PP Engineering Change Management Guide
`
`The following Help Topics are available:
`
`For Help on Help, Press F1 information contained herein up to date.
`Version
`
`SAP-00000619
`
`

`
`Version
`Prepared for R/3 Release 2.2.
`August 94
`
`SAP-00000620
`
`

`
`Copyrights
`
`@1994 SAP AG. All rights reserved.
`Neither this documentation nor any part of it may be copied or reproduced in any form or by any
`means or translated into another language, without the prior consent of SAP AG.
`SAP AG makes no warranties or represenations with respect to the content hereof and specifically
`disclaims any implied warranties of merchantability or fitness for any particular purpose. SAP AG
`assumes no responsibility for any errors that may appear in this document. The information
`contained in this document is subject to change without notice. SAP AG reserves the right to
`make any such changes without obligation to notify any person of such revision or changes. SAP
`AG makes no commitment to keep the information contained herein up to date.
`
`SAP-00000621
`
`

`
`Introduction
`
`Overview
`
`This section provides an overview of the options you have for changing objects (such as bills of
`material and routings) in the SAP R/3 System. It contains general information on changes with
`history, which are carried out using the Engineering Change Management System.
`
`SAP-00000622
`
`

`
`Changes in the SAP R/3 System
`
`For technical and commercial reasons, it is necessary to change industrial products from time to
`time.
`Technical reasons for changes include, for example, technical faults which have to be put right and
`the introduction of new environmental or safety regulations. For commercial reasons, it may be
`necessary to start using cheaper materials or to change a product to suit customer requirements.
`Changes with and without history can be made in the SAP R/3 System.
`Changes Without History
`Changes which occur during the development phase of a product and which are not to be
`documented. The state of the object
`(for example, bill of material or routing) before the change is not saved.
`Changes With History
`Changes which may affect further activities within the organization and which are to be documented
`(for example, change to bill of material -> change to routing -> change to inspection plan).
`The state of the object (for example, bill of material or routing) before the change is saved.
`Engineering Change Management in the SAP R/3 System offers you a comprehensive solution
`for documenting changes.
`Note
`This guide describes how to make changes with history using the R/3 Engineering Change
`Management System.
`For information on how to make changes without history to objects (such as bills of material or
`routings), please refer to the appropriate application guide.
`
`SAP-00000623
`
`

`
`Changes With History
`
`A change with history has the following distinguishing features:

`It becomes effective on a precisely defined date.
`¯ The changed object is stored twice: in its state before and after the change.
`The states of the object before the change ends with the validto date. The status of the object
`after the change begins with the valid from date.
`¯ Changes are documented in a change master.
`Changes are documented via the Engineering Change Management System. In the change
`master, you define when the change is to come into effect, and describe the change.
`
`Using Engineering Change Management
`
`Engineering Change Management is a central logistics function, which can be used when you
`change the following types of production master data:
`¯ Task lists
`- Standard routing
`- Reference operation set
`- Equipment maintenance routing
`- Standard maintenance routing
`¯ Bills of material
`- Material BOM
`
`- Equipment BOM
`Engineering change management can also be used for changes to document info records in the
`document management system, and for changes to inspection plans in quality management.
`
`SAP-00000624
`
`

`
`Using the Engineering Change Management Menu
`
`In the different logistics application areas which use Engineering Change Management, you have
`the option of accessing Engineering Change Management functions directly from the application
`you are using. For example, in production or quality management applications, you choose menu
`options Masterdata -~ Engin. change mgmt. You can also access Engineering Change
`Management as a central logistics function, via menu options Logistics --> Central Functions.
`You can access the following functions in Engineering Change Management via the Change
`master menu:
`¯ Create
`You use this function to create a change master. You describe the change master and define
`which objects can be changed with reference to the change master. You have the option of
`documenting each individual change separately.
`Change
`Data in the change master can be changed or added to. You can delete individual objects
`which are selected for changes with reference to your change master from the object list.
`If you
`want to delete a change master, you use the Change function.
`Display
`You can use this function to monitor all changes made with reference to a specific change
`master. The system also creates change documents for changes to change masters.
`
`SAP-00000625
`
`

`
`Authorizations
`The authorizations system in Engineering Change Management is taken from the general
`authorization structure of the R/3 System.
`When you use Engineering Change Management to process objects, you need to take into account
`the authorization structure of the Engineering Change Management System, as well as that of the
`application (such as bill of material).
`The authorization objects for Engineering Change Management are allocated to the object class
`Production Planning. In the standard system, the authorization object Engineering Change
`Management - Authorization group (C_AENR_BGR) is defined for Engineering Change
`Management.
`The table below shows the fields for this authorization object.
`Authorization Object and Fields for Engineering Change Management
`Authorization object
`Technical name
`
`Fields
`
`Change master
`Authorization group
`C AENR BGR
`
`Activity
`Authorization group
`
`In this way, you can define whether each user is allowed to create, change or display change
`masters. However, some change masters may be intended to be accessed only by a certain
`group of people. To effect this, you can set up an authorization group.
`For more information on authorization in the PJ3 System, please refer to the BC - System
`Administration Guide.
`
`SAP-00000626
`
`

`
`Change Data Reporting
`
`Overview
`
`This section describes reporting functions for change information.
`First, reporting functions for the change master record itself are described. This is followed by
`object lists for bills of material, task lists and documents.
`The individual steps are explained using the change number PP-SATST01 as an example.
`
`" ...........
`
`SAP-00000627
`
`

`
`Change Master Record Reporting
`
`A change master record can be used to obtain information on the following objects:

`change master header
`¯ object types
`¯ object management records (if defined)
`versions of material BOMs
`change documents for the change master record
`change documents for objects
`(bills of material and task lists)
`¯ document list
`


`
`Displaying the Change Master Record
`
`To obtain data from a change master record, you display the change master record. You can do
`this in two ways:
`¯ Display the change master record directly from the Engineering Change Management menu.
`This procedure is explained below.
`¯ From bills of material and document management functions, you can branch to the change
`master record and display all screens of the change master.
`To do this, position the cursor on the Change number field. Double click the mouse, and the
`system branches to the change master record.
`
`Starting the Display Function
`
`Starting from the Engineering Change Management menu, select Change master -~ Display.
`You see the Display change master: Initial Screen.
`¯ Enter the change number whose change master record you want to display.

`If you do not know the change number, you can select one via matchcode. The system
`requires a search string from the change number text for the generic search.
`a) To select via the matchcode, select the possible entries button. Enter your selection criteria.
`b) In the selection list, position the cursor on the line containing the change number you want to
`display.
`Select the change number with a double click.
`¯ Confirm your entries by pressing ENTER.
`You see the screen Display change master: Change Header.
`
`Displaying the Change Master Header
`
`Next to the change number, you see a short text which describes the change with the change
`number. If there is a long text for the change number, the system sets the indicator X to the right
`of the short text
`¯ To display the long text, choose menu option Details --> Chg header long text.
`
`SAP-00000628
`
`

`
`If this is a very long text and you want to find a certain text string, position the cursor anywhere
`in the text and choose menu option Edit--~ Find. You see a pop-up window in which you can
`enter the search string and search criteria. After you have confirmed your entries, the system
`branches to the first word which meets the search criteria or issues a message that the search
`string does not exist.
`You return from long text display to the change master header by selecting function Back.
`¯ The text is followed by data that describes the change number:
`a) Valid from date on which the changes become effective for all objects.
`b) Change no. status
`c) Authorization group
`d) Reason for change
`If object management records are provided for the change master record, there may be an
`object-specific long text for one or more object management records. You can display this
`from the detail screen of an object management record. For more information, see below.
`¯ The third block on the screen contains the Change data.
`It provides information on who created or last changed the change master record and when.
`
`Displaying Object Types
`
`To display the objects that can be edited with the change number and how processing with the
`change number is defined for the individual object types, display the Object Types screen.
`
`To do this, choose menu option Goto --> Object types.
`
`Displaying Object Management Records
`
`If object management records are defined for the change master record, you can create object
`overviews of the following objects:
`a) Material BOMs
`b) Equipment BOMs
`c) Task lists
`These lists contain individual objects for which there is specific change documentation or for which
`this is supported. The object-specific text for the change is displayed, together with the indicator
`that blocks the object for changes with reference to this change number, if applicable.
`
`Displaying Detail Information
`

`
`You can also display detailed information on every object management record.
`¯ Select the object for which you want to display detailed information via the selection field S and
`choose function key Details.
`If there is a long text for the individual change, the system sets the indicator X to the right of the
`short text.
`To display the long text, choose menu option Details --~ Object long text. You can also use the
`search function described above.
`In the Status block, administrative data on the change to the object (bill of material or task list) is
`stored, such as who last changed the bill of material with reference to the change number and
`when. The system also sets an indicator if the object is blocked for changes with reference to
`
`SAP-00000629
`
`

`
`the change number.
`¯ The Change data block contains information on who created or changed the object
`management record and when.
`Note
`For bills of material, the Display function is also active. With this function, you can produce an
`object overview of all the bills of material in a BOM group that are stored under one internal BOM
`number.
`For more information on the display function, see ~ Masters.
`
`Change Documents for Change Masters
`
`All changes to the change master record are logged and can be displayed in change documents.
`If you want to display data on changes to the Change master header, choose menu option
`Environment -~ Chg header chg docs. The system displays a list of the fields that were
`changed with the short text. If, for example, a date shift was carried out, the field AEDAT
`Change date is displayed in the list.
`

`
`If you want to display data on changes to the Object types, choose menu option Environment-~
`Object types chg docs. The system displays a list of the fields that were changed with the short
`text.
`
`SAP-00000630
`
`

`
`List of Change Objects
`Field changes made with reference to a change number can be reconstructed. Some exceptions
`are described below.
`The objects with the changed fields are grouped together in lists. The menu option Environment
`contains functions for creating up-to-date lists of objects changed with reference to a change
`number.
`These lists are created separately for the following objects:
`¯ BOM changes
`¯ Task list changes
`¯ Documents
`These lists are described in more detail below.
`
`BOM Changes
`
`If you want to display the BOM changes that were made with reference to this change number,
`choose menu option Environment --> BOM changes.
`You see a list of the changed bills of material. They are sorted according to the BOM category.
`First, all equipment BOMs are shown, then the material BOMs. The object numbers are sorted in
`ascending order.
`On the list, you see a heading for each bill of material which contains the following data:
`¯ alternative
`¯ object number (for example, material number)
`¯ description (short text)
`¯ plant
`This is followed by the historical changes made to the bill of material. The BOM header and item
`are separated from each other by a highlighted line of heading.
`The type of processing is displayed for all field changes:
`Old
`This record is logically the predecessor of the entry which becomes valid via the change number.
`The system determines the predecessor, which can change (for example, due to a date shift or a
`new change).
`
`New
`This
`Chg
`This
`Del
`This
`The
`
`is the new field entry, created using the change number.
`
`entry resulted from overwriting existing data.
`
`data was deleted.
`following table shows the fields that are displayed in the list for the header and item.
`
`Fields for the Header Record and Item Record
`
`SAP-00000631
`
`

`
`Object
`
`Fields
`
`Header
`
`Item
`
`Base quantity
`Base unit of measure
`Alternative text
`User who created a new header record by
`making the change
`
`Line item number
`Component
`Component text
`Component quantity
`Component unit of measure
`
`If you change the bill of material with reference to a change number, you do not always create a
`new header record or item record.
`Exceptions:
`¯ Some header data is not changed with history even if you change the BOM with reference to a
`change number.
`This applies to the following fields:
`
`- BOM text
`
`- external BOM number
`
`-
`lot size ranges
`If you change the sub-items of an item, you only create an item record if a change in sub-item
`quantities results in a new item quantity.
`
`Task List Changes
`
`If you want to display the task list changes that were made with reference to this change number,
`choose menu option Environment --> Task list changes.
`You see a list of groups in which task lists have been saved with reference to the change number.
`The groups are sorted according to type. The following table shows the sort sequence of the
`types.
`
`Sort Sequence of Task List Types
`Task list type
`Description
`
`General maintenance task list
`Equipment task list
`Inspection plan
`Reference operation set
`
`A E N
`
`Q
`
`S
`
`At the time of writing, one list is created for all these types. The group is displayed in a line of
`heading. The blocks in which changes can be made are listed afterwards. If no changes were
`made, you see a message.
`
`SAP-00000632
`
`

`
`The following data is displayed:
`¯ Changes to the header
`(for example, if the usage was changed)
`¯ Subsequent changes
`(for example, if the alignment key was changed)
`¯ Changes to operations
`(for example, if a new operation was created)
`¯ Changes to material components
`(for example, if a material component was re-allocated to an operation of a different sequence)
`¯ Changes to PRTs
`(for example, if the allocation to an operation was deleted)
`Note
`At the time of writing, you can display the field changes to a certain task list from the application
`menu. Starting from the main Routings menu, select Reporting -~ Changes to do this.
`A list with a similar structure is planned for Engineering Change Management.
`
`Document List
`
`The document list contains all documents whose document info record contains a reference to this
`change number.
`To identify a document uniquely within the system, documents are entered with the document
`number, document type, document part and version.
`The description from the document info record is displayed to describe the document.
`
`SAP-00000633
`
`

`
`Change Masters
`
`Overview
`
`This section provides an overview of the structure of a change master. It tells you which objects
`you can change with reference to a change number and which indicators you use to control
`processing.
`The topics ~.e..l~ast~[ and .C.haD. in..a_q.haD.qe...l~l.a.ste[ contain practical instructions
`for using Engineering Change Management in logistics.
`; ..................................................
`
`.............. i ..............................................
`
`SAP-00000634
`
`

`
`Organization of Data in the Change Master
`
`The change master serves as the basis for documenting changes. This is where you define when
`the change takes effect and describe the change.
`
`Number Assignment for Change Masters
`
`The object to be changed (for example, bill of material or routing) is changed with reference to a
`change number, which uniquely identifies a change master within the system. Depending on your
`company’s requirements, you can assign either an alphanumeric number or a numeric key.
`The SAP System supports two types of number assignment:

`Internal number assignment
`If you want to assign consecutive numbers which are purely numeric, do not enter a change
`number when you create a change master. When you save the change master, the system
`assigns the next available number from the number range defined for change masters. The
`system displays this number in a message.
`Via the system configuration menu (Eng. chg. mgmt), you can check which number within the
`internal number range has been reached.
`¯ External number assignment
`If you want to assign your own number that means something to you, you enter an
`alphanumeric character string. The following three special characters are supported in change
`numbers at any point in the string: - / _
`If you want to enter your own purely numeric numbers within a specific number range, a number
`range for external number assignment must be defined via the configuration function (Eng. chg.
`mgmt).
`
`Change Header
`
`The change header contains fields which define and describe the change and some administrative
`data for the change master which is updated by the system.
`The following data is maintained in the change header. The first three are required entries:
`¯ Change number text
`In this field, you describe the changes which are to be made with your change number. You
`have the option of going into the long text editor, where you can enter as long a text as you
`want.
`¯ Valid from
`In this field, you enter the date on which the changes are to come into effect.
`Under certain circumstances, you may be able to change this date later on.
`Change no status
`This field shows the current processing status of the change number. It determines whether
`objects (such as bills of material or routings) can be changed with the change number, and
`whether a change of valid from date is allowed.
`Authorization group
`If you enter an authorization group here, only those users who have this value in their user
`profile can maintain this change master.
`The authorization group is part of the authorization object "authorization group for change
`
`SAP-00000635
`
`

`
`masters" (see ~ctjoo).
`¯ Reason for change
`In this field, you can enter a reason for change which applies to all objects (such as bills of
`material or routings) which are changed with this change number.
`You can maintain information on individual changes in the object management record for the
`object (for example, the material BOM for the man’s racing bicycle PP-HRR01).
`¯ Change data
`This data is determined by the system. It tells you when the change master was created or last
`changed, and who saved it last.
`
`Object Types
`
`You use the object types to define the range of objects which can be changed with your change
`master.
`¯ You can change any number of the following objects with reference to a change master:
`
`- Bills of material
`- Task lists (such as routings)
`If the R/3 Document Management System is in use in your company, you have the option of
`storing a change number in the document info record.
`The Engineering Change Management function is used to group documents together, and
`not to make changes with history (see C.l~.a.n_ !.[~ _O.12~e.£t§..W!’c.13..~).
`
`Object Sub-types
`
`If the objects you want to change with your change number are of object type bill of material or task
`list, you can define them more closely by setting the indicator for the object sub-type:

`Indicator: BOMs managed by type in EC management (Bill of mat.)

`Indicator: task lists managed by type in EC management (Task list)
`
`The following table shows the object sub-types defined for the object types in the standard R/3
`System.
`Object sub-types in the standard system
`Object type Object sub-types
`
`Bill of material
`
`Material BOM
`Equipment BOM
`
`Task list
`
`Routing
`Reference operation set
`Inspection plan
`General maintenance task list
`Equipment task list
`
`Indicators which control processing with a change number are no longer entered for the object type
`as a whole, but for the object sub-types within it.
`
`SAP-00000636
`
`

`
`Indicators for Object Types
`
`The following indicators control processing with a change number for individual object types and
`sub-types:
`¯ Object type active for change number (Act.)
`Objects of this object type can be processed using the change number.
`¯ A management record is required for each object (Object)
`Only individual objects of this object type can be processed with the change number - first an
`object management record must exist for the object concerned. There is no limit to the number
`of object management records.
`
`The object management record contains details of each change to a specific object (such as the
`material BOM for the man’s racing bicycle PP-HRR01).
`¯ Object type blocked for changes (Block)
`Objects of this object type are blocked for processing with the selected change number until the
`indicator is removed. You can create object management records for objects directly in the
`change master (see ,.Creat!n .a Chan e M.aster).
`You can also have object management records generated by the system. This means that a
`record is automatically created by the system when an object is processed.
`The indicators below are used to define automatic generation of object management records:
`¯ Object management record generated (MgtRec)
`When you process (edit or create) an object of this object type with this change number (for
`example PP-AE01), the system automatically creates an object management record.
`The object is then added to the appropriate list of objects (such as material BOMs) in the
`change master. From here, you can document the change in detail for the individual object.
`The following two indicators are used to define how object management records are generated.
`Note
`You can only set these two indicators if you have already set the indicator object management
`record generated.
`Management record generated automatically only for new objects (Gen new)
`The system only automatically creates an object management record when an object of this
`object type is first created with this change number (for example when material BOM PP-HRR01
`is created). If you want to change an existing bill of material with reference to a change number
`which has this indicator, first you have to create an object management record for the BOM in
`the change master.
`Generation with dialog (GenDial)
`When you process an object of this object type with the change number, the system
`automatically automatically creates an object management record. The system displays a
`pop-up window which takes you from the object processing function to the change master.
`Here, you enter a description of the change to your object (for example, the man’s racing bicycle
`PP-HRR01).
`
`Object Management Records
`
`Object management records allow you to document changes to one specific object. Before you
`can create an object management record, the indicator A management record is required for each
`object (Object) must be set in the change master.
`
`SAP-00000637
`
`

`
`There is no limit to the number of objects you can process with a change number. The
`management records are either created directly in the change master or generated by the system.
`(See above for more information.)
`Individual object management records are listed or created in one of the following object overviews,
`according to object type:
`
`Material BOM
`
`Equipment BOM
`
`Task list
`On this overview, you see a short description of each object management record and whether or
`not it is blocked for changes with the change number. More data is displayed on the individual
`detail screens.
`
`Object Management Record Detail Screens
`
`You can also maintain more detailed information on each change to an object in the object
`management record:
`You can use the long text editor to describe individual changes in more detail. To do this,
`choose function Details --> Object long text.
`¯ Status data block
`This contains the following data:
`When was the object (such as bill of material or routing) last changed with the change
`number and who last changed it?
`
`Is the object blocked for changes with the change number?
`¯ Administrative data
`This data tells you when the object management record was created or changed, and who
`created or changed it.
`
`Displaying a Material BOM
`
`The system saves bills of material (BOMs) which are related to each other under one internal BOM
`number. BOMs are grouped together if a material BOM is, for example:
`- extended by a variant.
`- allocated to an additional plant.
`The figure below shows that the BOM for material MAT01 in plant 0001 with usage 01 has an
`object management record which also represents BOMs in two other plants.
`
`SAP-00000638
`
`

`
`Object manage-
`ment record
`
`Matedal BOM
`Matsrial :
`MAT01
`
`Plant :
`
`Usage -
`
`0001
`
`01
`
`Plants
`
`PLANT 1
`
`PLANT 2
`
`PLANT3
`
`The object overview for the change master lists the BOM from the group which was first entered as
`an object for the change number.
`To list all the BOMs stored in a BOM group, choose function Display.
`The system may set the following indicators:
`BOM exists
`A bill of material exists for the displayed material.
`Obj mgmtAn object management record exists for the
`displayed material.
`Usually, the indicator Object management record exists (Obj mgmt) is only set for one BOM. This
`BOM represents the BOM group in the object overview.
`Caution
`If more than one object management record exists for a BOM, you have to select one of them. For
`step by step instructions, see .C[ea..tLng..a....Ch.a..nge M..aste[.
`You have the option of selecting a different BOM from those displayed. This can be useful if, for
`example, an object management record exists for a BOM which has already been deleted.
`
`SAP-00000639
`
`

`
`Creating a Change Master
`Introduction describes how to call Engineering Change Management from other logistics
`applications. This topic describes how to create a change master.
`To create a change master, this is what you need to do:
`¯ Start the Create function and maintain the data on the initial screen
`¯ Process these screens:
`- Change header
`- Object types
`¯ Create the object management record
`(only possible if the object types are set up accordingly)
`¯ Enter detail data
`(only possible if the object types are set up accordingly)
`¯ Save your data
`
`Starting the Create Function
`
`Proceed as follows:
`
`Starting from the Engineering Change Management menu, choose function Change master -~
`Create.
`You see the the Create change master initial screen.
`You have two options. If you want to assign your own change number, enter it here. If you
`want the system to assign a change number, leave the field blank.
`In the Reference block you can enter the change number of an existing change master, in order
`to copy data (such as header data or indicators for object types) to the new change number as
`default values.
`To confirm your entries, press ENTER.
`You see the change header screen.
`
`Change Header Screen
`
`Enter your data for describing the change number.
`- The change number text field contains a description of all objects (for example, BOMs and
`routings) which are changed using this change number.
`If you need more than the 40 characters in this field, you enter a long text.
`To do this, choose menu option Details--> Chg headerlong text.
`
`-
`
`The Valid from field defines the date on which changes to all objects come into effect.
`You can only use the change number for objects which are valid on the valid from date.
`The Reason for change field allows you to enter 40 characters, and is relevant to all objects (for
`example, BOMs and routings).
`If an object type is defined as requiring object management records, you can store information
`on the reason for a change which is specific to an individual object (such as the material BOM
`
`SAP-00000640
`
`

`
`PP-SATST01) in the management record for the object. You can also enter a long text.
`Once you have entered your data for the change header, to confirm your entries, press ENTER.
`You see the Object types screen.
`
`Object Types Screen
`
`You can also call the screen by choosing menu option Goto --> Object types.
`The Object types detail screen lists the three object types with which you can use Engineering
`Change Management.
`¯ Bill of material
`¯ Task list
`¯ Document
`For object types bill of material and task list, all fields for indicators which control processing with
`the change number are ready for input. As documents are managed by version, not history, object
`management records are not supported for documents.
`
`Object Sub-types
`
`If you want to enter indicators for specific type of object within the object type (object sub-types),
`choose menu option Edit--> Object sub-types.
`You see a pop-up window, in which you can define which object type(s) you want to manage by
`type.
`
`To do this for bills of material, you set the indicator BOMs managedby type in EC management
`(Bill of mat.).
`To do this for task lists, you set the indicator Task lists managedby type in EC management
`(Task list).
`Save your settings with function key Save.
`
`Entering Indicators for Object Types
`
`Enter the indicators which control processing of individual object types with the change number.
`For more information, see ~anization of Data in the Chang~Master.
`Some of the indicators are interdependent, for example:
`Objects of an object type can only be changed with the change number if the indicator Object
`type active for change number (Act.) is set. This indicator must be set before you can set any
`other indicators.
`You can only enter indicators which apply to generating object management records if the
`indicator A management record is required for each object (Object) is set.
`
`Creating Object Management Records
`
`If you want to describe the change to a specific object in an object management record, the
`indicator A management record is required for each object (Object) must be set.
`You have two options for creating management records:
`1. The user creates the object management records manually in the change master.
`
`SAP-00000641
`
`

`
`2. The system generates the object management records automatically. Other indicators control
`generation of management records.
`
`Object Management Records Created by User
`
`Starting from the Object types screen, proceed as follows:
`
`Choose menu options Goto -~ Object overview --> New objects -~ <object>.
`
`Enter the data for the object (such as material BOM) and a text to describe the object
`management record.
`You can describe changes to individual objects in more detail on the detail screen. For more
`information, see below.
`
`Generating Object Management Records
`
`If more than one object is changed with the change number and you want to describe the change to
`each object separately, you can get the system to generate object management records
`automatically. To do this, you enter indicators in the change maste

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket