SPE 98511
`
`Accelerating Technology Acceptance: Hypotheses and Remedies for Risk-Averse
`Behavior in Technology Acceptance
`V. Rao, Halliburton Co., and R. Rodriguez, Shell Technology Ventures
`
`
`
`Copyright 2005, Society of Petroleum Engineers
`
`This paper was prepared for presentation at the 2005 SPE Annual Technical Conference and
`Exhibition held in Dallas, Texas, U.S.A., 9–12 October 2005.
`
`
`This paper was selected for presentation by an SPE Program Committee following review of
`information contained in a proposal submitted by the author(s). Contents of the paper, as
`presented, have not been reviewed by the Society of Petroleum Engineers and are subject to
`correction by the author(s). The material, as presented, does not necessarily reflect any
`position of the Society of Petroleum Engineers, its officers, or members. Papers presented at
`SPE meetings are subject to publication review by Editorial Committees of the Society of
`Petroleum Engineers. Electronic reproduction, distribution, or storage of any part of this paper
`for commercial purposes without the written consent of the Society of Petroleum Engineers is
`prohibited. Permission to reproduce in print is restricted to a proposal of not more than 300
`words;
`illustrations may not be copied. The proposal must contain conspicuous
`acknowledgment of where and by whom the paper was presented. Write Librarian, SPE, P.O.
`Box 833836, Richardson, TX 75083-3836, U.S.A., fax 01-972-952-9435.
`
`Abstract
`
`Risk aversion was concluded as being a significant
`factor in the observed slow uptake of technology in the
`Upstream Sector of
`the Oil and Gas business.
`Hypotheses centered on information asymmetry, effect
`of risk volatility on tolerance, and risk profiles of decision
`makers molded by structural or temporal considerations.
`Remedies proposed for debate and action included the
`creation of industry wide independent entities (testing
`agency or insurance company) charged with closing the
`gap created by asymmetries, as well as the creation of
`an industry award for excellence in technology uptake.
`
`
`Background
`to summarize a series of
`This paper attempts
`discussions held by a technical breakout group, as part
`of the larger SPE Applied Technology Workshop on
`Accelerating Technology Acceptance held on March 15-
`16, 2005 at the Del Lago Resort in Montgomery, Texas,
`USA. Approximately one hundred (100) attendees
`participated in the ATW, with six technical breakout
`sessions conducted during the 2-day workshop. Topics
`covered
`included Nucleating and Funding E&P
`Technology,
`Prioritization
`and
`Assessment,
`Incentives/Compensation and Culture, Blurring
`the
`Lines, and Technical Backbone.
`Some of the concepts discussed within the ATW were
`reported in an earlier article published in the May 2005
`issue of the Journal of Petroleum Technology titled
`Annual Drilling Conference Probes Technology
`Development and Lessons Learnedi, which reported on
`discussions held at the SPE/IADC Drilling Conference
`
`and Exhibition in Amsterdam earlier this year. The
`article expanded on the concept that the speed of
`technology uptake is an important problem faced by our
`industry. The SPE was subsequently encouraged by
`readership response to hold an Applied Technology
`Workshop in order to produce a platform for the
`discussion of remedies.
`
`Below we summarize some of the discussions held
`within
`the specific breakout session
`tasked with
`understanding the roles played in technology uptake
`from a risk and reward perspective. While the paper
`represents in large part the findings of the group, further
`influenced by discussion in the larger forum of the ATW
`members, the authors alone are responsible for the
`views expressed below, including the weight placed on
`the different hypotheses and remedies. We therefore
`have written this paper in the form of a normal
`publication, and acknowledge that its content is neither
`an actual accounting of discussions which took place,
`nor is it necessarily faithful to the chronology of events.
`
`Methods
`A breakout group of about
`considered the stated problem:
`
`Problem: Risk aversion is likely an important reason
`for slow technology uptake.
`
`It was generally presumed that the technologies in
`question have demonstrated application suitability with
`early adopters. Upstream technologies comprised the
`single focus of discussions. A presentation of macro
`economic trends having likely influencing behavior was
`given, followed by a moderated discussion. The general
`concepts surrounding risk-taking were also discussed
`and examples were provided. Basic ground rules were
`laid out: Hypotheses for the observed behavior would
`be put forward and discussed, and the group would rank
`the most relevant hypotheses.
`In some
`instances
`hypotheses were combined into logical groupings. The
`breakout group would then advance those specific
`remedies that addressed one or more of the chosen
`hypotheses. These in turn would be ranked for eventual
`
`
`twenty-two persons
`
`1 of 5
`
`Ex. 2093
`IPR2016-01506
`
`

`

`2
`
`
`
`SPE 98511
`
`the
`
`full ATW
`
`presentation and discussion with
`membership.
`
`Results
`
`Hypotheses
`Macroeconomic trends relevant to the discussion are
`presented in Figures 1 and 2. Figure 1 shows the
`progressive decline in collective oil company spending
`on upstream research and development over the last
`two decadesii. While it shows an accompanying
`increase in service company spending, this does not
`appear to significantly offset the overall decline trend.
`
`Figure 1 also shows a correlation between declines in
`R&D spending, and major oil company
`laboratory
`closings. It is surmised that oil company laboratory
`closings inevitably leads to 1) a reduced understanding
`of newer technologies, and, more importantly to this
`discussion, 2) the assessment of risk associated with the
`use of new upstream technologies.
`
`While the service providers are capable of conducting
`new technology development, there are inherent gaps in
`their ability to fully understand the most pressing needs
`of operators. These gaps stem in part from buyer/seller
`relationships and the confidential nature of oil company
`exploration and development strategies.
`
`Figure 2, derived from a commissioned study by Charles
`River Associatesiii and reproduced here by permission,
`shows patents held by the three super majors, as
`compared to patents held by the three largest service
`companies. Ignoring the drop in the year 2000 (an
`artifact of partial year data), it is obvious that patents are
`also proxies for R&D spending.
`
`
`
`The patent portfolio imbalance has contributed to greater
`scrutiny of
`intellectual property considerations
`in
`dealings between oil and service companies. The
`sharing of
`insights
`is often presaged by
`legal
`agreements outlining the rights associated with any
`findings. This inevitably creates a climate of reduced
`interaction, therefore reducing the ability of service
`companies to be responsive to needs of operators.
`
`The net result is that needed technology transfer and
`two-way collaboration between service companies and
`operators is reduced.
`
`Anecdotal information which leads to our first general
`hypothesis includes the following:
`
`1) There is significant variability in research spending
`levels between oil companies; spending may be heavy in
`select areas, and completely eliminated in other areas.
`Nonetheless, the overall spending trend for the industry
`as a whole is hard to dispute.
`
`2) It is obvious that the decline in research spending
`correlates with a related loss of experts, particularly in
`those technical fields essentially ceded to the service
`sector to develop.
`
`This leads us to the first hypothesis:
`
`Hypothesis 1: Current Practices foster Information
`Asymmetry
`
`1) Reduced expertise held by operators (and therefore a
`decreased understanding of the risk associated with new
`technology), and
`
`the
` 2) A decreased understanding of needs by
`technology developer (due
`to reduced cooperative
`interaction),
`
`combine to create Information Asymmetry. Information
`Asymmetry leads to devaluation of the technology by the
`user, and therefore slows average technology uptake.
`
`Information Asymmetry can be illustrated by the simple
`Lemon Discount Analogy posed by Nobel Laureate
`George Akerlofiv:
`
`If I were selling a car to you, and if you had little
`information about the car, you would assume it
`to be lemon, and accordingly discount the value
`to you.
`
`If, on the other hand, you were provided with
`reliable information about the car, the value of
`the car would rise from your perspective.
`
`In essence, information asymmetry causes devaluation.
`In the three decades preceding Akerlof’s awarding of the
`Nobel Prize in 2001, his theory has acquired a great deal
`of currency in economics, and in particular in the field of
`insurance. Akerlof’s paper deals with instances in which
`the existence of many goods of different qualities and
`uncertainty creates interesting problems for the market
`mechanism. In some cases, such a situation which is
`characterized by asymmetric information causes the
`market to break down completely so that there is no
`exchange of goods at all.
`
`
`Hypothesis 2: Risk Profile of the Decision-Maker
`
`The second hypothesis centers around three somewhat
`related issues:
`
`1) During collaborative decision-making, variances
`in
`individual
`risk profiles of decision-makers
`generally result
`in
`lower overall tolerance for
`potential
`failure as
`it pertains
`to using new
`technology on a well. Differences in risk profiles may
`be driven in part by reward systems adopted by different
`departments within a company. It is not uncommon, for
`example, for the drilling department of a company to
`
`2 of 5
`
`Ex. 2093
`IPR2016-01506
`
`

`

`SPE 98511
`
`
`
`3
`
`
`
`Scenario 1: A new product failure rate is 1 out of 5 during the testing stage. Scenario 1: A new product failure rate is 1 out of 5 during the testing stage. Scenario 1: A new product failure rate is 1 out of 5 during the testing stage.
`
`
`Installation costs are $600K Cost of Capital is 10%.Installation costs are $600K Cost of Capital is 10%.Installation costs are $600K Cost of Capital is 10%.
`
`
`
`•If successful, it creates $1,000K of value. •If successful, it creates $1,000K of value. •If successful, it creates $1,000K of value.
`
`
`•If it fails, it destroys $250K of value.•If it fails, it destroys $250K of value.•If it fails, it destroys $250K of value.
`
`
`
`r = 10%r = 10%r = 10%r = 10%
`
`
`
`
`
`
`
`($ 600K)($ 600K)($ 600K)($ 600K)
`
`
`
`
`
`
`
`4/54/54/54/5
`
`
`
`
`
`
`
`1/51/51/51/5
`
`
`
`
`
`
`
`$ 1,000K$ 1,000K$ 1,000K$ 1,000K
`
`
`
`
`
`
`
`($ 250K)($ 250K)($ 250K)($ 250K)
`
`
`
`
`
`
`
`Should the operator test the product in Should the operator test the product in Should the operator test the product in
`
`
`his well? his well? his well?
`
`
`Does the operator capture additional Does the operator capture additional Does the operator capture additional
`
`
`benefits?benefits?benefits?
`
`
`
`
`NPV10 = - 600 + (4/5)*1,000/1.1 – (1/5)*250/1.1NPV10 = - 600 + (4/5)*1,000/1.1 – (1/5)*250/1.1NPV10 = - 600 + (4/5)*1,000/1.1 – (1/5)*250/1.1NPV10 = - 600 + (4/5)*1,000/1.1 – (1/5)*250/1.1
`
`
`
`NPV10 = +82KNPV10 = +82KNPV10 = +82KNPV10 = +82K
`
`
`
`
`Scenario 2: Should the operator test the new product if Scenario 2: Should the operator test the new product if
`
`instead:instead:
`
`
`
`•it creates $2,000K in value if successful or •it creates $2,000K in value if successful or
`
`
`
`•destroys $4,250K in value if it fails?•destroys $4,250K in value if it fails?
`
`
`
`
`
`r = 10%r = 10%r = 10%
`
`
`
`
`
`($ 600K)($ 600K)($ 600K)
`
`
`
`
`
`4/54/54/5
`
`
`
`
`
`1/51/51/5
`
`
`
`
`
`$ 2,000K$ 2,000K$ 2,000K
`
`
`
`
`
`($ 4,250K)($ 4,250K)($ 4,250K)
`
`
`
`
`
`NPV10 = - 600 + (4/5)*2,000/1.1 – (1/5)*4,250/1.1NPV10 = - 600 + (4/5)*2,000/1.1 – (1/5)*4,250/1.1NPV10 = - 600 + (4/5)*2,000/1.1 – (1/5)*4,250/1.1
`
`
`
`
`
`NPV10 = +82KNPV10 = +82KNPV10 = +82K
`
`
`Note that both of the investment scenarios showed an
`identical, positive NPV of +$82K. From a classically
`trained economist’s perspective, this positive NPV would
`imply the risk therefore is warranted in order to obtain
`the possible outcome.
`
`Following the presentation of scenarios, the presenter
`then asked each audience to “vote”, through a show of
`hands,
`if
`they would personally assume
`the risk
`presented in each of the two scenarios.
`
`When queried on the first scenario, (which showed
`modest value
`if successful, and modest
`loss
`if
`unsuccessful), most audience members indicated they
`would assume the risk. Interestingly, when queried on
`the second scenario, (which showed higher value if
`successful, and correspondingly greater
`loss
`if
`unsuccessful), almost no respondents indicated they
`would assume the risk.
`
`Even though the audience was presented with similar
`curves having the same positive NPV, they reacted less
`willingly to the scenario having greater reward and risk
`(also termed “volatility”).
`
`This informal poll may indicate that when it comes to
`new technology, there is an imbedded negative incentive
`to take on high reward / high risk decisions.
`
`This tendency was also acknowledged by a risk expert
`who presented at a 2005 OTC session on gas
`transportationvi, who reiterated, for the audience’s sake,
`that “novel technology is not inherently riskier”.
`
`
`
`
`than
`
`the production
`
`have a different risk culture
`department.
`
`2) A technology that requires expense outlay in the
`present, for potential gratification in the future, may
`present a dilemma for a decision-maker.
` For
`example, smart wells require initial capital expense
`outlays in order to reap future benefits from optimal fluid
`production and reduced long-term intervention costs.
`This particular example also highlights another inequity:
`
`3) A technology that requires initial CAPEX outlays,
`in order to reap current or future OPEX benefits, may
`present a dilemma for a decision-maker.
`
`
`
`
`Hypothesis 3: Asymmetries in budgets, risks and
`rewards.
`
`The third hypothesis combines yet another set of issues.
`On occasion, limitations of current fiscal year budgets
`can prevent new
`technology
`trials.
` Budgetary
`constraints may be further exacerbated when potential
`value created may have benefit to altogether different
`company functions or regions. It is not atypical for logic
`to dictate that one company department bears the
`expense and risk, while an entirely different department
`recoups the greater value derived from assuming that
`risk. For example, it might make sense to pilot test a
`new subsea technology in shallow waters in the U.S.
`Gulf of Mexico with close proximity to infrastructure,
`although the ultimate “customers” for the new technology
`may be deepwater international operating groups.
`
`Hypothesis 4: Risk Tolerance is reduced when Risk
`Volatility is increased
`
`From the perspective of classic economic assessment of
`risk, reward and probability of outcomes, E&P managers
`are essentially paid to move forward on decisions having
`positive NPV outcomes.
`
`Yet, when making decisions for scenarios which
`have high reward and high risk, even when the
`calculated outcome is a positive NPV, Oil and Gas
`Operators will rationalize a lower tolerance for risk-
`taking when it comes to new technology.
`
`This behavioral tendency was demonstrated during a
`recent series of industry presentationsv. A contributor to
`this paper presented hypothetical investment scenarios
`in several public sessions, one having roughly 50
`Offshore Technology Conference attendees and the
`other comprised of approximately 25 SPE members.
`Each audience was primarily composed of oil and gas
`engineering staff.
`
`The presentation of scenarios was as follows:
`
`
`
`3 of 5
`
`Ex. 2093
`IPR2016-01506
`
`

`

`4
`
`
`
`SPE 98511
`
`Remedies
`
`Industry Organization for Validating Utility
`
`This concept describes the formation of an independent
`business entity which is charged with assessing key
`technologies and
`the value created by
`those
`technologies,
`and
`testing
`and
`validating
`the
`technologies. The entity would be sponsored, and
`likely owned, by user companies (oil and gas companies
`and service companies). The entity would have the
`appropriate expertise, equipment and facilities to run
`appropriate tests and analysis, and may have access to
`one or more field locations suitable for field testing of
`downhole equipment.
`
`The testing facility would also be charged with assessing
`the
`risk associated with new
`technologies, and
`publishing
`assessments
`of
`technology
`value
`propositions. Comprehensive, independent assessment
`coupled with open communication and full disclosure
`addresses the information asymmetry issue directly.
`One member of the working group quipped that this
`organization would be akin to the “Ministry of Truth”
`(1984 by George Orwell). A more mundane analogy
`would be the United Independent Laboratories (UIL)
`seal, although the entity’s responsibilities would likely be
`broader. Many details would need to be fleshed out,
`including business models, criteria for project selection,
`mechanisms for field testing, etc.
`
`The underlying concepts behind this proposed approach
`have been put into practice by one of the Working
`Group’s members, Bob Hinkle, Chief Executive Officer of
`Enventure Global Technology. Enventure is in the
`business of providing solid expandable tubulars, used in
`well construction to reduce risk associated with a variety
`of adverse drilling situations. Enventure was able to
`bear out the applicability of its solutions through its work
`with Shell’s laboratories in the Netherlands, coupled with
`a variety of tests performed on wells made available in
`South Texas.
`
`Industry Insurance Company
`
`insurance company would be
`The concept of an
`complimentary to the independent test facility described
`above. The insurance company (or variation thereof)
`would possess the expertise to properly evaluate tests
`results presented by the test facility, similar to the role of
`a Lloyd’s of London, for example. It would be judicious
`in determining which offerings were evaluated and
`backed. Based on its assessment of upside and
`associated risk,
`it would
`then selectively offer
`to
`underwrite the costs of failure for the use of certain
`technologies, thus traversing the risk aversion due to
`information asymmetry.
`
`If the insurance company does its job well, the premiums
`paid by users would result in a net profit for the entity.
`
`Various business models could be considered to make
`such an offering attractive to industry participants.
`Assuming the company was owned by its user base,
`profitability could be distributed in the form of equity
`participation to its shareholders. Alternately, premiums
`could be rebated to its users.
`
`in enabling
`lies
`the real value
`In either model,
`participants to put high value technology to work while
`mitigating their risk, even if the user company does not
`have
`the expertise
`to properly evaluate
`risk.
`Interestingly, the concept largely rests on the ability of
`the insurance entity to properly select and evaluate
`technologies such that the actual risk is significantly less
`than the perceived risk.
`
`Industry Award for Technology Uptake
`
`The concept of an Industry Award for Technology
`Uptake addresses some of
`the
`issues raised
`in
`Hypotheses 2 and 3, which relate
`to challenges
`stemming from current practices in corporate policies,
`incentive plans and decision making structures. Well-
`publicized industry recognition for the company having
`the best record for technology uptake in a given year
`might provide an impetus for fostering the desired
`behaviors for technology uptake and risk management.
`Such an award might be presented to the CEO, or the
`executive management team as a whole. Reference
`The Malcolm Baldrige National Quality Award vii, which
`proved to be very effective for a number of years as a
`significant behavior driver.
`
`The strengths and shortcomings of the Baldrige program
`would be studied and used as a guide in the design of
`the Technology Uptake award. The metrics most
`depictive of fast uptake would have to be identified. For
`example, one method might be
`to compare new
`technology based spending to total spending for the
`year. New technology would have to be defined in
`consistent, replicable manner, such as commercial use
`within five years of the vendor’s first revenue.
`
`
`This particular remedy was in fact developed by one of
`the other breakout sessions.
` Participants
`in our
`breakout group also regarded this concept as particularly
`compelling, and one
`that uniquely addressed our
`hypotheses when revealed in the combined session at
`the end of the ATW. It struck a strong chord with the
`entire working group.
`
`
`Conclusions
`
`Risk aversion is concluded as being a significant factor
`in the observed slowness of technology uptake in the
`upstream sector of
`the Oil and Gas business.
`Hypotheses for this behavior include:
`• The existence and continued exacerbation of
`Information Asymmetry, leading to devaluation
`
`4 of 5
`
`Ex. 2093
`IPR2016-01506
`
`

`

`SPE 98511
`
`
`
`5
`
`
`
`
`Figure 1: R&D Investments – Upstream SectorFigure 1: R&D Investments – Upstream Sector
`
`
`
`
`
`1,4001,4001,4001,4001,400
`
`
`
`
`
`
`
`
`
`
`
`
`
`1,2001,2001,2001,2001,200
`
`
`
`
`
`
`
`
`
`1,0001,0001,0001,0001,000
`
`
`
`800800800800800
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`600600600600600
`
`
`
`
`
`
`
`
`
`400400400400400
`
`
`
`
`
`
`
`
`
`200200200200200
`
`
`
`
`
`E&P Firms*E&P Firms*E&P Firms*E&P Firms*E&P Firms*
`
`
`
`
`Oilfield Service Firms**Oilfield Service Firms**Oilfield Service Firms**Oilfield Service Firms**Oilfield Service Firms**
`
`
`
`
`Seismic Service Firms***Seismic Service Firms***Seismic Service Firms***Seismic Service Firms***Seismic Service Firms***
`
`
`
`
`Research Center ClosingResearch Center ClosingResearch Center ClosingResearch Center ClosingResearch Center Closing
`
`
`
`20022002200220022002
`
`R&D Investment
`R&D Investment
`R&D Investment
`
`($, millions)
`($, millions)
`($, millions)
`
`of a technology by the user, thus slowing
`uptake;
`• The individual risk profile of the decision maker,
`conditioned by issues such as lack of direct
`realization of rewards (benefit accrues to a
`different group within
`the company) and
`temporal disconnects (spending risk accrued
`today for gratification in later years); and
`• Level of risk volatility (for a typical decision
`maker,
`risk
`tolerance
`is
`reduced when
`(perceived or real) risk volatility is increased.
`
`Proposed remedies suggested
`further action include:
`
`for debate and
`
` •
`
` Formation of an Independent Validation Entity
`(likely owned by a group of operators) charged
`with assessing and validating
`technologies,
`including risk assessment and value creation;
`• Formation of an Industry Insurance Company for
`assessing and underwriting the costs of failure
`associated with selected technologies (where
`the actual risk is significantly less than the
`perceived risk,
`the disparity occasioned by
`information asymmetry); and
`• An Industry Award for Technology Uptake, with
`public recognition for the leadership of the
`company with the swiftest uptake in a given
`year, as defined by set metrics.
`
`
`
`
`i Donnelly, J. (May 2005), “Annual Drilling Conference
`Probes Technology Development and Lessons Learned”,
`Journal of Petroleum Technology.
`ii Cambridge Energy Research Associates (Cambridge,
`Massachusetts USA)
`iii CRA International, Inc. (formerly Charles River Associates
`Incorporated), (Boston, Massachusetts USA)
`iv Ackerlof, G. (1970) “The Market for ‘Lemons’: Quality
`Uncertainty and the Market Mechanism.” The Quarterly
`Journal of Economics, 84 (1970), pp. 488-500.
`v Rodriguez, R. (2005) “Accelerating Technology Acceptance
`(Risk and Return”), 2005 Offshore Technology Conference
`(Houston, Texas USA)
`vi Casada, M & Serratella, C (2005) “Risk-Based Novel
`Concepts Reviews for Offshore Gas Handling and
`Transportation”, 2005 Offshore Technology Conference,
`Deepwater Oil and Associated Gas Technical Session
`(Houston, Texas USA)
`vii Malcolm Baldrige National Quality Award, National
`Institute of Standards and Technology,
`http://www.quality.nist.gov
`
`
`
`
`
`
`
`
`
`
`00000
`19971997199719971997
`19921992199219921992
`19871987198719871987
`19821982198219821982
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`19771977197719771977
`
`*US E&P firms and the US R&D investments of international E&P firms; Department of Energy, EIA, CERA analysis*US E&P firms and the US R&D investments of international E&P firms; Department of Energy, EIA, CERA analysis
`
`**Traditional Oil Field Service companies (Baker Hughes, Halliburton, Schlumberger, Smith, Weatherford) annual Reports, CERA Analysis**Traditional Oil Field Service companies (Baker Hughes, Halliburton, Schlumberger, Smith, Weatherford) annual Reports, CERA Analysis
`
`***Seismic Service companies (CGG, Input/Output, OYO Geospace, PGS, Veritas) annual reports, CERA analysis. Source: Cambridge Energy ***Seismic Service companies (CGG, Input/Output, OYO Geospace, PGS, Veritas) annual reports, CERA analysis. Source: Cambridge Energy
`
`Research Associates.Research Associates.
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`Figure 2: Top 3 Super Majors vs. Service Companies Figure 2: Top 3 Super Majors vs. Service Companies
`
`Upstream Patent Awards 1991-2002Upstream Patent Awards 1991-2002
`
`
`500500
`
`450450
`
`400400
`
`450450
`
`300300
`
`250250
`
`200200
`
`150150
`
`100100
`
`5050
`
`00
`
`
`Major Service Major Service
`
`CompaniesCompanies
`
`
`SelectedSelected
`
`Super MajorsSuper Majors
`
`
`
`91 92 93 94 95 96 97 98 99 00 01 02*91 92 93 94 95 96 97 98 99 00 01 02*
`
`
`*Year to date 2002; Source: Derwent WPI, Global patent search on Upstream code*Year to date 2002; Source: Derwent WPI, Global patent search on Upstream code
`
`H01) published patents (1991-2002) ; Source: Charles River AssociatesH01) published patents (1991-2002) ; Source: Charles River Associates
`
`
`
`Higher Volatility DistributionHigher Volatility Distribution
`
`
`
`Area 1’Area 1’
`
`
`
`Area 1Area 1
`
`
`
`Area 1- Area 1’ = Area 2 – Area 2’Area 1- Area 1’ = Area 2 – Area 2’
`
`
`
`Area 2’Area 2’
`
`
`
`Area 2Area 2
`
`
`
`Risk NPVRisk NPV
`
`
`
`00
`
`
`
`Reward NPVReward NPV
`
`
`
`
`
`Value
`Value
`
`5 of 5
`
`Ex. 2093
`IPR2016-01506
`
`

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket