`Safety Information .
`
`Safety \X/arnings
`
`Overview .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`3
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. I
`
`.
`
`. 7
`
`PDU with System Bypass 9
`
`I2
`Symmetra 3-Phase UPS
`Netshelter VX Enclosures
`
`I4
`
`3-Phase Automatic Transfer Switch
`
`16
`
`Metered Rack-Mount PDU I7
`
`Information Controller and Hub
`
`18
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. .19
`
`Site Planning .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`PDU with System Bypass
`
`21
`
`Symmetra 3-Phase UPS 24
`
`Emergency Power-Off Switch 26
`NetSheIter VX Enclosures 27
`
`Installation .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. .29
`
`PDU with System Bypass
`
`31
`
`Symmetra 3-Phase UPS 38
`
`Emergency Power-Off Switch 42
`NetSheIter VX Enclosures 44
`
`Cable Troughs, Partitions, and Ladders 47
`
`Power Cables (Whips) 54
`3-Phase Automatic Transfer Switch 58
`
`Metered Rack-Mount PDU 60
`
`Information Controller and Hub 63
`
`System Start-Up .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. .65
`
`Start-Up Procedure 67
`
`IPR Page 2
`
`IPR Page 2
`
`

`
`Contents
`
`Communication Connection .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. 75
`
`Information Controller and Hub 77
`
`.
`.
`.
`.
`.
`.
`.
`.
`.
`.
`.
`.
`Configuration .
`Metered Rack-Mount PDU 89
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. 87
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. 97
`
`Operation .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`System Operation 99
`
`PDU with System Bypass
`
`102
`
`1 16
`Symmetra 3-Phase UPS
`3-Phase Automatic Transfer Switch
`
`122
`
`Metered Rack-Mount PDU 123
`
`Information Controller and Hub
`
`125
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. 127
`
`Customization .
`
`.
`
`.
`
`NetShelter VX Enclosures
`
`131
`
`Metered Rack-Mount PDU 142
`
`Specifications .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. 145
`
`PDU with System Bypass
`
`147
`
`148
`Symmetra 3-Phase UPS
`3-Phase Automatic Transfer Switch
`
`150
`
`Metered Rack-Mount PDU 151
`
`Information Controller
`
`152
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. 153
`
`Maintenance .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`155
`Symmetra 3-Phase UPS
`Metered Rack-Mount PDU I61
`
`Product Information .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. 163
`
`Warranty 165
`
`166
`Life-Support Policy
`How to Obtain Service
`
`167
`
`How to Contact APC 168
`
`Document Information 169
`
`User's Manual—PowerStruXure Type B
`
`IPR Page 3
`
`IPR Page 3
`
`

`
`Safety Information
`
`Safety \X/arnings .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. 3
`
`Safety symbols used in this guide 3
`
`General safety warnings
`
`3
`
`PDU with System Bypass 4
`
`Symmetra 3-Phase UPS
`
`5
`
`Other components
`
`5
`
`IPR Page 4
`
`IPR Page 4
`
`

`
`IPR Page 5
`
`IPR Page 5
`
`

`
`Safety \X/arnings
`
`This manual is intended for use by the following groups:
`0 Users
`
`- Licensed electricians
`
`- APC Field Service Engineers
`
`0 Qualified, APC-trained personnel
`
`This manual indicates who must perform specific procedures. Failure to
`follow the instructions in this manual could result in damage to property,
`personal injury, or even deaths
`
`Indicates a hazard, which, ifnot avoided, could result in injury
`or death.
`
`Indicates a hazard, wl1ic11, if not avoided, could result in
`
`damage to product or other property.
`
`Indicates important information.
`
`l>Electrical
`
`Hazard
`
`DW
`
`arning
`
`(9
`
`Note
`
`Safety symbols used in
`this guide
`
`Indicates a heavy load that should not be lifted without
`
`assistance.9
`
`Heavy
`
`General safety warnings
`
`9Note
`
`IMPORTANT SAFETY INSTRUCTIONS
`
`Save these instructions. This manual contains important
`instructions that should be followed during installation and
`maintenance of the PowerStruXure system.
`
`INSTUCTIONS IMPORTANTES CONCERNANT LA
`
`SECURITE
`Conserver ces instructions. Cette notice contient des
`
`instructions importantes concemant la sécurité.
`
`User's Manual—PowerStruXure Type B
`
`3
`
`IPR Page 6
`
`IPR Page 6
`
`

`
`Safety Information: Safety Warnings
`
`Total Power Off Procedure:
`
`1. Set the Symmetra 3-Phase UPS System Enable switch to
`the Standby or Off position.
`
`Note
`
`2. Open the Symmetra 3-Phase UPS DC Disconnect
`breaker.
`
`3. Open the PDU with System Bypass Main Input breaker.
`
`4. Open the DC Disconnect breaker of each XR Battery
`Cabinet.
`
`5. Disconnect the batteries in the Symmetra 3-Phase UPS by
`pulling them out approximately one inch (25.4 mm) from
`their normal position.
`
`Hazardous, live parts inside the Symmetra 3-Phase UPS are
`energized from the battery supply even when the AC power is
`Electrical disconnected.
`Hazard
`
`Hazardous, live parts may exist inside the PDU with System
`Bypass due to the Symmetra 3-Phase UPS inverter even when
`the AC power is discomrected. Test before touching any
`electrical parts.
`
`This equipment has been tested and found to comply with the
`
` limits for a Class A digital device, pursuantto Part 15 ofthe
`
`Warning
`
`FCC Rules and the Class A limits for radio noise emissions
`
`PDU with System Bypass
`
`from digital apparatus set out in the Radio Interference
`Regulations of the Canadian Department of Communications.
`These limits are designed to provide reasonable protection
`against harmful interference when the equipment is operated
`in a commercial environment. This equipment generates, uses
`and can radiate radio frequency energy and, if not installed
`and used in accordance with the instruction manual, may
`cause harmful interference to radio communications.
`
`Operation of this equipment in a residential area is likely to
`cause harmful interference in which case the user will be
`
`required to correct the interference at his or her own expense.
`
`i>
`
`Hazardous, live parts inside the PDU with System Bypass are
`
`energized from the battery supply of the attached Symmetra
`
`El|_¢'=-acztgircgl 3-Phase UPS even when the AC power is disconnected.
`
`Risk of Electrical Shock. No user serviceable parts inside.
`Refer all servicing to an APC Field Service Engineer.
`
`A licensed electrician must perform the following:
`0 Connection to the branch circuit.
`
`- Connection of PDU power cords in addition to the
`factory -installed power cords.
`
`4
`
`User's Manual—PowerStruXure Type B
`
`IPR Page 7
`
`IPR Page 7
`
`

`
`Safety Information: Safety Warnings
`
`:
`
`Warning
`
`Changes or modifications to this unitnot expressly approved
`
`by the party responsible for compliance could void the user's
`authority to operate the equipment.
`
`The Branch Circuit conductors are secured to the Main Input
`Circuit Breaker. Ensure that the circuit breaker terminals are
`
`tightened to the torque specified on the circuit breaker's label.
`
`® This product is intended for installation in atemperature-
`
`controlled (00 C-40” C), indoor area, free of conductive
`contaminants.
`
`Note
`
`Symmetra 3-Phase UPS
`
`The Symmetra 3-Phase UPS contains an internal energy
`source. Hazardous voltage can be present even when
`
`Ell;-acztgircdal disconnected from the utility power source.
`
`All power wiring from the Symmetra 3-Phase UPS to the PDU
`with System Bypass must be completed by an APC Field
`Service Engineer.
`
`A battery can present a risk of electrical shock and high short-
`circuit current. The following precautions should be observed
`when working on batteries:
`
`- Remove all conductive jewelry such as chains, watches,
`and ri11gs.
`0 Use tools with insulated handles.
`
`- Wear rubber gloves and boots.
`
`° Do not lay tools or metal parts on top of the batteries.
`
`:> When replacing batteries, replace with same nmnber and type
`
`as installed. For customer-supplied external batteries, see
`
`warning manufacturer’s installation and safety instructions.
`
`Other components
`
`Automatic Transfer Switch, Metered Rack-Mount PDU, Information
`Controller, and Information Controller Hub.
`
`This equipment contains potentially hazardous voltages. Do
`not attempt to disassemble the unit.
`
`Warning This equipment contains no user serviceable parts. Repairs are
`performed only by factory-trained service personnel.
`
`User's Manual—PowerStruXure Type B
`
`5
`
`IPR Page 8
`
`IPR Page 8
`
`

`
`IPR Page 9
`
`IPR Page 9
`
`

`
`Overview
`
`PDU with System Bypass .
`Front veiw 9
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. .9
`
`Front view (interior)
`
`10
`
`Rear view (interior)
`
`1 l
`
`Symmetra 3-Phase UPS .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. I2
`
`. l4
`
`NetShelter VX Enclosures .
`
`.
`
`.
`
`.
`
`Cable-routing equipment
`
`15
`
`Netshelter VX options
`
`15
`
`Expansion and mounting hardware
`
`15
`
`3-Phase Automatic Transfer Switch .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. l6
`
`AP770l
`
`lb
`
`Metered Rack-Mount PDU .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`Information Controller and Hub .
`
`Information Controller Hub
`
`18
`
`Information Controller
`
`18
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. .17
`
`.
`
`. 18
`
`IPR Page 10
`
`IPR Page 10
`
`

`
`IPR Page 11
`
`IPR Page 11
`
`

`
`PDU with System Bypass
`
`Front veiw
`
`
`
`///7
`\ \
`
`\
`
`
`///
`
`\
`
`9\\\§\
`
`0
`
`9
`
`9
`
`Power cable (whip)
`
`0 Cable access holes
`
`Display interface
`
`9 Power cable trough
`
`L21-20 outlet
`
`5 Data cable trough
`
`User's Manual—PowerStruXure Type B
`
`9
`
`IPR Page 12
`
`IPR Page 12
`
`

`
`Overview: PD U with System Bypass
`
`Front view (interior)
`
`0 Information Controller Hub 9 Wraparound maintenence
`bypass panel
`
`9 Information Controller
`
`0 42-position circuit breaker
`panels
`
`10
`
`User's Manual—PowerStruXure Type B
`
`IPR Page 13
`
`IPR Page 13
`
`

`
`Rear view (interior)
`
`m,Bm
`
`mwW7a&.T.nfiUShee0e
`.mmmdmmmm.mmDmmmmPusmmw.U0S.wDPWmumPECw900B0e
`
`D.
`
`mnD.a|
`
`41e9m
`
`
`
` r_w.m.meC4|.rm.nmmmmmmmcmM.mmflr.nWemwmmwu.no..ws&§32asafifififlfiwwwwwwwwwwwmwwwwmwwwwwwww.9.p0WPW.mmF.hMM.mUawu0aDMnLMD1FS«Ma0990.s
`
`rmU
`
`IPR Page 14
`
`

`
`Symmetra PX UPS
`
`0 Main intellegence module (MIM)
`
`9 Access for data cables
`
`9 Redundant intellegence module (RIM) 0 Static switch module
`9 Power module
`
`0 Documentation tray
`
`0 Battery module (four battery units)
`
`12
`
`User's Manual—PowerStruXure Type B
`
`IPR Page 15
`
`IPR Page 15
`
`

`
`Overview: Svmmelm 3-Phase UPS
`
`
`
`0 DC disconnect breaker
`
`0 External switch gear monitoring card
`
`9 System-enable switch
`
`9 Display/computer interface card
`
`9 System power supply cards 9 Battery monitoring card
`0 Available card slots
`9 Reserved for future use
`
`9 Network Management Card ‘D Extended-Run Frame card
`
`User's Manual—PowerStruXure Type B
`
`I3
`
`IPR Page 16
`
`IPR Page 16
`
`

`
`Netshelter VX Enclosures
`
`The APC Netshelter® VX enclosure allows 42U (73.50 in) of storage
`height for EIA-310, 19-inch, rack-mount equip1ne11t. It comes i11 two
`models:
`
`- AR2l00BLK—the base enclosure
`
`0 AR2 l0 lBLK—an expansion enclosure
`
`0 Frame posts
`
`Ventilated split rear door for added
`access in narrow aisles
`
`9 Adjustable horizontal
`braces
`
`Quick—release side panels with
`locks (base model only)
`
`9 Vertical mounting rails
`
`8 Ventilated roof
`
`0 Skirt
`
`9 Access on roof, sides, and base
`
`9 Quick-release,Ventilated,
`reversible front door
`
`14
`
`User's Manual—PowerStruXure Type B
`
`IPR Page 17
`
`IPR Page 17
`
`

`
`Cable-routing equipment
`
`Overview: NetShelter W(Encl0sures
`
`
`
`0 Overhead ladders
`
`9
`
`Power cable trough
`
`9 Data partitions
`
`NetShelter VX options
`
`Options for this enclosure include the following:
`
`0 Stabilizer plate
`- Bolt-down brackets
`
`- Cable management devices
`0 Toolless mounting for some accessories
`
`Expansion and mounting
`hardware
`
`AR2100BLK AR2101BLK
`
`Expansion hardware
`
`Baying brackets
`
`Vertical baying trim
`M6 X 12 socket—head screws
`
`M6 caged nuts
`
`Mounting hardware
`
`M6 X 16 mm Phillips/slotted
`screws
`
`Caged nut installation tool
`
`8
`
`—
`
`—
`
`60
`
`1
`
`User's Manual—PowerStruXure Type B
`
`I5
`
`IPR Page 18
`
`IPR Page 18
`
`

`
`3-Phase Automatic Transfer Switch
`
`AP770l
`
`@@@@®0
`
`Network Management Card (AP9617)
`
`Two NEMA L21-20 plugs (cords: 36 inches)
`
`NEMA L21-20R receptacle (cord: 36 inches)
`Rack—rn0unt brackets
`
`Rear rail segments
`
`Front rail segments
`
`16
`
`User's Manual—PowerStruXure Type B
`
`IPR Page 19
`
`IPR Page 19
`
`

`
`Metered Rack-Mount PDU
`
`
`
`AP7602
`
`0
`
`9
`
`9
`
`9
`9
`
`NEMA 5-20R outlets
`
`Cord retension clip holes
`
`Digital display
`
`L21-20 power cord
`NEMA L6-20R outlets
`
`(9
`
`0
`
`9
`
`9
`
`Serial cable (940-0144)
`
`Hardwire end cap (870-70803)
`
`Hardwire access cover (870-70804)
`
`C d
`t
`t‘
`l' —AP760l :42;
`A;76:)e2:e2n11E)§17((:)_1§0945>
`
`User's Manual—PowerStruXure Type B
`
`I7
`
`IPR Page 20
`
`IPR Page 20
`
`

`
`Information Controller and Hub
`
`Information Controller
`Hub
`
`Information Controller
`
`
`
`0 Information Controller Hub (32-port hub)
`
`9 Rack-Inount brackets (2) and screws (6)
`
`
`
`0 Inforrnation Controller
`
`9 Rack-mount brackets (2) and screws (4)
`
`The Information Controller and the Information Controller
`
`Hub connect to powercords pre-installed ill the PDU. These
`
`Note
`
`cords are a 5-15 to IEC C13 and a11IEC C13 to an IEC C14.
`
`I8
`
`User's ManuaI—PowerStruXure Type B
`
`IPR Page 21
`
`IPR Page 21
`
`

`
`Site Planning
`
`PDU with System Bypass .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. .21
`
`\X/eight/Dimensions 21
`
`Space considerations 21
`
`Weight considerations 21
`BTU Considerations 22
`
`Operating conditions 22
`
`Electrical requirements 23
`
`Electrical specifications 23
`
`Symmetra 3-Phase UPS .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. .24
`
`\X/eight/Dimensions 24
`
`Space considerations 24
`
`Weight considerations 25
`BTU Considerations 25
`
`Operating conditions 25
`
`Electrical Requirements 25
`
`Emergency Power-Off Switch .
`Overview of EPO 26
`
`.
`
`.
`
`.
`
`.
`
`.
`
`NetShelter VX Enclosures .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. .26
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. .27
`
`\X/eight/Dimensions 27
`
`Space considerations 27
`
`Weight considerations 27
`
`IPR Page 22
`
`IPR Page 22
`
`

`
`IPR Page 23
`
`IPR Page 23
`
`

`
`PDU with System Bypass
`
`\X/eight/Dimensions
`
`PDU with System Bypass
`1500 lb (680 kg)
`
`85 in. (215 cm)
`
`1I1Cl11d]I1g power
`cable trough:
`S9 in. (226 cm)
`
`Data Cable Troughs
`
`\\
`V \x £\i%*\7\
`0
`4.8 in
`23 in
`g
`I
`(58 em)
`‘.12 Cm)
`
`Power Cable Trough
`
`Space considerations
`
`Study the figure below to deter111i11e your space requirements for
`installing the PDU with System Bypass. The clearances listed below are
`required to comply with Table 110-26 of the 1999 National Electric
`Code. In accordance with section 110-26 of this code, the 36-inch depth
`is required for all 120/208V products and the majority of 277/480V and
`346/600V products. If 277/480V and 346/600V products are installed
`adjacent to an iminsulated concrete wall, you must have a working depth
`space of 42 inches. Consult your local code for additional requirements.
`
`Floor-to-Ceiling Ventilation
`>l 01 in. (236 cm)
`
` , 24 in.
`
`(86 cm)
`
`(50 mm)
`
`X.’
`‘/ 36 111
`(91 cm)
`
`Weight considerations
`
`Ensure that the floor and sub-floor can support the total weight of the
`configuration when concentrated on the leveling feet. If you are placing
`equipment on a raised floor, consult the flooring manufacturer for
`loading requirements prior to installing equipment.
`
`PDU with System Bypass Weight: 1500 lb (680 kg)
`
`See “Weight considerations” on page 25 and on page 27 for weight
`measurements for the Symmetra 3—Phase UPS and NetShelter VX
`enclosures.
`
`User's Manual—PowerStruXure Type B
`
`2]
`
`IPR Page 24
`
`IPR Page 24
`
`

`
`Site Planning: PDU with S1/stem Bypass
`
`BTU Considerations
`
`Consider the BTU ratings of equipment to determine cooling
`requirements. Additional cooling equipment may be required. Refer to
`the table below for BTU output of the PDU with System Bypass.
`
`Product Voltage
`
`480 V
`
`600 V
`
`3425 208 V
`
`BTU Output
`4645
`
`4617
`
`BTU was calculated with the following formula:
`[(LOad X % 2 X Mfg. specified load loss)
`specified core loss] X 3.414
`
`+ Mfg.
`
`This calculation is based on the following Square D transformers:
`0 208 V: 60T2llHCUOCSW3
`
`- 480 V: 60T3HCUOCSW3
`
`- 600 V: 60T65HCUOCSW3
`
`The BTU output is higher while batteries are charging. Under
`normal operating conditions, battery recharge periods are
`
`Note
`
`relatively infrequent.
`
`Operating conditions
`
`Operating enviromnent
`
`PDU with System Bypass
`Protected from water and conductive
`contaminates
`
`
`
`Temperature class (transformer)
`
`Class H 220° C
`
`Storage elevation (for shipping
`by air)
`
`33,000 ft(l0 000 m)
`
`Relative humidity (for operating
`and storage)
`
`95% nomcondensing
`
`Operating temperature
`Acoustic noise emission
`
`32- 104° F (O—40° C)
`
`Maximum 50 dB(A) at l m
`
`22
`
`User's Manual—PowerStruXure Type B
`
`IPR Page 25
`
`IPR Page 25
`
`

`
`Site Planning: PDU with System Bypass
`
`Electrical requirements
`
`AElectrical
`
`All power wiring, including connection to the branch circuit,
`must be installed by a qualified electrician and must comply
`
`Hazard with local and country codes.
`
`Electrical specifications
`
`Service distribution breaker
`
`(provided by customer)
`
`Conductors to main input
`breaker (provided by
`customer)
`
`3/0 conductors #3 conductors #4 conductors
`
`‘ 2°”
`Transformer type
`
`Transformer configuration
`
`-W
`Step—down
`Delta to WYE
`
`“AV
`Step—down
`
`Delta to WYE
`
`Voltage requirements, nominal 208/120 V
`
`208/1 20V
`
`208/ 120V
`
`Input voltage AC
`
`Output voltage AC
`
`“~63 HZ
`3-phase
`3-wire plus
`ground, 208V
`
`“~63 HZ
`3 -phase
`3-wire plus
`ground, 480V
`
`“~63 Hz
`3 -phase
`3-wire plus
`ground, 600V
`
`3-phase
`4-wire plus
`ground, 120/
`208V
`
`3 -phase
`4-wire plus
`ground, 120/
`208V
`
`3 -phase
`4-wire plus
`ground, 120/
`208V
`
`Output rating (full load)
`
`40 kW
`
`40 kW
`
`Maximum continuous input
`current (at minimum mains)
`Maximum continuous output
`current + 125% overload
`
`(Bypass mode only)
`
`Internal static switch ruses
`
`External output breaker
`
`155 A
`
`139A
`
`111 A
`125 A
`175 A
`
`150A
`
`67 A
`
`139A
`
`111 A
`54 A
`175 A
`
`150A
`
`40 kW
`
`_
`>4 A
`
`139A
`
`1“ A
`43A
`
`175 A
`
`150A
`
`User's Manual—PowerStruXure Type B
`
`23
`
`IPR Page 26
`
`IPR Page 26
`
`

`
`Symmetra 3-Phase UPS
`
`\X/eight/Dimensions
`
`Symmetra 3-Phase UPS
`Full 1700 lb (775 kg)
`.-/\
`
`Symmetra 3-Phase UPS
`Empty 600 lb (265 kg)
`
`(208 cm)
`
`82 111.
`
`Power Module
`
`60 lb (26 kg)
`
`Battery Module
`4 >< 50 lb (4 >< 23 kg)
`
`
`
`Space considerations
`
`Study the figure below to determine your space requirements for installing
`the Symmetra 3-Phase UPS. The clearances listed below are required to
`comply with Table 110-26 of the 1999 National Electric Code. ln
`accordance with section 110-26 of this code, the 36-inch depth is required
`for all 120/208V products and the majority of 277/480V and 346/600V
`products. If 277/480V and 346/600V products are installed adjacent to an
`uninsulated concrete wall. you must have a working depth space of 42
`inches. Consult your local code for additional requirements.
`
`Floor-to-Ceiling Ventilation
`> 91 in. (230 cm)
`
` 23.5
`
`.
`(50 Cm)
`
`(91 cm)
`
`24
`
`User's Manual—PowerStruXure Type B
`
`[PR Page 27
`
`IPR Page 27
`
`

`
`\X/eight considerations
`
`BTU Considerations
`
`Operating conditions
`
`Electrical Requirements
`
`Site Planning.‘ Symmetra 3-Phase UPS
`
`Ensure that the floor and sub-floor can support the total weight of the
`configuration when concentrated on the leveling feet. If you are placing
`equipment on a raised floor, consult the flooring manufacturer for
`loading requirements prior to installing equipment.
`
`Symmetra 3-Phase UPS Weight:1700 lb (775 kg)
`
`See “Weight considerations” on page 21 and on page 27 for weight
`measurements for the Power Distribution Unit and NetShelter VX
`enclosures.
`
`Consider the BTU ratings of equipment to determine cooling
`requirements. Additional cooling equipment may be required. BTU
`output of the Symmetra 3-Phase UPS is: 12,682 BTU/hr (North
`America)
`
`The BTU output is higher while batteries are charging. Under
`normal operating conditions, battery recharge periods are
`
`Note
`
`relatively infrequent.
`
`Symmetra 3-Phase UPS
`
`Temperature range
`
`32- 1 04°F (0— 40°C)
`
`Maximum elevation
`Nominal full load
`Full load loss at nominal mains
`
`0- 10,000 ft (0—3048 m)
`12,682 BTU/h
`3716 W
`
`Operating environment
`
`Keep ventilated; lieep dust and
`corrosive fumes away from the
`
`A Power wiring must be installed by an APC Field Service
`
`Electrical En glneer‘
`Hazard
`
`Input voltage AC, nominal
`
`Output voltage AC, nominal
`
`3-phase 208 V
`
`3-phase 208 V
`
`Symmetra 3-Phase UPS.
`162 A
`
`40 kw
`
`()0 Hz
`
`Synchronized to mains in normal
`operation; 60 Hz in battery operation.
`
`140 A
`
`1,, 9 A
`3
`111 A
`
`Full load output rating (in maximum
`configuration)
`
`Input frequency
`
`Output frequency
`
`Maximum input current
`
`Maximum output current (125%
`load—Bypass mode only)
`Output current per phase, nominal
`
`Output per neutral, nominal
`(APC recommends the neutral to be
`2 X phase.)
`
`Input current, nominal
`
`Input current limit
`
`User's Manual—PowerStruXure Type B
`
`25
`
`IPR Page 28
`
`IPR Page 28
`
`

`
`Emergency Power-Off Switch
`
`Overview of EPO
`
`A remote switch (not included) is attached at the EPO interface in the
`PDU with System Bypass. The EPO interface 0 is connected to the
`PDU with Sy ste111 Bypass Main breaker 9 a11d to the Sy111n1etra 3-Phase
`UPS internal EPO switch (9 (connection to the Symmetra 3-Phase UPS
`is made during installation of PowerStruXure). When the remote EPO
`Switch is enabled, power will be terminated at the PDU with System
`Bypass and the Symmetra 3-Phase UPS, providing a single point for
`emergency shutdown of the PowerSlruXure system.
`___________________‘
`
`Switch
`‘\
`\_,/
`
`__________________.1
`
`26
`
`User's Manual—PowerStruXure Type B
`
`IPR Page 29
`
`IPR Page 29
`
`

`
`Netshelter VX Enclosures
`
`\X/eight/Dimensions
`
`The American Power Conversion (APC) NetShelter® VX is a high-
`quality enclosure for storage of industry-standard (EIA-310) 19-inch
`equipn1ent, which includes servers, voice, data, networking,
`internetworking, and APC power protection equipment. Both the base
`enclosure (AR2100BLK) and the expansion enclosure (AR2101BLK)
`provide 42U of mounting space.
`
`Netshelter VX
`(base enclosure)
`
`A Vv\23.5 in. (59.60 cm)
`%$\ Na,‘
`%
`
`Data Cable Troughs
`
`81.5 in.
`
`(206.92 cm)
`
`Space considerations
`
`Study the figure below to determine your space requirements for
`installing NetShelter VX enclosures.
`
`Floor-to-Ceiling Ventilation
`>91 in. (231 cm)
`
` 23.6 111.
`
`/
`
`4%. in.
`(lO7.l9 cm)
`
`(59 94 cm)
`
`\X/eight considerations
`
`
`
`Ensure that the floor and sub-floor can support the total weight of your
`system configuration when concentrated on the leveling feet. If you are
`placing equipment on a raised floor, consult the flooring manufacturer
`for loading requirements prior to installing equipment.
`
`Enclosure weight (empty): 359 lb (162.8 kg)
`
`The rack is rated at 2000 lb for a static load, and 1400 lb for a dynamic
`load. See “Weight considerations” on page 21 and on page 25 for weight
`measurements for the PDU with System Bypass and the Symmetra 3-
`Pl1ase UPS.
`
`User's Manual—PowerStruXure Type B
`
`27
`
`IPR Page 30
`
`IPR Page 30
`
`

`
`IPR Page 31
`
`IPR Page 31
`
`

`
`Installation
`
`PDU with System Bypass .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. .31
`
`Tools required 31
`
`Exchange side panels 32
`
`Join the Symmetra 3-Phase UPS enclosure to the PDU
`with System Bypass enclosure 33
`
`Connection to be performed by a licensed electrician
`only! 33
`
`Connect main utility power 34
`
`Symmetra 3-Phase UPS .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. .38
`
`Tools required 38
`
`Position, level, and attach the Symmetra 3-Phase
`UPS 38
`
`Ensure that all power is off 38
`Connect the PDU to the UPS 40
`
`.
`
`. .42
`
`.
`.
`Emergency Power—Off Switch .
`Choose a connection method 42
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`Connect a switch to the EPO interface 43
`
`NetShelter VX Enclosures .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. .44
`
`Tools required 44
`Position the enclosures 44
`
`How to level an enclosure 44
`
`How to stabilize the enclosure 45
`
`How to join enclosures together 45
`
`Cable Troughs, Partitions, and Ladders .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. .47
`
`Troughs and partitions for overhead wiring along
`rows 47
`
`How to install power cable troughs 48
`
`How to install data cable partitions 49
`
`Ladders for overhead wiring across rows 50
`
`IPR Page 32
`
`IPR Page 32
`
`

`
`Installation.‘ Contents
`
`How to install ladders across rows
`
`51
`
`Power Cables (Whips)
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. 54
`
`Route and attach overhead wiring 54
`
`\X/iring under the floor 57
`
`3-Phase Automatic Transfer Switch .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. 58
`
`Placement 58
`
`Attach mounting brackets 58
`
`Disassemble segments of the adjustable bracket 58
`
`Attach rear segments to the rack 58
`
`Attach front segments to the switch 59
`Mount the Automatic Transfer Switch in the
`enclosure 59
`
`Metered Rack—Mount PDU .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. 60
`
`Mounting options 60
`
`Toolless mounting 60
`
`Bracket-mounting 61
`
`Information Controller and Hub .
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`.
`
`. 63
`
`Attach mounting brackets to the Controller and
`Hub 63
`
`Mount the Controller and Hub in the PDU with
`
`System Bypass 63
`
`30
`
`User's Manual—PowerStruXure Type B
`
`IPR Page 33
`
`IPR Page 33
`
`

`
`PDU with System Bypass
`
`Tools required
`
`The following table lists all tools required for installation if your
`configuratio11 places the PDU witl1 System Bypass adjacent to the
`Symnietra 3—Phase UPS. For an installation in which the PDU with
`System Bypass is not adjacent to the Symmetra 3—Phase UPS, you will
`also need a selection of tools that are part of a standard electrician’s tool
`set.
`
`Standard screwdriver
`
`Tool Required
`
`Supplied?
`No
`
`
`
`Phillips screwdrivers (Various sizes)
`Metric socket wrench (13 mm) or adjustable open-ended wrench,
`for connecting input and output wires between the PDU with
`System Bypass and the UPS
`Hex driver (3/16 in.)
`
`Open—ended wrench (14 mm) for adjusting the leveling feet of the
`PDU with System Bypass
`17 mm socket wrench
`
`es
`Y
`
`No
`
`User's Manual—PowerStruXure Type B
`
`3]
`
`IPR Page 34
`
`IPR Page 34
`
`

`
`Installation .' PDU with System Bypass
`
`Exchange side panels
`
`Before installing the PDU with System Bypass and the Symmetra
`3-Phase UPS, you will need to exchange side panels so that the adjacent
`panels will have matching holes for joining the enclosures together and
`for routing input and output wiring between them. Perform these steps
`before moving the enclosures to adjacent positions.
`
`1. Remove the side panel from the side of the
`Symmetra 3-Phase UPS that will be adjacent
`to the PDU with System Bypass in your
`planned configuration. (For instructions on
`removing side panels, see “How to remove
`and install the side panels” on page 131.)
`
`2. Remove the side panel from the side of the
`PDU with System Bypass that will not be
`adjacent to the Symmetra 3-Phase UPS.
`
`3. Install on the Symmetra 3-Phase UPS the side panel (with the pre-
`punched hole) that you removed from the PDU with System Bypass
`in Step 2.
`
`4. Install, 011 the PDU with System Bypass, the solid side panel that
`you removed from the Symmetra 3-Phase UPS in Step 1.
`
`
`
`32
`
`User's Manual—PowerStruXure Type B
`
`IPR Page 35
`
`IPR Page 35
`
`

`
`Installation .' PDU with System Bypass
`
`Join the Symmetra
`3-Phase UPS enclosure to
`the PDU with System
`
`1. Move the Symmetra 3-Phase UPS into position next to the PDU
`with System Bypass, aligning the two openings in the lower part of
`the adjacent side panels.
`
`B)/P355 enclosure
`
`2. Level both the PDU with System Bypass and the Symmetra 3-Phase
`UPS. For instructions, see “How to level an enclosure” on page 44.
`
`3. Thread the chase nipple (p/n 820-0071), through the opening in the
`adjacent side panels of the PDU with System Bypass and the Sym-
`metra 3-Phase UPS.
`
`
`
`4. Tighten the lock-nut and the bushi11g 011 the chase nipple.
`
`A licensed electrician must connect the PDU with System
`Bypass to the main utility power. Procedures requiring a
`licensed electrician include:
`
`A - connection of main utility conductors
`
`Efiacztgircgl
`
`0 connection to the input circuit breaker of the PDU
`with System Bypass
`- connection to a branch circuit
`
`This PDU with System Bypass contains no parts that are
`serviceable by general users. Refer all servicing to APC Field
`
`Note
`
`Service Engineers.
`
`Connection to be
`
`performed by a licensed
`electrician only!
`
`User's Manual—PowerStruXure Type B
`
`33
`
`IPR Page 36
`
`IPR Page 36
`
`

`
`Installation .' PDU with System Bypass
`
`Connect main utility
`
`power
`
`& Ensure that utility power is OFF before beginning
`
`Electrical
`Hazard
`
`installation.
`
`A licensed electrician must connect the main utility power:
`
`1. Run three-wires with an equipment ground wire and a GEC
`(grounding electrode conductor) from the main utility service ofthe
`building to the PDU with System Bypass.
`
`2. Open the back doors of the PDU with System Bypass, using the
`provided key for the top, smaller door and loosen the two screws
`holding the larger hinge door in place.
`
`La) . Remove the rectangular gland plate by loosening the captive
`screws, using a Phillips or standard screw driver:
`
`a.
`
`in the bottom of the PDU with System Bypass for wiring under a
`raised floor.
`
`
`
`34
`
`User's Manual—PowerStruXure Type B
`
`IPR Page 37
`
`IPR Page 37
`
`

`
`Installation .' PDU with System Bypass
`
`b. or in top of the PDU with System Bypass for overhead wiring.
`
`E E
`
`‘,/\}~\
`Q o 0
`
`’,/'
`i
`“-.___
`..%i/’ 0 <> ° 0
`z“”"\*> \\‘\.
`// /se /a\
`V
`.2»
`0 0 ° 9
`,./”” } fig//~\\\ K
`/
`/W
`0 ©:\
`\\
`F” </
`\\> //
`R V
`\< fl gr?’ ‘ \
`/‘T % %
`R \
`<§;,_o.§;::©~%<W// /
`‘ N O
`/
`x \ g V
`\.\J:}
`
`4. Cut a11 appropriately-sized hole i11 the gland plate for the conduit.
`
`5. Re-attach the gland plate.
`
`6. Install a lock—nut and bushing to the conduit.
`
`7. Thread the conduit through the hole.
`
`
`
`User's Manual—PowerStruXure Type B
`
`35
`
`IPR Page 38
`
`IPR Page 38
`
`

`
`Installation .' PDU with System Bypass
`
`8. Route the input conductors to the main input circuit breaker of the
`PDU with System Bypass, as follows:
`
`a. For wiring under a raised floor, run the input co11ductors through
`the wireways Q at the right or left side within the PDU with Sys-
`tem Bypass to the main input circuit breaker of the PDU with
`System Bypass.
`
`
`
`b. For overhead wiring, run the cable directly to the main input cir-
`cuit breaker of the PDU with System Bypass.
`
`36
`
`User's Manual—PowerStruXure Type B
`
`IPR Page 39
`
`IPR Page 39
`
`

`
`Installation .' PDU with System Bypass
`
`A licensed electrician must connect the input wiring to the PDU with
`System Bypass:
`
`9. At the main input circuit breaker, connect the input wiring to the
`PDU with System Bypass circuit breaker terminals for phase L1, L2,
`and 13, according to the following color-codin g:
`
`Input
`Voltage
`
`L1
`
`L2
`
`L3
`
`480 V
`
`600 V
`
`Brown
`
`Red
`
`Orange
`
`Black
`
`Yellow
`
`Blue
` Tightenthe lugs on the circuit breaker terminals only to the
`
`torque specified on the circuit breakers label.
`
`Warning
`
`10. Connect the equipment ground wire to the lug on the bracket next to
`the circuit breaker.
`
`11. Connect the GEC to the second lug on the bracket next to the
`breaker and connect to building steel.
`
`
`
`User's Manual—PowerStruXure Type B
`
`37
`
`IPR Page 40
`
`IPR Page 40
`
`

`
`Symmetra 3-Phase UPS
`
`Only qualified personnel trained by APC may connect the
`Symmetra 3-Phase UPS to the PDU with System Bypass.
`
`AW
`
`arning
`
`Tools required
`
`Tool Required
`13 mm socket Wrench
`
`17 mm socket wrench
`
`T-20 screwdriver
`
`Standard screwdriver
`
`Position, level, and attach
`
`the Symmetra 3-Phase
`UPS
`
`Before connecting the Symmetra 3-Phase UPS, you should first position
`and level it and then join the Symmetra 3-Phasc UPS to thc PDU with
`System Bypass. See “Exchange side panels” on page 32, “How to level
`an enclosure” on page 44, and “Join the Symmetra 3-Phase UPS
`enclosure to the PDU with System Bypass enclosure” on page 33.
`
`Ensure that all power is
`off
`
`AElectrical
`
`Hazard
`
`Before electrical installation begins, ensure that power is
`off by following the procedure below:
`
`1. Set utility power to the OFF or Locked Out position.
`
`ON
`
`OFF
`
`OFF
`
`2. Open the DC breaker and set the System Enable switch on the Sym-
`metra 3-Phase UPS to the Off position.
`
`
`
`38
`
`User's Manual—PowerStruXure Type B
`
`IPR Page 41
`
`IPR Page 41
`
`

`
`Installation: Symmetra 3—Phase UPS
`
`3. Open the Main input circuit breaker on the PDU with System
`Bypass.
`
`
`
`
`4. Open the Q1, Q2, and Q3 breakers on the PDU with System
`Bypass.
`
`® Perform all powerWiringbefore installingmodules i11to the
`
`Symmetra 3-Phase UPS.
`
`Note
`
`User's Manual—PowerStruXure Type B
`
`39
`
`IPR Page 42
`
`IPR Page 42
`
`

`
`Installation.‘ Symmetra 3—Phase UPS
`
`Connect the PDU to the
`UPS
`
` Only qualified personnel trained byAPC may connect the
`
`Symmetra 3—Phase UPS to the PDU with System Bypass.
`
`Warning
`
`Attach power wiring to and from the Symmetra 3—Phase UPS. The
`power wires are coiled in the bottom of the PDU with System Bypass.
`Five input wires are at left and four output wires are at the right. Both
`sets are labeled with colors: black for L1, red for L2, blue for L3, white
`
`for neutral, and (input only) green for the equipment ground wire.
`
`@ Refer to the wiring diagram on page 41 as youfollow this
`
`procedure:
`
`Note
`
`1. Rem

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket