact of the ball from damaging the tool
`o Designed for vertical and horizontal wells
`- Maximizes flow area through the flow ports
`
`- Patentedshockabsorbersystemisincorporatedinthetoolto
`
`31 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V ZoneSelectT'V' Sleeves — MultiShift
`
`
`
`1..-
`
`I-II—IlslI-IllillI—l_l_l_-I
`
`J
`
`.
`
`RIH closed
`
`
`
`Ball shifts sleeve open and isolates lower wellbore
`
`I-II—II I—i“II—I—I-Im—
`
`Sleeve open after fracing and seat milled out
`
`
`
`Sleeve closed with B shifting tool
`32 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`v ZoneSelectT'V' Sleeves - Toe
`
`
`Weatherford’s toe sleeve is a differential opening sleeve that is
`typically placed at the bottom or “toe” of the completion and
`functions with the application of internal pressure.
`
`Features/Benefits
`
`- Opens with internal pressure
`' Designed for vertical and horizontal wells
`- Maximizes flow area through the flow ports
`' The inner sleeve shifts past the flow ports of outer body, thus
`no fracing through inner sleeve
`- Locked open, through tubing will not accidentally close the tool.
`
`
`
`33 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V ZoneSeIectTM Sleeves — Toe
`
`
`
`Differential pressure shears and pushes the insert down
`34 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`
`
`v ZoneSelectTIVI Fracturing System
`
`LirieF’rHla‘nger.r
`ac er
`
`,2”, 4-1/2”,
`gives the customer options to customize their multi-zone
`openhole frac for each zone.
`
`ROK ANKOR'”
`
`u
`
`Horizontal
`33” seat
`
`'-'\..\
`Po“
`Munomre 5'63“? M0
`_
`_
`SingleShot
`
`\ "ix?- Calllar
`Composite Cover
`MultIShllfl Sleeve
`Sleeve
`
`SingIeShol
`Sleeve
`
`Tee Sleeve
`
`
`
`,
`
`-
`
`:
`
`|
`Bungdgm HD
`Inflatable packer
`
`____ _____
`l
`
`_
`_
`GenISIs'”
`Swellable Packer
`
`.
`FraXsis‘"
`Swellable Packer
`
`ARES'" Packet
`
`Combol—"racTM
`Packer
`
`_J
`
`"
`
`.
`.
`Stlmulating the 4th zone
`
`' Minimizes the time and cost to complete multi-zone reservoir sections
`
`- Enables interventionless diversion of the fracture stimulation treatment and
`life—of—well zonal isolation capability
`
`- Modular design — designed to fit your well
`
`35 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`v ZoneSeleotTM System — Central Distribution in Fort
`
`Worth
`
`
`
`
`All ZoneSeIectjobs are staged out of
`this facility. This provides a consistent
`product since the same people
`assemble and test every tool.
`
`36 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`v ZoneSelectTM System — Engineered Composite Balls
`
`
`
`To address the high demands on the material, Weatherford has developed a proprietary
`material with outside vendors, that far exceeds the strength of our competitors.
`
`Frac Ball Comparision
`
`Specification
`
`37 of 53
`
`Ex. 2047
`IPR2016-01380
`
`l Weatherford
`
`E] Competition
`
`Flexural Strength Flexural Modulus Tensile Strength
`(psi)
`(ksi)
`(psi)
`
`Compressive
`Strength (psi)
`
`
`
`v ZoneSelectT'V' —Actual results on flowing back
`and milling using Engineered Composite Balls
`
`
`
`- Each of the 8 zones of the 4-1/2” tight gas well was stimulated with 100T of
`sand at a rate of 21 bpm. The balls were landed at 11 bpm.
`
`- The seats and remaining balls were milled out with 2-7/8” coil
`and a 94 mm Starcut mill.
`
`v
`-
`-
`-
`-
`-
`-
`-
`
`8465'
`9120'
`9776'
`10436’
`11100'
`11755’
`12411’
`13067'
`
`17 min —- 3.25” ball seat (3.50” ball flowed back)
`13 min — 3.03” ball seat (3.25” ball flowed back)
`12 min — 2.78” ball seat (3.00” ball flowed back)
`10 min — 2.53" ball seat (2.75” ball flowed back)
`10 min — 2.28" ball seat (2.50” ball flowed back)
`14 min — 2.03” ball seat (2.25” ball flowed back)
`29 min — 1.78” ball seat (2.00” ball remained)
`13 min — 1.53” ball seat (1.75” ball remained)
`
`where it seated 3 times
`
`
`~
`-
`35» ba“ _ you can see
`
`38 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V ZoneSeIectT'V' System - 21 Zones
`
`- We tested our engineered composite
`balls to determine the smallest bearing
`area we can efficiently use and still
`reliably hold 10,000 psi and still flow
`back.
`
`
`
`3.75” ball after holding 10,000 psi and
`pumping off seat at 640 psi.
`
`
`
`mm
`mum
`mm
`mmm
`mmm
`mmm
`“mm
`mm
`39 of 53
`——
`
`Ex. 2047
`IPR2016-01380
`
`-mm
`-mm
`_mm
`_mm
`-m
`
`mm-
`—m
`
`m
`mm
`mm
`
`
`
`4v—
`
`ZoneSelectT'V' Monobore Frac System
`
`40 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`v ZoneSelectT'VI Monobore Frac System
`
`
`Each zone is isolated with cement instead of openhole
`packers.
`
`Substantially reduces the operational time normally
`required to stimulate multiple zones
`
`Each zone can be stimulated
`
`A composite skin covers the ports to keep free of cement.
`
`A garage is used to reduce the possibility of sand in the
`HWB shifting tool
`
`
`
`Once the liner hanger is set, the cement is pumped
`through the tubing out the shoe. The wiper plugs
`used during cementing will not open the sleeves
`since all sleeves move down to close. Two hydraulic
`Weatherford (HWB) shifting tools are utilized to
`selectively open and close the sleeves before and
`after the fractures.
`41 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`v ZoneSelectT'V' Monobore Frac System
`Operational Sequence
`
`Run in the lower completion string. set the liner hanger, and pump the cement.
`.
`Cement
`
`ZoneSeIem Frac Sliding Sleeve: the wrper plug WI“
`not open the sleeve as it passes. since it is down In
`
`LinerHanger :
`
`I
`
`“‘4
`
`/ wage!
`
`
`
`—' L. _—-x——"-"__.
`
`h” -
`
`'__I-:—.'—'—''
`
`After the plug is bumped set the liner hanger packer.
`
`—-_—‘
`
`
`
`After the cement is set‘ open the lowest ZoneSelect Frac Sliding Sleeve with the HWB shifting tool.
`HWB Shining tool facing down
`
`HWB shifting tool facing up
`
`
`
`
`
`HWB "garag a"
`
`42 of 53
`
`When pumping is stopped on the coiled
`tubing the keys of the HWB shifting tool
`collapse. The shifting tool is pulled into a
`“garage” above the Liner Hanger.
`Typically the "garage" is installed in the
`vertical section of the well to help minimize
`cement and proppant from collecting in the
`larger ID‘
`
`Ex. 2047
`IPR2016-01380
`
`
`
`v ZoneSeIectT'V' Monobore Frac System
`Operational Sequence
`
`After the shifting tool is “parked”. the frac is pumped into the open zone
`
`Open the next zone's ZoneSelect Frac Sliding Sleeve with the HWB shifting tool and repeat the process until all zones are traced and closed
`_-__A
`
` I
`
`__ __ ouch
`
`I
`
`.
`
`_v
`
`Once the Fracing is done on all zones open the ZoneSelect Frac sleeves with the HWB shifting tool. The well can now be produced.
`zone ever needs to be closed the the HWB shifting tool can close that zone’s respective ZoneSelect Frac sliding sleeve.
`
`If any
`
`
`
`43 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`4v—
`
`ZoneSelectT'V' SingleShot Frac System
`
`44 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`v ZoneSeIectTM SingIeShot Frac System
`
`
`
`Allows multiple stimulations (acid or proppant) to be
`performed in a single trip without thru-tubing
`intervention.
`
`Saves the operator valuable time and money
`The sleeves are a one-time open only device.
`
`Ball seats are designed so the ball seals but doesn’t get
`stuck, so it can be flowed (produced) out.
`
`Substantially reduces the operations time normally
`required to stimulate multiple zones
`
`Each zone can be stimulated to meet its own requirements
`
`A composite skin covers the ports to keep free of debris.
`
`-
`-
`
`'
`
`-
`
`-
`
`-
`
`-
`
`
`
`Quick milling of seats
`
`45 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`v ZoneSelectT'V' SingleShot Frac System
`Operational Sequence
`
`Run-in string, set the liner hanger or packer and the open-hole packers
`Liner Hanger if Packer
`
`ZoneSelect‘“ SS sliding sleeve
`
`opemhole Packer
`
`Zone-Select toe sleeve
`
`4" -
`
`..
`
`' +'nh—-
`
`H _.
`
`' H'Th—I
`
`_
`
`_"— 'l'hI'
`
`‘W'
`
`Start pumping the frac, hydraulically open the ZoneSelect toe sleeve
`
`
`
`WI
`
`‘
`
`"“r— -
`
`-
`
`-—I-'
`
`"*‘d—
`
`.
`
`.
`
`Continue pumping the frac. drop the smallest ball to seat in the lowest ZoneSelect SS sliding sleeve and hydraulically open the sleeve.
`
`
`
`«w v
`
`
`
`
`#-
`
`Drop the next-Iargest ball to seat in the next ZoneSeiect‘ SS sliding sleeve isolating the wellbore below and hydraulically opening the sleeve.
`
`
`
`46 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`v ZoneSeIectT'V' SingleShot Frac System
`Operational Sequence
`
`rop the last ball and complete the frac job.
`
`
`
`47 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`4v—
`
`ZoneSelectT'V' MultiShift Frac System
`
`48 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`v ZoneSelectT'V' MultiShift Frac System
`
`
`
`Allows multiple stimulations (acid or proppant) to be
`performed in a single trip without thru-tubing intervention.
`
`°
`
`Saves the operator valuable time and money
`
`
`
`Patented shock absorber to minimize the damage from a
`ball seating at too high of a rate
`
`Ball seats are designed so the ball seals but doesn’t get
`stuck, so it can be flowed (produced) out
`
`Substantially reduces the operations time normally required
`to stimulate multiple zones
`
`A composite skin covers the ports to keep free of debris
`
`Quick milling of seats
`
`-
`
`°
`
`49 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`v ZoneSeIectTIVI MultiShift Frac System
`Operational Sequence
`
`Run-in string, set the Packer, and inflate the open hole packers
`
`Zone Select Sliding
`
`Packer —\
`A
`— ““I
`
`l" H
`
`'
`
`.—
`
`ll. H
`
`Sleevy
`.
`.
`
`OpEnholePacker:
`
`ZoneSeleclToeSleeve
`Il\
`_
`
`Start pumping the frac, hydraulically open the ZoneSelect Toe Sleeve
`
`
`
`Continue pumping the frac, drop the smallest ball to seat on the lowest ZoneSelect Sliding Sleeve and hydraulically open it.
`
`a.
`HA; JVLTKA.
`445. H,
`‘
`54-;
`I‘li‘lW'
`
`‘
`
`Drop the next size larger ball, to seat in the next ZoneSelect Sliding Sleeve and hydraulically open it.
`
`_
`
`“hi—i—
`
`‘
`
`50 of 53
`
`i
`
`Ex. 2047
`IPR2016-01380
`
`
`
`v ZoneSelectTIVI MultiShift Frac System
`Operational Sequence
`
`Drop the last ball and complete the frac job.
`
`
`
`Mill-out any balls that remain and all ball seats
`
`-._.
`
`a.
`.h
`m _
`‘fi
`
`
`‘
`
`If any zone needs to be isolated a shifting tool can close any of the ZoneSelect Sliding Sleeves.
`Produce the well.
`Sleeve needs to be closed then a bridge plug can be set just above it in the blank pipe.
`
`1f the ZoneSelect Toe
`
`
`
`51 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`v ZoneSelectT'VI System — Cluster Completion
`
` -
`
`Patent pending
`
`- One ball size opens up to 5 sleeves (cluster) at a time
`
`-
`
`-
`
`-
`
`All 5 in a cluster are frac'd at the same time
`
`The ports can be sized so the frac is distributed properly
`across the cluster.
`
`Since the ID has limited restrictions then there is no need
`
`to mill out seats.
`
`
`
`52 of 53
`
`Ex. 2047
`IPR2016-01380
`
`
`
`V Openhole Completion Systems
`
`
`
`“Providing modular systems
`for isolation and
`
`communication in the open
`
`hole”
`
`53 of 53
`
`Ex. 2047
`IPR2016-01380
`
`