Case 1:16-cv-00453-RGA Document 176 Filed 06/14/17 Page 1 of 20 PageID #: 18896
`
`IN THE UNITED STATES DISTRICT COURT
`FOR THE DISTRICT OF DELAWARE
`
`C.A. No. 16-453 (RGA)
`
`C.A. No. 16-454 (RGA)
`
`C.A. No. 16-455 (RGA)
`
`)))))))))
`
`)))))))))
`
`)))))))))
`
`
`)
`)
`
`ACCELERATION BAY LLC,
`
`Plaintiff,
`
`v.
`
`ACTIVISION BLIZZARD, INC.,
`
`Defendant.
`
`ACCELERATION BAY LLC,
`
`Plaintiff,
`
`v.
`
`ELECTRONIC ARTS INC.,
`
`Defendant.
`
`ACCELERATION BAY LLC,
`
`Plaintiff,
`
`v.
`
`TAKE-TWO INTERACTIVE SOFTWARE,
`INC., ROCKSTAR GAMES, INC., and 2K
`SPORTS, INC.,
`
`Defendants.
`
`PLAINTIFF ACCELERATION BAY’S OPPOSITION
`TO DEFENDANTS’ MOTION TO STRIKE PROPOSED CLAIM CONSTRUCTIONS
`
`

`

`Case 1:16-cv-00453-RGA Document 176 Filed 06/14/17 Page 2 of 20 PageID #: 18897
`
`Philip A. Rovner (# 3215)
`Jonathan A. Choa (#5319)
`POTTER ANDERSON & CORROON LLP
`1313 North Market Street 6th Floor
`Wilmington, Delaware 19801
`(302) 984-6000
`provner@potteranderson.com
`jchoa@potteranderson.com
`
`Attorneys for Plaintiff
`Acceleration Bay LLC
`
`OF COUNSEL:
`
`Paul J. Andre
`Lisa Kobialka
`Hannah Lee
`KRAMER LEVIN NAFTALIS
` & FRANKEL LLP
`990 Marsh Road
`Menlo Park, CA 94025
`(650) 752-1700
`
`Aaron M. Frankel
`KRAMER LEVIN NAFTALIS
` & FRANKEL LLP
`1177 Avenue of the Americas
`New York, NY 10036
`(212) 715-9100
`
`Dated: June 14, 2017
`5245753
`
`2
`
`

`

`Case 1:16-cv-00453-RGA Document 176 Filed 06/14/17 Page 3 of 20 PageID #: 18898
`
`TABLE OF CONTENTS
`
`Page
`
`I.
`II.
`III.
`
`B.
`
`C.
`
`SUMMARY OF THE ARGUMENT ..................................................................................1
`STATEMENT OF FACTS ..................................................................................................2
`ARGUMENT .......................................................................................................................6
`A.
`Acceleration Bay Timely Disclosed Its Means-Plus-Function
`Constructions ...........................................................................................................6
`Acceleration Bay Timely Disclosed Its Constructions For “M-Regular”
`and “M-Connected” .................................................................................................6
`Acceleration Bay Never Changed Its Position For the Forty-Six Terms
`That Do Not Require Construction ..........................................................................7
`Acceleration Bay Met and Conferred With Defendants For Over an Hour
`on the Parties’ Proposed Constructions .................................................................11
`Defendants Fail to Identify Any Prejudice, and No Sanctions Are
`Warranted ...............................................................................................................13
`
`D.
`
`E.
`
`i
`
`

`

`Case 1:16-cv-00453-RGA Document 176 Filed 06/14/17 Page 4 of 20 PageID #: 18899
`
`TABLE OF AUTHORITIES
`
`
`
`Page(s)
`
`Cases
`
`EMC Corp. v. Pure Storage Inc.,
`C.A. No. 13-1985-RGA, D.I. 66 (D. Del. Sept. 19, 2014) ......................................................10
`
`Energy Transp. Group, Inc. v. William Demant Holding A/S,
`697 F.3d 1342 (Fed. Cir. 2012)................................................................................................10
`
`Finjan, Inc. v. Secure Computing Corp.,
`626 F.3d 1197 (Fed. Cir. 2010)................................................................................................10
`
`Integrated Discrete Devices, L.L.C. v. Diodes Inc.,
`C.A. No. 08-888-GMS (D. Del. Apr. 28, 2010) ......................................................................15
`
`Magnetar Technologies Corp. v. Six Flags Theme Parks Inc.
`C.A. No. 07-127-LPS-MPT, 2012 WL 394660 (D. Del. Feb. 1, 2012) ..................................14
`
`Meyers v. Pennypack Woods Home Ownership Ass’n,
`559 F.2d 894 (3d Cir. 1977)...............................................................................................13, 15
`
`Microbix Biosystems, Inc. v. Novartis Vaccines and Diagnostics, Inc.,
`No. 6:14-cv-00003-JDL, D.I. 65 (E.D. Tex. Dec. 3, 2014) .......................................................7
`
`NuVasive, Inc. v. Globus Medical, Inc.,
`C.A. No. 10–849–LPS, 2013 WL 3705731 (D. Del. July 12, 2013) .......................................14
`
`The Proctor & Gamble Co. v. Teva Pharms. USA, Inc.,
`C.A. No. 04-940-JJF, 2006 WL 2241128 (D. Del. Aug. 4, 2006) ...........................................13
`
`Sound View Innovations, LLC v. Facebook, Inc.,
`C.A. No. 16-116-RGA, D.I. 85 (D. Del. March 13, 2017) .....................................................10
`
`V. Mane Fils S.A. v. Int’l Flavors and Fragrances, Inc.,
`No. 06-2304 (FLW), 2011 WL 1344193 (D.N.J. Apr. 8, 2011) ..............................................14
`
`Via Vadis LLC v. Skype Inc.
`C.A. No. 11-507-RGA, D.I. 91 (D. Del. Nov. 20, 2012).........................................................14
`
`Other Authorities
`
`United States District Court for the Northern District of California
`Patent Local Rules 4.1(b) .........................................................................................................11
`
`Manual of Patent Examining Procedure § 2173.01 .........................................................................2
`
`ii
`
`

`

`Case 1:16-cv-00453-RGA Document 176 Filed 06/14/17 Page 5 of 20 PageID #: 18900
`
`Acceleration Bay LLC (“Acceleration Bay”) submits this opposition brief in response to
`
`Defendants Activision Blizzard, Inc., Electronic Arts Inc., Take-Two Interactive Software, Inc.,
`
`Rockstar Games, Inc. and 2K Sports, Inc.’s (collectively, “Defendants”) motion to strike Plaintiff
`
`Acceleration Bay LLC’s proposed claim constructions (the “Motion”). For the reasons set forth
`
`below, Defendants’ Motion should be denied.
`
`I.
`
`SUMMARY OF THE ARGUMENT
`
`Defendants’ Motion, long on vitriol and short on actual facts, is entirely baseless. Indeed,
`
`its main two premises are plainly wrong. First, contrary to Defendants’ claim that Acceleration
`
`Bay “proposed constructions for nearly every claim term identified by Defendants,” even a
`
`cursory review of the Declaration of Nenad Medvidović in Support of Plaintiff Acceleration Bay
`
`LLC’s Opening Claim Construction Brief (D.I. 166-1 (“Def. Ex.”), Ex. 13) proves that
`
`Acceleration Bay never changed its position from the Joint Claim Construction Chart.
`
`Acceleration Bay has maintained from the very beginning that the vast majority of the claim
`
`terms proposed by Defendants should be given their plain and ordinary meaning, as shown in
`
`Exhibit A to the Declaration of Aaron Frankel (“Frankel Decl.”), a table comparing the claim
`
`constructions Acceleration Bay proposed in the Joint Claim Construction Chart and in the claim
`
`construction briefing.
`
`Second, Defendants offer a selective and misleading characterization of the parties’ meet
`
`and confer regarding their claim construction positions. Contrary to their claims, Acceleration
`
`Bay’s counsel was fully prepared to discuss the claim terms at issue and discussed those
`
`positions with Defendants’ counsel for over an hour. Thus, Defendants’ Motion is nothing more
`
`than a trumped up collateral attack on Acceleration Bay, a side show that falls apart upon even a
`
`quick review of the facts, which confirm that Acceleration Bay disclosed its claim construction
`
`

`

`Case 1:16-cv-00453-RGA Document 176 Filed 06/14/17 Page 6 of 20 PageID #: 18901
`
`positions in full compliance with the Scheduling Order. Defendants’ meritless Motion should be
`
`denied.
`
`II.
`
`STATEMENT OF FACTS
`
`Pursuant to the Scheduling Order, the Parties exchanged an identification of terms
`
`requiring construction on March 25, 2017. D.I. 62 at 6. Defendants identified fifty-six terms for
`
`construction. Defendants’ proposal was surprising because during the related inter partes review
`
`(IPR) proceedings, Defendants proposed constructions for only a handful of terms, including “m-
`
`regular” and “m-connected,” but never claimed that the vast majority of the fifty-six terms for
`
`which they now seek constructions needed to be construed. Because Defendants did not provide
`
`constructions for these terms, Defendants’ position during the IPR proceedings was that those
`
`terms should have their plain and ordinary meaning in the context of the invention. See, e.g.,
`
`Manual of Patent Examining Procedure § 2173.01 (“Under a broadest reasonable interpretation,
`
`words of the claim must be given their plain meaning, unless such meaning is inconsistent with
`
`the specification. The plain meaning of a term means the ordinary and customary meaning given
`
`to the term by those of ordinary skill in the art at the time of the invention.”).
`
`In contrast to Defendants’ identification of nearly every word in every claim as requiring
`
`construction, Acceleration Bay identified eight means-plus-function (“MPF”) limitations as
`
`requiring constructions. Acceleration Bay did not nominate any other terms for construction
`
`because all other terms should be given their plain and ordinary meaning. Def. Ex. 5.
`
`Thereafter, on April 3, 2017, the parties disclosed their proposed constructions for the terms at
`
`issue. Def Exs. 4, 6. Specifically, Acceleration Bay provided its proposed constructions and
`
`underlying support for the eight MPF terms (Def. Ex. 6) and Defendants’ provided their
`
`proposed constructions for fifty-six terms (Def. Ex. 4).
`
`2
`
`

`

`Case 1:16-cv-00453-RGA Document 176 Filed 06/14/17 Page 7 of 20 PageID #: 18902
`
`The exchange on April 3, 2017 was the first time Acceleration Bay learned that
`
`Defendants were proposing different constructions for “m-regular” and “m-connected” than
`
`those they proposed during the IPRs. Specifically, Defendants proposed much broader
`
`constructions in the IPRs, likely hoping that a broader reading would cover the alleged
`
`invalidating prior art. In the IPRs, Defendants advocated that these terms should mean simply
`
`that “each node is connected to exactly m other nodes” and “dividing the network into two or
`
`more separate parts would require the removal of at least m nodes.” D.I. 119-1, Ex. C-1 at 9.
`
`The PTAB agreed and used Defendants’ construction for the IPR review. Now, however,
`
`Defendants changed their proposed constructions materially and are seeking a narrower
`
`construction (presumably in the hopes of avoiding a finding of infringement) that adds the
`
`additional requirements of “seeks to maintain” and “at all times.” The chart below shows (1)
`
`Defendants’ constructions during the IPR proceedings; (2) what the PTAB adopted; and (3)
`
`Defendants’ new constructions.
`
`Term
`
`Defendants’ IPR Position
`
`17.1 M-
`Regular
`
`“each node is connected to
`exactly m other nodes.” Pet.
`14 (citing Ex. 1101, 4:38–39,
`14:65-15:7). Patent Owner
`does not offer a construction
`of this term. Prelim. Resp. 13;
`PO Resp. 17–23.
`D.I. 119-1, Ex. C-1 at 9
`[PTAB Opinion]
`
`PTAB’s Construction Defendants’ April 3
`Claim Construction
`Position
`“a state that the network
`seeks to maintain at all
`times, where each
`participant is connected to
`exactly m neighbor
`participants.” Def Ex. 4 at
`5 (emphasis added).
`
`“we agreed that
`Petitioner’s proposed
`construction accords with
`the broadest reasonable
`construction consistent
`with the specification”
`D.I. 119-1, Ex. C-1 at 9
`[PTAB Opinion]
`
`1 The numbering for the terms corresponds to the numbering used in the filed Joint Claim
`Construction Chart filed on May 17, 2017. D.I. 117-1.
`
`3
`
`

`

`Case 1:16-cv-00453-RGA Document 176 Filed 06/14/17 Page 8 of 20 PageID #: 18903
`
`Term
`
`Defendants’ IPR Position
`
`18. M-
`Connected
`
`“dividing the network into
`two or more separate parts
`would require the removal of
`at least m nodes.” Pet. 14
`(citing Ex. 1101, 4:42–46).
`Patent Owner does not offer
`a construction of this term.
`Prelim. Resp. 13; PO Resp.
`17–23.
`D.I. 119-1, Ex. C-1 at 9
`[PTAB Opinion]
`
`PTAB’s Construction Defendants’ April 3
`Claim Construction
`Position
`“a state that the network
`seeks to maintain at all
`times, where dividing the
`network into two or more
`separate parts would
`require the removal of at
`least m participants.” Def
`Ex. 4 at 5 (emphasis
`added)
`
`Because Petitioner’s
`construction accords with
`the specification
`description, we see no
`reason to alter that
`construction here.
`
`D.I. 119-1, Ex. C-1 at 9
`[PTAB Opinion]
`
`On April 10, 2017, the parties engaged in a meet and confer to discuss their positions and
`
`whether they could resolve any disputes. Frankel Decl., at ¶ 2. The parties conferred for well
`
`over an hour, and discussed almost all of the claim terms at issue. Id. Acceleration Bay objected
`
`to Defendants’ proposal that the Court construe fifty-six terms as unwieldly and unnecessary.
`
`Acceleration Bay also explained why it thought that many of the terms, such as “computer” and
`
`“network” did not require any construction beyond their plain and ordinary meaning. Def. Ex.
`
`10 (Email from A. Frankel to K. Barry); Frankel Decl., at ¶ 3. In response to Defendants’ new
`
`proposed constructions for “m-regular” and “m-connected,” Acceleration Bay stated during the
`
`meet and confer that it would provide a counter-proposal to Defendants’ overly narrow
`
`constructions, which Acceleration Bay did three days later. Def. Ex. 10; Frankel Decl., at ¶ 4.
`
`Finally, when asked about the details for the support that Acceleration Bay cited for some of its
`
`MPF constructions, counsel stated that, while other members of the team had worked on this
`
`issue, Acceleration Bay identified in its disclosure to Defendants the citations to the specification
`
`upon which it would rely as the structures corresponding to those limitations. Frankel Decl., at
`
`¶ 5.
`
`4
`
`

`

`Case 1:16-cv-00453-RGA Document 176 Filed 06/14/17 Page 9 of 20 PageID #: 18904
`
`Throughout its Motion, Defendants provide an inaccurate summary of the parties’
`
`discussions. Acceleration Bay promptly refuted Defendants’ summary of the meet and confer,
`
`noting that the parties had extensively discussed the claim terms at issue, and that Acceleration
`
`Bay had identified the support for its MPF constructions and had explained why Defendants’
`
`proposed constructions were overly narrow and why a plain and ordinary meaning was
`
`appropriate:
`
`Your purported summary of our meet and confer is completely
`inaccurate. Over the course of more than an hour we discussed
`virtually every
`term
`identified by
`the parties as requiring
`construction. We do not believe that a further meet and confer would
`be productive at this time.
`
`that Acceleration Bay’s proposed
`told you
`For example, I
`constructions identify the structure and function for the means plus
`function terms at issue. As to the terms for which Acceleration Bay
`proposes plain and ordinary meaning, I walked you through many
`examples, such as “computer” and “network,” which are well-
`understood and do not require construction, and explained that
`Defendants’ construction improperly import requirements from
`other parts of the claim or provide overly narrow constructions.
`
`Def. Ex. 10 (emphasis added). Acceleration Bay also provided its constructions for m-regular
`
`and m-connected, in response to Defendants’ new constructions, as it said it would during the
`
`meet and confer. Id. At no time after receiving these proposed constructions did Defendants
`
`claim they required some additional discovery or request more time.
`
`Consistent with the Scheduling Order, the parties filed their Joint Claim Construction
`
`Chart on April 17, 2017. D.I. 117-1. Acceleration Bay served its opening and reply claim
`
`construction briefs on April 28 and June 2, 2017, along with the supporting Medvidović
`
`Declaration. Acceleration Bay’s claim construction positions are the exact same constructions it
`
`set forth in the parties’ Joint Claim Construction Chart. See Frankel Decl., Exhibit A (comparing
`
`constructions).
`
`5
`
`

`

`Case 1:16-cv-00453-RGA Document 176 Filed 06/14/17 Page 10 of 20 PageID #: 18905
`
`III.
`
`ARGUMENT
`
`Defendants’ Motion should be denied because Acceleration Bay timely disclosed its
`
`claim construction positions and did not change them in its Opening Claim Construction Brief.
`
`Acceleration Bay Timely Disclosed Its Means-Plus-Function Constructions.
`
`In their Motion, Defendants concede that Acceleration Bay’s proposed constructions for
`
`the eight MPF terms at issue (Terms 1-8) have not changed from Acceleration Bay’s initial
`
`proposal. Motion at 2, 5-6, 11; see also Def. Ex. 6; D.I. 117-1 at 1-18; Def. Ex. 12 at 7-13.
`
`Therefore, Defendant’s Motion should be denied for these terms.
`
`Acceleration Bay Timely Disclosed Its Constructions For “M-Regular” and
`“M-Connected”.
`
`Acceleration Bay timely disclosed its constructions for “m-regular” and “m-connected.”
`
`While Acceleration Bay originally proposed the plain and ordinary meaning, a proposed
`
`construction became necessary when Defendants proposed constructions for these terms that
`
`were different and inconsistent from the constructions that they convinced the PTAB to adopt
`
`during the IPRs. The problem with Defendants’ new constructions, aside from the fact that
`
`Defendants should be estopped from arguing for a new claim construction position after the
`
`PTAB adopted Defendants’ original construction, is that they include an intent requirement and a
`
`“substantially all times requirement.” Both of these elements significantly narrow the scope of
`
`the plain language of the claims. See Table in Section II (comparing Defendants’ IPR and
`
`litigation proposed constructions). As it became apparent during the meet and confer process
`
`that the parties had a fundamental dispute regarding the meaning of these terms, Acceleration
`
`Bay informed Defendants that it would propose responsive constructions. Three days later, in
`
`advance of the preparation of the Joint Claim Construction Chart, Acceleration Bay served its
`
`proposed constructions for these two terms. Def. Ex. 10 (Email from A. Frankel to K. Barry).
`
`6
`
`

`

`Case 1:16-cv-00453-RGA Document 176 Filed 06/14/17 Page 11 of 20 PageID #: 18906
`
`It can hardly be improper (let alone sanctionable) for a party to address newly introduced
`
`claim construction positions, particularly where, as here, Defendants’ new constructions varied
`
`substantially from those they presented to the PTAB. To the contrary, as other courts have
`
`recognized, the purpose of the meet and confer is to identify and resolve disputes. To the extent
`
`it becomes apparent that a construction should be modified as part of the meet and confer
`
`process, there is no unfair prejudice to the other party. Microbix Biosystems, Inc. v. Novartis
`
`Vaccines and Diagnostics, Inc., No. 6:14-cv-00003-JDL, D.I. 65, slip op. at 2 (E.D. Tex. Dec. 3,
`
`2014) (modifying construction as part of meet and confer process under P.R. 4-2 may be
`
`expected and amendments after the deadline for preliminary construction, while not encouraged,
`
`are not unfairly prejudicial) (Frankel Decl., Ex. 1).
`
`Acceleration Bay Never Changed Its Position For the Forty-Six Terms That
`Do Not Require Construction.
`
`Acceleration Bay timely disclosed its position that the remaining forty-six terms should
`
`be given their plain and ordinary meaning and do not require a claim construction. Indeed, as
`
`made clear in the Medvidović Declaration and as show in the summary table provided as Exhibit
`
`A, Acceleration Bay’s position on these terms has not changed from its original list of proposed
`
`constructions. Def. Ex. 6; D.I. 117-1; Def. Ex. 12; Frankel Decl., Ex. A. The premise of
`
`Defendants’ attack on these constructions is that Acceleration Bay had a sudden change of heart
`
`and proposed constructions in its opening brief for these terms, but that is demonstrably
`
`incorrect.
`
`To rebut Defendants’ unsupported, narrow constructions for these 46 terms, Acceleration
`
`Bay argued in its Opening Brief that these terms, such as “computer,” “network,” “participant”
`
`and “connection,” should not be construed because they have a well-known meaning and are
`
`used in the specifications consistently with that well-known meaning. See, e.g., Def. Ex. 12 at 1
`
`7
`
`

`

`Case 1:16-cv-00453-RGA Document 176 Filed 06/14/17 Page 12 of 20 PageID #: 18907
`
`(“Almost all of these terms — such as “computer,” “network,” and “connection” — require no
`
`construction because they are readily understood by those skilled in the art.”) (emphasis added);
`
`see also id. at 6, 13-15. For other terms, Acceleration Bay maintained that no construction is
`
`necessary because the claims fully explain the meaning of the term. For example, Defendants
`
`incorrectly contended that Acceleration Bay has provided a new proposed construction for “m”.
`
`To the contrary, Acceleration Bay contends no construction is necessary because the claims
`
`themselves expressly define “m”: “where m is the exact number of neighbor participants of each
`
`participant.” See, e.g., D.I. 117-2, Ex. A-1 at Claim 1. Acceleration Bay does not contend that
`
`the terms should be construed to have that well-known meaning. Rather, Acceleration Bay
`
`maintains that no construction should be given for the additional forty-six terms identified by
`
`Defendants. Thus, Acceleration Bay did not provide alternative or belated constructions in its
`
`briefing.
`
`Likewise, the Medvidović Declaration provides exemplary discussions of the plain and
`
`ordinary meaning in order to explain that no constructions are needed because the usage of the
`
`terms in the specifications is consistent with the plain and ordinary meanings. Below is an
`
`exemplary excerpt from his declaration explaining that the term “computer” should not be
`
`construed because it has a well understood plain and ordinary meaning:
`
`8
`
`

`

`Case 1:16-cv-00453-RGA Document 176 Filed 06/14/17 Page 13 of 20 PageID #: 18908
`
`Def. Ex. 13 at 28-29; see also, e.g., id. at 12 (“Based on my professional experience, a person of
`
`ordinary skill in the art would understand the term ‘m’ to be consistent with its plain and
`
`ordinary meaning, and no construction is needed.”), 29 (“a person of ordinary skill in the art
`
`would understand [a plurality of participants] to be consistent with its plain and ordinary
`
`meaning, and no construction is needed.”), 30 (“a person of ordinary skill in the art would
`
`understand [‘participant,’ and ‘participants’] to be consistent with their plain and ordinary
`
`meaning, and no construction is needed.”), 31 (“a person of ordinary skill in the art would
`
`understand
`
`[‘connection’;
`
`‘connections’;
`
`‘connected’;
`
`‘connect’;
`
`‘connecting’;
`
`9
`
`

`

`Case 1:16-cv-00453-RGA Document 176 Filed 06/14/17 Page 14 of 20 PageID #: 18909
`
`‘interconnections’; ‘disconnecting’] to be consistent with their plain and ordinary meaning, and
`
`no construction is needed.”).
`
`An argument that the meaning of a word is well-known and, therefore, the word need not
`
`be explained to the jury, is not a new claim construction. Rather, it is explaining Acceleration
`
`Bay’s consistent position that these terms should be given the plain and ordinary meaning. The
`
`Federal Circuit has consistently held that, where claim terms have a plain and ordinary meaning
`
`and are not given any special meaning in the patent specifications, the court need not construe
`
`them. Finjan, Inc. v. Secure Computing Corp., 626 F.3d 1197, 1206-07 (Fed. Cir. 2010)
`
`(affirming district court’s holding that no construction was needed and finding the court resolved
`
`the parties’ dispute when it rejected and prohibited the use of a construction that was more
`
`narrow than the plain and ordinary meaning); Energy Transp. Group, Inc. v. William Demant
`
`Holding A/S, 697 F.3d 1342, 1349 (Fed. Cir. 2012) (claim term given plain and ordinary
`
`meaning and “even where a patent describes only a single embodiment, claims will not be read
`
`restrictively unless the patentee has demonstrated a clear intention to limit the claim scope using
`
`words or expressions of manifest exclusion or restriction.”) (citation omitted). Therefore,
`
`Acceleration Bay has not changed its position as to these terms since the parties first exchanged
`
`their proposed claim constructions.
`
`Defendants’ suggestion that Acceleration Bay has been trying to hide the ball by avoiding
`
`the claim construction process is entirely unreasonable.
`
` Acceleration Bay proposed
`
`constructions for ten terms. While Defendants criticize this as a “small” number of terms, ten
`
`terms is the maximum that this Court previously allowed parties to argue at a Markman hearing.
`
`Sound View Innovations, LLC v. Facebook, Inc., C.A. No. 16-116-RGA, D.I. 85, slip. Op. at 1
`
`(D. Del. March 13, 2017) (anticipating limiting oral argument for claim construction to 10
`
`10
`
`

`

`Case 1:16-cv-00453-RGA Document 176 Filed 06/14/17 Page 15 of 20 PageID #: 18910
`
`terms); EMC Corp. v. Pure Storage Inc., C.A. No. 13-1985-RGA, D.I. 66, slip op. at 2 (D. Del.
`
`Sept. 19, 2014) (limiting oral argument for claim construction to 10 terms) (Frankel Decl., Ex.
`
`2); see also N.D. Cal. Patent Local Rule 4.1(b) (“The parties shall also jointly identify the 10
`
`terms likely to be most significant to resolving the parties’ dispute”) (Frankel Decl., Ex. 3). In
`
`contrast, as discussed in Acceleration Bay’s claim construction briefs, Defendants have abused
`
`the claim construction process by asking the Court to construe fifty-six terms, a wholly
`
`unfocused approach that forces the parties to brief, and the Court to construe, an unmanageable
`
`number of terms. Defendants likely hope that by sheer force of numbers they can obtain some of
`
`their unsupported and unwarranted constructions.
`
`Acceleration Bay Met and Conferred With Defendants For Over an Hour on
`the Parties’ Proposed Constructions.
`
`Acceleration Bay engaged in an extensive meet and confer with Defendants on the
`
`parties’ claim constructions. During the course of well over an hour, the parties discussed almost
`
`all of the claim terms at issue. Frankel Decl., at ¶ 2; Def. Ex. 10 (Email from A. Frankel to K.
`
`Barry). Acceleration Bay explained the problems with Defendants’ constructions, including that
`
`Defendants sought to unnecessarily construe many terms that had a plain and ordinary meaning
`
`and were seeking to read in unsupported limitations. Frankel Decl., at ¶ 3; Def. Ex. 10.
`
`Acceleration Bay also stated during the meet and confer that it would be providing responsive
`
`constructions for “m-regular” and “m-connected,” which it did shortly thereafter. Frankel Decl.,
`
`at ¶ 4; Def. Ex. 10. Thus, Acceleration Bay met and conferred with Defendants in good faith,
`
`fully discharging its obligation under the Scheduling Order.
`
`To trump up some deficiency in the parties’ meet and confer, Defendants repeatedly
`
`argue throughout their Motion that Acceleration Bay was not prepared to substantively address
`
`the issues raised during the meet and confer because counsel for Acceleration Bay purportedly
`
`11
`
`

`

`Case 1:16-cv-00453-RGA Document 176 Filed 06/14/17 Page 16 of 20 PageID #: 18911
`
`stated that he was not a member of the “tech team.” See e.g., Motion at 3, 8, 9, 11, 19.
`
`Defendants are wrong. Acceleration Bay’s counsel addressed all questions regarding the m-
`
`regular and m-connected terms, and the forty-six terms for which Acceleration Bay proposed a
`
`plain and ordinary meaning. For the eight MPF terms, while noting that other members of the
`
`team had worked on these terms, counsel confirmed that Acceleration Bay’s disclosure of its
`
`proposed claim constructions identified the support for its MPF constructions. Frankel Decl., at
`
`¶ 5. Counsel did not reference other members of the team on any other issue discussed during
`
`the meet and confer. Id. The purpose of the claim construction meet and confer was not to
`
`debate the merits of particular citations in support of a handful of MPF constructions, but rather
`
`to discuss the parties’ positions to see if it was possible to reach agreement on terms or narrow
`
`the issues in dispute.
`
`Defendants repeatedly cite to their self-serving and inaccurate summaries of the meet
`
`and confer as though they were a transcript of the proceedings, but ignore Acceleration Bay’s
`
`contemporaneous email refuting their version of the meet and confer:
`
`Your purported summary of our meet and confer is completely
`inaccurate. Over the course of more than an hour we discussed
`virtually every
`term
`identified by
`the parties as
`requiring
`construction. We do not believe that a further meet and confer would
`be productive at this time.
`
`that Acceleration Bay’s proposed
`told you
`I
`For example,
`constructions identify the structure and function for the means plus
`function terms at issue. As to the terms for which Acceleration Bay
`proposes plain and ordinary meaning, I walked you through many
`examples, such as “computer” and “network,” which are well-
`understood and do not require construction, and explained that
`Defendants’ construction improperly import requirements from other
`parts of the claim or provide overly narrow constructions.
`
`Def. Ex. 10 (Email from A. Frankel to K. Barry). As Acceleration Bay’s constructions for the
`
`MPF terms have been unchanged since the start of the claim construction process, there is no
`
`12
`
`

`

`Case 1:16-cv-00453-RGA Document 176 Filed 06/14/17 Page 17 of 20 PageID #: 18912
`
`basis for Defendants’ Motion. Moreover, Defendants have not been prejudiced whatsoever from
`
`any alleged deficiencies in the meet and confer process. Indeed, if Defendants truly believed
`
`they needed some additional time to prepare their positions, they should have asked for an
`
`extension.
`
`Defendants Fail to Identify Any Prejudice, and No Sanctions Are Warranted.
`
`Defendants’ Motion should be denied because Acceleration Bay timely disclosed its
`
`claim construction positions. Moreover, with the exception of the “m-regular” and “m-
`
`connected” terms discussed above, Acceleration Bay has not changed its original constructions
`
`served on April 3, 2017. Even if Defendants’ manufactured claims regarding the meet and
`
`confer and allegedly changed positions were true, there still is no basis to strike Acceleration
`
`Bay’s proposed claim constructions because there is no evidence of any material prejudice to
`
`Defendants (or any of the other Pennypack factors, including bad faith or disruption to the case
`
`schedule). Meyers v. Pennypack Woods Home Ownership Ass’n, 559 F.2d 894, 904-905 (3d Cir.
`
`1977) (overturned on other grounds) (to decide a motion to strike the Court should consider (1)
`
`the prejudice or surprise to the moving party; (2) the ability to cure such prejudice; (3) the extent
`
`to which the violation of the court order would disrupt the orderly and efficient trial of the case;
`
`and (4) the bad faith or willfulness of the non-moving party in failing to comply with the court’s
`
`order.); Proctor & Gamble Co. v. Teva Pharms. USA, Inc., C.A. No. 04-940-JJF, 2006 WL
`
`2241128, at *1, n.1 (D. Del. Aug. 4, 2006) (applying Pennypack factors in denying motion
`
`asserting violation of court’s scheduling order where court found neither prejudice nor bad faith).
`
`Because Acceleration Bay timely disclosed its claim construction positions there can be
`
`no prejudice to Defendants. Furthermore, Defendants’ responsive brief was due twenty-one days
`
`after Acceleration Bay’s opening brief, such that it had ample time to respond to Acceleration
`
`Bay’s positions. D.I. 62 at 6-7. Belying their claims of prejudice, Defendants never requested
`
`13
`
`

`

`Case 1:16-cv-00453-RGA Document 176 Filed 06/14/17 Page 18 of 20 PageID #: 18913
`
`any additional time for their claim construction brief or for their purported expert Dr. John P.J.
`
`Kelly to prepare his rebuttal declaration, confirming that this is not a bona fide claim.
`
`Judges have denied motions to strike under situations considerably worse than those
`
`alleged (incorrectly) here. For example, in Magnetar Techs. Corp. v. Six Flags Theme Parks
`
`Inc., Chief Judge Stark declined to strike a parties’ claim construction brief or proposed
`
`constructions because the other side had adequate time (twenty-eight days) to respond, even
`
`where there was no dispute that the party proposed new terms and constructions for the first time
`
`in its opening brief (which is not the case here). C.A. No. 07-127-LPS-MPT, 2012 WL 394660,
`
`at *3, n.4 (D. Del. Feb. 1, 2012); see also, e.g., NuVasive, Inc. v. Globus Med., Inc., C.A. No.

This document is available on Docket Alarm but you must sign up to view it.


Or .

Accessing this document will incur an additional charge of $.

After purchase, you can access this document again without charge.

Accept $ Charge
throbber

Still Working On It

This document is taking longer than usual to download. This can happen if we need to contact the court directly to obtain the document and their servers are running slowly.

Give it another minute or two to complete, and then try the refresh button.

throbber

A few More Minutes ... Still Working

It can take up to 5 minutes for us to download a document if the court servers are running slowly.

Thank you for your continued patience.

This document could not be displayed.

We could not find this document within its docket. Please go back to the docket page and check the link. If that does not work, go back to the docket and refresh it to pull the newest information.

Your account does not support viewing this document.

You need a Paid Account to view this document. Click here to change your account type.

Your account does not support viewing this document.

Set your membership status to view this document.

With a Docket Alarm membership, you'll get a whole lot more, including:

  • Up-to-date information for this case.
  • Email alerts whenever there is an update.
  • Full text search for other cases.
  • Get email alerts whenever a new case matches your search.

Become a Member

One Moment Please

The filing “” is large (MB) and is being downloaded.

Please refresh this page in a few minutes to see if the filing has been downloaded. The filing will also be emailed to you when the download completes.

Your document is on its way!

If you do not receive the document in five minutes, contact support at support@docketalarm.com.

Sealed Document

We are unable to display this document, it may be under a court ordered seal.

If you have proper credentials to access the file, you may proceed directly to the court's system using your government issued username and password.


Access Government Site

We are redirecting you
to a mobile optimized page.





Document Unreadable or Corrupt

Refresh this Document
Go to the Docket

We are unable to display this document.

Refresh this Document
Go to the Docket