`BLD Services, LLC v. LMK Technologies, LLC
`IPR2014-00770
`
`1
`
`
`
`lateral host pipe
`
`
`
`groundwater
`
`
`
`hydrophilic
`main hOSt pipe
`dispersed
`chemical grout
`
`
`
`, CIPP main liner
`
`29.
`
`The process of chemical grouting is one of the oldest forms of
`
`trenchless pipe rehabilitation and is usually performed by pumping the chemical
`
`grout from a truck above ground through hoses that are strung through the main
`
`pipe to the lateral connection whereby the chemical grout is dispensed through
`
`inflatable bladders under pressure to penetrate pipe defects. Shown below is an
`
`illustration of such a chemical grouting operation using inflatable bladders from
`
`the website of Avanti International, www.avantigrout.com. Avanti is an industry
`
`leader in providing chemical grout for sealing sewer pipes.
`
`14
`
`2
`
`
`
`
`
`30. Our use of chemical grout in the ‘663 patent approach was intended to
`
`perform the same end; it’s just that our process avoided the need for expensive
`
`pumps, hoses and inflatable bladders. We were trying to grout the pipe defect using
`
`an extremely compressible low cost piece of foam While simultaneously renewing
`
`the pipe using CIPP. The open cell foam does not penetrate the pipe defects, but
`
`only the chemical grout does, as described in the ‘663 patent. (12:43—47) The
`
`chemical grout expelled from the foam forms the seal, not the foam carrier.
`
`31.
`
`The ‘663 patent approach embodies a principle that a seal is to be
`
`created by enveloping the damaged pipe areas and penetrating the surrounding soil
`
`with chemical grout in order to keep groundwater out of the pipe, as illustrated in a
`
`picture of a mocked up sample (shown below) prepared at LMK.
`
`3
`
`
`
`
`
`Photographs that are fair and accurate representations of the sample (prepared
`
`under my direction at LMK) are attached as EX. E to my Declaration.
`
`32.
`
`I made attempts to implement the ‘663 patent approach. Plagued by
`
`practical problems,
`
`the approach produced inconsistent results. One of these
`
`problems was that there was a limit on the amount of liquid hydrophilic chemical
`
`grout that could be delivered to the juncture region for dispersal based on the size
`
`of the open cell foam carrier in order to effectively form a seal. Another problem
`
`was that there was little control over the dispersal of the grout upon inflation of the
`
`bladder(s). The technicians are unable to see through the pipe and know exactly
`
`where the grout is traveling to and often the grout did not penetrate all of the areas
`
`necessary to form the seal. The difficulties were compounded by the widely
`
`variable and unpredictable pipe defect/damage conditions at
`
`the junctures.
`
`Ultimately,
`
`these difficulties led me to abandon the technique and to seek to
`
`develop a better solution.
`
`16
`
`4
`
`