throbber
Withdrawn
`
`5/8/2006Noted
`
`5/8/2006Noted
`
`Decision
`Discussion/
`Discussion
`
`Disucssion
`
`7
`
`7
`
`7
`
`Page 1
`
`Nokia
`Nokia
`Nokia
`
`HSDPA MIMO system performance results
`receiver
`D-TxAA and PARC performance comparison with LMMSE
`
`R1-061121Way forward for Rel-7 MIMO
`R1-061120
`R1-061119
`
`Yes
`Yes
`
`5/12/2006After the disuccsion on the reflector,
`
`revised in R1-061646
`
`5/11/2006Noted
`
`R1-061646
`
`Approval
`
`11.8
`
`5/10/2006Endorsed as v1.3.0 in R1-061582
`
`5/8/2006Noted
`5/8/2006Approved in R1-061642
`
` = R2-061101
`
`Approval
`
`Incoming LS
`
`Approval
`
`11
`
`3
`
`4
`
`Decision
`
`11
`
`5/10/2006noted
`
`(R1-061107)
`
`5/9/2006Noted
`
`Not treated
`
`5/10/2006Noted
`
`Not treated
`
`Withdrawn
`
`Decision
`
`11
`
`Decision
`Discussion/
`Decision
`Discussion/
`Information
`Decision
`Discussion/
`
`Discussion
`
`11.1.3
`
`11.1.2
`11.6.2
`11.1.2
`
`11.6.2
`
`Discussion
`
`11.6.2
`
`Revised in R1-061118
`5/8/2006Approved in R1-061641
`5/8/2006Approved
`
`R1-061118
`
`Conclusion/Decision
`
` Treated
`
`Date
`
`Rrevised to
`
`(from)
`
`Siemens
`Nortel, Samsung,
`Motorola, Nokia,
`Qualcomm,
`Mobile, Ericsson,
`Orange, TIM, T-
`DoCoMo,
`Vodafone,
`
`E-UTRA Physical Layer Framework for Evaluation
`
`R1-061107
`
`Yes
`
`Approval
`Decision
`
`Type
`
`
`
`23
`
`MCC Support
`RAN1 Chairman
`
`Agenda
`
`Item
`
`Source
`
`Draft Report from RAN1#44bis Meeting
`Draft Agenda for RAN1#45
`
`Title
`
`R1-061106
`R1-061105
`Number
`Tdoc
`
`Yes
`Yes
`
`Available
`
`R1 #45 (May2006)
`
`List of WG1 Temporary Documents
`(Layer 1)
`3GPP TSG RAN Working Group 1
`
`Cingular
`Siemens,
`Nortel, Samsung,
`Motorola, Nokia,
`Qualcomm,
`Ericsson,
`Italia, T-Mobile,
`Orange,Telecom
`DoCoMo,
`Vodafone,
`
`ETRI
`
`ETRI
`Panasonic
`Panasonic
`Electric
`Mitsubishi
`Electric
`Mitsubishi
`NTT DoCoMo
`DoCoMo
`
`Motorola
`RAN WG2,
`MCC Support
`
`Spectrum Efficiency
`Downlink System Evaluation Results -User Throughput,
`25.912, Chapter 7
`Text proposals on LTE Physical Layer Description for TR
`TR25.814 v.1.2.3 Physical Layer Aspects for Evolved UTRAEditor, NTT
`(To: RAN1, RAN4)
`LS on UE measurement and reception capabilities for LTE
`Draft Report from RAN1/RAN2 Joint Meeting in Athens
`
`R1-061112
`
`R1-061111
`
`R1-061110
`
`R1-061109
`R1-061108
`
`E-UTRA Physical Layer Framework for Evaluation
`
`R1-061118
`
`Yes
`
`EUTRA Cell Search
`Comparison of One-SCH and Two-SCH Schemes for
`Diversity for Random Access
`System level simulation result on SC-FDMA
`Random access design for E-UTRA uplink
`
`R1-061117
`
`R1-061116
`R1-061115
`R1-061114
`
`R1-061113Ordered transmission scheme for LDPC-coded symbols
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`
`ZTE/HTC
`Exhibit 1024-0001
`
`

`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`5/8/2006Agreed
`
`Not treated
`
`Not treated
`
`Not treated
`
`5/8/2006TP was not agreed.
`
`5/8/2006TP was not agreed.
`
`5/8/2006Noted
`
`Not treated
`Not treated
`
`5/9/2006Noted
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`5/9/2006Noted
`
`Not treated
`
`5/9/2006Noted
`
`5/9/2006Noted
`
`Not treated
`
`Not treated
`
`Not treated
`
`Discussion
`
`Discussion
`
`Decision
`Discussion/
`
`11.1.5
`
`Discussion
`
`11.1.3
`
`Decision
`Discussion/
`
`Decision
`Decision
`Discussion/
`
`Disucssion
`
`Decision
`Discussion/
`
`Decision
`
`Decision
`
`Decision
`
`Decision
`Discussion/
`Discussion
`
`Discussion
`
`11.1.3
`
`5.4
`
`11.3.4
`
`11.1.2
`
`11.1.3
`
`6.1
`
`6.1
`
`6.1
`
`11.1.1
`11.1.3
`11.6.3
`
`Discussion
`
`11.6.2
`
`Discussion
`
`11.6.5
`
`Discussion
`
`11.6.2
`
`Decision
`Discussion/
`
`Discussion
`
`Discussion
`
`Discussion
`
`Proposal
`
`Text
`
`Proposal
`
`Text
`
`Proposal
`
`Text
`
`Decision
`Discussion/
`Decision
`Discussion/
`
`11.6.2
`
`11.6.5
`11.6.2
`11.6.2
`
`11.2.3
`
`11.3.1
`
`11.6.2
`
`11.2.3
`
`11.2.3
`
`11.2.3
`
`11.2.3
`
`Sharp
`Sharp
`Ltd
`HighDimention
`Ltd
`HighDimention
`Ltd
`HighDimention
`Ltd
`HighDimention
`Ltd, CCL/ITRI
`HighDimention
`Intel Corporation
`Intel Corporation
`Intel Corporation
`
`Intel Corporation
`
`Intel Corporation
`
`Alcatel
`
`R1 #45 (May2006)
`
`Alcatel
`
`Siemens
`(CHTTL)
`Laboratories
`Telecom
`Chunghwa
`(CHTTL)
`Laboratories
`Telecom
`Chunghwa
`(CHTTL)
`Laboratories
`Telecom
`Chunghwa
`(CHTTL)
`Laboratories
`Telecom
`Chunghwa
`Panasonic
`SHRCWC, RITT
`
`Page 2
`
`SHRCWC, RITT
`
`SHRCWC, RITT
`
`ZTE
`
`ZTE
`
`Reconfiguration of EUDCH
`Solution to mitigate the ACK/NACK misinterpretation
`Access
`Performance of Transmit Antenna Switch for Random
`Cell Search and TP
`Consideration on Multi-cell Interference for SCH Design in
`Uplink
`Enhanced uplink power control for 1.28Mcps TDD Enhanced
`Enhanced Uplink
`Random access physical channel for 1.28Mcps TDD
`Random access control for 1.28Mcps TDD Enhanced UplinkZTE
`
`BCH Simulation Results for Capacity Estimation
`
`R1-061148
`
`Yes
`
`E-UTRA Downlink
`System Evaluation of Intra-Cell Macro Diversity Schemes for
`
`R1-061147
`
`Yes
`
`Schemes
`Impact of Mobility on the Performance of LTE MIMO
`
`R1-061146
`
`Yes
`
`Aspects of Cell Search for E-UTRA Downlink
`
`R1-061145
`
`Yes
`
`UTRA
`Three-Step Initial Cell Search and System Acquisition for E-
`
`R1-061144
`
`Yes
`
`Schemes
`Stem-level Evaluation of Open-loop Transmit Diversity
`System-level Evaluation of MIMO with Unitary Precoding
`precoded MIMO
`Comparison between single and multiple codewords for
`Scalable precoding and implementation complexities
`systems
`Text proposal for modulation and power adaptation of MIMO
`Text proposal for reference signal design in Downlink MIMOIntel Corporation
`the PAPR of the SC-FDMA in E-UTRA Uplink
`Effect of different ST/SF coding and mapping schemes on
`Uplink
`Performance evaluation of STBC/SFBC schemes in E-UTRA
`
`UE Identity in L1/L2 Downlink Control Signalling
`Cell Search Scheme in E-UTRA Downlink
`layer perspective
`Security and service differentiation in MBMS from physical
`bits removal
`System performance impact of release 6 turbo coding tail-
`in channel coding
`Implementation complexity and power consumption concerns
`backward compatiblility and secure trasmission
`A simple inter-block permutation in channel coding to provide
`iterations of release 6 turbo coding
`
`R1-061130Modify puncturing pattern to improve performance and
`R1-061129
`R1-061128
`R1-061127
`
`R1-061143
`R1-061142
`
`R1-061141
`
`R1-061140
`
`R1-061139
`
`R1-061138
`
`R1-061137
`
`R1-061136
`R1-061135
`R1-061134
`
`R1-061133
`
`R1-061132
`
`R1-061131
`
`R1-061126
`
`R1-061125
`
`R1-061124
`
`R1-061123
`
`R1-061122
`
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`ZTE/HTC
`Exhibit 1024-0002
`
`

`
`5/8/2006Noted
`5/10/2006Noted
`
`Not treated. Revised in R1-051543
`
`5/9/2006Noted
`
`R1-061543
`
`Decision
`Discussion/
`Discussion
`
`Decision
`
`7
`
`11.2.1
`11.2.1
`
`11.2.3
`
`11.2.3
`
`11.2.3
`
`Not treated
`Not treated
`Not treated
`
`Not treated
`Not treated
`
`Not treated
`Revised in R1-061626
`
`Revised in R1-061550
`
`Not treated
`Not treated
`
`5/9/2006Noted
`
`Not treated
`Not treated
`
`5/9/2006Noted
`
`Not treated
`Not treated
`Not treated
`Not treated
`
`Not treated
`
`5/10/2006Noted
`
`Not treated
`Not treated
`
`5/8/2006Noted
`
`Not treated
`
`Not treated
`Not treated
`
`5/9/2006Noted
`
`Not treated
`
`Discussion
`Decision
`Discussion/
`Proposal
`
`Proposal
`
`Text
`
`Text
`
`R1-061626
`
`R1-061550
`
`Dicussion
`
`Decision
`Discussion/
`Proposal
`
`Text
`
`Decision
`Discussion/
`Proposal
`
`Text
`
`Decision
`Discussion/
`Decision
`Discussion/
`
`Text
`
`Decision
`Discussion/
`Discussion
`Discussion
`Decision
`Discussion/
`Discussion
`Discussion
`Decision
`Discussion/
`Proposal
`
`Decision
`
`11.5
`
`Discussion
`
`Discussion
`
`Decision
`Decision
`Decision
`Discussion/
`
`Discussion
`
`Decision
`Discussion/
`Proposal
`
`Text
`
`Decision
`Discussion/
`
`4
`
`11.6.2
`11.2.2
`11.1.2
`11.2.1
`
`11.6.2
`
`11.6.2
`
`11.1.2
`11.1.2
`11.1.2
`11.1.1
`11.1.1
`11.1.1
`11.6.2
`11.2.3
`11.1.3
`11.1.2
`
`11.6.2
`
`11.2.3
`11.2.1
`
`11.2.1
`
`11.1.5
`
`11.1.5
`11.1.5
`
`Page 3
`
`NTT DoCoMo
`RITT, Huawei
`RITT, Huawei
`Motorola
`Motorola
`
`Motorola
`Motorola
`DoCoMo
`Motorola, NTT
`Motorola
`
`Motorola
`
`Motorola
`
`Motorola
`
`LG Electronics
`
`LG Electronics
`
`LG Electronics
`LG Electronics
`LG Electronics
`Electric
`Mitsubishi
`Philips
`
`Philips
`Intel Corporation
`
`11.2.3
`
`R1 #45 (May2006)
`
`Intel Corporation
`
`Interference-aware MIMO feedback: A Text Proposal
`discussion on control information
`mapping rules for distributed mode users in E-UTRA, with
`Text Proposal for downlink OFDMA resource allocation and
`
`R1-061151MIMO resource definition for E-UTRA
`R1-061150
`
`R1-061149
`
`Yes
`
`LTE Downlink System Performance Evaluation Results
`and TP
`LTE Uplink System Performance and comparison to HSUPA
`Preamble Sequence Design for Random Access of E-UTRAMotorola
`Motorola
`Synchronized Random Access Channel Design
`Motorola
`Random Access Payload Size
`Channels
`Motorola
`Downlink Acknowledgement and Group Transmit Indicator
`Motorola
`Downlink Control Channel Modulation and Coding
`Motorola
`Downlink Control Channel Coding
`ITRI
`Improving Spectral Efficiency by Dispersive Coding
`LG Electronics
`TP on localized and distributed SC-FDMA
`TD Tech
`Cell search and identification of Cell ID for EUTRA TDD
`TD Tech
`Random access preamble design for EUTRA TDD
`scheduling
`TP on simulation results for uplink fast frequency domain
`scheduling
`Simulation results for uplink fast frequency domain
`FDMA
`Performance comparison of localized and distributed SC-
`Uplink reference signal for channel quality measurement
`Discussion and draft answers on LS R1-061109
`Uplink Reference Signal Design Based on TTI Grouping
`Downlink
`Simulation Results of Coded MIMO-OFDM for E-UTRA
`
`R1-061172
`R1-061171Overhead Analysis and Resource Assignment for Uplink CQI
`R1-061170
`
`Investigation on Throughput Improvement by Rel. 7 MIMO
`System Simulation Results for the LTE Uplink
`performance and TP
`Combination of ICI cancellation and coordination:
`Summary of RACH e-mail reflector discussion
`TP
`E-UTRA SC-FDMA Uplink Pilot/Reference Signal Design &
`Text proposal for direct channel feedback in EUTRA
`Text proposal for uplink sounding in EUTRA
`Rules TP
`EUTRA Downlink Distributed Multiplexing and Mapping
`EUTRA Uplink Control Signaling + TP
`Feedback Channel and TP
`
`R1-061180
`R1-061179
`R1-061178
`R1-061177
`R1-061176
`
`R1-061175
`R1-061174
`
`R1-061173
`
`R1-061169
`
`R1-061168
`R1-061167
`R1-061166
`R1-061165
`R1-061164
`R1-061163
`R1-061162
`R1-061161
`R1-061160
`R1-061159
`
`R1-061158
`
`R1-061157
`
`R1-061156
`R1-061155
`R1-061154
`R1-061153
`
`R1-061152
`
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`Yes
`
`ZTE/HTC
`Exhibit 1024-0003
`
`

`
`Decision
`Discussion/
`
`11.1.5
`
`Not treated
`
`Noted
`
`Not treated
`
`Decision
`Discussion/
`
`Decision
`Discussion/
`Decision
`Discussion/
`
`5/9/2006Noted
`
`Not treated
`
`5/9/2006Agreed
`
`(R1-060781)
`
`(R1-060042)
`
`Decision
`Discussion/
`Decision
`Discussion/
`Proposal
`
`Text
`
`11.1.5
`
`11.1.4
`
`11.1.3
`
`11.1.3
`
`11.1.3
`
`11.1.3
`
`5/9/2006Noted
`
`Not treated
`
`(R1-060320)
`
`Not treated
`
`(R1-060305)
`
`5/9/2006Noted
`
`(R1-060032)
`
`Decision
`Discussion/
`
`11.1.2
`
`Decision
`Discussion/
`
`11.1.1
`
`Decision
`Discussion/
`
`11.1.1
`
`Decision
`Discussion/
`
`11.1.1
`
`R1 #45 (May2006)
`
`Page 4
`NTT DoCoMo
`Corporation
`Sharp, Toshiba
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`Corporation
`Sharp, Toshiba
`Panasonic,
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`NTT DoCoMo
`Corporation
`Toshiba
`Panasonic,
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`NTT DoCoMo
`
`NTT DoCoMo
`Corporation
`Sharp, Toshiba
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`Corporation
`Sharp, Toshiba
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`Corporation
`Sharp, Toshiba
`Panasonic,
`Nokia,
`Motorola, NEC,
`Electric,
`Mitsubishi
`Ericsson, Fujitsu,
`NTT DoCoMo,
`Corporation
`Sharp, Toshiba
`Panasonic,
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`
`Reference Signal Structure for Uplink MIMO in E-UTRA
`
`R1-061191
`
`Yes
`
`R1-061190MIMO Scheme in E-UTRA Downlink - Signaling Aspect
`
`Yes
`
`MBMS in E-UTRA Downlink
`Investigations on Cell-Common Pilot Channel Structure for
`
`R1-061189
`
`Yes
`
`Mode in E-UTRA Downlink
`Neighboring Cell Search Method for Connected and Idle
`
`R1-061188
`
`Yes
`
`in E-UTRA Downlink
`SCH-Replica Based and Auto-Correlation Based Detections
`Comparison on Cell Search Time Performance between
`
`R1-061187
`
`Yes
`
`Downlink
`SCH Structure and Cell Search Method for E-UTRA
`Text Proposal on Cell Search Proposal
`
`R1-061186
`
`R1-061185
`
`Yes
`
`Yes
`
`Random Access Channel Structure for E-UTRA Uplink
`
`R1-061184
`
`Yes
`
`L1/L2 Control Channel Structure for E-UTRA Uplink
`
`R1-061183
`
`Yes
`
`E-UTRA Downlink
`Distributed FDMA Transmission for Shared Data Channel in
`
`R1-061182
`
`Yes
`
`L1/L2 Control Channel Structure for E-UTRA Downlink
`
`R1-061181
`
`Yes
`
`ZTE/HTC
`Exhibit 1024-0004
`
`

`
`Not treated
`
`(R1-060037)
`
`Not treated
`
`Not treated
`
`Not treated
`
`Decision
`Discussion/
`
`Decision
`Discussion/
`
`Decision
`Discussion/
`
`Decision
`Discussion/
`
`Not treated
`
`(R1-060050)
`
`Proposal
`
`Text
`
`5/9/2006Noted
`
`(R1-060307)
`
`Decision
`Discussion/
`
`Not treated
`
`(R1-060306)
`
`Decision
`Discussion/
`
`Not treated
`
`Not treated
`
`Not treated
`
`(R1-060300)
`
`(R1-060991)
`
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`
`11.3.2
`
`11.3.1
`
`11.2.3
`
`11.2.3
`
`11.2.3
`
`11.2.3
`
`Corporation
`Toshiba
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`Corporation
`Sharp, Toshiba
`Electric, NEC,
`Mitsubishi
`NTT DoCoMo,
`Corporation
` Toshiba
`Sharp,
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`Corporation
`Sharp, Toshiba
`Panasonic,
`Electric, NEC,
`Mitsubishi
`Ericsson, Fujitsu,
` NTT DoCoMo,
`
`Corporation
`Sharp, Toshiba
`Panasonic,
`Electric, NEC,
`Mitsubishi
`Ericsson, Fujitsu,
`NTT DoCoMo,
`
`Sharp
`Panasonic,
`Electric, NEC,
`Mitsubishi
`Ericsson, Fujitsu,
`NTT DoCoMo,
`
`11.2.1
`
`NTT DoCoMo
`
`Page 5
`
`11
`
`Corporation
`Toshiba
`NEC, Sharp,
`NTT DoCoMo,
`
`Code for Shared Data Channel in E-UTRA Downlink
`Performance Comparison between Turbo Code and LDPC
`
`R1-061201
`
`Yes
`
`11.3.4
`
`NTT DoCoMo
`
`and Synchronous Hybrid ARQ for E-UTRA Downlink
`Comparison of Signaling Overhead between Asynchronous
`
`R1-061200
`
`Yes
`
`Paging Channel Structure for E-UTRA Downlink
`
`R1-061199
`
`Yes
`
`Broadcast Channel Structure for E-UTRA Downlink
`
`R1-061198
`
`Yes
`
`Channel in E-UTRA Uplink
`TP on Fast Transmission Power Control for L1/L2 Control
`
`R1-061197
`
`Yes
`
`Downlink
`Link Adaptation Scheme for MIMO Transmission in E-UTRA
`
`R1-061196
`
`Yes
`
`E-UTRA Downlink
`Link Adaptation Scheme for Single-antenna Transmission in
`
`R1-061195
`
`Yes
`
`11.1.5
`
`R1 #45 (May2006)
`
`Channel Dependent Scheduling with Cyclic Delay DiversityNTT DoCoMo
`
`R1-061194Orthogonal Reference Signal Structure for Sectored Beams
`
`in E-UTRA Downlink
`
`R1-061193Multiplexing Method for Orthogonal Reference signals for E-
`R1-061192
`
`UTRA Uplink
`
`Yes
`
`Yes
`
`Yes
`
`ZTE/HTC
`Exhibit 1024-0005
`
`

`
`5/8/2006Agreed
`5/8/2006Noted
`
`5/8/2006Agreed.
`
`5/8/2006Agreed.
`
`5/8/2006Agreed
`
`5/8/2006Agreed
`
`5/8/2006Agreed
`
`Withdrawn
`
`Not treated, Revised in R1-061583
`
`R1-061583
`
`5/10/2006Noted
`
`Withdrawn
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`5/9/2006Noted
`5/10/2006Noted
`
`Not treated
`
`5/8/2006Noted
`5/8/2006Noted
`
`Decision
`Discussion/
`Discussion
`Decision
`Discussion/
`
`Decision
`
`Decision
`
`CR
`
`CR
`
`Decision
`Discussion/
`
`Decision
`
`Discussion
`
`Proposal
`
`Text
`
`Discussion
`
`Decision
`Discussion/
`
`Decision
`Discussion/
`
`Decision
`Discussion/
`Decision
`Discussion/
`Discussion
`Decision
`Discussion/
`
`Discussion
`
`Discussion
`
`Not treated
`
`(R1-060993)
`
`Decision
`Discussion/
`
`Not treated
`
`(R1-060787)
`
`Decision
`Discussion/
`
`Not treated
`
`(R1-060044)
`
`Decision
`Discussion/
`
`6.1
`6.1
`6.1
`
`6.1
`
`6.1
`
`5.4
`
`5.4
`
`11.5
`
`7
`
`7
`
`11
`
`11
`
`11
`
`Page 6
`
`CATT
`CATT
`CATT
`
`CATT
`
`CATT
`
`11.1.4
`
`11.1.5
`
`11.3.4
`
`11.6.2
`
`11.1.5
`
`11.1.5
`
`11.1.5
`
`11.1.5
`11.6.1
`11.2.3
`
`CATT
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Semiconductor
`Freescale
`Motorola
`Motorola
`
`R1 #45 (May2006)
`
`Motorola
`Motorola
`Corporation
`Toshiba
`NEC, Sharp,
`NTT DoCoMo,
`Corporation
`Toshiba
`Sharp,
`Electric, NEC,
`Mitsubishi
`Fujitsu,
`NTT DoCoMo,
`Corporation
`Sharp, Toshiba
`Electric, NEC,
`Mitsubishi
`Ericsson, Fujitsu,
`NTT DoCoMo,
`
`R1-061224Modulation for 1.28Mcps TDD Enhanced Uplink
`R1-061223
`R1-061222
`
`R1-061221
`
`R1-061220
`
`R1-061219
`
`R1-061218
`
`R1-061217
`
`R1-061216
`
`R1-061215
`
`R1-061214
`
`R1-061213
`
`R1-061212
`
`R1-061210
`
`R1-061209
`R1-061208
`R1-061207
`
`R1-061211
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`Yes
`
`HARQ schemes for 1.28Mcps TDD Enhanced Uplink
`Proposal for TR 25.XXX
`Support for Node-B Controlled Uplink Scheduling and Text
`TDD Enhanced Uplink
`Text Proposal for basic physical layer structure for 1.28Mcps
`Draft TR Physical Layer Aspects for 1.28Mcps TDD HSUPACATT
`TDD TA"
`25.225 CR0081 (Rel-7, A)"Clarify the reference point for LCR
`TDD TA"
`25.225 CR0080 (Rel-6, F)"Clarify the reference point for LCR
`structures and text proposal
`Evaluation of E-MBMS MIMO reference-signal
`reference-signal structures and text proposal
`Evaluation of E-UTRA downlink MIMO
`HARQ for Uplink SC-FDMA
`System Level Evaluation of Synchronous and Asynchronous
`Text proposal on carrier mapping for Uplink SC-FDMA
`mapping for Uplink SC-FDMA
`System Level Evaluation of localized and distributed carrier
`Downlink MIMO
`Evaluation of Synchronous and Asynchronous HARQ for
`proposal
`MIMO schemes with four transmit antennas and text
`Evaluation of Antenna Selection for Downlink Open loop
`MIMO and text proposal
`Evaluation of EUTRA schemes for Downlink Open loop
`EUTRA Downlink MIMO and text proposal
`Evaluation of localized and distributed carrier mappings for
`Peak Rate with Precoded MIMO in E-UTRA
`(with TP)
`Interference and Open Loop Transmit Diversity Reception
`Microcells
`D-TxAA, PARC, and Single Antenna Systems in Urban
`
`R1-061206
`R1-061205W-CDMA MIMO with FTP Traffic
`
`Spread OFDM based SC-FDMA in Uplink
`Investigations on Adaptive Control of Roll-off Factor for DFT-
`
`R1-061204
`
`Yes
`
`Measurement for E-UTRA Uplink
`Adaptive Transmission Bandwidth of Pilot Channel for CQI
`Frequency Domain Channel-Dependent Scheduling with
`
`R1-061203
`
`Yes
`
`UE Capability in E-UTRA Downlink
`
`R1-061202
`
`Yes
`
`ZTE/HTC
`Exhibit 1024-0006
`
`

`
`Not treated
`Not treated
`Not treated
`Not treated
`
`5/8/2006Rejected
`
`5/8/2006Agreed that that SF/2 method is not
`
`supported for E-DCH
`
`5/8/2006Rejected
`
`Not treated
`Not treated
`Not treated
`
`Not treated
`Not treated
`
`5/9/2006Noted
`
`Not treated
`Not treated
`Not treated
`Not treated
`
`Not treated
`
`Revised in R1-061555
`Withdrawn
`Not treated
`
`Not treated
`
`5/10/2006Noted
`5/11/2006Noted
`
`5/11/2006Revised in R1-061620
`
`(R1-061555)
`
`(R1-060802)
`
`Not treated
`Not treated
`
`Not treated
`
`5/10/2006Revised in R1-061605
`
`R1-061605
`
`5/9/2006Noted
`
`Not treated
`
`Not treated
`
`5/9/2006Noted
`
`Withdrawn
`Withdrawn
`
`Decision
`Discussion/
`Decision
`Discussion/
`Proposal
`
`Text
`
`Discussion
`
`CR
`
`CR
`
`Discussion
`
`5.4
`
`Proposal
`
`Text
`
`Proposal
`
`Proposal
`
`Text
`
`Text
`
`Decision
`Discussion/
`Discussion
`Decision
`Discussion/
`
`Discussion
`
`Discussion
`Discussion
`Discussion
`
`Discussion
`
`Proposal
`
`Text
`
`Discussion
`Disucssion
`Decision
`Discussion/
`Decision
`Discussion
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`
`Discussion
`
`Proposal
`
`Text
`
`Discussion
`
`Proposal
`
`Text
`
`Discussion
`
`Discussion
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`
`6.1
`6.1
`
`11.1.2
`11.2.3
`11.1.1
`11.1.1
`
`5.4
`
`5.4
`
`11.2.3
`11.2.3
`11.2.3
`
`11.1.5
`11.1.5
`11.1.3
`
`11.1.2
`11.1.1
`11.1.5
`11.3.2
`11.6.2
`
`11.7.6
`11.1.1
`11.2.1
`11.5
`11.6.2
`11.1.3
`11.6.5
`11.2.1
`11.3.4
`
`11.1.5
`
`11.5
`
`11.1.5
`
`11.5
`
`11.1.5
`11.1.2
`11.1.2
`
`Page 7
`
`ZTE
`ZTE
`ZTE
`ZTE
`ZTE
`
`ZTE
`
`ZTE
`
`Huawei
`Huawei
`Huawei
`
`Huawei
`Huawei
`Huawei
`
`Huawei
`Huawei
`Nokia
`Nokia
`Nokia
`
`Nokia
`Nokia
`Nokia
`Nokia
`Nokia
`Nokia
`Nokia
`Nortel
`Nortel
`
`Nortel
`
`Nortel
`
`Nortel
`
`Nortel
`
`PCH and Paging indicator presence on LTE Layer 1
`and coverage
`Impact of DL control signaling overhead on LTE throughput
`aspects
`Text proposal for synchronisation aspects for TR 25.912, L1
`DL control signaling for LTE
`UL reference signal structure and text proposal
`Further evaluation results for SC-FDMA
`LTE Evaluation results
`LTE Cell Search
`Fulfilment of LTE Complexity Requirements, L1 aspects
`Uplink Adaptive Transmission with TP
`STBC-HARQ for UMTS LTE Downlink MIMO with TP
`MIMO systems for LTE
`the presence of Inter-cell/sector interference in Downlink
`Performance evaluation of STTD and cyclic shift diversity in
`MIMO
`Text Proposal for System level simulation for UL virtual
`Performance Evaluation for E-UTRA UL
`SC-FDMA based Multi-user MIMO System Level
`for E-UTRA
`Text Proposal for System Performance of DL Adaptive MIMO
`DL Adaptive STTD/SM Performance Evaluation for E-UTRA Nortel
`Nortel
`Nortel
`CATT
`CATT
`
`R1 #45 (May2006)
`
`R1-061229
`R1-061228On the period of L1 synchronization RACH
`R1-061227On the design of non-synchronized RACH
`R1-061226
`R1-061225
`
`LCR TDD E-HICH: Simulation Results
`LCR TDD: E-HICH structure and coding
`
`TP: Downlink Control Signalling resource division
`Considerations on downlink shared control signalling
`by reducing the spreading factor by 2 for E-DCH"
`25.212CR0234(Rel-7,A)"Clarification of compressed mode
`by reducing the spreading factor by 2 for E-DCH"
`25.212CR0233(Rel-6,F)"Clarification of compressed mode
`SF reduction on compressed mode for 10ms TTI E-DCH
`
`Random access preamble and message
`
`R1-061260
`R1-061259Measurement at the Network Side
`R1-061258
`R1-061257
`R1-061256
`
`R1-061255
`
`R1-061254
`
`Text proposal for TR25.814, Section 7.1.3
`Text proposal on comparison of SCH structures
`Text proposal on RACH preamble design for E-UTRA
`B’s
`Evaluation of DL control channel for multiple antenna Node
`Benefits of the generalized CSD scheme in E-UTRA
`signals
`Cell search times of hierarchical and non-hierarchical SCH
`UTRA
`R1-061247
`System performances of RACH preamble designs for E-
`R1-061246
`Unified uplink CQI signaling by efficient labeling
`R1-061245On 2 Antenna Open Loop Downlink TX Diversity
`R1-061244
`R1-061243
`
`R1-061253
`R1-061252
`R1-061251
`
`R1-061250
`R1-061249
`R1-061248
`
`R1-061242
`R1-061241
`R1-061240
`R1-061239
`R1-061238
`R1-061237
`R1-061236
`R1-061235
`R1-061234
`
`R1-061232
`
`R1-061231
`
`R1-061230
`
`R1-061233
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`ZTE/HTC
`Exhibit 1024-0007
`
`

`
`5/10/2006Noted
`
`Not treated
`Not treated
`
`Not treated
`Not treated
`
`Not treated
`
`5/9/2006Noted
`
`Not treated
`Not treated
`Not treated
`
`5/10/2006Noted
`
`5/11/2006Noted
`5/10/2006Noted
`
`5/10/2006Noted
`
`5/9/2006Noted
`
`5/10/2006Noted
`5/10/2006Noted
`
`5/9/2006Noted
`
`5/9/2006Noted
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`
`Not treated
`Not treated
`
`Not treated
`Not treated
`
`5/9/2006Noted
`
`Not treated
`Not treated
`Not treated
`
`Decision
`Proposal
`
`Text
`
`Discussion
`
`Discussion
`
`Proposal
`
`Text
`
`Discussion
`Decision
`
`Decision
`
`Decision
`Discussion/
`Discussion
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`
`Decision
`Discussion/
`
`Discussion
`
`Discussion
`
`Discussion
`
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`
`11.6.3
`11.1.1
`11.1.1
`11.1.1
`
`11.1.1
`11.1.1
`11.2.3
`11.2.3
`
`11.2.1
`11.1.3
`11.6.2
`
`11.6.2
`
`11.6.2
`11.6.1
`11.1.1
`
`11.1.5
`
`11.2.1
`
`11.2
`
`Discussion
`
`11.1.3
`
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Proposal
`
`Text
`
`Decision
`Discussion/
`Discusison
`
`Discussion
`
`Discussion
`
`Decision
`Proposal
`
`Text
`
`11.1.5
`
`11.1.2
`
`11.1.3
`
`11.2.1
`
`11.2.1
`11.1.3
`11.1.4
`
`11.1.5
`11.1.5
`11.1.2
`
`11.6.1
`
`11.6.1
`
`11.1.1
`
`Page 8
`
`Siemens
`Siemens
`Siemens
`Siemens
`
`Siemens
`Siemens
`Siemens
`Fujitsu
`
`Fujitsu
`Fujitsu
`NTT DoCoMo
`
`NTT DoCoMo
`
`NTT DoCoMo
`
`NTT DoCoMo
`
`TP on Signalling in DL for UL resource allocation
`Signalling in DL for UL resource allocation
`allocation
`Joint coding vs individual coding for downlink resource
`TP on downlink resource allocation signalling
`Signalling for downlink resource allocation
`Downlink resource multiplexing
`Introduction of the shortened code concept in Turbo coding
`
`R1-061292MBMS throughput performance
`R1-061291
`R1-061290
`R1-061289
`
`CATT
`CATT
`CATT
`
`CATT, RITT
`
`CATT, RITT
`Tech
`CATT, RITT, TD-
`CATT
`
`CATT
`
`CATT, RITT
`
`CATT, RITT
`
`ZTE
`
`ZTE
`ZTE
`Corporation
`Toshiba
`
`Cubic Metric properties of CAZAC sequences
`Initial cell search and long-CP sub-frame structure
`Throughput, and Coverage in E-UTRA Uplink
`System-Level Simulations on Spectrum Efficiency, User
`Throughput, and Coverage in E-UTRA Downlink
`System-Level Simulations on Spectrum Efficiency, User
`Link-Level Simulations on peak data rate in E-UTRA UplinkNTT DoCoMo
`Downlink
`Link-Level Simulations on peak data rate in E-UTRA
`Downlink
`Repetition Factor for L1/L2 Control Channel in E-UTRA
`Optimum Combination of Channel Coding Rate and
`Frame Structure
`System Performance Evaluation Results for LCR TDD base
`Peak data rates for LCR TDD base Frame Structure
`for control channel
`Performance comparison between beam-forming and CDD
`method in TDD mode and text proposal
`Clarifications of the dynamic beam-forming/pre-coding
`requirement for downlink pre-coding in TDD mode
`Further clarifications of the uplink reference signal
`based TDD frame structure
`The numerology of 1.6MHz bandwidth for EUTRA LCR-
`for EUTRA TDD
`The impact of frequency offset on modulation performance
`Beamforming for EUTRA TDD
`Further consideration on the reference symbol of
`procedure for EUTRA TDD
`Further on the non-synchronization random access
`system
`SCH Structure and Cell Search Method for E-UTRA TDD
`TP: Interference Mitigation for Uplink Reference Design
`in Uplink Reference Design
`Interference Mitigation Comparisons between FDM and CDM
`Further considerations on cell search information mapping
`Further Study on Reference Signal Structure for MBMS
`
`R1 #45 (May2006)
`
`Reference-signal arrangement for E-UTRA Downlink MIMOLG Electronics
`Load dependent feedback for MIMO LTE
`TP: Random access preamble and message
`
`Siemens
`ZTE
`
`R1-061288
`R1-061287
`R1-061286
`R1-061285
`
`R1-061284
`R1-061283
`R1-061282
`
`R1-061281
`
`R1-061280
`
`R1-061279
`
`R1-061278
`
`Yes
`
`R1-061277
`R1-061276
`R1-061275
`
`R1-061274
`
`R1-061273
`
`R1-061272
`
`R1-061271
`
`R1-061270
`
`R1-061269
`
`R1-061268
`
`R1-061267
`
`R1-061266
`R1-061265
`R1-061264
`
`R1-061263
`R1-061262
`R1-061261
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`ZTE/HTC
`Exhibit 1024-0008
`
`

`
`5/9/2006Noted
`
`Not treated. Revised in R1-061577
`
`R1-061577
`
`5/9/2006Noted
`
`Not treated
`
`Not treated
`Not treated
`
`5/9/2006Noted
`
`Not treated
`
`5/9/2006Noted
`
`Not treated
`
`5/8/2006Noted
`
`Not treated
`
`Not treated
`
`Not treated
`Not treated
`Not treated
`
`Not treated
`
`5/9/2006Noted
`
`Not treated
`Not treated
`Not treated
`Revised in R1-061545
`Revised in R1-061548
`
`5/8/2006Rejected
`
`5/8/2006Rejected
`
`5/8/2006Noted
`
`5/8/2006Noted
`
`5/8/2006Agreed
`
`5/8/2006Agreed
`
`5/8/2006Agreed
`
`5/8/2006Agreed
`
`Discussion
`Proposal
`
`Text
`
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Discussion
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`Discussion
`Decision
`Discussion/
`Decision
`Discussion/
`Discussion
`Proposal
`
`Text
`
`Proposal
`
`Text
`
`Decision
`R1-061545
`Discussion/
`DiscussionR1-061548
`
`Text
`
`Proposal
`
`CR
`
`CR
`
`Discussion
`
`Discussion
`
`CR
`
`CR
`
`CR
`
`CR
`
`11.1.5
`
`11.1.3
`
`11.1.3
`11.1.2
`11.1.1
`11.1.1
`11.1.1
`
`4
`
`7
`
`8
`
`8
`
`8
`
`8
`
`8
`
`5.4
`
`5.4
`
`4
`
`4
`
`5.4
`
`5.4
`
`5.4
`
`5.4
`
`11.1.5
`11.1.5
`
`11.1.5
`
`Samsung
`Page 9
`NTT DoCoMo
`Samsung, ETRI,
`Samsung
`
`Samsung
`
`Samsung
`
`Samsung
`Samsung
`Samsung
`Samsung
`Samsung
`
`Samsung
`
`11.2.3
`
`11.2.1
`
`11.2.1
`11.1.5
`11.1.1
`
`11.1.1
`
`NEC Group
`
`NEC Group
`DoCoMo
`NEC Group, NTT
`NEC Group
`NEC Group
`DoCoMo
`NEC Group, NTT
`NEC Group
`NEC Group
`
`NEC Group
`NEC Group
`NEC Group
`NEC Group
`NEC Group
`
`R1 #45 (May2006)
`
`NEC Group
`DoCoMo
`NEC Group, NTT
`DoCoMo
`NEC Group, NTT
`Samsung
`Panasonic,
`Siemens,
`Samsung
`Panasonic,
`Siemens,
`Samsung
`Panasonic,
`Siemens,
`Samsung
`Panasonic,
`Siemens,
`
`Dynamic Switching between Single and Multi-User MIMO
`TP on Cyclic Delay Diversity for Scheduling Gains
`Sizes
`Performance Evaluation of PU2RC with Different Codebook
`Link Performance of Multi-User MIMO
`BCH Transmission Bandwidths
`Performance Comparison between 1.25 MHz and 5 MHz
`Cell search issues and views
` Random access message transmission
`DL ACK/NACK signalling performance evaluation
`Downlink Control Signalling Overhead Evaluation
`Uplink ACK/NACK performance: FDM vs TDM
`concerning the LS R1-061109
`UE capabilities and spectrum allocation scenarios
`CQI reporting
`sequences
`Considerations on uplink pilot design using CAZAC
`Reference signal multiplexing for EUTRA uplink
`Consideration on LTE MIMO scheme
`Resource Allocation Signalling for EUTRA
`
`Physical channel mapping & power control for SCCH
`Power balancing mechanism with DPCCH gating
`operation
`TP on further simplification for "Restricted HS-SCCH
`TP on Clarification for "Restricted HS-SCCH operation
`TP on Clarification for "HS-SCCH less operation
`Comments on the proposals to modify HS-SCCH for VoIP
`Consideration on UTRA MIMO scheme
`sequence indexallocation for E-HICH and E-RGCH"
`25.211CR0229(Rel-7, A)"Clarification of the signature
`sequence index allocation for E-HICH and E-RGCH"
`25.211CR0228(Rel-6, F)"Clarification of the signature
`Proposed response to RAN2 LS in [R1-061109]
`
`R1-061323
`R1-061322
`
`R1-061321
`
`R1-061320
`
`R1-061319
`
`R1-061318
`R1-061317
`R1-061316
`R1-061315
`R1-061314
`
`R1-061313
`
`R1-061312
`
`R1-061311
`
`R1-061310
`R1-061309
`R1-061308
`
`R1-061307
`R1-061306
`R1-061305
`
`R1-061304
`R1-061303
`R1-061302
`R1-061301
`R1-061300
`
`R1-061299
`
`R1-061298
`
`L1 UE measurement to support intra E-UTRA mobility
`
`R1-061297
`
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`
`Yes
`Yes
`Yes
`Yes
`Yes
`
`Yes
`
`Yes
`
`Yes
`
`terminology"
`25.214CR0420 (Rel-7, A)"Clarification of E-TFCI
`
`R1-061296
`
`Yes
`
`terminology"
`25.214CR0419 (Rel-6, F)"Clarification of E-TFCI
`
`R1-061295
`
`Yes
`
`terminology"
`25.212CR0236 (Rel-7, A)"Clarification of E-TFCI
`
`R1-061294
`
`Yes
`
`terminology"
`25.212CR0235 (Rel-6, F)"Clarification of E-TFCI
`
`R1-061293
`
`Yes
`
`ZTE/HTC
`Exhibit 1024-0009
`
`

`
`5/9/2006Noted
`
`5/9/2006Noted
`
`5/9/2006TP2 was agreed and TP1 was
`
`revised in R1-061571
`
`5/9/2006Noted
`5/9/2006Agreed
`
`Revised in R1-061553
`
`5/9/2006Agreed
`5/8/2006Noted
`
`5/8/2006Noted
`
`Discussion
`
`Discussion
`
`Discussion
`
`Decision
`Discussion/
`Decision
`Discussion/
`
`Decision
`
`Decision
`Discussion/
`DiscussionR1-061553
`Discussion
`
`5/8/2006Noted
`
`5/8/2006Noted
`5/8/2006Noted
`
`5/8/2006Revised in R1-061616
`
`R1-061616
`
`5/8/2006Noted
`
`5/10/2006Noted
`
`Revised in R1-061549
`
`R1-061549
`
`5/10/2006Noted
`
`Withdrawn
`Not treated
`Not treated
`Not treated
`Not treated
`
`Not treated
`Not treated
`Not treated
`Not treated
`
`Not treated
`Not treated
`Not treated
`Not treated
`Not treated
`
`5/9/2006Noted
`
`5/9/2006Noted
`
`Discussion
`
`Discussion
`
`Decision
`Discussion/
`
`CR
`
`Discussion
`
`Decision
`Discussion/
`Decision
`Discussion/
`Proposal
`
`Text
`
`Proposal
`
`Text
`
`Decision
`Discussion/
`Decision
`Discussion/
`Proposal
`
`Proposal
`
`Text
`
`Text
`
`Decision
`Discussion/
`Decision
`Discussion/
`Proposal
`
`Proposal
`
`Text
`
`Text
`
`Decision
`Discussion/
`Proposal
`
`Text
`
`Decision
`Discussion/
`Decision
`Discussion/
`Decision
`Discussion/
`
`Text
`
`Decision
`Discussion/
`Proposal
`
`4
`
`7
`
`7
`
`
`
`77
`
`7
`
`8
`
`8
`
`8
`
`8
`
`8
`
`8
`
`5.5
`
`5.5
`
`11.6.2
`
`11.5
`
`11.4
`
`11.2.3
`
`11.2.3
`
`11.1.5
`
`11.6.2
`
`11.3.4
`11.3.1
`11.2.3
`11.2.3
`
`11.2.3
`11.2.3
`11.2.3
`
`11.2.3
`11.2.3
`11.2.3
`11.2.1
`11.1.5
`
`Text Proposal on Downlink System Performance EvaluationSamsung
`
`R1-061339
`
`Samsung
`Samsung
`Samsung
`Samsung
`
`Samsung
`
`Samsung
`Samsung
`Samsung
`
`Samsung
`
`Samsung
`Samsung
`Samsung
`Samsung
`Samsung
`
`Low Overhead Asynchronous Adaptive Hybrid ARQ
`Evaluation of BCH cost vs bit rate
`TP on DL ACK/NACK signalling
`TP on downlink data multiplexing
`existence of distributed transmission
`System throughput of DL localized transmission with
`Link performance of DL distributed transmission
`TP on Downlink Control Signalling Multiplexing
`TP on BCH Transmission Bandwidth
`and QPSK, and TP
`Bandwidth and Power Efficiency Evaluation for pi/2-BPSK
`TP on uplink ACK/NACK signaling
`Link Adaptation in Evolved UTRA Downlink and TP
`TP on HARQ
`Reference signal structure for EUTRA uplink and TP
`Summary of LTE MIMO email discussion
`
`R1 #45 (May2006)
`
`Performance Evaluation of Multi-User vs. Single User MIMOSamsung
`
`Page 10
`
`UL DPCCH Gating: Impact of Gating Gap Length
`Results
`UL DPCCH Gating: Further System-Level Performance
`UL DPCCH Gating: Further Link-Level Performance ResultsEricsson
`
`Ericsson
`Ericsson
`
`R1-061356
`R1-061355
`
`R1-061354
`
`Ericsson
`
`Ericsson
`
`UL DPCCH Gating: Realistic VoIP Example
`
`R1-061353
`
`New DPCCH Slot Format: Link-Level Performance
`
`R1-061352
`
`Replace the Abbreviation 'ConCon' with 'CPC' in TR 25.903Ericsson
`
`R1-061351
`
`Ericsson
`Ericsson
`Ericsson
`Ericsson
`
`Ericsson
`
`Ericsson
`
`Siemens
`
`Siemens
`
`Samsung
`
`Samsung
`
`Samsung
`
`System level results for Rel-7 MIMO schemes
`Link level evaluation of D-TxAA
`transmission schemes
`Complexity and performance trade-offs of MIMO
`channel reception in a non-MIMO capable UE
`Impact of MIMO transmission on the performance of legacy
`E-UTRA UE Measurements and Capabilities
`measurement

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket