throbber
Energy Cogeneration Handbook
`
`Criteria for Central Plant Design
`
`Design criteria for central plants that facilitate energy conversion, uftilization, and
`conservation; an evaluation of project alternatives and an examination of systems and
`their functions to achieve optimum overall design in the generation of heating, cooling,
`and electricity.
`
`.by
`
`GEORGE POLIMEROS
`
`INDUSTRIAL PRESS INC.
`200 Madison Avenue, New York, N.Y. 1015 7
`
`PAGE 1 of 18
`
`PETITIONER'S EXHIBIT 1026
`
`

`
`Library of Congress Cataloging in Publication Data
`
`Polimeros, George.
`Energy cogeneration handbook.
`
`Includes bibliographies and index.
`1. Cogeneration of electric power and heat.
`I. Title.
`1981
`TK1041.P64
`ISBN 0—8311—1130-5
`
`621 .1'9
`
`so-257186
`'
`
`FIRST PRINTING
`
`ENERGY COGENERATION HANDBOOK
`
`Copyright © 1981 by Industrial Press Inc., New York, NY. Printed in the United States of America. All
`rights reserved. This book, or parts thereof, may not be reproduced in any form without permission of the
`publishers.
`
`PAGE 2 of 18
`
`PETITIONER'S EXHIBIT 1026
`
`

`
`CHAPTER 3
`
`Chiller Arrangements
`
`Air conditioning accounts for a substantial portion of
`the annual energy consumption in most buildings. Re-
`frigeration constitutes a large sector of industrial energy
`applications.
`Indubitably, the efficiency of these opera-
`tions is of immense importance.
`their
`Since chillers are energy-consuming machines,
`many sizes, numbers and arrangements in various ap-
`plications are not only evidence of design flexibility in
`handling air conditioning or refrigeration loads, but are
`proof that design engineers consider seriously the question
`of energy use.
`p
`This chapter addresses the factors that influence chill-
`er selection and arrangement. There are many possible
`arrangements;
`those examined here are the four basic
`configurations exemplified in Fig. 3-1, as well as others
`shown in Figs. 3-8 through 3-16. These are somewhat
`complex, but appear often enough in actual practice
`to merit comment.
`
`3.! Basic Arrangement
`
`Two or more chillers may be employed, either in
`series or in parallel, in the fourbasic arrangements at,
`b, c, and d of Fig. 3-1. A fifth, a series-parallel arrange-
`ment,
`is illustrated in Fig. 3-9, Section 3.6. Each ar-
`rangement presents the designer with specific choices,
`requiring a grasp of design objectives. Understanding
`the significance of the four basic arrangements will
`facilitate examination and analysis of the more involved
`cycles. These four arrangements deal with water side
`control and are predicated on full Water flow through
`both evaporator and condenser and a fixed leaving chilled
`water temperature. ~
`Central cooling plants invariably have more than one
`chiller. The justification for more than one chiller and the
`determination of the final number of chillers depend on
`a variety of factors.
`
`At the present time, machine size is limited by ship-
`ping dimensions and a lack of technical and operating
`experience for machines in excess of 7000-8000 tons.
`However,
`13,000-ton (45 760 kW) machines can be
`ordered.
`Large machines are shipped as components
`to be field-assembled. Undoubtedly, for plants in excess
`of 50,000-tons (176 000 kW) machines of greater than
`13,000-ton capacity can ‘be used; the huge refrigeration
`
`UNIT B
`CONDENSER
`
`UNIT B
`CHILLER
`
`UNIT E
`CONDENSER
`
`UNIT B
`CHILLER
`
`WPARALLEL
`CONDENSERS
`PARALLEL
`CHlU_ERS
`
`(8)
`PARALLEL
`CONDENSERS
`SERIES CHILLERS
`
`UNIT B
`CONDENSER
`
`um 3
`CHILLER
`
`(5;
`sgmes CQNDENSQJS
`SERES C|-EILLERS
`(CONDENSER WATER
`PARALLEL. TO
`CHILLER WATER)
`
`"
`
`45‘
`,
`
`-
`um a
`cowoewsan
`
`LJMT Q
`- CHlLLER
`
`’
`
`(D)
`55'
`SERIES CHILLERS
`.__ SERIES CONDENSERS
`(CONDENSER WATER
`COUNTER!-‘LOW re
`CHILLER WATER)
`
`45”
`
`1
`r’
`
`,
`1
`l
`
`UN|T A
`CONDENSER
`
`UNIT A
`CHILLER
`
`UNIT A
`CONDENSER
`
`UNITA
`CHILLER
`
`A
`
`50"
`
`—...¢-—
`90°
`
`95"
`
`55'
`
`um A
`CONDENSER
`
`UNIT A
`CH|LLER
`
`Figure 3-1. Four basic chiller and condenser arrangements em-
`ploying conventional
`temperatures
`[temperatures given are F:
`95F (35C); 90F (32.2C); 85F (29.4C); 55F (12.8C); 50F (IOC);
`45F (7.2C)] .
`
`PAGE 3 of 18
`
`PETITIONER'S EXHIBIT 1026
`
`

`
`Ch. 3
`
`plants of the future will require machines of increased
`tonnage. Commercial demand is bound to determine
`ultimate size development. Open centrifugal compressors,
`rather than hermetic, are used in large central plants,
`when the need is for centrifugals, since hermetic centri-
`fugal machines are currently limited to approximately
`l20O tons (4224 kW).
`Spare or standby capacity is another important factor.
`A fully redundant unit
`is ordinarily too expensive to
`tolerate in commercial applications.
`In industrial work,
`it becomes a matter of process needs and weighing of
`acceptable alternatives. With no standby capability,
`a machine breakdown is liable to deprive the plant of
`its services for a few hours or many months. Decreasing
`the impact of the loss of one machine, not taking into
`consideration the size and total number of chillers,
`will
`insure minimal
`inconvenience except at
`times of
`top load conditions. Machine breakdowns are associ-
`ated with the concept of reliability, which for centri-
`fugal chillers is more than 99%.
`In general, repair of large machines may be too costly
`and the downtime prohibitive. Although even a small
`hermetic machine may be out of service for a long time,
`dismantling of
`large
`chillers
`is very time-consuming
`and spare parts ‘for them may be harder to obtain and
`the need for factory assistance more probable.
`Efficiency and surging are two aspects that must be
`examined carefully. Large machines perform best at full
`load and become increasingly inefficient at diminishing
`part
`loads. At low-load ranges, centrifugal compressors
`are subject
`to surgingpand other operating difficulties.
`Thus,
`it
`is practical to select centrifugal machines for
`peak efficiency at prevailing part loads, perhaps in the
`neighborhood of 75% load. Efficiency selection at part
`load makes surging a little less likely or, at least, shortens
`the periods of occurrence, since most machines operate
`at partial loads most of the time.
`the
`If a substantial number of chillers are involved,
`question of series versus parallel arrangement emerges
`from the beginning. A series arrangement is limited to
`three or four chillers, bearing in mind that a minimum
`six degrees of chilled water temperature difference is
`needed for each chiller. On the other hand, an unlimited
`number of chillers can be piped in parallel.
`The designer must strike aneconornic and operational
`balance in arriving at
`the total number of machines,
`considering power consumption, piping and valving econ-
`OTTIY, Inaintainability, total installed cost, operating costs,
`Space limitations, the extent of automatic operation of
`the refrigerant. and Water cycles and availability and
`Capability of operating personnel.
`
`3.2 Arrangement .9 (Fig. 3-1), Chillers in Parallel,
`Condensers in Parallel
`
`Both evaporators and condensers are piped in parallel,
`an arrangement with Widespread‘ acceptance and one that
`designers
`are most
`familiar with, offering extensive
`flexibility and the ability to accommodate phased ad-
`ditions.
`
`A cardinal advantage of parallel flow is that it lends
`itself extremely well to variable flow, especially in pri-
`mary—secondary loops, and is the main reason for its
`popularity. As load decreases, condenser and chilled
`water pumps can be disengaged, saving horsepower and
`contributing to a more economical operation.
`Based on chiller heat transfer area of 6-8 ft2 per ton
`(0.l5—O.2l m2 /kW) and maximum water velocity of 12 ft
`per sec (3.64 m/s), units connected in parallel require
`two- or
`three-pass evaporators
`and,
`therefore, offer
`excellent heat
`transfer performance for a large chilled
`water range.
`In the last
`two decades, economics have
`tended to increase water velocities both in the chiller
`and condenser sections from 8 to approximately 10 ft
`per sec (2.4—3 m/s), at times, even higher.
`A great deal is known about this arrangement and many
`designers
`feel comfortable in using it. Nevertheless,
`there are some disadvantages of a rather serious nature,
`especially in the case of full system flow. To maintain
`full flow at partial loads, return chilled water must be
`circulated through all units, both active and inactive,
`with the non-refrigerated water being mixed with water
`that has passed through the evaporators and chilled to
`design temperature.
`The mixture, of course,
`is at a
`higher temperature than design.
`If design temperature
`water is desired,
`the active chiller must overchill the
`water passingthrough it. The problem of overchilling
`is examined a little further on in this section. In general,
`overchilling increases the risk _of an evaporator freeze-up
`because of lower suction temperatures and tends to in-
`crease horsepower
`requirements, and therefore oper-
`ating costs. Unpleasant alternatives to overchilling in-
`clude a variable chilled water supply temperature above
`design levels, if one machine is operated, or operation
`of both machines at very low loads, which requires more
`horsepower per ton and is entirely uneconomical.
`As for condensers in parallel, they present few diffi--
`culties. Water temperature problems do not exist, and
`lift is identical for all units. Whether condenser water
`is allowed to circulate through an inactive unit or not,
`does not affect the performance of the cooling tower.
`Reduced condenser water flow is desirable at times be-
`cause it
`reduces pumping requirements (see Section
`
`PAGE 4 of 18
`
`PETITIONER'S EXHIBIT 1026
`
`

`
`60
`
`4.10 “Optimization of Condenser and Chilled Water
`Flow”). Various techniques can be used to minimize
`low flow problems. The subjects of reduced Water flow
`and variable primary-secondary flow are discussed in
`Chapter 7.
`Undoubtedly, a great deal more piping, valving, pumps,
`‘and instrumentation are needed for the parallel arrange-
`ment than for the series. However, pipe sizes may be
`reduced due to smaller flows through each branch. Piping
`in parallel is quite involved spatially and there is a greater
`abundance so that, in an overall sense, costs are high. On
`the other hand,
`series piping throughout
`the system
`handles full flow at all times and is full size, including the
`bypasses around the chillers. Costs may exceed those of
`the parallel arrangement. A piping layout, a flow diagram,
`and an accurate estimate will establish relative costs.
`
`When examining the question of overchilling more close-
`ly one comes to the conclusion that the problem is caused
`perhaps by an unrealistic requirement for constant flow in
`the primary circuit at all times, regardless of load size.
`Specification of constant flow is a holdover from past
`practices, when constant
`flow for small systems was
`acceptable economically and offered the hydraulic stabil-
`ity that most engineers prefer. Full flow in large systems
`' is wasteful of pumping horsepower and, in terms of wear
`and tear, of the machines and system in general.
`Overchilling may be eliminated by adhering to one of
`four main curative methods. First, all units may be op-
`erated together down to a small portion of their capacity
`in order to handle part loads.
`In doing so, the chillers
`
`1.00
`
`.90
`
`.80
`
`.70
`
`.60
`
`.50
`
`.40
`
`.30
`
`.20
`
`.10
`
`
`
`PERCENTPOWER
`
`10
`
`20
`
`30
`
`70
`60
`50
`40
`PERCENT LOAD
`
`80
`
`90
`
`100
`
`Figure 3-2. Typical reduced part load performance for centrifugal
`compressor system.
`
`Ch.3
`
`sacrifice operating economy.
`illustrates the point:
`
`The following example
`
`Assume a 1000-ton (3520 kW) chiller requiring about
`1000 Bhp (746 kW) at design conditions. If two identical
`1000-ton (3520 kW) units are installed in parallel and at
`30% system load, each chiller must operate at 300 tons
`(1056 kW) and 330-Bhp (246 kW) (Point A, Fig. 3-2) a
`total of 660 Bhp (492 kW). If the 30% system load wen
`to be satisfied by operating only one machine, then it
`would operate at 60% capacity and 57% power (Point B)
`or 570 Bhp (425 kW) a clear saving of 90 Bhp (67 kW)_
`This approach introduces
`some complications.
`It
`requires automatic valves for each chiller if one pump is
`used, or a pump for each chiller with a check valve in its
`discharge. Furthermore, it is assumed that the pumps are
`non-overloading; if not, a pump bypass or a back pressure
`valve may be necessary to control the pump operating
`point.
`'
`A second alternative to: overchilling is reduction of
`overall system flow by maintaining full flow only through
`the active units, if building flow requirements permit it
`and if pump transients are rrfanageable.
`A third solution to accept chilled water temperatures
`above design conditions, if it does not present control
`problems and can satisfy load conditions throughout
`the project. Ordinarily, the supply chilled water tem-
`perature is constant in large projects because buildings
`peak at different times and variable temperature control
`would hamper design flexibility. On the other hand,
`advocates of this solution maintain that higher design
`temperatures at part load can be accommodated if cool-
`ing coils are oversized when fuH load is anticipated in
`one building at the same time. Oversizing coils can be
`considered a viable design alternative, if it is applied to
`a limited number of coils.
`
`A fourth method is a series arrangement of evaporators,
`provided economic as well as hydraulic considerations
`and project design philosophy are favorable.
`Over-
`chilling is not ?'possible since, at part load, chillers may
`be deactivated, While through flow is maintained.
`Up to this p_oint, overchilling and methods to avoid
`it have been ; defined. The question remains
`as to
`whether some -degree of overchilling may be usefully
`employed and; what may be its practical
`limits in
`application. Tables 3-1 through 3-4 examine two and
`three chillers piped in parallel, using 10F (5.55C) and
`18 F (IOC)
`temperature differentials between supply
`and return water.
`
`Table 3-1 indicates that two chillers in parallel with
`a 10F (5.55 C) temperature difference constitute a usable
`combination. However,
`the low 37F temperature is
`
`PAGE 5 of 18
`
`PETITIONER'S EXHIBIT 1026
`
`

`
`Ch. 3
`
`Table 3-1
`
`lldeal Performance of Two Chillers in Parallel
`[Design Chilled Water Supply 42F (5.6 C), Design Chilled Water Return 52F (1 1.1 C)—10F Temperature Differential]
`
`% Load % Load
`of
`of
`System
`Unit
`
`Supply
`Temp.,
`
`Return % Load % Load
`Temp.,
`of
`of
`F
`System
`Unit
`
`Supply
`Temp.,
`F
`
`Return
`Temp.,
`F
`
`Both Chillers Operating
`
`Unit No. 2
`
`50
`37.5
`25
`18.75
`12.5
`6.25
`
`100
`75
`50
`37.5
`25
`12.5
`
`50
`37.5
`25
`18.75
`12.5
`6.25
`
`100
`75
`50
`37.5
`25
`12.5
`
`First Chiller Operating, Second Chiller Bypassing
`(First chiller providing 42F water; mixture temperature increasing above 42 F)
`50
`100
`37.5
`75
`25
`50
`12.5
`25
`
`First Chiller Operating, Second Chiller Bypassing
`(First chiller overchilling, mixture temperature at 42 F)
`
`47
`45.75
`44.5
`43.25
`
`and may need resetting to 38~39F to
`problematic
`prevent evaporator freeze-up. Two and three chillers in
`parallel using an 18 F (l0C)
`temperature differential
`are unfeasible, since they require overchilling to 3l~
`28 F.
`A
`,
`
`In general, a 10 F (S.55C) chilled water range may
`prove practical under
`limited conditions for
`smaller
`central installations of a few thousand tons with short
`
`PYllTl3Iy piping networks, and not more than two chill-
`ers able to tolerate overchilling and not requiring close
`temperature control.
`If the number of chillers or the
`temperature differential
`increases
`to an appreciable
`extent, overchilling is not a useful design tool. Again,
`we conclude that an arrangement based on constant
`tlhilled water
`flow throughout
`the system at all times
`18 not ordinarily attractive because constant flow at
`partial loads contributes to higher operating costs.
`
`3.3 Arrangement b (Fig. 3-ll, Chillers in Series,
`Condensers in Parallel
`
`is next in popularity to arrangement
`22
`Arrangement
`0- The condensers are piped in parallel, since no con-
`
`denser water temperature problem exists. Chillers in
`series deliver design temperature chilled Water at all
`loads, entirely eliminating the overchilling problem of
`the parallel arrangement.
`The designer must decide during the early stages of
`a project whether series or parallel chiller flow is best-
`suited to his project, taking the special conditions of a
`particular job into consideration.
`If constant flow is
`envisaged for the primary chilled water circuit, the series
`arrangement is preferable. Under special circumstances,
`some variation in flow can be tolerated even in a series
`
`arrangement, although this violates the old taboo against
`varying flow through the chiller for fear of a freeze-up.
`Constant flow may be the result of staggered demand,
`when diversity remains fairly constant. Large temperature
`differentials can dovetail well into a constant flow sit:
`uation.
`‘
`
`Although constant refrigeration loads do not neces-
`sarily accompany constant
`flo.w,
`they very often do.
`The series arrangement is strongly indicated when con-
`stant refrigeration loads are present.
`The point can be made that, at full-load maximum
`horsepower, savings can be effected by using series flow
`
`PAGE 6 of 18
`
`PETITIONER'S EXHIBIT 1026
`
`

`
`[Design Chilled Water Supply 42F (5.6 C), Design Chilled Water Return 52F (11.1 C)—10F Temperature Differential]
`
`Table 3-2
`Ideal Performance of Three Chillers in Parallel
`
`%
`
`Supply
`Temp.,
`F
`
`Return
`Temp .,
`
`% Load
`of
`Unit
`
`Supply
`Temp.,
`F
`
`Return
`Temp.,
`F
`
`52
`49.5
`47
`45.75
`44.5
`43.25
`
`% Load
`of
`System
`All Chillers Operating
`100
`33.33
`75
`25
`50
`16.6
`12.5
`37.5
`25
`8.33
`4.16
`12.5
`
`"/13 Load
`of
`Unit
`
`Supply
`Temp .,
`F
`
`Return
`Temp .,
`F
`
`% Load
`of
`System
`
`% Load
`of
`Unit
`
`Supply
`Temp.,
`F
`
`Return
`Temp _ 1F
`
`33.33
`25
`16.66
`12.5
`8.33
`4.16
`
`100
`75
`50
`37.5
`.25
`12.5
`
`First Two Chillers Operating, Third Chiller Bypassing
`1
`(First two chillers providing 42F water; mixture temperature increasing above 42 F)
`33.33
`100
`42
`52
`33.33
`100
`42
`52
`25
`42
`75
`42
`25
`75.
`49.5
`49.5
`42
`47.62
`42
`18.75
`56.25
`47.62
`18.75
`56.25
`42
`42
`12.5
`37.5
`45.75
`12.5
`37.5
`45.75
`42
`6.25
`42
`43.88
`18.75
`6.25
`18.75
`43.88
`
`First Two Chillers Operating, Third Chiller Bypassing
`(First two chillers overchilling; mixture temperature at 42F)
`100
`38.66
`48.66
`38.66
`33.33
`47
`25
`75
`39.5
`39.5
`18.75
`56.25
`40.13
`40.13
`45.75
`40.85
`37.5
`40.85
`44.5
`12.5
`6.25
`41.38
`41.38
`43.25
`18.75
`
`100
`75
`56.25
`37.5
`18.75
`
`45.33
`44.5
`43.25
`
`First Chiller Operating, Second Two Chillers Bypassing
`(First chiller overchilling; mixture temperature at 42 F)
`35.33
`45.33
`’ 45.33
`37.83
`44.5
`44.5
`43.25
`39.5
`43.25
`
`000
`
`100
`75
`37.5
`
`that, at part-load conditions with all compressors
`but
`operative,
`the difference between series and’ parallel
`flow diminishes substantially.
`Selection of the proper
`refrigerant on the part of the manufacturer is important
`because at a particular evaporating condition,
`the load
`carried by one unit versus the other can be greater,
`depending on which refrigerant is being used. However,
`the engineer is not
`in a position to select the refrig-
`erant and often the manufacturer chooses the refrigerant
`which will make his machine most competitive.
`Besides series arrangement and selection of proper
`refrigerant,
`there are two additional factors that affect
`energy consumption and power requirements in hp/ton,
`z'.e., suction temperature and the number of passes; At
`the higher temperature differentials of l5—20 F, (8.3-ll.lC)
`the series arrangement effects operating costs savings be-
`cause less chilled water need be circulated. The leading
`chiller (unit A, Fig. 3-1) operates at a very high suction
`temperature and hp/ton is reduced to a minimum. On
`
`the other hand, lagging chiller (unit B) operates at low
`suction temperature and high horsepower requirements.
`Nevertheless,
`the average hp/ton for the two machines
`is below that of an equal tonnage arrangement in_par-
`allel. A chilled water range of 10 F (5.55C) or less for
`a series arrangement penalizes the application because of
`increased flow rate, velocity through the chiller becoming
`the limiting factor. The greater the number of machines
`in series, the greater the flow limitation. Ordinarily, more
`than three machines in series is disadvantageous. A
`minimum 6F (3.33C) chilled water temperature drop
`across each chiller is the rule of thumb. Conceivably,
`four machines in series could be considered with a 24F
`
`(l3.55C) differential. However, not all machines will be
`the same size. Most probably, the first two will be of one
`size and the last two of a different size.
`
`A series arrangement most often results in a single-pass
`evaporator, due to chiller flow and piping considerations.
`Single-pass evaporators are less efficient in heat transfer
`
`PAGE 7 of 18
`
`PETITIONER'S EXHIBIT 1026
`
`

`
`Ch. 3
`
`Table 3-3
`Ideal Performance of Two Chillers in Parallel
`[Design Chilled Water Supply 40 F (4.4 C), Design Chilled Water Return 58 F (14.4 C)——l8F Temperature Differential]
`
`Supply
`Temp.,
`F
`
`Return
`Supply
`Return % Load % Load
`Temp., ‘
`Temp.,
`Temp.,
`of
`of
`F
`F
`F
`System Unit
`Both Chillers Operating
`
`% Load % Load
`of
`of
`System Unit
`
`Supply
`Teinp.,
`F
`
`50
`37.5
`25
`18.75
`l2.5
`6.25
`
`100
`75
`50
`37.5
`25
`12.5
`
`First Chiller Operating, Second Chiller Bypassing
`(First chiller providing 40F water; mixture temperature increasing above
`
`First Chiller Operating, Second Chiller Bypassing
`(First chiller overchilling, mixture temperature at 40 F)
`31
`49
`33.25
`46.75
`35.5
`44.5
`37.75
`42.25
`
`49
`48.75
`44.5
`=4]-2.25
`
`than multiple-pass. Thus, single-pass evaporators for a
`particular leaving chilled water temperature“'require either
`lower evaporator temperature and increased horsepower
`or
`larger heat
`transfer surface and,
`therefore, greater
`initial investment.
`
`In general, the greater the chilled water range, the more
`economically attractive a two-pass chiller becomes by re-
`ducing the horsepower gap between parallel and series
`chillers.
`‘
`The designer of a series arrangement faces the problem
`of selecting identical or unequal chillers for the leading
`and follower unit. Equally sized chillers are desirable
`from a maintenance and logistical point of view, but,
`either case involves particular considerations in terms of
`Performance and convenience.
`Figures 3-3 and 3-4 indicate some of the parameters
`that affect Clijller selection‘
`Iloadmg the leading and follower unit properly in a
`series arrangement is of primary importance.
`Initial load
`balancing is re
`. d f
`t.
`f
`f hm
`,
`_
`qmre
`OI OP 1-mum Per Ormance 0 C
`BIS
`in series. When refrigeraion load is reduced or when one
`
`_
`
`the other continues to
`of the machines breaks down,
`handle its sir are of the load. Ordinarily,
`the leading
`machine assumes more thai 50% of the load because of
`
`$lip,léavingchilledwaterternperu1ure~evaporator
`
`
`temperatureFlC)
`
`’
`_
`'3 lg 20
`,2 ,3 ,4 ,'g—|S _7
`,0 H
`5 5 7 8 E‘,
`su.~race,souare Feet per‘ Ton (m2lkW)
`(0.13)
`(Q25)
`(0.39)
`(0.52)
`Courtesy York Division ofBorg-Warner Corp.
`.
`.
`,
`Figure 3-3. Typical chiller performance.
`(Curves based on i6 ft
`length, 0.56" l.D. pipes; 10 ft/sec velocity. Dashed curves indicate
`a velocity ofless than 200 ft/min.)
`
`.
`-1
`
`PAGE 8 of 18
`
`PETITIONER'S EXHIBIT 1026
`
`

`
`Table 3-4
`Ideal Performance of Three Chillers in Parallel
`[Design Chilled Water Supply 40F (4.4 C), Design Chilled Water Return 58F (14.4 C)—]8F Temperature Differential]
`Unit No. 1
`Unit No. 2
`% Load
`% Load
`of
`of
`Unit
`Unit
`
`% Load
`of
`System
`
`Supply Return
`Temp .,
`Temp.,
`F
`F
`
`Supply
`Temp.,
`F
`
`Return
`Temp.,
`F
`
`Unit No. 3
`% Load % Load
`Supply
`of
`of
`Temp.,
`F
`System
`Unit
`
`Return
`Temp.,
`F
`
`% Load
`of
`System
`All Chillers Operating
`100
`33.33
`25
`75
`50
`16.6
`12.5
`37,5
`8.33
`25
`12.5
`4.16
`
`40
`40
`40
`40
`40
`40
`
`58
`53.5
`49
`46.75
`44.50
`42.25
`
`40
`40
`40
`40
`40
`40
`
`33.33
`25
`16.66
`12.5
`8.33 "
`4.16
`
`46
`44.5
`43.37
`42.25
`41.12
`
`53
`53.5
`50.12
`46.75
`43.37‘
`
`First Two Chillers Operating, Third Chiller Bypassing
`(First two chillers providing 40F water; mixture temperature increasing above 40F)
`33.33
`100
`100
`33.33
`25
`75
`25
`75
`l8.75
`18.75
`56.25
`56.25
`12.5
`37.5
`12.5
`37.5
`6.25
`18.75
`6.25
`18.75
`
`p
`
`- First Two Chillers Operating, Third Chiller Bypassing
`(First two chillers overchilling; mixture temperature at 40F)
`100
`33.33
`25
`75
`18.75
`56.25
`12.5
`37.5
`6.25
`18.75
`
`First Chiller Operating, Second Two Chillers Bypassing
`(First chiller overchilling; mixture temperature at 40F)
`28
`46
`31
`44.5
`42.25
`35.5
`
`46
`44.5
`52.25
`
`100
`75
`37.5
`
`
`
`APPROX.Em/YON(kW/kW .5E i inO
`
`42
`
`40
`-i(4.51
`
`ONEPASS COOLER
`
`TWO-PASS COOLER
`
`.
`
`46
`
`44
`45
`u
`I
`(6:7)
`(5.9),
`LEAVING WATER TEMP-F(C)
`
`v
`
`-
`
`~
`
`(11.1)
`
`-
`
`I-
`.
`“ (I13)
`
`Courtesy Carrier Corp.
`From Handbook of Air Conditioning-
`System Design, ©Mc Graw-Hil1Baak Ca. Used with pennisslon of
`McGraw-Hill Book Co.
`
`Figure 3-4. Centrifugal compressor power—refrigerant 11.
`
`This implies that the
`its higher suction temperature.
`follower machine can be smaller, resulting in cost reduc-
`tions.
`From a practical point of view,
`two identical
`machines at
`increased cost are preferred because this
`presents
`fewer maintenance problems.
`In selecting
`identical machines, and in order to produce identical
`speeds, it is necessary to divide the load at 55% for the
`leading machine and 45% for the follower machine as a
`firs’: approximation, or at percentages that are not ap-
`preciably different. Centrifugal compressors are selected
`at a definite speed to satisfy a fixed design head. Since
`the leading and follower compressors have different heads,
`it
`is possible that different speeds are required if the
`55%/45% ratio is exceeded appreciably.
`It follows that balancing both chillers at 50% unbal-
`ances loads and requires a different head and speed for
`each machine, precluding the possibility of sequencing
`the two machines as leading or follower units alternately.
`Two or more machines may be placed in series provided
`
`PAGE 9 of 18
`
`PETITIONER'S EXHIBIT 1026
`
`

`
`Ch. 3
`
`that a minimum of 6F (3 .33C) chilled water temperature
`drop is maintained across each chiller.
`Automatic speed resetting by a controller is difficult,
`and more so for motor than for turbine drive. It is pre-
`ferable that any seasonal speed adjustment be manual
`and that vane control be automatic so that there is less
`chance of the machines “hunting.”
`Constant flow through the machines promotes pump-
`ing smoothness and control stability, two distinctly de-
`sirable qualities, which are discussed in Chapter 7 as
`constant flow in the primary circuit,
`Unfortunately, friction of the two chillers in series
`is additive, most often resulting in higher heads, although
`not necessarily so for single pass evaporators. Relatively
`speaking,
`there are fewer pipes than in the parallel ar-
`rangement, although of a larger diameter since they must
`handle full
`flow.
`. The designer can compare costs of
`piping arrangements, and he must weigh the cost of a
`back-up unit
`in either parallel or series arrangement.
`Series arrangement’ piping costs may be reduced to some
`extent by using four-way valves as Figs. 3-5, 3-6, 3-7 and
`3-9 indicate.
`,
`
`Figure 3-5 shows single-pass and two-pass chillers ar-
`ranged in opposed or side-by-side positions. Four-way
`valves eliminate two gate Valves in each case. The star-
`delta arrangement of Fig. 3-6 allows either unit A, B or
`C to become the spare but does not permit unit B in the
`leading position. Bypassing around each unit is pro-
`vided.
`The star-delta arrangement is capable of three
`combinations using ten gate valves. Four 4-way valves
`(Fig. 3-7) permit six possible combinations at consider-
`ably less cost. However, all six combinations may not be
`desirable and present difficult control problems.
`The arrangement presented in Fig. 3-8 has both chilled
`water
`and condenser water in series in counterflow
`fashion and possesses much flexibility in refrigeration
`load handling and. some variation in chilled water flow
`bl’ employing more or fewer pumps as the circumstances
`demand. One chiller is used for low loads, two chillers
`for normal loads and three chillers for high loads. The
`third chiller serves as a spare when it is not used for high
`loads. Two or three pumps can be used, depending on
`load magnitude and system heat
`transfer character-
`istics.
`
`3-4 Arrangementc (Fig. 3-I), Chillers in Series,
`Condensers in Series (condenser water parallel to chilled
`water)
`
`This arrangement is of theoretical interest only. The
`leadmg machine (Unit A) has the lowest condensing
`
`><
`+4
`OPPOSED
`
`B——I><)——1—V
`>+
`
`>4
`>4
`
`A
`
`>4
`>4
`
`OPPOSED
`
`>4
`>4
`‘
`A
`>1
`" i
`E .‘
`
`SlDErBY— SIDE
`
`A LEADING
`
`‘USING 4-WAY VALVES
`
`Figure 3-5. Two chillers in series without a spare unit.
`
`Figure 3-6. Two chillers in series with a spare unit in star-delta
`arrangement.
`
`PAGE 10 of 18
`
`PETITIONER'S EXHIBIT 1026
`
`

`
`FOLLOWER UNIT B,
`LEADING UNIT A,
`SPARE UNIT C
`I
`
`F LLOWER UNIT C,
`LEADING UNIT
`SPARE UNIT B
`
`LEADING UNIT B, FOLLOWER UNIT A,
`SPA
`R UNIT C
`
`LEADING UNIT B, FOLLOWER UNIT C,
`SPARE UNIT A
`
`LEADING UNIT C, FOLLOWER UNIT A,
`SPARE UNIT B
`
`LEADING UNIT C, FOLLOWER UNIT B,
`SPARE UNIT A
`
`Figure 3-7. Two chillers in series with a spare unit using 4-way valves.
`
`temperature and highest evaporator temperature. The
`follower (Unit B) has the highest condensing and the
`lowest evaporator
`temperatures.
`The lift (difference
`between condensing and evaporating temperatures) of
`the two units is distinctly diverse and, therefore,
`the
`heads of the two compressors will be quite opposed,
`creating problems of speed and control, and generally
`serious application problems. This arrangement cannot
`
`be recommended because it imposes severe design limit-
`ations.
`
`3.5 Arrangement d (Fig. 3-II, Chillers in Series,
`Condensers in Series (condenser water in counterflow
`to chilled water)
`
`this arrange-
`By following the counterflow principle,
`ment creates roughly equal lift
`(condensing temp. —
`
`PAGE 11 of 18
`
`PETITIONER'S EXHIBIT 1026
`
`

`
`CONDENSER WATER
`
`CHILLER UNIT
`No 3
`
`> ‘
`
`> ‘
`
`CHlLlhiR1 UNIT
`
`> ‘
`
`V
`A
`
`V
`A
`
`BY PASS
`
`Figure 3-8. System load with flexibility in load handling and variation in chilled water flow possible because of use of multiple pumps.
`
`evaporator temp.) for both units, matching the highest
`condensing and evaporator temperatures in the leading
`machine (Unit A) to the lowest condensing and evap-
`orator temperatures in the follower machine (Unit B).
`Compressor head requirements are equalized at an equal
`load split.
`Condenser series flow can be utilized at great advantage
`where there is a dearth of condenser water and its temper-
`ature is low, as usually is the case with well water. A
`large condenser water
`temperature rise is practically
`mandatory.
`A valved bypass around each chiller and condenser is
`required for repairs andcleaning. As in any series ar-
`rangement,
`larger valves and pipes are required. The
`follower condenser andevaporator must be sized to do a
`leading unit job if exchange of duties between units is
`contemplated.
`
`3.6 Arrangement e, Series—Paral|e|
`
`The classic series-parallel arrangement is represented by
`the diagrams of Fig. 3-9. A tonnage of 25,000 is being
`handled in this fashion for the Capitol Building in Wash-
`ington,D.C.
`This arrangement is used extensively because it com-
`bines the most desirable features of both series and
`
`parallel arrangements, flexibility and economy, plus its
`Own advantage of a multiplicity of components and the
`implied potential -of combining these components to
`match loads and obtain maximum efficiency.
`Some disadvantages of the parallel arrangement also
`appear here. Constant system flow at partial system
`refrigeration load signifies circulating water
`through
`inactive chillers, requiring either overchilling or accept-
`ance of water temperatures higher than design.
`The overchilling operation means that at 50% load the
`deactivation sequence is A1 — B1 or A2 ~ B2. Overchil-
`
`ling may be eliminated by deactivating A1 — A2 first with
`B1 and B2 still on the line, handling their share of the
`load.
`
`An alternate solution, reducing flow through the chill-
`ers at partial load, may cause pump head and water dis-
`tribution problems. Controlling the operation of the
`units becomes more complex in the sense that
`ideal
`performance would require identical performance from
`corresponding units in each series branch. Whereas one
`single branch may not be particularly difficult to con-
`trol, several series branches acting in concert demand
`more precision on the part of control and instrumen~
`tation systems.
`Introducing or withdrawing load from
`
`->4
`
`i><lll><l
`
`NG 4-WAY VALVES
`
`Figure 3-9. Four chillers in series-parallel arrangement without a
`spare.
`
`PAGE 12 of 18
`
`PETITIONER'S EXHIBIT 1026
`
`

`
`68
`
`Ch. 3
`
`the system requires engagement or disengagement of
`refrigeration units in a particular pattern to maintain
`system design parameters with the least disturbance
`or inconvenience possible. A thermodynamic and op-
`erational analysis should provide the answer to the de-
`activation procedure for different control schemes. These
`are some of the questions that the designer must consider.
`Like the parallel,
`the parallel-series arrangement can
`accommodate additional ser

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket