Case 2:13-cv-00178-JRG Document 118 Filed 03/26/14 Page 1 of 11 PageID #: 6828
`
`UNITED STATES DISTRICT COURT
`FOR THE EASTERN DISTRICT OF TEXAS
`MARSHALL DIVISION
`
`THOMAS SWAN & CO. LTD.,
`
`Plaintiff,
`
`
`
`v.
`
`FINISAR CORP. and FUJITSU NETWORK
`
`COMMUNICATIONS, Inc.,
`
`Defendants.
`
`
`
`
`
`Case No. 2:13-cv-178-JRG
`
`JURY TRIAL DEMANDED
`
`
`
`
`
`
`
`
`
`JOINT CLAIM CONSTRUCTION AND PREHEARING STATEMENT
`
`Pursuant to Local Patent Rule 4-3 and the Court’s Amended Docket Control Order (Dkt.
`
`No. 94), Plaintiff Thomas Swan & Co. Ltd. (“Thomas Swan”) and Defendants Finisar Corp. and
`
`Fujitsu Network Communications, Inc. (together “Defendants”) (collectively, “the Parties”)
`
`hereby provide this Joint Claim Construction and Pre-Hearing Statement regarding U.S. Patent
`
`Nos. 7,145,710, 7,664,395, 8,089,683, and 8,335,033.1,2
`
`
`1 Plaintiff provided Defendants with an initial draft of this pleading (a draft which included both Plaintiff and
`Defendants’ proposed constructions) at 2:00pm CST on March 25, 2014. Despite repeated—and unanswered—
`requests throughout the day on March 26, 2014 for Defendants to confirm that they would not be changing their
`proposed constructions, Defendants waited until 8:30 CST to provide Plaintiff with their portion of the pleading
`which contained changes to their proposed constructions of a number of terms. As such, and in view of the fact that
`Plaintiff resides in the UK, Plaintiff reserves the right to submit an Amended P.R. 4-3 pleading to respond to the
`eleventh-hour changes made by the Defendants, if needed.
`2 Plaintiff has asserted 132 claims in this case, rendering the claim construction process unduly burdensome.
`Nevertheless, Defendants have worked hard to narrow disputes where possible even in the face of Plaintiff’s
`unwillingness to disclose which claims it will be pursuing in this case. Any alleged timing issues are of Plaintiff’s
`own making. Defendants made repeated requests for an earlier draft of this pleading, but Plaintiff failed to provide a
`draft in a timely manner. The parties were in contact throughout the day on March 26, 2014. At several times
`during the day, Defendants reached out to Plaintiff to seek agreement on terms for construction. Defendants do not
`consent to Plaintiff’s submission of an Amended P.R. 4-3 pleading but remain willing to meet and confer in an effort
`to further narrow disputed issues.
`
`1
`
`THOMAS SWAN 2008
`Finisar v. Thomas Swan
`IPR2014-00461
`
`

`

`Case 2:13-cv-00178-JRG Document 118 Filed 03/26/14 Page 2 of 11 PageID #: 6829
`
`I.
`
`CONSTRUCTION OF THOSE CLAIM TERMS, PHRASES, OR CLAUSES
`ON WHICH THE PARTIES AGREE (PARAGRAPH 4-3(a))
`
`The Parties have agreed to the construction of the following claim terms, phrases, or clauses
`
`at this time. The Parties will continue to meet and confer in an attempt to reach agreement on
`
`other claim terms, phrases, or clauses.
`
`Term Or Phrase
`
`Patent
`
`Agreed Construction
`
`sensors for detecting
`temperature change
`
`
`temperature responsive
`devices constructed and
`arranged to feed signals
`indicative of device
`temperature to said
`control circuit
`
`710
`
`two or more sensors for detecting temperature change
`
`710
`
`two or more temperature responsive devices constructed
`and arranged to feed signals indicative of device
`temperature to said control circuit
`
`arbitrary shape
`
`395
`
`any shape
`
`LCOS
`
`Liquid Crystal On Silicon
`
`395,
`683,
`033
`
`WDM
`
`033 Wavelength Division Multiplexing
`
`rectangle
`
`395
`
`four-sided figure with four right angles
`
`multiplex of optical
`signals
`
`683
`
`ensemble of optical signals
`
`-2-
`
`

`

`Case 2:13-cv-00178-JRG Document 118 Filed 03/26/14 Page 3 of 11 PageID #: 6830
`
`Term Or Phrase
`
`Patent
`
`Agreed Construction
`
`033
`
`means for delineating a
`respective group of
`controllable elements for
`each chosen location
`whereby the light from
`said locations is
`determined by the size,
`shape or position of said
`groups
`
`
`
`Function: delineating a respective group of controllable
`elements for each chosen location whereby the light from
`said locations is determined by the size, shape or position
`of said groups
`
`Corresponding Structure: control circuit (e.g., processing
`circuit 42 of Fig. 6) that delineates groups of controllable
`elements for each chosen location whereby the light from
`said locations is determined by the size, shape or position
`of said groups
`
`specularly reflected
`
`033
`
`reflected in a manner that a mirror reflects
`
`710
`
`710
`
`performing said varying
`step in response to the
`outputs of those sensors
`
`control circuit being
`responsive to signals from
`the sensor devices to vary
`said delineation and/or
`said selection
`
`varying the delineation of the groups or the selection of
`control data in response to the outputs of those two or more
`sensors
`
`control circuit being responsive to signals from the two or
`more sensor devices to vary said delineation and/or said
`selection
`
`delineation of the group
`boundaries in response to
`signals from sensors
`arranged to provide
`signals indicative of said
`emergent beams
`
`033
`
`delineation of the group boundaries in response to signals
`from two or more sensors arranged to provide signals
`indicative of said emergent beams
`
`-3-
`
`

`

`Case 2:13-cv-00178-JRG Document 118 Filed 03/26/14 Page 4 of 11 PageID #: 6831
`
`Term Or Phrase
`
`Patent
`
`Agreed Construction
`
`determining, by means of
`a control device, selection
`of the groups, selection of
`control data and
`delineation of the group
`boundaries in response to
`signals from sensors
`arranged to provide
`signals indicative of said
`emergent beams
`
`two[-]dimensional array
`
`two[-]dimensional array of
`pixels
`
`033
`
`determining, by means of a control device, selection of the
`groups, selection of control data and delineation of the
`group boundaries in response to signals from two or more
`sensors arranged to provide signals indicative of said
`emergent beams
`
`710,
`033
`
`395,
`683
`
`an arrangement of two or more elements in each of two
`dimensions
`
`an arrangement of two or more pixels in each of two
`dimensions
`
`
`two-dimensional group(s)
`
`033
`
`a group of two or more elements arranged in each of two
`dimensions
`
`
`
`
`
`
`II.
`
`DISPUTED CONSTRUCTIONS OF TERMS, PHRASES, OR CLAUSES
`(PARAGRAPH 4-3(b))
`
`The Parties dispute construction of the following claim terms, phrases, or clauses
`
`contained in the asserted claims.
`
`Term, Phrase, or
`Clause
`SLM / Spatial Light
`Modulator
`
`Patent
`
`710, 395,
`683, 033
`
`Thomas Swan Proposed
`Constructions
`a device that modifies a
`property of light as a
`function of time and
`position across it
`
`
`
`
`Defendants’ Proposed
`Constructions
`a device that modifies a property
`of light as a function of time and
`position across the device, and is
`at least somewhat polarisation-
`
`independent3
`3 In order to focus the claim construction process on the main dispute between the Parties with respect to this
`term, Defendants have incorporated the language from Thomas Swan’s proposed construction for this term
`
`
`
`-4-
`
`

`

`Case 2:13-cv-00178-JRG Document 118 Filed 03/26/14 Page 5 of 11 PageID #: 6832
`
`Term, Phrase, or
`Clause
`hologram(s)
`
`Patent
`
`710, 395,
`683, 033
`
`actual holograms
`
`710
`
`Thomas Swan Proposed
`Constructions
`a modulation pattern (e.g.,
`a phase ramp)
`
`
`
`
`
`
`Plain and ordinary meaning
`in light of other
`constructions proposed
`herein (e.g., hologram)
`
`
`
`generat[ed/ing a]
`hologram
`
`710, 395 Plain and ordinary meaning
`in light of other
`constructions proposed
`herein (e.g., hologram)
`
`
`
`Defendants’ Proposed
`Constructions
`indefinite
`
`To the extent the Court
`determines that a construction is
`ascertainable:
`
`the ideal set of phase modulation
`values for achieving a desired
`change in incident light
`indefinite
`
`To the extent the Court
`determines that a construction is
`ascertainable:
`
`sets of phase modulation values
`that are derived from and are the
`closest available approximations
`to the respective ideal sets of
`phase modulation values adapted
`to the physical limitations of the
`SLM
`indefinite
`
`To the extent the Court
`determines that a construction is
`ascertainable:
`
`determin[ed/ing the] ideal set of
`phase modulation values for
`achieving a desired change in
`incident light using an ideal SLM
`(i.e., having a continuously
`variable limitless phase
`modulation ability)
`
`into their own proposed construction. However, Defendants believe that the phrase “as a function of time” in
`Thomas Swan’s proposed construction is not necessary.
`
`
`
`
`
`-5-
`
`

`

`Case 2:13-cv-00178-JRG Document 118 Filed 03/26/14 Page 6 of 11 PageID #: 6833
`
`Defendants’ Proposed
`Constructions
`indefinite
`
`To the extent the Court
`determines that a construction is
`ascertainable:
`
` a
`
` “generated hologram” formed
`by combining two or more
`“generated holograms” for
`achieving two or more different
`desired types of changes in
`incident light
`indefinite
`
`To the extent the Court
`determines that a construction is
`ascertainable:
`
` a
`
` grating made holographically
`the optical signals within the
`ensemble
`
`two or more sensor devices
`arranged to detect light
`originating from an input fiber
`and emergent from the SLM
`
`light sensor arranged to provide
`signals indicative of light
`originating from an input fiber
`and emergent from the SLM
`light sensor arranged to provide
`signals indicative of light
`originating from an input fiber
`specularly reflected at the SLM
`
`Term, Phrase, or
`Clause
`combined hologram
`
`Patent
`
`710
`
`Thomas Swan Proposed
`Constructions
`Plain and ordinary meaning
`in light of other
`constructions proposed
`herein (e.g., hologram)
`
`
`holographic grating
`
`395
`
`the optical signals of
`the multiplex
`
`683
`
`710
`
`033
`
`033
`
`sensor devices
`arranged to detect light
`emergent from the
`SLM
`
`light sensor arranged
`to provide signals
`indicative of emergent
`light
`light sensor arranged
`to provide signals
`indicative of light
`specularly reflected at
`the SLM
`
`a grating made from a
`material whose optical
`properties are changed by
`exposure to light
`
`
`
`Plain and ordinary meaning
`in light of other
`constructions proposed
`herein (e.g., multiplex of
`optical signals)
`two or more sensor devices
`arranged to detect light
`emergent from the SLM (as
`construed herein)
`
`Plain and ordinary meaning
`
`
`
`Plain and ordinary meaning
`in light of other
`constructions proposed
`herein (e.g., specularly
`reflected)
`
`
`
`-6-
`
`

`

`Case 2:13-cv-00178-JRG Document 118 Filed 03/26/14 Page 7 of 11 PageID #: 6834
`
`Term, Phrase, or
`Clause
`two dimensional
`[SLM/ Spatial Light
`Modulator] having an
`array of pixels
`
`Patent
`
`395
`
`Thomas Swan Proposed
`Constructions
`an SLM having an
`arrangement of two or
`more pixels in each of two
`dimensions
`
`pixel
`
`395, 683
`
`Defendants’ Proposed
`Constructions
`
`a device having an
`arrangement of two or more
`pixels that modifies a property
`of light in two dimensions as a
`function of time and position
`across the device, and is at
`least somewhat polarisation‐
`independent4
`the smallest element of the
`SLM that can be independently
`controlled
`
`
`two or more groups of pixels
`each of which is positioned
`between and not a part of said
`blocks of pixels
`vary the voltage on the pixels in
`at least one group of pixels
`positioned between and not a
`part of said blocks of pixels to
`prevent light incident upon said
`group from being directed to an
`output
`No construction required
`
`a device that separates a light
`beam into spectral components
`
`common position on the
`dispersion device located by
`means of its coordinates
`
`683
`
`683
`
`the smallest element of a
`display surface that can be
`assigned independent
`characteristics
`Plain and ordinary meaning
`
`
`
`Plain and ordinary meaning
`in light of other
`constructions proposed
`herein (e.g., pixel)
`
`
`710, 395,
`033
`
`data from which a
`hologram is generated
`
`395, 033 a device that spreads out a
`light beam into spectral
`components
`
`common location on the
`dispersion device (as
`construed herein)
`
`033
`
`guardband blocks that
`are discrete from said
`blocks of pixels
`
`control the pixels in at
`least one guardband
`block to prevent light
`incident upon said
`guardband block from
`being directed to an
`output
`control data
`
`dispersion device
`
`common point on the
`dispersion device
`
`
`
`4 In order to focus the claim construction process on the main dispute between the Parties with respect to this
`term, Defendants have incorporated the language from Thomas Swan’s proposed construction for this term
`into their own proposed construction. However, Defendants believe that the phrase “as a function of time” in
`Thomas Swan’s proposed construction is not necessary.
`
`
`
`-7-
`
`

`

`Case 2:13-cv-00178-JRG Document 118 Filed 03/26/14 Page 8 of 11 PageID #: 6835
`
`Patent
`
`Term, Phrase, or
`Clause
`light from a common
`point on the dispersion
`device is substantially
`collimated
`substantially reflective 710
`
`033
`
`683
`
`683
`
`683
`
`683
`
`683
`
`approximately a
`desired passband of a
`respective channel
`
`approximately a
`desired center
`wavelength of a
`respective channel
`
`substantially at the
`centers of the
`respective different
`blocks of pixels
`
`a substantially non-
`reflective optical
`absorber
`substantially flat
`transmission between
`one or more pairs of
`adjacent channels at
`the output
`
`683
`
`033
`
`reflects substantially
`all of an incident light
`beam
`substantially
`collimated by the
`focusing device when
`incident upon the SLM
`
`
`
`Thomas Swan Proposed
`Constructions
`light from a common
`location on the dispersion
`device is largely collimated
`
`largely reflective
`
`
`close to a desired
`passband of a respective
`channel; a “channel” is a
`band of frequencies
`
`close to a desired center
`wavelength of a
`respective channel; a
`“channel” is a band of
`frequencies
`
`largely at the centers of
`the respective different
`blocks of pixels (as
`construed herein)
`
`a largely non-reflective
`optical absorber
`
`largely flat transmission
`between one or more pairs
`of adjacent channels at the
`output; a “channel” is a
`band of frequencies
`
`reflects largely all of an
`incident light beam
`
`largely collimated by the
`focusing device when
`incident upon the SLM (as
`construed herein)
`
`
`Defendants’ Proposed
`Constructions
`indefinite
`
`
`indefinite
`
`
`indefinite
`
`
`indefinite
`
`
`indefinite
`
`
`indefinite
`
`
`indefinite
`
`
`indefinite
`
`
`indefinite
`
`
`Exhibit A attached hereto provides the Parties’ identification of intrinsic evidence (e.g.,
`
`the claim language, specification, figures, prosecution histories, and references cited on the face
`
`-8-
`
`

`

`Case 2:13-cv-00178-JRG Document 118 Filed 03/26/14 Page 9 of 11 PageID #: 6836
`
`of the patents-in-suit) and extrinsic evidence that the Parties contend support their respective
`
`proposed constructions or oppose the other Party’s proposed constructions. With respect to the
`
`intrinsic and extrinsic evidence, all citations to figures are to be construed as including citations
`
`to the portions of the specification discussing these figures, and all citations to portions of the
`
`specification are to be construed as including citations to any figures that are referenced in these
`
`portions of the specification. The Parties’ proposed claim constructions set forth are subject to
`
`change as claim construction discovery progresses and the Parties fully brief the issues. In
`
`addition, the Parties agree that each Party may rely on any intrinsic or extrinsic evidence
`
`identified by the other Party.
`
`III. LENGTH OF TIME NECESSARY FOR CLAIM CONSTRUCTION
`HEARING (PARAGRAPH 4-3(c))
`Pursuant to the Amended Docket Control Order, the Claim Construction Hearing is set to
`
`be held on May 30, 2014 at 1:30 pm. The Parties respectfully request 2 hours per side (total of 4
`
`hours) for the Claim Construction Hearing.
`
`IV. WITNESSES AT THE CLAIM CONSTRUCTION HEARING
`(PARAGRAPH 4-3(d))
`
`The Parties will not call any witnesses to testify at the Claim Construction Hearing.
`
`V.
`
`ADDITIONAL ISSUES (PARAGRAPH 4-3(e))
`
`The Parties do not believe there are any issues that must be addressed in a prehearing
`
`conference prior to the Claim Construction Hearing.
`
`Dated: March 26, 2014
`
`
`
`
`
`
`
`Respectfully submitted,
`
`/s/ Michael C. Tyler
`
`Ruffin B. Cordell
`Lauren A. Degnan
`Michael C. Tyler
`Dmitry Brant
`
`/s/ Etai Lahav
`
`Harry Gillam
`GILLAM & SMITH LLP
`303 South Washington Avenue
`Marshall, Texas 75670
`
`-9-
`
`

`

`Case 2:13-cv-00178-JRG Document 118 Filed 03/26/14 Page 10 of 11 PageID #: 6837
`
`FISH & RICHARDSON P.C.
`1425 K Street NW, 11th Floor
`Washington, DC 20005
`Telephone: (202) 783-5070
`Facsimile: (202) 783-2331
`Email: cordell@fr.com
`Email: degnan@fr.com
`Email: tyler@fr.com
`Email: brant@fr.com
`Christopher G. Smith
`FISH & RICHARDSON P.C.
`222 Delaware Avenue
`17th Floor
`Wilmington, DE 19801
`Telephone: (302) 652-5070
`Facsimile: (302) 652-5070
`Email: cgsmith@fr.com
`
`Wesley Hill
`T. John Ward
`WARD & SMITH LAW FIRM
`1127 Judson Rd., Suite 220
`Longview, Tx 75606-1231
`(903) 757-6400 (telephone)
`(903) 757-2323 (facsimile)
`Email: wh@wsfirm.com
`
`Attorneys for Plaintiff Thomas Swan & Co.
`Ltd.
`
`
`Phone: (903) 934-8450
`Fax: (903) 934-9257
`Email: gil@gillamsmithlaw.com
`
`David C. Radulescu
`Tigran Vardanian
`Etai Lahav
`Gregory S. Maskel
`RADULESCU LLP
`136 Madison Avenue, 6th Floor
`New York, NY 10016
`Phone: (646) 502-5950
`Fax: (646) 502-5959
`Email: david@radulescullp.com
`Email: tigran@radulescullp.com
`Email: etai@radulescullp.com
`Email: greg@radulescullp.com
`
`Attorneys for Defendant Finisar
`Corporation
`
`
`
`By: Nathaniel T. Browand
`
`Melissa Smith
`GILLAM & SMITH LLP
`303 S. Washington Avenue
`Marshall, Texas 75702
`Telephone: (903) 934-8450
`Facsimile: (903) 934-9257
`Email: melissa@gillamsmithlaw.com
`
`
`Christopher E. Chalsen
`Lawrence T. Kass
`Nathaniel T. Browand
`Suraj Balusu
`MILBANK, TWEED, HADLEY
` & McCLOY LLP
`1 Chase Manhattan Plaza
`New York, New York 10005
`Tel: (212) 530-5380
`Fax: (212) 822-5380
`Email: cchalsen@milbank.com
`Email: lkass@milbank.com
`Email: nbrowand@milbank.com
`Email: sbalusu@milbank.com
`
`-10-
`
`

`

`Case 2:13-cv-00178-JRG Document 118 Filed 03/26/14 Page 11 of 11 PageID #: 6838
`
`
`Attorneys for Defendant
`Fujitsu Network Communications, Inc.
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`
`-11-
`
`

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket