throbber
-A
`
`T k Engineering
`Resource For
`Achran~ing MObility
`
`400 COMMONWEALTH DRIVE WARRENDALE, PA 15096
`
`TruckIMobile Equipment Performance .-: . 7 -/., *.;.
`Monitoring Management Information
`Systems (MIS)
`LeRoy G. Hagenbuch
`Philippi-Hagenbuch
`
`,
`
`International Off-Highway & Powerplant
`Congress and Exposition
`Miiwaukee, Wisconsin
`September 8-1 1, 1986
`
`Petitioner Nissan North America, Inc. - Exhibit 1014 - Page 1
`
`

`
`The appearance of the code at the bottom of the first page of this paper indicates
`SAE's consent that copies of the paper may be made for persona! or internzl use, or
`for the personal or internal use of specific clients. This consent is given on !he con-
`dition. however, that the copier pay the stated per article copy fee through the
`Copyright Clearance Center, Inc., Operations Center, P.O. Box 765, Schenectady,
`N.Y. 12301, for copying beyond that permitted by Sections 107 or 108 of the U.S.
`Copyright Law. This consent does not extend to other kinds of copying such as
`copying for general distribution, for advertising or promotional purposes, for
`creating new collective works, or for resale.
`
`Papers published prior to 1978 may also be copied at a per paper fee of $2.50
`--
`under the above stated conditions.
`-a-L
`
`SAE routinely stocks printed papers for a period of three years following date of
`publication. Direct your orders to SAE Order Department.
`
`To obtain quantity reprint rates, permission to reprint a technical paper or per-
`mission to use copyrighted SAE publications in other works, contact the SAE
`Publications Division.
`
`% .
`
`-
`
`SAE GLOBAL MODlLlN DATABASE
`
`No part o f this publication niay be rcpmduccd in any f i ~ r ~ i i .
`in
`an clcctronic rctricval syste~ii or othcrwisc. wiihout thc prior
`writtcn pcrniission of thc publisher.
`
`Copyright 0 1986 Society d Automotive Engineers. Inc.
`
`This papcr is subject t o revision. Statc~nents and opinions ad-
`vanced in papers or discussion are the author's and arc his
`responsibility. not SAl!'s; ho\vcver. the paper has been cditcd
`by SAI. for uniforltt styling and format. Discussion will be
`printed witit the papcr if it is published in SAI: Transactions.
`I or permission to publish this paper in full or in p u t . contact
`the SA 1- Publications liivision.
`
`Pcrsons \vishing t o submit papcrs to bc considered for pre-
`scntation or publication through S.41. should scnd the manu-
`sc.ript or a 300 word abstract of a proposed manuscript to:
`Sccrctary . I'nginccring Activity Hoard. SAli.
`
`Printed in L1.S.A.
`
`Petitioner Nissan North America, Inc. - Exhibit 1014 - Page 2
`
`

`
`TruckIMobile Equipment Performance
`Monitoring Management Information
`Systems (MIS)
`LeRoy G. Hagenbuch
`Philippi-Hagenbuch
`
`ABSTRACT
`
`Performance
`Equipment
`Truck/Mobile
`Monitoring is a vital part of every mining
`operation. Performance Monitoring identifies
`current performance baselines for use in
`analyzing, refining, and improving equipment
`performance levels. Further, to be meaningful,
`equipment monitoring requires real time data
`collection. Equipment Performance Monitoring
`is the key to building a Management Information
`System leading to Computer Integrated Mining.
`
`Can management be of a higher quality
`than the data upon which it is based? Is there
`a relationship between the effectiveness of
`management and the integrity of the information
`is uses to formulate its decisions?
`
`You bet your bottom dollar there is!
`
`Without doubt, where "management" is
`maximized, information "integrity" has been
`maximized. But how is this accomplished? All
`successful, complex organizations now have a
`Management Information
`System (MIS) to
`gather, compile, and distribute the information
`that
`described
`organizational
`affairs.
`Corporate success is then based on MIS
`success: the complete, accurate, and timely
`flow of appropriate, definitive information."**
`
`*GIGO
`
`*Babel
`
`Garbage In Garbage Out
`
`The Tower of Babel
`
`TRUCK/MOBILE EQUIPMENT PERFORMANCE MONITORING
`
`MANAGEMENT INFORMATION SYSTEMS (MIS)
`
`Corporate Integration
`
`YOUR CHOICE!
`
`truck/equipment
`Typical
`monitoring/management syst-take
`many factors.
`Appropriately one might ask, why implement
`a truck/equipment monitoring/management system?
`
`performance
`into account
`
`THE NEED:
`
`"You Choose:
`
`GIGO
`
`Babel
`
`Corporate Integration
`
`** Harry Burke, "Field of View," Automatic I.D.
`News, May 1986, pp. 28-31.
`
`Whether equipment owners choose to admit
`it or not, truck/mobile equipment monitoring
`does exist in every operation. (Fig 1) It
`is just that in some operations it is more
`formalized than others.
`
`01 48-71 91/86/0908-1249$02.50
`Copyright 1986 Society of Automotive Engineers, Inc.
`
`Petitioner Nissan North America, Inc. - Exhibit 1014 - Page 3
`
`

`
`Computer 1 ntegra ted Mining
`The OBOAS System Approach
`
`Mlne Slmulatlon
`Syrtem
`
`Real Vehlcle/Eau$ment
`Performance ~ o h l t o r
`Syrlem
`
`Dlrpatch/Productlon
`Monltorlng Syrtem
`
`Equipment Management
`(I Equipment
`
`\I/ ~alntenance Syrtem
`
`Flnanclal Management,
`Accountlng 6 Flnanclal
`Reporting Syrtem
`
`Truck/mobile equipment monitoring is there
`whether equipment owners choose to legitimize-
`formalize it or not.
`This being the case, accepting and
`equipment
`that truck/mobile
`recognizing
`monitoring is going to occur one way or
`another, how does one implement good-valid
`truck/mobile equipment monitoring?
`
`THE CONCEPT:
`
`The what, when, and where of equipment
`monitoring. What is being monitored, when are
`the results available, and where is the
`information/output obtained.
`
`The what of equipment
`
`monitoring:
`
`Equipment monitoring primarily takes two
`forms: vital signs monitoring and performance
`monitoring. Consider a runner running a race,
`his vital signs are his blood pressure, pulse,
`temperature, rate of respiration, etc., while
`his performance is his time at the quarter
`mile, half mile, and finish line.
`monitors
`Vital
`signs
`monitoring
`components, i.e. what is happening to the items
`being monitored?
`Performance monitoring (normally) monitors
`the whole, i.e. what the item being monitored
`does?
`Typically, truck/mobile equipment items
`that can be vital signs monitored are:
`
`1. Engine Criticals
`
`2. Hydraulic System
`Criticals
`a. Hydraulic
`a. Oil Pressure
`b. Water Temperature
`Pressure
`c. Exhaust Temperature b. Hydraulic Oil
`Temperature
`d. Etc.
`c. Etc.
`
`3. Drive Train Criticals
`a. Wheel/Motor
`Current Draw
`b. Wheel/Motor
`Temperature
`c. Etc.
`
`Numerous other items are also capable of
`being monitored, in fact, for every component
`on a vehicle there are corresponding vital
`signs that can be monitored.
`monitoring,
`Equipment
`performance
`(nominally) equipment performance as a whole
`versus individual components; what
`the
`equipment does and when the equipment is a
`truck, some items considered are:
`
`1. Equipment Logding, Amount Being Hauled
`2. Equipment Use/Abuse (is the equipment
`being operated in a proper manner in
`accordance with mine parameters and
`manufacturer's guidelines)
`3. Equipment Tracking
`4. Equipment ,&cle,-Times
`5. Equipment Utilization
`
`The Equipment Monitoring Chain. First
`monitor vital signslperf ormance signs then
`process the data obtained so that action
`initiation can take place reacting to the
`results of the monitoring process, i.e.
`monitor, process the results, and initiate
`action accordingly.
`Truck/mobile equipment monitoring system
`building blocks are hardware and software.
`Truck/mobile equipment hardware breaks
`down into three categories:
`
`Input Devices
`- Analog
`- Digital
`
`Processor
`- Analog
`- Digital
`
`Output Devices
`- Display
`- Digital (numeric)
`- Alpha/numeric
`- Video
`- Printer
`- Data storage
`Devices
`- Real time data
`output devices
`
`Truck/mobile equipment monitoring system
`software interrogates the input devices,
`directs the processing of the date obtained
`from the input devices, and consequently
`formulates and initiates data output.
`Vital signs monitoring while normally
`guarding against premature component failures,
`fails to address equipment performance.
`In today's competitive world, improved
`equipment performance/utilization is where the
`returns are at; with improved equipment
`performance flowing directly to an operation's
`bottomline profitability.
`Equipment Performance is improvable as
`monitoring identifies current performance
`baselines for use in analyzing, refining, and
`improving equipment performance levels. After
`all if you don't know where you're at, how can
`you determine if you are maintaining status
`quo, improving, or worse, falling off, i.e. to
`go anyplace you have to know where you are at,
`with
`Equipment
`Performance
`Monitoring
`establishing both where you are at and where
`you are going.
`
`Petitioner Nissan North America, Inc. - Exhibit 1014 - Page 4
`
`

`
`THE IMPLEMENTATION:
`
`The balance of this paper is directed to
`equipment performance monitoring and the
`implementation of truck performance monitoring;
`specifically in a mining environment and how
`this performance monitoring can lead to
`integrated
`Mine
`Management
`Information
`Systems and Computer Integrated Mining.
`
`Basic Truck Performance Monitoring
`Hardware Items
`
`- Loadlweighing sensors
`- Transmission/vehicle direction monitor F-N-R
`- Dump switch
`- Vehicle control number statuslkeypad
`- Microprocessor with built in display and
`battery back-up clock
`
`~oadlweighing sensors and why weigh
`trucks? Trucks are weighed because it is
`central to truck performance monitoring.
`Trucking is material haulage. And, optimum
`truck ~tilization/~erformance is basic to
`efficientlprofitable mining operation. The
`basic definition of work is: to move "X"
`amount of material from point A to point B over
`"Y" amount of time. (A basic trucking
`operation definition.)
`Further, with 170 ton capacity mining
`trucks costing $750,000 to $850,000, 35 ton
`trucks aL $225,00 to $250,00, and 85 ton
`trucks at $400,00 to $500,00 it becomes very
`important, considering the owning operating
`cost of these trucks, to operate these
`mining trucks at optimum utilization within
`performance parameters. (Fig 2 & 3)
`
`Providing the point is made for the need
`to weigh trucks, how can an on board truck
`weighing system be installed? Separating a
`truck into discrete components: 1) running
`gear, front axle and rear axle, 2) the truck
`frame, and 3) the truck body. These are
`the areas at which a truck can be weighed.
`(Fig 4, THE VARIOUS POINTS AT WHICH
`A TRUCK CAN BE WEIGHED
`
`LOAD S E N S O R T -
`
`/PINS
`
`SUSPENSION
`
`TRANSDUCER
`
`, TRANSDUCER
`
`+UP 6 DOWN
`
`The running Rear: it is possible to
`attach strain gauges to the running gear or in
`the running gear mounting pins, however, these
`strain gauges are very susceptible to damage
`and do require ongoing calibration. Further
`as the rear axle, in particular, oscillates
`its relative position to the truck frame
`changes throwing meaningful load weighing way
`out of wack. (Fig 5)
`
`The area between the running gear and the
`frame: various devices can be utilized
`between the running gear and the truck frame.
`Nominally, pressure transducers in the running
`gear suspension cylinders, provided the truck
`has an air over oil type of suspension.
`However, with internal friction in the
`suspension cylinders and because of the fact
`that the rear axle moves sideways and fore to
`aft as it oscillates up and down, this method
`provides only a relative indication of load,
`i.e. somewhere in the area of +/- 20% of load.
`(Fig 6 & 7)
`
`Petitioner Nissan North America, Inc. - Exhibit 1014 - Page 5
`
`

`
`good truck weighing system. Looking at a cut
`away of this unique load sensor, the load
`sensor consists of 1) a base plate, 2) hose
`assembly with fluid in it, and 3) a cap channel
`with contact plate on the bottom of this cap
`channel; this contact plate resting on the
`hose. (Fig 8)
`
`R A T E
`
`HOSE A S S Y . 7 /
`
`B A Y PLATE ASSXJ-
`
`In an end view of this load sensor
`assembly, note that the hose has a very small
`amount of fluid in it and that the load sensor
`height is 314" to an 1 1/8" minimum. (Fig 9)
`CAP CHANNEL
`AREA
`[HOSE W/ OIL
`
`FRAME
`But how does a load sensor, a hose with a
`little bit of fluid in it at an accuracy of
`+/- 2% of total load, support a 170 ton
`load?* Consider a 170 ton load and a 30 ton
`body (a total load of 400,000 lbs.) on the load
`sensors. * LeRoy G. Hagenbuch, "Development of
`Unique Load Sensors for On-Board Truck Weighing
`Systems," Sensors Expo '86, North American
`Technology, Inc.
`
`The truck frame: it is possible to
`attach strain gauges to the truck frame;
`however, these strain gauges do require on
`going
`calibration-recalibration from the
`nature of the strain gauges themselves and from
`the standpoint of the truck frame working, i.e.
`as the frame works (is operated in a
`dynamic condition) and is racked side to
`side, front to rear, the truck frame tends
`to (over time) perceptibly work harden. As
`such, the same load will not always produce
`the same relative strain in the truck frame.
`The body pivot and hoist cylinders: yes,
`strain gauges can be put in the body pivot pins
`and combined with either pressure transducers
`in the hydraulic hoist cylinder circuit or
`strain gauges in the hoist cylinder mounting
`pins. However, this method requires that the
`body be lifted off the truck frame to take a
`weight measurement which
`precludes the
`possibility of weighing the load dynamically--
`as the truck is being loaded and/or operated--
`plus the continuing nemesis of on going strain
`gauge calibration-recalibration problems.
`The area between the frame and the body:
`yes, it is possible in lieu of frame pads or
`sill plates to put load sensors in this area.
`Yes, this is a method that we recommend, with
`unique
`load
`sensors
`being
`installed
`accordingly. An OBDAS Load Sensor the key to a
`
`Petitioner Nissan North America, Inc. - Exhibit 1014 - Page 6
`
`

`
`With a load sensor length of 112" and a
`load sensor width of 12" - 1344 square inches
`results. Taking this 1344 square inches times
`two (left and right side of the truck), times a
`typical 150 lbs. per square inch load sensor
`hose pressure 403,200 lbs. results. (Fig 10)
`Thus, with very nominal pressure in the hose it
`is possible to carry very substantial loads.
`
`Body P i W
`Pin Afler
`Moden
`
`-
`
`P i d Mount Assy Y-'
`
`In a basic truck performance monitoring
`system, other inputs added to the OBDAS on
`board weighing sensors are: a gear directional
`monitor, body dump switch, -and keypad with
`basic system outputs being a digital display
`and printer. (Fig 13)
`
`340,000 Ib. LOAD
`+ 60,000 Ib. BODY
`400.000 Ib.
`TO BE CUIRAD ON
`LOAD SENSOR
`
`112'
`112.
`M 4 .+Lr
`
`I344 ¶q. h.
`1 2
`.HO wl.
`403.200 lb.
`
`..
`
`A load sensor assembly on a 140 - 170 ton
`class vehicle from the side of the truck with
`the body down. (Fig 11)
`
`Putting load sensors between the frame of
`the truck and the truck body, in lieu of frame
`pads, works at its optimum when the bodyfframe
`pivot mount ~:l:.lizes a floating body hinge pin
`concept. In Lieu of the flsating body hinge
`pin concept, strain gauges can be installed in
`the body hinge pins, however, this procedure
`defeats the calibration ease of the load sensor
`weighing systen as (nominally) used with a
`floating hinge pin.
`To overcome the problem associated with a
`fixed body hinge pin, the fixed hinge pin can
`be modified by removing a crescent shaped piece
`of material from the top of the hinge pin over
`the hinge pin length that goes through the
`frame pivot area. This approach converts
`fixed hinged pin mounted bodies to floating
`hinge pin mounted bodies and is done very
`successfully. (Fig 12)
`
`Basic Truck Performance Monitoring
`Input Devices are:
`- ~oadlweighing Sensors for weighing the load
`on the truck (analog input)
`
`- A ~ransmission/Truck Direction Monitor,
`F-N-R, (digital input)
`
`- Dump Switch for indicating when the truck
`dumps (digital input)
`
`- A Truck Control Number ~tatusl~eypad for
`inputting truck status operatinglnot
`operating, material being hauled, etc.
`(digital input)
`
`Taking only these four inputs: load
`sensor, dump switch, F-N-R monitor, and keypad
`what output is obtained from a basic
`truck performance monitoring system?
`
`Petitioner Nissan North America, Inc. - Exhibit 1014 - Page 7
`
`

`
`The processor monitors and initiates output as:
`
`1. Operator number changes
`2. Body dumps
`3. Gear direction changes
`4. Truck starts
`
`1) As the truck is started, data is output as
`to date and time truck started, truck
`number, and operator number.
`
`As gear directional changes occur, the
`various haul cycle segments are broken out,
`including time to load, travel time to dump
`area, time to dump, and travel time to
`loading area. For every gear directional
`change, the tonnage on the truck at time of
`gear directional change, the direction the
`truck was going, and how long it was going
`in that direction is/can be output. (A
`continuous time and motion, weighing
`study . )
`
`Tons
`
`Gear Direction
`
`Time
`
`3) When the body is dumped, output generated
`is how many tons were hauled in the load
`and the time it has taken from dump to dump
`to haul this load.
`
`4) An operator number change outputs:
`
`1. Operator number (New and Old)
`2. Time of operator number change
`3. Number of loads hauled by previous
`operator
`4. .Total tonnage hauled by previous
`operator
`5. Average load hauled
`6. Average haul cycle time
`7. Total time truck was under previous
`operator's control
`
`Thus, basic output from a truck monitoring
`system with only four inputs: load/weighing
`sensors, transmission-directional monitor, dump
`switch, and operator keypad. (Fig 14)
`
`Additionally, there are several optional
`enhancements that can occur to this basic
`truck performance monitoring system. What
`are these enhancements?
`These advanced/enhanced truck performance
`monitoring systems options are divided into
`three groups.
`
`1. No additional input/outputs required
`(manipulates existing data)
`2 . Additional output devices are required
`(existing data output in different
`forms)
`3. Additional input devices required
`(collects further data to be output)
`
`ADVANCED TRUCK PERFORMANCE MONITORING
`SYSTEM OPTIONS
`GROUP 1
`
`No Additional Inputs or Outputs Required
`
`Group One, Advanced Truck Performance
`Monitoring System Options
`include the
`f 01 lowing :
`
`1. Loading Equipment Analysis, i.e. size
`of each bucket going into a truck,
`time from first bucket to second
`bucket, from first bucket to last
`bucket, etc.
`2. Monitoring of haul back as to any
`material carried back with an
`appropriate signal as to when truck
`bed cleaning might be required.
`
`Petitioner Nissan North America, Inc. - Exhibit 1014 - Page 8
`
`

`
`3. Haul road condition monitoring, where
`in addition to the total load being
`carried on the truck, load spikes or
`load peaks as a truck moves down a
`haul road (dynamic loading of the load
`sensors) are recorded.
`
`ADVANCED TRUCK PERFORMANCE MONITORING
`SYSTEM OPTIONS
`GROUP 2
`
`Require Additional Output Devices
`
`Group Two, Advanced Truck Performance
`Monitoring System Options are options requiring
`some additional output devices, still working,
`however, with the same basic four input
`devices. (Fig 15) These additional output
`devices and corresponding outputs are:
`
`Load Monitor Lights, a bank of five
`(5) load indicator lights placed on
`the outside of the truck to provide
`feedback to a shovel runner or
`loader operator as to truck load
`status. This bank of five lights
`consists of a green light, three
`yellow lights, and one red light.
`As a truck is loaded, average bucket
`size being loaded is determined by the
`performance monitoring system. The
`green light is lit as long as full
`buckets are required, with the bottom
`yellow light coming on once only 314
`of a bucket is required, the middle
`yellow light if only 112 a bucket, or
`the top yellow light if only 114 of
`any average bucket is required to
`complete the load. As soon as
`measured tonnage equals or exceeds the
`programmed truck load, preprogrammed
`in the microprocessor, the red light
`is lit telling the loader operator or
`shovel runner the truck is loaded.
`
`2. Weight Distribution Monitors
`
`a. Side to Side Load Imbalance
`Monitor with an-qudio alarm for
`alerting the truck driver of any
`potentially unsafe off center,
`side to side loading, again as
`programmed into the
`microprocessor.
`
`b. Fore to Aft Loading Monitor Lights
`indicting load balance on the
`truck (front to rear) and giving
`the loader/shovel operator
`feedback as to proper load
`placement for correct front to
`rear truck loading.
`
`E-AFT
`mdALANCE
`
`LOAD
`
`EYPAD
`
`E d
`
`SENSOR
`ASSEMBLES
`ADVANCED TRUCK PERFORMANCE MONITORING
`SYSTEM OPTIONS
`GROUP 3
`
`Require Additional Input Devices
`
`Group Three, Advanced Truck Performance
`Monitoring System Options are options requiring
`additional input devices to provide some very
`substantive output. (Fig 16) These input
`devices and corresponding outputs are:
`
`1. Dump Cylinder Pressure Sensor
`installed in the dump or hoist
`cylinder hydraulic circuit to provide
`a very definitive analysis of front
`axlelrear axle loading with the
`microprocessor outputting data as to
`empirical axle weight loading.
`
`2. Distance ~ensor/~dometer outputting
`both total travel distance and
`distance traveled in each truck
`directional segment. This distance
`sensor also yields two other truck
`performance outputs:
`
`a. tire tone mile per hour analysis,
`i.e. load X distance / time,
`output for each haul cycle
`segment, each haul cycle, each
`hour, each period the truck is
`under a different operator/control
`number, etc.
`b. a body up monitor for indicating
`if a truck has been driven any
`measurable distance, over a
`preprogrammed limit, with the body
`up identifying situations creating
`unnecessary body pivot mount
`strain as is often incurred when
`driving a truck with the body up.
`
`Petitioner Nissan North America, Inc. - Exhibit 1014 - Page 9
`
`

`
`3. Inclinometer (slope transducer)
`
`a. indicating at what angle the truck
`is being operated at/driven on
`
`b. in conjunction with the odometer
`outputting a haul road plot or
`profile
`
`4. Compass. A compass in conjunction
`with the odometer allows remote
`truck tracking as it leaves known
`discrete points in the haul cycle,
`i.e. loading site, dump site, ready
`line, etc.
`
`5. Fuel Sensor. Providing an indication
`of fuel consumption through each
`segment of the haul cycle and/or each
`period truck is under a different
`operator/control number (not presently
`implemented/to be implemented in the
`future).
`
`Equipment Monitoring Chain, once we monitor in
`what time frame do we want to process the
`results and initiate act ton, on a historical
`basis; on a real time basis?
`Historical monitoring is a recordation,
`recording what happens for later review. Real
`time monitoring means having that same
`information to review almost as it occurs so
`real time control is achievable.
`In mining, it is nice to know after the
`Working Faces have been surveyed every month,
`how much material hasxpeen moved; but wouldn't
`this same information be more meaningful by
`week, by shift, or by class of vehicle as
`production occurs?
`Real time monitoring inplies real time or
`near instantaneous data down load. ( ~ i g 17)
`Real time monitor<pa r_equires that the on
`board equipment performance monitoring system
`be linked through an on-line wireless data link
`to a central control computer. With this--
`real time vehicle performance monitoring--
`potentially inputting to a total equipment
`management system.
`
`I hrr-rn
`
`0 8 D A I 8I.l.m v.yd.
`o,".th,
`
`I
`II UI+ oat.
`Down W
`
`oat. 1
`- Mhc.
`
`.
`
`L..dS#*lpucl(fbm,
`roat/r*aa
`II) LkL oat. Down Load
`
`Anabab
`I
`
`I
`
`I
`
`I
`I
`A
`L , - - - -
`I)ornrlr Pail 04 DIaprnlcUhoductloa Y 6 n l l w
`Symlam. Wowavr Cam k Wad Aa A Stmd A l o u
`M
`e
` h Vahkb/Lprlplmt Perfamanca
`W t a Sralom.
`
`TRUCK~MOBILE EQUIPMENT
`PERFORMANCE
`MONITORING AS IT LEADS TO A MINE MANAGEMENT
`INFORMATION SYSTEM
`
`Obviously, the need for data storage in
`addition to a paper tape exists with a
`basic truck performance monitoring system.
`The Advanced Truck
`Performance Monitoring
`System further spawns a mine management
`information system and accentuates the need
`for data storage -- data processing devices.
`
`The when of equipment monitoring:
`
`In considering data storage devices, it is
`important to understand the difference between
`historical monitoring and real time (near
`instantaneous) monitoring.
`Considering the
`
`Data Output Forms
`
`1 . Historical (On Board) Data Output
`a. Printer
`b. Cassette Tape
`c. Non-Volatile Memory Pack
`Internal w/Cassette Tape
`d. Non-Volatile Memory Pack
`(External)
`
`2 . Real Time (Base Station) Data Output
`a. Radio Telemetry down loading to a
`central control computer
`b. Infra Red Telemetry down loading to a
`central control computer (quasi-real
`time)
`
`-
`
`Yes, it is possible to use on board data
`output devices (printer, cassette tape, or
`bubble memory) to store data for later
`processing, however, none of these devices
`allow for remote real time data collection
`and review. Meaningful equipment monitoring
`requires real time remote data monitoring
`
`Petitioner Nissan North America, Inc. - Exhibit 1014 - Page 10
`
`

`
`output hardware either in addition to or in
`lieu of display, printer and on board data
`storage devices. Thus, on-line wireless data
`link down load capabilities with radio or
`infra red real time remote data monitoring
`telemetry. ( ~ i g 18)
`OPTIONAL DATA OUTPUT,
`
`hardware
`monitoring
`This real time
`consists of wireless data links
`with
`transceivers on each vehicle and a central base
`station transceiver for receiving data from
`the equipment and for down loading this data
`to the central control computer. ( ~ i ~
`19)
`WIRELESS DATA LINKS
`(Preferred Approach)
`
`Typically, when one is going to spend the
`money for any on board data storage device, it
`is wise in lieu of this device to spend a
`little more money for real time remote
`monitoring telemetry hardware, allowing for a
`meaningful Mine Management Information System.
`
`REAL TIME REMOTE DATA MONITORING HARDWARE
`
`3 Wireless Data Link - with transceivers
`on vehicle and at the central control
`computer
`- Radio Frequency (RF) Data Links
`--polled data collection
`--packet- swiehing data
`collection
`- Infra Red (IR) Data Links
`* Base Station
`- Computer
`- Communications Controller
`..
`(optional)
`OPTIONAL * Vehicle/Equipment Signpest (Address
`
`Code)
`Data Link IR or RF
`- IR Limited Range Data Links
`Preferred
`- RF Data Link Characteristics
`Limited Capabilities
`
`Wireless data llnks arc typically of two
`different types--Radio Frequency (RF) and Infra
`Red (IR).
`Radio Frequency (RF) wireless data links
`typically have a range similar to any two way
`radio. RF data links, however, require data
`transmission control. There are two basic RF
`data transmission control methods:
`
`1. Polled data collection system wherein
`the base station transceiver
`sequentially calls or polls each of
`the equipment transceivers
`1-2-3-4-5. .. with a data transfer of
`any stored data occurring (equipment
`to base station or vice versa as each
`polled connection takes place). This
`polling process takes place quite
`rapidly and depending on the amount of
`data to be transferred occurs at the
`rate of 5 to 10 equipment polls
`(connections) per second.
`
`Packet switching data collection
`wherein as data is generated by any
`particular piece of equipment or by
`the base station, the transmission
`frequency is checked for cl~nr by the
`sending transceiver and if so, that
`particular transceiver sends its data
`out in a burst or packet to be
`received by whichever transceiver the
`data is addressed to. This system
`works fine as long as data streams are
`relatively short. (Long data streams
`from individual pieces cf equipment
`can tend to monopolize the
`transmitting frequency tying the
`entire data collection system into
`somewhat of a knot.)
`
`Petitioner Nissan North America, Inc. - Exhibit 1014 - Page 11
`
`

`
`Infra Red (IR) wireless data links are a
`quasi real time data link, as IR is of a
`very limited range. 200 to 600 feet typically
`and is basically limited to line of sight.
`When using IR or inf ra , red data links,
`equipment has to come within range of the
`receiving
`transceiver
`before a
`data
`transmission can take place (200 to 600
`typically).
`As such, equipment can be out of
`contact with the central base station for
`periods of time before coming within range of
`an IR transceiver, thus quasi real time.
`WIRELESS DATA LINKS
`(Fig
`(leas1 preferred approach)
`
`(signposts), the signal (identif in^ that
`signpost/address) is picked up
`by the
`equipment with this signal (data)
`then
`included
`with
`the
`equipment's
`data
`transmission (down load) to the base station
`via the wireless data link on the equipment.
`Though either RF or IR signpost data
`signal transmissions can be used, IR is the
`preferred approach because of its very limited
`range. IR signals do not skip and jump around
`and IR signals -have an easily adjustable
`intensity (limited) %power. RF on the other
`hand, even though the transmission power can be
`severely cut back, may skip and jump around
`i.e. radio transmission is cimi directional
`of indeterminate range versus IR
`and
`transmission which can be very directional
`and range controlleth "
`Through proper data links, a total
`Equipment Monitoring System and Mine Management
`Information System can result, monitoring all
`mine equipment: haulage equipment, loading
`equipment, crushing equipment, etc. (Fig 21)
`
`WIRELESS DATA LINKS
`(Preferred Approach )
`(other equipment added in addition to lruds)
`
`Infra Red data links do have the
`advantages of not requiring FCC licenses to
`operate and with IR's limited range as data
`transmission occurs the location of the
`transmitting equipment is known, i.e. it would
`be within 200 to 600 feet of the IR data
`collector.
`
`The where of equipment monitoring:
`
`On board or the base station. In reality,
`to truly, effectively monitor it has to be at
`the base station. The base station has a
`RF and/or an IR transceiver for receiving
`data with a computer for accepting this data
`for
`processing, reviewing, and further
`equipment control; A final piece of base
`station hardware is, if RF data links are
`utilized in a polled data collection process,
`a base station communications controller.
`controlling communications between the base
`station and the various pieces of equipment.
`Signposts, in addition to standard real
`time remote monitoring data down load
`hardware, meaningful real time data monitoring,
`almost by necessity, requires a method
`(optional) to establish equipment location or
`equipment address code; this being done
`through equipment signposts. These equipment
`signposts transmit either via an IR or RF data
`link on a continuous basis so as equipment
`comes within range of these transmitters
`
`In addition to the wireless data links
`from the vehicle to the base station and the
`base station hardware, there is software at
`the base. station for controlling the data flow
`and operating this communications data link
`hardware.
`The base station software: 1) accepts
`equipment data from the
`data -links,
`2) processes, manipulates, and stores this data
`in proper data bases while at the same time,
`3) formulating data output. Optionally, the
`base station software may poll or integrate the
`equipment microprocessors via the wireiess data
`links to initiate data down load from the
`equipment, in the polling mode of RF wireless
`data down load versus packet switching.
`With the addition of on-line real time
`remote data monitoring hardware, a real
`time Equipment Performance Monitoring System
`and Mine Management Information System can
`begun to be built.
`
`Petitioner Nissan North America, Inc. - Exhibit 1014 - Page 12
`
`

`
`is
`Exception reporting--management
`informed of situations requiring timely
`management input, while giving management only
`an overview of all normal situations.
`A successful mine truck performance
`monitoring Management Information System does
`allow mine management to:
`
`1 . See what mine production has been and make
`extremely accurate projections as to future
`production.
`
`2 . To change and assign equipment based on
`these projections.
`
`3. To use equipment in the most efficient way
`possible.
`
`As a truck performance monitoring system
`is implemented, an integrated equipment
`Management Information S

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket